34

CSAPL (hp)

Embed Size (px)

Citation preview

Page 1: CSAPL (hp)
Page 2: CSAPL (hp)

Foot Prints Across the country ‐ Projects 

Total value of different projects  

Rs. 1774 Crores 

DPR prepared, waiting for approval 

Different ongoing construction sites 

Page 3: CSAPL (hp)

PROJECTS Location Budget (in millions $) INFRASTRUCTURE 

1  Erode Textiles Mall Ltd  Erode, TN  58 

2  Perarignar Anna Handloom Silk Park  Kancheepuram, TN  14 

3  SLS Textiles Park – Apparel Park  Bagalur, TN  21 

4  Himachal Pradesh Textile Park, (Technical Textiles)  UNA, HP  17 

5  Pallavada Technical Textile Park  Chennai, TN  17 

6  Gouthambudha Textile Park  Guntur, AP  18 

7  Hinganghat Integrated Textile Park  Wardha, Maharashtra  18 

Total  163 

COMMERCIAL 

1.  Agri Mall  Anayara, Kerala  7 

    2.     Erode Textiles Mall Ltd                                                                 Erode, TN                                                        58 

Income Tax Office Building  Belgaum, KA  7 Total  72 

Summary of projects

Page 4: CSAPL (hp)

PROJECTS  Location  Budget RESIDENTIAL  

1.  Tamil Nadu Housing Board, 606 houses (G +15)  Thirumangalam,Chennai 

50 

2.  Tamil Nadu Housing Board 204 Houses  Indhra Nagar, Chennai  

3.  Tamil Nadu Housing Board  270 Houses,   Padikuppam, Chennai 

4.  Tamil Nadu Housing Board 280 Houses,   Shollinganallur, Chennai  

5.  Tamil Nadu Housing Board Commercial & Residential flats  Mandavelipakkam, Chennai 

6.  Rajasthan Housing Board , BPCL Staff Quarters and Private Apartments   Various places  21 

Total  71 

INSTITUTIONAL 1.  KSR Educational & Charitable Trust  Tiruchengode  10 2.  Alagappa University  Karaikudi  10 3.  SSM College of Engineering  Namakkal  7 4.  Shivraj Siddha Medical college  Salem  4 5.  National Academy for customs exercise and Narcotics  Bangalore   5 

6.  National Institute of Electronics and Information Technology  Srikakulam, AP  3 

7.  India Statistical Institute, Bangalore  Bangalore  5 

Total  44 

Summary of projects

Page 5: CSAPL (hp)

The high points…. 

About Us

Year  Milestone  Why it was an important one .. 

1991  CS AND ASSOCIATES PVT. LTD.  Made a modest beginning with 3 employees.  

1992 ‐1996  Formative Period  SBI, 1st state of art multi storied building at Attur, near Salem Rasi Seeds – 1st seed processing unit in Tamil Nadu 

1997‐ 1999  Period of Recognition Empanelled by Hindustan Petroleum , Bharat Petroleum , Indian Oil Corp –Designing and Construction of Petrol Bunks Airtel –Designing of their Retail Showrooms 

1997 ‐  Entry into Institutional Segment  SSM Educational institute, Alagappa University. 

2008  Entry into Infrastructure  Empanelled as one of the 8 consultants representing Ministry of Textiles. 

2009  Awarded first project – Erode Textile Mall and Erode Textile Cluster. 

2011  Empanelled as one of the 12 consultants representing the (NIFTEM ) Ministry of Food Processing Industries. 

2012 (March)  Entry into Large Scale Housing Projects  Awarded 606 Houses project by Tamil Nadu Housing Board ,(Ground + 15 )  

2012(July )   Empanelled by Indian Institute of Technology,Madras.  

2012 (August )  International Collaboration   International Collaboration with firms in Europe 

Page 6: CSAPL (hp)

About Us

The high points…. 

Year  Milestone  Why it was an important one .. 

