7
Crossrail 2 An essential piece of national infrastructure

Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

Crossrail 2 An essential piece of national infrastructure

Page 2: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

2

A proposed new railway serving London and the South East, Crossrail 2 would run underground between Wimbledon and Tottenham Hale and New Southgate, connecting with existing National Rail networks in Surrey and Hertfordshire.

Crossrail 2 would transform travel in the region, improve connectivity throughout the UK and support other major national transport projects, such as HS2. It is an important part of a national programme of transformational infrastructure investment which will provide for a prosperous and productive future for the whole country. Crossrail 2 would be an essential piece of this programme, unlocking tens of thousands of new jobs and homes, and driving economic growth across the UK.

Cities increasingly rely on their transport systems and London is no exception. For more than 150 years the rail and Underground network has connected people with homes, jobs, services and all that the capital has to o�er, creating economic prosperity for the benefit of the whole nation.

As a city expands, it’s vital that its infrastructure grows with it. London’s population is set to soar from 8.6 million today to more than 10 million by 2030 – equivalent to the population of Birmingham. An extra 1.4 million people will mean five million more journeys each day, on top of the 26 million daily trips already taking place on the capital’s network.

Driving future prosperityThis rise in demand will inevitably put pressure on London’s transport systems and its already squeezed housing supply. We must, therefore, invest in infrastructure projects – like Crossrail 2 – to increase capacity and unlock areas where new homes, jobs and communities can be created. If we delay our investment, it could jeopardise housing targets and slow job creation, putting the brakes on future growth.

Investment already under way – such as Crossrail 1, Thameslink and the Tube upgrades – will relieve overcrowding in the coming years, but as London contines to grow, congestion will return.

New transport infrastructure takes a long time to plan, design and build, so work to develop Crossrail 2 needs to start now. This is the only way it can be engineered ready for construction to start in the early 2020s and services to begin in 2030.

Why do we need Crossrail 2?

What is Crossrail 2?

London’s population is set to soar from 8.6 million today to more than 10 million by 2030.

3

‘For the capital to remain globally competitive there needs to be continued investment in our transport network and that’s why we have to get cracking on planning for Crossrail 2.’Boris Johnson, Mayor of London

Page 3: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

4

Cities are the economic powerhouses of any nation and this is especially true of London and the UK. As the country’s global city, it attracts foreign direct investment and is responsible for almost 25 per cent of our national GDP.

By 2035, the capital is projected to generate a tax revenue surplus of £159bn* a year and the whole of the UK will benefit. However, this can only be achieved if businesses have access to a large pool of talented labour.

Commuter rail services into the capital are heavily congested and the Tube is carrying more passengers than ever. We are already upgrading our Underground and rail networks, improving roads, running more buses and better integrating the rail network, as well as encouraging journeys by walking and cycling. But we also need new infrastructure to relieve bottlenecks, for instance at Waterloo and Liverpool Street stations, and significantly boost transport capacity. For this reason, Crossrail 2 is an essential part of both Transport for London and Network Rail’s future plans.

Bringing commuters closerCrossrail 2 would increase central London’s rail capacity by more than 10 per cent (90,000 passengers per hour). This would bring hundreds of thousands more people within a one hour commute of vital employment centres across the city, maintaining the capital’s attractiveness as a global investment centre.

Business leaders agree that this investment is needed – nine out of 10 ‘strongly support’ or ‘support’ Crossrail 2. A clear commitment to the project in the Comprehensive Spending Review would give the private sector the confidence to continue investing in London for the long term, which would be good news for the economy.

Maintaining the UK’s position as a global centre of trade

Unlocking good quality homes to address London’s housing crisis

54

By 2035, the capital is projected to generate a tax revenue surplus of £159bn* a year and the whole of the UK will benefit.

‘London’s housing crisis is damaging to UK competitiveness and eroding the agglomeration benefits that are an important factor in London’s international success. Crossrail 2 is a vital part of the solution, helping to open up potential areas for future development.’London Chamber of Commerce and Industry

* London’s Finances and Revenues, Centre for Economics and Business Research (Cebr), www.cityoflondon.gov.uk/economicresearch

The high cost of living and shortage of good quality housing at prices and rents people can a�ord is widely recognised as one of the biggest threats to the capital’s success.

