4
CRONOGRAMA VALORIZADO DE O OBRA "CONSTRUCCION DE LA IGLESIA PERUANA " TIEMPO DE EJECUCION: 180 DIAS CALENDARIOS DISTRITO TARMA PROVINCIA TARMA PRESUPUESTO: 913,125.77 DEPARTAMENTO JUNIN Fecha: ENERO DEL 2011 CODIGO PARTIDA TIEM 1ER MES 2DO MES 3ER MES 1° SEMANA 2° SEMANA 3° SEMANA 4° SEMANA 1° SEMANA 2° SEMANA 3° SEMANA 4° SEMANA 1° SEMANA 2° SEMANA 3° SEMANA 4° SEMANA ESTRUCTURAS 453.57 O1 OBRAS PROVISIONALES 604.62 O2 OBRAS PRELIMINARES 883.20 1,324.81 O3 MOVIMIENTO DE TIERRAS 13,250.02 8,833.34 O4 CONCRETO SIMPLE 103,894.84 155,842.26 155,842.26 103,894.84 O5 CONCRETO ARMADO ARQUITECTURA 14,089.09 32,874.54 32,874.54 14,089.09 O1 ALBAÑILERIA 12,056.45 16,075.26 12,056.45 O2 REVOQUES, ENLUCIDOS Y MOLDURAS 59,033.74 O3 PISOS Y PAVIMENTOS O4 ZOCALOS O5 CARPINTERIA DE MADERA O6 CARPINTERIA METALICA O7 VIDRIOS, CRISTALES Y SIMILARES O8 CIELORASO O9 PINTURA 10 APARATOS Y ACCESORIO SANITARIOS INSTALACION SANITARIA O1 INSTALACION SANITARIA INSTALACION ELECTRICA

Cronograma Valorizado Iglesia

Embed Size (px)

DESCRIPTION

costos y presupuestos

Citation preview

CRONOG PARCIALCRONOGRAMA VALORIZADO DE OBRAOBRA"CONSTRUCCION DE LA IGLESIA PERUANA "TIEMPO DE EJECUCION:180 DIAS CALENDARIOSDISTRITOTARMAPROVINCIATARMAPRESUPUESTO:913,125.77DEPARTAMENTOJUNINFecha:ENERO DEL 2011CODIGOPARTIDATIEMPO1ER MES2DO MES3ER MES4TO MES5TO MES6TO MESMONTO1 SEMANA2 SEMANA3 SEMANA4 SEMANA1 SEMANA2 SEMANA3 SEMANA4 SEMANA1 SEMANA2 SEMANA3 SEMANA4 SEMANA1 SEMANA2 SEMANA3 SEMANA4 SEMANA1 SEMANA2 SEMANA3 SEMANA4 SEMANA1 SEMANA2 SEMANA3 SEMANA4 SEMANAESTRUCTURAS453.57453.57453.570.00O1OBRAS PROVISIONALES604.62604.62604.620.00O2OBRAS PRELIMINARES883.201,324.812,208.012208.010.00O3MOVIMIENTO DE TIERRAS13,250.028,833.3422,083.3622083.360.00O4CONCRETO SIMPLE103,894.84155,842.26155,842.26103,894.84519,474.19519474.190.00O5CONCRETO ARMADOARQUITECTURA14,089.0932,874.5432,874.5414,089.0993,927.2793927.270.00O1ALBAILERIA12,056.4516,075.2612,056.4540,188.1540188.150.00O2REVOQUES, ENLUCIDOS Y MOLDURAS59,033.7459,033.7459033.740.00O3PISOS Y PAVIMENTOS8,250.518,250.518250.510.00O4ZOCALOS4,000.004,000.0040000.00O5CARPINTERIA DE MADERA5,790.005,790.0057900.00O6CARPINTERIA METALICA671.06671.06671.060.00O7VIDRIOS, CRISTALES Y SIMILARES28,872.5228,872.5228872.520.00O8CIELORASO6,158.948,211.926,158.9420,529.7920529.790.00O9PINTURA11,410.0011,410.00114100.0010APARATOS Y ACCESORIO SANITARIOSINSTALACION SANITARIA11,143.3616,715.0427,858.4027858.40.00O1INSTALACION SANITARIAINSTALACION ELECTRICA27,007.4340,511.1567,518.5867518.580.00O1INSTALACION ELECTRICAVARIOS100.80151.20252.002520.00O1DIVERSOSCOSTO DIRECTO - SUB TOTAL129,244.40462,542.99146,185.5318,711.5795,400.3561,040.94913,125.77913,125.77GASTOS GENERALES 10%12,924.4446,254.3014,618.551,871.169,540.046,104.0991,312.5810.00%SUPERVISION 3%3,877.3313,876.294,385.57561.352,862.011,831.2327,393.7710.00%TOTAL PRESUPUESTO146,046.17522,673.58165,189.6421,144.07107,802.4068,976.26$1,031,832.12