Oct – Nov 2012  Awarded  5 TNHB Projects  Got 5 Various Tamil Nadu Housing Board Projects, comprising 2000 houses 

July 2014  Entry into Food Processing Sector   PMC Agri Mall at Anayara, Trivandrum, Kerala 

Sep 2014   Awarded several Textile Park by MOT  Submitted DPR more projects all over India for the first time  

Dec 2014  MOU in Austria   Signed agreement with architect Arch.DI. Marcus Schulz, Graz 

April 2015  Awarded Indian Statistical Institute  

Awarded to design an Institute of National Importance . An University of International recognition 

April 2015  Management consultancy   Shortlisted by Ministry of Textiles to study advise on FDI Scenario in Indian Textile  

Page 7: CSAPL (hp)

Contribution of each sector

Page 8: CSAPL (hp)

MANPOWER DETAILS

Page 9: CSAPL (hp)

Name   Qualification  Position   High Points  C.Sivagnanaselvam  BA,PGDCM,C.E(Chrtrd ) 

Project Management Diploma ,MBA  

Founder and Chairman   Rotary International Governor 2008‐2009 , Advisor to 2 states in India , in formation of Industrial policy .  

Somu R Sundaram   MBA ,Kellog USA   Advisor , Ex Honorary Board Chairman  

Present Vice President of Navistar International (Truck Company ) USA  

Sivaraman   MSc‐Textile Chemistry,   

Director (Vorstand )  Expert in sewage treatment plants and Environmental Consultancy  

Kirubhashankar   Dipl‐Ing Architecture   Director (Vorstand )   14 Years of experience  

V.Sivagnanam      MBA (IIM‐A)  Advisor and Honorary Board of Governors  

Ex Head for Supply Chain South India at Reliance India (Biggest indian company )  

Dharanidharan .S   B.Tech (Civil Engineering ) NIT‐Bhopal ( Institute of National Importance )  

Director (Vorstand)  Business Development  

German (B2 to C1 ) , 2 years in Austria , Responsible for CS Associates entry into housing segment  

Blaz Mulavec  MSc (Civil Engineering TU Graz ) 

Responsible for EU – CS Associates corporation and  Schulz Architecture 

Coordination for the partnership, German, English,   

Page 10: CSAPL (hp)

Company’s scope

Page 11: CSAPL (hp)

Government advisory services for Public,Private,Partnership Projects (As P.M.C ,Transaction Advisor and Management Consultant )

• Project Identification: coming up with a project idea , Assessing of demand for the idea(Feasibility report )  Mobilizing of interested entrepreneurs  .  

 • Market Survey and Feasibility Report  

 • Establishment and Structuring of Special Purpose Vehicle (SPV)/Implementing Agency :Drafting and 

structuring the Company , Share Holders agreement, Registering of spv .  • Identification of Location : Connectivity, effluent treatment,availability of water and power . 

 • In Preparation of Project Report :bankable Detailed Project Report (DPR), for the identified Cluster that 

meets the funding requirements of MOT and the financial institutions .   

• Financial Closure: To assist Project SPV in designing the funding plan‐ debt, equity, viability gap funding   

• Statutory Approvals: To assist the Project SPV in obtaining all necessary statutory approvals/clearances including environmental clearances, which are prerequisite to commencement of the project. also liaise with the State governments to resolve issues related with the State Government.  

 This would involve the following: 1.  Undertaking the Environment Impact Assessment (EIA) 2.  Filing the applications with the Pollution Control Boards for obtaining the Consent to establish 

and   environmental Clearances. 3.  Filing applications for obtaining approval from Town & Country Planning Organisation. 4. Other approvals such as Municipal Corporation, Airports Authority etc,based on the need. 

  

Page 12: CSAPL (hp)

• Liaison with the State Government agencies : the connections for utilities, such as 1.  Power. 2.  Water. 3.  Approach Roads .  

