15117 CSL National Maternal CHC Project Crosshole Sonic Logging Results of Defect Analysis RL CSL 1-2 1-3 1-4 1-5 2-3 2-4 2-5 2-6 3-4 3-5 3-6 4-5 4-6 5-6 6-1 RL CSL 1-2 1-3 1-4 1-5 2-3 2-4 2-5 2-6 3-4 3-5 3-6 4-5 4-6 5-6 6-1 -0.66 0 -0.60 0 -0.91 0.25 -1.50 0.90 -1.66 1 -1.60 1 -2.66 2 -2.60 2 -3.22 2.56 -3.22 2.62 -3.66 3 -3.60 3 -4.66 4 -4.60 4 -5.66 5 -5.60 5 -6.66 6 -6.60 6 -7.66 7 -7.60 7 -8.66 8 -8.60 8 -9.66 9 -9.60 9 -10.66 10 -10.60 10 -11.66 11 -11.60 11 -12.66 12 -12.60 12 -13.66 13 -13.60 13 -14.66 14 -14.60 14 -15.66 15 -15.60 15 -16.66 16 -16.60 16 -17.66 17 -17.60 17 -18.66 18 -18.60 18 -19.66 19 -19.60 19 -20.66 20 -20.60 20 -21.66 21 -21.60 21 -22.66 22 -22.60 22 -23.66 23 -23.60 23 -24.66 24 -24.60 24 -25.66 25 -25.60 25 -26.66 26 -26.60 26 -27.56 26.9 16/- 15/5.7 16/2.8 22/- 22/3.8 -27.64 27.04 -28.00 -28.00 10/6 : less than 10% increase in FAT / less than 6dB energy reduction 20/9 : between 10% and 20% increase in FAT / less than 9dB energy reduction 30/12 : between 20% and 30% increase in FAT / between 9dB and 12dB energy reduction 31/13 : more than 30% increase in FAT / more than 12dB energy reduction BP07 Top of Concrete BP06 Top of Concrete Design Cut-off Level Top of tubes Top of tubes Design Cut-off Level Satisfactory Anomaly Flaw Defect Designed pile length Designed pile length 5 4 3 2 1 6 5 4 3 2 1 6 A2

CSL Level

Embed Size (px)

DESCRIPTION

sdf

Citation preview

Page 1: CSL Level

 15117 CSL National Maternal CHC Project Cross‐hole Sonic Logging ‐ Results of Defect Analysis

RL CSL 1-2 1-3 1-4 1-5 2-3 2-4 2-5 2-6 3-4 3-5 3-6 4-5 4-6 5-6 6-1 RL CSL 1-2 1-3 1-4 1-5 2-3 2-4 2-5 2-6 3-4 3-5 3-6 4-5 4-6 5-6 6-1

-0.66 0 -0.60 0-0.91 0.25 -1.50 0.90-1.66 1 -1.60 1-2.66 2 -2.60 2-3.22 2.56 -3.22 2.62-3.66 3 -3.60 3-4.66 4 -4.60 4-5.66 5 -5.60 5-6.66 6 -6.60 6-7.66 7 -7.60 7-8.66 8 -8.60 8-9.66 9 -9.60 9

-10.66 10 -10.60 10-11.66 11 -11.60 11-12.66 12 -12.60 12-13.66 13 -13.60 13-14.66 14 -14.60 14-15.66 15 -15.60 15-16.66 16 -16.60 16-17.66 17 -17.60 17-18.66 18 -18.60 18-19.66 19 -19.60 19-20.66 20 -20.60 20-21.66 21 -21.60 21-22.66 22 -22.60 22-23.66 23 -23.60 23-24.66 24 -24.60 24-25.66 25 -25.60 25-26.66 26 -26.60 26-27.56 26.9 16/- 15/5.7 16/2.8 22/- 22/3.8 -27.64 27.04-28.00 -28.00

10/6 : less than 10% increase in FAT / less than 6dB energy reduction20/9 : between 10% and 20% increase in FAT / less than 9dB energy reduction

30/12 : between 20% and 30% increase in FAT / between 9dB and 12dB energy reduction31/13 : more than 30% increase in FAT / more than 12dB energy reduction

BP07

Top of Concrete

BP06

Top of Concrete

Design Cut-off Level

Top of tubes Top of tubes

Design Cut-off Level

SatisfactoryAnomaly

FlawDefect

Designed pile lengthDesigned pile length

54

32

1

6

54

32

1

6

A‐2

sun.ba
Polygonal Line
sun.ba
Polygonal Line
Page 2: CSL Level

 15117 CSL National Maternal CHC Project Cross‐hole Sonic Logging ‐ Results of Defect Analysis

RL CSL 1-2 1-3 1-4 2-3 2-4 3-4

-0.31 0-1.31 1-2.31 2 27/1.0-3.31 3-4.31 4-5.31 5 18/1.0-6.31 6-7.31 7-8.31 8-9.31 9

-10.31 10-11.31 11-12.31 12-13.31 13-14.31 14-15.31 15-16.31 16-17.31 17-18.31 18-19.31 19-20.31 20-21.31 21-22.31 22-23.31 23-24.31 24-25.31 25-26.31 26-27.31 27

SatisfactoryAnomalyFlawDefect

Top of Concrete

Design Cut-off Level

BP25

4

3

2

1

sun.ba
Polygonal Line
Page 3: CSL Level

 15117 CSL National Maternal CHC Project Cross‐hole Sonic Logging ‐ Results of Defect Analysis

RL CSL 1-2 1-3 1-4 2-3 2-4 3-4

0 -3-0.56 -2 13.0/--1.56 -1 19.0/--3.22 0-3.56 1-4.56 2-5.56 3-6.56 4-7.56 5-8.56 6-9.56 7

-10.56 8-11.56 9-12.56 10-13.56 11 12.0/--14.56 12-15.56 13-16.56 14-17.56 15-18.56 16-19.56 17-20.56 18-21.56 19-22.56 20-23.56 21-24.56 22-25.56 23-26.56 24-27.56 24.34 13.0/-

-28 24.78

SatisfactoryAnomalyFlawDefect

Design Cut-off Level

BP27

Top of Concrete

Designed pile length

4

3

2

1

sun.ba
Polygonal Line