Page 1: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

CtrlS PresentationCII National Award for “Excellence in Energy Management 2018

2018

USA | Singapore | India | Middle East | APAC

www.ctrls.in

Dedicated Focus on Energy Conservation

Page 2: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Asia’s Largest Tier 4 Datacenter Provider and Managed Services Provider

Promoted by Pioneer Group and $39 bnOCH ZIFF capital, OZM (NYSE) www.ozcap.com

Cumulative Business Revenues of

$200 Million (approximately)

Since the beginning of our business operations

200Innovationsin technologies since 2008

Serving 12 of the Fortune 100

Globally and 24of ET 100 Indian companies

Powering

3,500+ Enterprises

Global Footprint

USAAPACMiddle East India

1,000 People

Strong Group

Corporate Factsheet - APAC’s Largest Tier-4 Datacenters

MostAwardedDatacenter in India

World Class Datacenter Serving Fortune 500 Companies Globally

Page 3: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Providing Global Connectivity

Global Footprint

170 PoPs (CDN) across 35 countries

18 Domestic PoPs across India

Large concentrations of edge servers

Key locations with high internet traffic

High computing and caching power at each PoP

Intelligent storage load balancing, caching /routing

High QoS leading to High Quality of Experience (QoE)

100% Redundancy to address Fail-over’s

Network built to protect from SQL injection, DoS attacks etc

100% Guaranteed Uptime

- Hyderabad, - Mumbai- Chennai - New Delhi (upcoming)- Bangalore (upcoming)

Hyderabad (A)

Bangalore (A)

Chennai (A)

Mumbai (A)

Pune

LucknowJaipur

Chandigarh

Delhi (A)Gurgaon

Ahmedabad

Dehradun

Patna

Aurangabad

Kokata (A)

Gauhati

Kochi

Raipur

Varnasi

Noida

A – Active Cities

Rest of the cities are planned as a part of future rollout

Africa2016

USA

Canada

Europe

India

Africa

Middle East

Australia

Singapore

-Hyderabad,

-Mumbai

-Chennai

-New Delhi (upcoming)-Bangalore (upcoming)

Page 4: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

PUE Advantages

Power Efficiency

GuaranteedPUE of

1.8

While Industry

Offers PUE of 2and above

Power Efficiency driving cost savings

Page 5: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

PUE 2.5 (Initially- 2008) PUE 1.8 (Year -2015)

PUE 1.50 (Target-2020)

Representative Energy Use Breakdown of Hyderabad Facility

PUE 1.65 (Present -2018)

Computer Loads, 61%

UPS losses, 8%

HVAC - Air Movement,

10%

HVAC -Pumps and Chiller, 20%

Lighting, 1%

Page 6: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

1. PUE in last 3 years

ENERGY DATA

Parameters 2015 - 2016 2016 - 2017 2017 - 2018

Annual Average PUE Maintained Total Load/ IT Load 1.8 1.72 1.65

1.8

1.72

1.65

2015-16 2016-17 2017-18

ANNUAL AVEARGE PUE TOTAL LOAD/IT LOAD

Page 7: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

2. Information on Competitors, National & Global benchmark

As we are Data centre industry the PUE which is offered to the clients will not be revealed.As per the standard global bench marking Data centres has to maintain a PUE as per below table

Global Benchmark

Description Standard Good Better

PUE 2 1.4 1.1

Temperature 20 +/- 1 22+/- 2 >23

Humidity 40%-55% 25%-60% No control

Page 8: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

In Summary:

Variable frequency drive – Savings of 3.3 Lac KWh annually

VFD for Cooling tower Fans & Motors

Resulted in saving of3% to 5% energy.

Provided: VFD For Cooling tower Fans &

Motors

Implantation Project #1

3a. Energy Saving projects implemented in FY 2015-16

Page 9: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Effective usage of Pumping & cooling system

Technical Specifications – Varying the speed of the Pumps according to load

on it.

Variable frequency drive is the logic system

which operates Pumps & Motors on limited RPM

as per the load available on it. Due to which the

excessive drawing of currents and wear & tear of

mechanical parts are avoided.

Accessories: VFD drives as per the capacity of the motors and pumps with necessary control wiring.