 • Financial Advisory Services to the government : To release and ensure proper utilization of government grant by 

private company (SPV ) . Report the government on the same .  • Monitoring & Evaluation: To monitor the progress/maintain quality of sanctioned projectprojects and submit periodical 

progress reports to the government .   

• Quality Control and measurement: To ensure Quality control tests and nsoundness of construction & structural stability. Ensure rectification of defects in the works notified during the defect liability period of one year after completion.  

•  Day to day supervision   • Detailed engineering/procurement process: This includes layout design, detailed engineering drawings, preparation of 

cost estimates,bid documents, selection and appointment of contractors for specific activities 

Page 13: CSAPL (hp)

Special projects

PR OJE C T Significance Location Budget (in millions INR)

1 Erode Textile Mall and Cluster

CS Architects appointed as Cluster management and Technical Agency , by ministry of textiles and Finance Ministry to streamline SMEs in Erode .Project was announced in Finance Budget . It is one of the 4 mega clusters announced in the country

Erode,Tamil Nadu 3000

2

Bhiwandi Mega Power Loom Cluster (UNDER PROGRESS)

CS Architects appointed as Cluster management and Technical Agency , by ministry of textiles and Finance Ministry to streamline SMEs in Bhiwandi .Project was announced in Finance Budget . It is one of the 4 mega clusters announced in the country

Bhiwandi ,Maharastra 1000

Page 14: CSAPL (hp)

PERARIGNAR ANNA HANDLOOM SILK PARK

CLIENT     – MINISTRY OF TEXTILES LOCATION   – KANCHIPURAM, TAMILNADU PROJECT COST  ‑  869.6 millions INR SITE AREA   – 74.85 ACRES PLINTH AREA   ‑ 64500 SQM  

INTEGRATED HANDLOOM SILK PARK AND FIRST OF ITS KIND IN INDIA GOVERNMENT ADVISORY SERVICES;ARCHITECURAL & PMC FOR SPV

Page 15: CSAPL (hp)

TEX VALLEY – TEXTILE MARKET COMPLEX GOVERNMENT ADVISORY SERVICES;ARCHITECURAL & PMC FOR SPV

CLIENT  – MINISTRY OF TEXTILES LOCATION  – ERODE, TAMILNADU PROJECT COST ‑  3.5 billion INR SITE AREA – 14.70 ACRES PLINTH AREA – 140 000 SQM  SOUTH INDIA’S BIGGEST TEXTILE MALL  SOUTH EAST ASIA’S BIGGEST  TEXTILE PROJECT  

Page 16: CSAPL (hp)

TEX VALLEY – TEXTILE MARKET COMPLEX GOVERNMENT ADVISORY SERVICES;ARCHITECURAL & PMC FOR SPV

Page 17: CSAPL (hp)

Architectural Consultancy • Preparation of conceptual design  • Preparation of Initial design concept  • Surveying the land  • Preparation of floor plans  • Approval of the plans and views from local authority / government • Soil test   • Preparation of Structural drawings and designing  • Vetting of Structural drawings  • Preparation of Work plan time schedule  • HVAC(Heat Ventilation Air Conditioning  and MEP(Mechanical, Electrical and Plumbing ) Services • Preliminary cost estimate  • Material Specifications  • BOQ (Bill of Quantities) • Preparation of Tender document  • Selection of contractor  • Working drawings  • Periodical inspection

Page 18: CSAPL (hp)

Institutional Projects

Architectural Projects

ALAGAPPA UNIVERSITY, KARAIKUDI COST OF THE PROJECT – 55 CRORES

NIELIT(NATIONAL INSTITUTE OF ELECTRONICS AND INFORMATION TECHNOLOGY), SRIKAKULAM, AP

COST OF THE PROJECT – 18 CRORES

STAFF QUARTETS, BPCL– 16 FLATS, ANNANAGAR, CHENNAI

COST OF THE PROJECT -12 Crores

AGRI MALL, TRIVANDRUM, KERALA COST OF THE PROJECT – 45 CRORES

INCOME TAX OFFICE BUILDING, BELGAUM

COST OF THE PROJECT – 40 CRORES

Page 19: CSAPL (hp)

