CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM

DRAFT EVALUATION CRITERIA

November 18, 2013

Page 2: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

CRTPA TA ProgramBackground

At March 25, 2013 Board Meeting, members approved a timeline associated with the establishment of the CRTPA Transportation Alternatives Program (TAP)

Related to the federal Transportation Alternatives Program (TAP) was established as part of MAP-21 (Moving Ahead for Progress in the 21st Century) – federal transportation funding package signed into law by President Obama in July 2012

Projects formerly known as Transportation Enhancements were consolidated with Recreational Trails Program and Safe Routes to School Program, to create the Transportation Alternatives Program.

Page 3: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

CRTPA TA ProgramBackground

Collectively, Transportation Alternatives (TA) are defined as federally funded, community-based projects that expand travel choices and enhance the transportation experience by integrating modes and improving the cultural, historic, and environmental aspects of our transportation infrastructure.

Associated with the March approval of the CRTPA TA Program was the establishment of the Transportation Alternatives Subcommittee (comprised of 6 TAC and CMAC members)

Initial Task: Develop evaluation criteria to rank the Transportation Alternatives applications that will be received in 2014

Page 4: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

TA Evaluation CriteriaProcess

TA Subcommittee met on September 26 and October 29

Subcommittee examined the CRTPA’s former Transportation Enhancements criteria; TA criteria used by other agencies (Florida and other states)

Identified ten (10) criteria to be used

Ranked 10 criteria in terms of points

Page 5: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

TA Evaluation CriteriaDraft Subcommittee Criteria

EVALUATION CRITERIA SUBCOMMITTEERECOMMENDED

MAXIMUM POINTSProject Constructability (is right-of-way required, etc.) 15

Qualifying Activities (how many of the nine (9) TA eligible activities does the application meet?) 15

LAP Certification (Is the application sponsor LAP certified; capable of being certified) 15

Project improves safety for users (e.g. reduces hazards for pedestrians, cyclists, motorists) 15

Project facilitates/improves multimodal transportation linkages 5

Contributes to enhanced mobility options for the transportation disadvantaged 5

Project identified in a plan of the region 5

Project demonstrates leveraging of other funds 5

Project has community/public support 5

Public benefit versus project cost (To what extent will the project benefit the community or region?) 5

MAX TOTAL = 90

Page 6: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

TA Evaluation CriteriaRECOMMENDED Criteria

EVALUATION CRITERIA SUBCOMMITTEERECOMMENDED

MAXIMUM POINTSProject Constructability (is right-of-way required, etc.) 15

Qualifying Activities (how many of the nine (9) TA eligible activities does the application meet?) 15

LAP Certification (Is the application sponsor LAP certified; capable of being certified) 15

Project improves safety for users (e.g. reduces hazards for pedestrians, cyclists, motorists) 15

Project facilitates/improves multimodal transportation linkages 10

Contributes to enhanced mobility options for the transportation disadvantaged 5

Project identified in a plan of the region 10

Project demonstrates leveraging of other funds 5

Project has community/public support 5

Public benefit versus project cost (To what extent will the project benefit the community or region?) 5

MAX TOTAL = 100

Page 7: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

CRTPA TA ProgramNEXT STEPS

CRTPA TAP Informational Meeting with member governments and others in December (Tentative Date: December 12, 2013)

CRTPA call for applications in early 2014 (Early February)

CRTPA TA Subcommittee will regroup to review applications in spring of 2014 (May, June, July)

CRTPA Board Adopts TA Priority Project List (FY 16 – FY 20) in September 2014

Page 8: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

“Connecting People and Places”

Page 9: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

“Connecting People and Places”

www.crtpa.org

Page 10: CRTPA TRANSPORTATION ALTERNATIVE (TA) PROGRAM …crtpa.org/files/78041524.pdf · TA Evaluation Criteria Process TA Subcommittee met on September 26 and October 29 Subcommittee examined

“Connecting People and Places”