VFD For Cooling tower Fans & Motors

3a. Energy Saving projects implemented in FY 2015-16

Page 10: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Implantation Project

HVAC Energy Consumption saved in KWH Million

Cost of Energy saved in Rs. Million

Savings in %Year

Converted: VFD For Cooling tower Fans & Motors

2015-16

2016-17

3.3

3.42

2.38

2.46

3%

3.2%

2017-18 3.23 2.32 2.9%

Page 11: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Implantation Project #2Provided: Blanking panels in the racks for

empty “U” space

In Summary:

Blanking panels in the racks –savings of

10 to 12% on fan power cost

comparatively without blanking panel datacenter

Saved

2%of overall cooling

cost

Optimization of air flow in the datacenters

Avoided air short cycling

Avoided Hot Spots in the Datacenter

3a. Energy Saving projects implemented in FY 2015-16

Page 12: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Blanking Panel in Server racks

Server racks with Blanking panels

Blanking Panels

Server

Provided: Blanking panels in the racks for empty “U” space

Page 13: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Implantation Project

Converted: Air cooled PAC to Water cooled PAC

2015-16

2016-17

0.06

0.08

0.49

0.57

10%

11%

2017-18 0.08 0.57 14%

Blanking Panels energy saved in KWH Million

Cost of Energy saved in Rs. Million

Savings in %Year

Converted: Blanking panels in the racks for empty “U” space

14% in Savings

Page 14: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Evaporator fan motor with VFD– savings of

18% - 22% on fan power cost

Optimization of air flow requirement in the

datacenter

Implantation Project 1 Provided: Awareness & motivation to clients

on datacenter temperatures as per ASHRAE TC

9.9In Summary:

3b. Energy Saving projects implemented in FY 2016-17

Page 15: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

PAC VFD

Water cooled DX PAC along with Variable Frequency Drive

Page 16: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Provided: Variable frequency drive to PAC evaporative cooling coil fan motor

Converted: Air cooled PAC to Water cooled PAC

2016-17

2017-18

0.14

0.16

1.02

1.12

20.5%

21.5%

PAC Evaporator fan motor energy saved in KWH Million

Cost of Energy saved in Rs. Million

Savings in %Year

21.5% in Savings

Page 17: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Implantation Project #2Provided: Cold Aisle containment in the

datacenter

In Summary:

Cold aisle containment in the datacenter – savings of

45% to 50% on fan power cost comparatively

non-contained datacenter fan power cost

Saved

10%of overall cooling

cost

Optimization of air flow in the datacenters

Avoided air short cycling

3b. Energy Saving projects implemented in FY 2016-17

Page 18: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Datacenter cold aisle containment

Cold Isle Containment

Provided: Cold Aisle containment in the datacenter

Page 19: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Provided: Cold Aisle containment in the datacenter

Converted: Air cooled PAC to Water cooled PAC

2016-17

2017-18

0.47

0.48

3.41

3.45

12.5%

12.8%

Cold isle containment energy saved in KWH Million

Cost of Energy saved in Rs. Million

Savings in %Year

12.8% in

Savings

Page 20: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Implantation Project #1Provided: Provided Digital scroll compressor

PAC’s in place of Fixed scroll Compressor PAC’s.

In Summary:

We have opted for Digital scroll compressor units in our new DC instead of Fixed scroll

compressor.

Saved

12%of Power

consumption

Optimization of power consumption.

3c. Energy Saving projects implemented in FY 2017-18

Page 21: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Digital Scroll Compressor - PDX PX092E.

Provided: Provided Digital scroll compressor PAC’s in place of Fixed scroll Compressor PAC’s.

Page 22: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Savings

Converted: Air cooled PAC to Water cooled PAC

2017-18 1.16 8.36 12%

Energy saved in KWH Million

Cost of Energy saved in Rs. Million

Savings in %Year

Energy Savings with Digital scroll compressor PAC’s

12% in Savings

Page 23: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

OWN SOLAR POWER PLANT OF 20MW

In Summary

SOLAR POWER PLANT –Capacity of 20 MW to cater 98%

load of Building.

Usage of renewable/Green energy. Which reduces a

carbon foot print of 408336 Kgco2/turn of final

products.

Innovation Project-1

Page 24: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Effective usage of Renewable energy

Technical Specifications – 20 MW solar power plant catering the load of

present structure.

Establishing own solar power plant of 20MW to

cater the 98% load of our present structure. So

that we are mostly on renewable energy which

will reduce large amount of carbon foot print.

SOLAR POWER PLANT OF 20MW

Innovation Project-1

Page 25: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Innovative Project

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

Innovation Project-1: SOLAR POWER PLANT OF 20MW

2018-19 (Projected)

20 90 100 %

Page 26: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Replacement of Closed loop cooling tower system with Open loop

In Summary

Open loop cooling towers –Replacing the closed loop

cooling tower with closed loop.

Effective usage of condenser water with effective

condensation. And reduction in descaling chemicles.