NATIONAL ACADEMY OF CUSTOMS EXCISE AND NARCOTICS

CLIENT     – NACEN LOCATION   – BANGALORE BUDGET     – 400 million INR SITE AREA   – 12315 SQM PLINTH AREA   ‑ 11682 SQM  

ADMIN & ACADEMIC (B+G+5 FLOORS)    ‑ 5300 SQM AUDITORIUM & SPROTS COMPLEX(S+3 FLOORS)  ‑ 2470 SQM HOSTEL BLOCK(G+4 FLOORS)      ‑ 3912 SQM  

Page 20: CSAPL (hp)

3rd party auditing and PMC of building works

 CONSTRUCTION SUPERVISION: 

• Vetting of all Architectural , Structural and Electrical drawings . 

• overall monitoring of the construction on a day to day basis  maintaining of  the checklist and report of day‐to‐day progress .  

• To check the bills submitted by the contractor  every month and certify the credibility of the same within three to four days from the date of receipt of bill  

• To ensure time schedule as per agreement .  

• To ensure compliance by the contractors of all labour laws and relevant Statutory Acts including Labour License, Minimum Wages Act, etc. and ensure of insurance.  

• To  ensure internal  safety of structure by taking all necessary precautions  

QUALITY CONTROL 

•  To monitor the quality of the work and ensure of the quality as per specification,relevant codes and as per Sound Engineering practices. 

• Inspect and approve the materials at site as per specifications and Indian code provisions 

• To ensure that work proceeds as per tender conditions and specifications.  

• To verify all material brought to the  site  

SITE CO‐ORDINATION 

• arrange  periodic site meetings amongst all stake holders to discuss various issues such as Time over runs , cost over runs , deviation from quality . 

• Preparation of periodic reports concerning quality monitoring progress  and to prepare   preliminary completion report, defect liability completion report, final job completion report .  

 

 

 

 

Page 21: CSAPL (hp)

Residential Projects

TAMILNADU HOUSING BOARD – 606 FLATS ANNA NAGAR, CHENNAI

COST OF THE PROJECT – 103 CRORES (Ground +14 )

TAMILNADU HOUSING BOARD – 204 FLATS INDIRA NAGAR, CHENNAI

COST OF THE PROJECT – 78.5 CRORES (Ground +10)

TAMILNADU HOUSING BOARD – 280 FLATS SHOLLINGANALLUR, CHENNAI COST OF THE PROJECT – 47 CRORES

TAMILNADU HOUSING BOARD – 270 FLATS PADIKUPPAM, CHENNAI

COST OF THE PROJECT – 51 CRORES

RAJASTHAN HOUSING BOARD – 252 FLATS, JAIPUR

COST OF THE PROJECT – 36 CRORES (Ground + 9)

ALAGAPPA UNIVERSITY, KARAIKUDI COST OF THE PROJECT – 55 Crores

3rd party auditing and PMC of building works

Page 22: CSAPL (hp)

MULTISTORIED RESIDENTIAL COMPETITION PROJECTS FOR TNHB CS & Associates (P) Ltd 1st place , Ground + 14 floors

Page 23: CSAPL (hp)

What we look in our partners

Page 24: CSAPL (hp)

What we look from our future partner .

Partners from German or French speaking world with advanced engineering practices , Who match our portfolio Who complement our portfolio with experience match our project size Who can help us enter into new areas such as Roads , Bridges , High buildings , Railway , Renewable Energy ,Environmental engineering and sustainability . Purpose ? A long term partner for providing services to western companies such as BMW,AUDI,MERCEDES,FORD,KTM ,AVL, etc . For projects of International or national repute in India . World Bank , Asian Development Bank , Deutsche Geselschaft für Internationale zussamen Arbeit projects To enter into areas in which we do not have experience . An Indian firm which shares international values and work ethics

Page 25: CSAPL (hp)