Families on low incomes have limited access to homes near transport links that allow them to get to jobs, while young people struggle to get on the housing ladder and companies are finding it increasingly hard to retain talented sta�.

Crossrail 2 would breathe life into new areas of the capital, for instance the Upper Lea Valley, enabling and potentially accelerating the development of up to 200,000 new homes with ready-made access to skilled jobs and opportunities across London.

New transport infrastructure is essential to unlocking opportunity areas and the housing developments the capital so desperately needs.

Crossrail 2 would breathe life into new areas of the capital potentially accelerating the development of up to 200,000 new homes.

Page 4: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

7

CITY OFLONDON

WESTMINSTER

TOWERHAMLETS

BARNETHARROW

HILLINGDON

BRENT

ISLINGTON

WALTHAMFOREST

LAMBETH

GREENWICH

BEXLEY

HAVERING

BARKING &DAGENHAM

HA

MM

ERSMITH

& FU

LHA

MK

ENSIN

GTO

N

& C

HELSEA

RICHMONDUPON

THAMES

REDBRIDGE

MERTON

SOUTHWARK

KINGSTONUPON

THAMES

EALING

SUTTON

SURREY

BROMLEY

HOUNSLOW

WANDSWORTH

LEWISHAM

CROYDON

HARINGEY

CAMDEN

HACKNEY

NEWHAM

ENFIELD

River Thames

Victoria

Clapham Junction

Wimbledon

Epsom

Motspur Park

Tooting Broadway

Angel

Twickenham

HamptonWick

Kingston

Tottenham Court Road

Cheshunt

Euston St. Pancras

Surbiton

Dalston Junction Hackney Central

AlexandraPalace

New Southgate

Seven Sisters

Turnpike Lane

King’s RoadChelsea

Tottenham Hale

Tramlink

Stations

National Rail

London Underground

London Overground

Core tunnel portal

Regional scheme- possible options

Safeguarded option for a future eastern branch

TfL Road network

Safeguarded central core of route

Key

Motspur Park

Twickenham

HamptonWick

Kingston

Cheshunt

Tooting Broadway

Victoria

Tottenham Court Road

Euston St. Pancras

Clapham Junction

Epsom

Surbiton

Dalston Junction

Tottenham Hale

AlexandraPalaceNew Southgate

Angel

Turnpike LaneSeven Sisters

Hackney Central

King’s RoadChelsea

Wimbledon

6

The safeguarded routeThe route map below shows where Crossrail 2 stations could be located. No station or infrastructure locations have been finalised and more information will be shared with the public during a consultation planned for autumn 2015.

Page 5: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

9

Derby Thousands of jobs in Britain’s rail industry manufacturing centre would be secured

Midlands and the NorthConnecting Crossrail 2 with HS2 at Euston would make journeys around the UK faster and easier, and would support long-term growth across the country

North EastCrossrail awarded 25 contracts to firms in the North East, including specialists in borehole drilling, engineering lubricants and waste removal. Crossrail 2 would provide new opportunities, supporting jobs around the UK

London Stansted Cambridge Corridor There would be improved connections to, from and between locations in one of the UK’s fastest developing science and technology clusters, home to more than 1,400 businesses

South EastThe 36,000 people who arrive into London Waterloo every hour in the peak would benefit from increased resilience and reliability on the South West Main Line

Crossrail 2 would benefit cities across the South East such as Cambridge, Portsmouth and Southampton by freeing up mainline rail routes into Waterloo and Liverpool Street. This would enable these cities to prosper while supporting the whole of the region and better connecting the UK’s employment centres.

It is also vital to realise the benefits of projects such as HS2, supporting long-term growth in the Midlands and North. Without Crossrail 2, passengers travelling from Manchester to London in just over an hour would have to spend the time they’ve saved waiting for crowded Tube trains to take them to their destination. Investment in major new transport infrastructure projects such as Crossrail 2 would mean a stronger London and a stronger UK.

Investing in industryIn addition, Crossrail 2 would be part of a vital infrastructure pipeline that would create orders up and down the country, giving firms the confidence to invest in jobs, skills and innovation. Crossrail 1 is generating enough work to support 55,000 jobs nationwide and creating a legacy of apprenticeships and training. This new railway would build on that and ensure the UK’s newly developed skills base – such as that created through the Tunnelling and Underground Construction Academy in Ilford, East London – does not go to waste.

