12
Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut Tantimekabut (Toon) Air Traffic Management Network Manager Network Operations ATM Centre, AEROTHAI

Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

Embed Size (px)

Citation preview

Page 1: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

C r o s s - B o r d e r M u l ti - N o d a l AT F M

C o n c e p tI ATA - I C AO C r o s s - B o r d e r AT F M Wo r k s h o p

3 – 4 September 2015Delhi, India

Piyawut Tantimekabut (Toon)Air Traffic Management Network Manager

Network Operations ATM Centre, AEROTHAI

Page 2: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

Asia-Pacific ATFM Landscape

2

Domestic ATFM

Cross-Border ATFM

Regional Central ATFM

Unit

?

?3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Page 3: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

3

• 10 months proof of concept research project supported by industry partner.

• Develop a viable ATFM/CDM concept suitable for adoption by States in the APAC region

• Concept development through the concept engineering process involving concept Analysis, Exploration, Development including a benefit analysis

• Industry Stakeholders such as ANSPs, Airlines and airports operators collaborated as key contributors of operational inputs

• The project has concluded in Jan 2014 with the concept and shared at the ICAO ATFM/SG 3 meeting

ATFM/CDM Proof of Concept Project

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Page 4: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

4

• ATFM Implementations Studied: USA, Europe, Australia, and South Africa

• Current ATFM implementations achieve demand and capacity balance when applied to flights regulated by a single authority

• Asia Pacific has a number of international hub airports with limited domestic traffic to apply existing ATFM principles– e.g. Hong Kong and Singapore are 100% international– Concept applicable to ANSPs with significant domestic traffic

• Concept had to be developed to regulate flights to an airport with a demand and capacity imbalance departing from ANSPs under a different control authority

Use of Existing ATFM/CDM Methods

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Page 5: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

5

Stakeholder Involvement

• Present concept engineering process

• Operational site visits

• Introduce Stakeholders to current ATFM/CDM procedures and demonstrate benefits

• Introduce and refine core functionality of Regional ATFM/CDM concept

• Explore potential modifications to improve the Regional ATFM/CDM concept

Session 3

Session 4Session 2

Session 1

Mar Apr May Jun Jul Aug Sep Oct Nov

• Discussion on specific components of concept

• Prepare for November HITL

Session 5

Session 6

• Explore Regional ATFM concept with Thailand, Malaysia, and Hong Kong ANSPs

Session 7(HITL)

• Validate concept in a simulation environment

Local industry stakeholders Local & other stakeholders

ANSP (ATC), Airlines and Airport Operators3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Page 6: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

HITL Simulation - Technology Testbed

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept 6

Server and Storage Array

HITL Software Workstations

Technology Testbed

Flow Manager Position (FMP)Airline

Airport Operator

Departure Tower

Page 7: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

7

• Each ANSP operating an independent, virtual ATFM/CDM Node supported by an interconnected information sharing framework.

• A-CDM mechanisms, especially at busy airports, can supplement ATFM in the CDM process.

– Air traffic flow effectively managed between participating ANSPs through agreed set of business rules for stakeholders.

– Concept of Operation allows inclusion of international flights and airborne flights

• Accords greater flexibility to airspace users to manage delays through collaboration and negotiation with ANSPs and Airport Operators within existing ATC procedures and constraints

Multi-Nodal ATFM Concept of Operation

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Page 8: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

8

Regional ATFM/CDM Stakeholders & Environment

• Each ANSP has an independent FMP and ATFM System• Each ANSP independently manages demand/capacity of its own Arrival Airport(s)/ Air space• Stakeholders/ANSPs communicate via existing Internet/Telecommunications networks• Data from each ANSP is viewable by stakeholders via software web interfaces

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

Regional ATFM

System

Flow Management Position (FMP)

Departure ATC Tower

Arrival ATC Approach / Tower

Airport OperatorFlight Operations Centre (FOC)

En-route ATC

A-CDM

Pilot

• Between ATFM and Stakeholders

• Between Stakeholders

Page 9: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

9

Delay Management by Aircraft Operators

• Aircraft Operators manage the TMI delay assigned to flights• Aircraft Operators perform CDM with Airport Operators for ground/surface delay intent• Slot assignments can be viewed via software web interface and notifications • FOC performs CDM with Pilots to coordinate delay absorption intent and update into ATFM• Pilots operate request Cruise Speed and Flight Levels per current ATC procedures and within ATC

constraints

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept

• Between ATFM and Stakeholders

• Between Stakeholders

Page 10: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

• Conduct Distributed Multi-Nodal ATFM Operational Trial– Phase 1 : June 2015 – June 2016– Phase 2 : TBD

• Support ICAO Asia-Pacific ATFM Steering Group – ATFM Information Requirements Small Working Group (ATFM-IR/SWG)– Develop Operational Requirements documents for exchange

and interaction with ATFM information– Develop Technical Interface Control Document– Participation: China, Hong Kong China, India, Indonesia,

Japan, Singapore, Thailand, ICAO

Next Steps?

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept 10

Page 11: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

• Support ICAO Asia-Pacific ATFM Steering Group – Further development of ICAO Regional Framework for Collaborative ATFM– Delay Absorption Intent– Flight Information Exchange Model (FIXM) Extension– ATFM Measures for Long Range Flights– ATFM – AMAN/DMAN – A-CDM Interoperability– Collaborative Trajectory Options– Network CDM– Harmonization of Multiple ATFM Measures

Next Steps?

3-7 Aug 2015 Cross-Border Multi-Nodal ATFM Concept 11

Page 12: Cross-Border Multi-Nodal ATFM Concept Cross-Border Multi-Nodal ATFM Concept IATA-ICAO Cross-Border ATFM Workshop 3 – 4 September 2015 Delhi, India Piyawut

Questi ons & Discuss ions