Offices and Clients

Page 26: CSAPL (hp)

Foot Prints Across the country - Offices

Total 10 Offices including Associates

Associate Offices/Personal  

Own Office  

Page 27: CSAPL (hp)

Our Offices

C.S. ARCHITECTS

OFFICES

Head Office (Salem) CS Towers KMS Garden, Ramakrishna Road, Salem – 636 016, Tamilnadu

Branch offices

Erode: Bangalore: Guwahati

5/1, Veterinary Hospital Road, No.7, First Cross, D.No 20, Ashok Path Survey Canara Bank upstairs, 10th Main HAL II nd Road, Beltala, Guwahati – 781028 Erode – 638 001, Tamilnadu Indira Nagar, Bangalore-560038 Chennai: Cochin: (HVAC & MEP Consultant ) Flat No.A4-2, 4th, Floor 40 W, Pulimood Building, No.1,Vijayaraghava Road, Church Road, North Kalamassery, T-Nagar, Chennai – 600078 Cochin-683104, Kerala

Bhopal: Delhi:

J-170, Harshvardhan Nagar, No: C-152, (Basement), Near Mata Mandir, Nirman Vihar, New Delhi-110012 Bhopal-462003

Page 28: CSAPL (hp)

Ministry of Food Processing, Govt. of India

Customs and Central Excise

Income Tax Department

National Institute of Electronics & Information Technology

National Buildings Construction Corporation

National Projects Construction Corporation

Ministry of Textiles, Govt. of India

Footwear Design & Development Institute

Rajasthan Housing Board

Airtel

URC Constructions

Rasi Seeds

Vinayaga Missions

Indian Institute of Technology, Madras

National Institute of Technical Teachers Training & Research

Govt. of Tamil Nadu

Tamil Nadu Housing Board

Chennai Corporation

Govt. of Kerala

Kerala Agro Industries Corporation

Alagappa University, Tamil Nadu

HPCL

BPCL

IOCL

Techno park, Kerala

SSM College of Engineering

KSR Educational & Charitable Trust Sivaraj Siddha Medical College

Indian Oil Petronas (P) Ltd

MAJOR CLIENTS

International Collaboration with firms in Europe

Page 29: CSAPL (hp)

Advantage India

Page 30: CSAPL (hp)

FDI Inflows: Global rank :

32nd in 2001 9th in 2014

Rank among developing countries:

13th in 2005 4th in 2014

India’s share of world FDI inflows:

0.78% in 2005 3.11% in 2014

INDIA’s GLOBAL POSITION*

Page 31: CSAPL (hp)

0

20000

40000

60000

80000

100000

120000

140000

160000

1 2 3 4 5 6 7 8

Year (End of the March) Inflow of FDI (Rs. in Crores)

Gross Inflow of FDI to India from 1948 to 2014

Page 32: CSAPL (hp)

 Top Ten Country‐wise FDI Equity Inflows to India from 

April, 2000 to July, 2014

S.No  Name of the Country  Amount of FDI Inflows (Rs. in crore) 

%age with total  FDI Inflows (+) 

1   Mauritius   390691.18   35.88  

2   Singapore   135784.52   11.88  

3   United Kingdom   105795.83   9.46  

4   Japan   85639.02   7.49  

5   Netherlands   65256.29   5.57  

6   U.S.A   57835.90   5.38  

7   Cyprus   37349.33   3.38  

8   Germany   33486.48   2.99  

9   France   19398.74   1.75  

10   Switzerland   13801.42   1.23  

Page 33: CSAPL (hp)

SECTOR WISE INVESTENT

Service, 191752.15

Construction , 111127.49

Telecommunication , 80608.47

Computer Software & Hardware, 61707.07

Drugs &Pharmaceutic

als, 61340.03

Automobile Industry, 49678.09

Chemicals , 47538.99

Power, 44667.08

Metallurgical Industry, 39225.17

Hotel & Tourism, 38030.37

Page 34: CSAPL (hp)