Creating opportunities across the UK

We work with tens of thousands of suppliers across the UK. The TfL and Crossrail 1 supply chain alone supports nearly 60,000 jobs outside the capital.

Supporting the UK economy

8

Crossrail 2 would give businesses the confidence to invest in jobs, skills and innovation.

Crossrail 2 is estimated to cost approximately £27bn in today’s prices. This includes new trains and National Rail improvements that are required even if the railway does not go ahead, and providing for possible risks.

Alternatives have been considered to address particular challenges, but piecemeal interventions would be costly, cause significant disruption and would not have the same transformational impact.

Funding now, confidence for the futureCrossrail 1 generated significant wider funding sources, as would this new railway. There is a strong business case for building Crossrail 2 and it is clear that taxpayers would see a significant return on any investment. Development funding now would drive forward vital work so the project can be designed and planned, ready for construction to start by the early 2020s. Conversely, stop-start investment would add costs and a�ect long-term growth.

London has a strong track record of developing innovative funding packages for major infrastructure projects to minimise general taxpayer contributions. To demonstrate how Crossrail 2 could continue this trend and be a�ordable to the UK taxpayer, we appointed PwC to carry out an independent funding and financing feasibility study*. This showed London could shoulder more than half the cost of building the scheme using existing funding sources, as it is doing for Crossrail 1.

A breakdown is shown below; it illustrates how local funding sources would minimise Government contributions – the usual source of funding for most major UK infrastructure projects.

Providing value for the taxpayer

Funding mechanisms

‘Crossrail 2 is a major infrastructure project with the potential to attract significant local funding contributions.’London First

Resale of land and property

Doubling of Mayoral Community Infrastructure Levy

Balance

Council tax precept

Project generated revenue

Business rate supplement

Enhanced Mayoral Community Infrastructure Levy49.8%

20%

15.2%

5.8%

5.8%

1.5%

1.9%

* Crossrail 2 Funding and financing study, PwC, www.crossrail2.co.uk/funding

Page 6: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will

10

Next stepsWork to progress Crossrail 2 is accelerating and will hit a series of milestones this year. The safeguarded route (a revision of the Chelsea-Hackney line) was confirmed in March, an updated business case will be submitted to Government this summer and we will launch a consultation on more detailed proposals in the autumn.

Work is currently under way to establish a single preferred route, develop station designs and carry out environmental appraisals. We are also continuing to assess the case for Crossrail 2 and find ways to reduce risks and uncertainties, including working with local authorities to establish plans for areas that will benefit.

Development funding is needed in this summer’s Comprehensive Spending Review to drive forward this vital work. Crossrail 2 is not guaranteed to go ahead but Government investment now would allow us to move forward at pace and unlock jobs, homes and long-term growth.

Over the coming months we will continue to work with our stakeholders and the public to make the case for this essential piece of national infrastructure, developing the scheme to maximise its benefits at a local and strategic level.

London’s rapid population growth provides an opportunity that we must grasp if we are to deliver huge long-term returns and support other major UK infrastructure projects.

For more information, visit www.crossrail2.co.uk

‘It is a project that has long been discussed – I remember people talking about the Chelsea to Hackney Tube line when I was a kid. Now we need to look at how to get the idea o� the page and into construction.’ George Osborne, Chancellor of the Exchequer

11

72km

of tunnels

250 metre trains able to hold

1,500 passengers each

Additional capacity for up to

270,000 more trips into and across

the capital in the three-hour peak period

Unlocks the potential for up to

200,000 new homes

More than

£13.5bn of the cost could come

from local sources

Up to 30 trains per hour in each

direction through central London

Adds

10% to central London’s

rail capacity

96% of consultation respondents

support the project (more than 13,700 responses)

Investment now would allow us to move forward at pace and unlock jobs, homes and long-term growth.

Safeguarded route confirmed

March 2015

Comprehensive Spending Review

Summer 2015

Public consultation

Autumn 2015

Single preferred option

2016

Submit powers application

2017

Start construction

2020

First Crossrail 2 service

2030

Page 7: Crossrail 2 An essential piece of national infrastructurecrossrail2.co.uk/wp-content/uploads/2015/05/CROSS... · business case will be submitted to Government this summer and we will