Innovation Project-2

Page 27: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Effective usage of Condenser System

Technical Specifications – 650 TR closed loop cooling tower in place of 450 TR

Open loop

Replacing the open loop cooling tower system

with closed loop system. So that we can reduce

the evaporation losses and effective use of

condenser water. And the usage of descaling

chemicals will be less as water is less exposed to

atmosphere.

Replacement of Closed loop cooling tower system with Open loop

Innovation Project-2

Page 28: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Innovative Project

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

Innovation Project-2: 650 TR closed loop cooling tower

2018-19 (Projected)

4.5 15 100 %

Page 29: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

7. GHG Inventorisation

YearScope 1 Emissions

Kgco2/Turn of final products Tons/Turn of final product

Scope 2 Emissions Kgco2/Turn of final products

Tons/Turn of final product

Scope 3 Emissions Kgco2/Turn of final products

Tons/Turn of final product

TotalKgco2/Turn of final products Tons/Turn of

final product

2014-15 0 87524.37 0 87524.37

2015-16 0 140513.96 0 140513.96

2016-17 0 216384.54 0 216384.54

2017-18 0 408336.94 0 408336.94

Page 30: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

8. Green Supply Chain

CtrlS Data Centres Pvt LTD and its subsidiaries are committed to protect the Environment by striving for the

greening of supply chain in collaboration with our stakeholders for long term sustainability.

Initiatives taken to promote Green supply chain:

1. Replacing the exiting old systems with the latest technology to reduce Co2 Emissions/Eco friendly.

2. Upgraded to latest LED system from convectional type of illumination system.

3. Effective usage of treated water for indoor and outdoor applications.

4. Procurement process has adopted only to go for eco friendly systems from market.

5. Have modified the frequency of load testing done on the DG sets for ensuring the healthiness of the system from

weekly to fortnightly. Which is saving 1240 Litres diesel consumption per month and reduction in GHG emissions

of 3261.2 KgC02.

Page 31: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

9. Team work, Employee Involvement & Monitoring

MONITORING & REPORTINGParameters Details

Frequency of Review of PUE & Consumption : Monitor through BMS 24/7 and review Once in a Week

Roles & Responsibilities of Energy Manager : Minimum 12% power savings to be achieved.

Details of Monitoring & Reporting System / Methodology Employed by the Unit for Review of SEC & Consumption (Max. 100 Words):

Mr. Brahma Reddy - VP, Mr. Rajesh Kumar Singh, PAN India Lead, Mr. Umesh, Sr. Manager, Mr. Manikanta, Mr. Hari.

Who Chairs the Review Meeting on SEC & Consumption (Provide Designation) :

Mr. Brahma Reddy VP, Mr. Rajesh Kumar Singh, PAN India Lead, Mr. Umesh, Sr. Manager, Mr. Manikanta, Mr. Hari.

Budget for Energy Conservation 20.2 Millions which is 0.4% on total company turn overEnergy efficiency / awareness training program

Training are planned quarterly for all the team members

Projects implemented through Kaizens ( Workers and Supervisor level)

Operational savings of all the Electro mechanical equipment, utilization of optimized energy or power.

Page 32: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Energy Consumption saved in KWH Million

Investment in Rs. Million

Savings in %Year

10. Implementation of ISO 50001/Green Co/IGBC rating

Implementation of ISO 50001/Green Co/IGBC rating

Parameters Details

Is your Building ISO 50001 Certified? No

Is your Building Certified by IGBC/Any other Building Certification?

USGBC Platinum (O&M) applied and we are in process of acquiring the certification,almost through required points has been achieved.

Total Turnover of the company/Plant FY 2017-18 (RS. Millions)

5,000.00

Amount invested in EnCon Projects FY 2017-18 (Rs. Millions)

20.20

Investment % 0.40

Page 33: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Awards

CII Energy Efficiency Award 2012, 2014, 2015

Best Data Center Award 2013

CIO Choice Award for Data Centre Managed Services, Cloud 2013. 2014, 2015

Nasscom Awards 2010, 2011

TIA Tier 4 certificationIndustries highest Uptime of 99.995%

ISO 20000-1Efficient and timely service delivery

ISO 27001Ensuring data security and safety

ISO 22301Industries highest Uptime of 99.995%

SOC-1, SOC-2Organization wide process

Certifications People

Certified people resources

ITIL, COBIT

CISA, CISSP

Six Sigma, PMP

CCNA, MCSE,

SAP Basis, HANA etc

More than 75% of the people resources are dedicated to customer support (Service Delivery) operations.

India’s Most Awarded Datacenter

Page 34: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Green Initiatives

Power Cooling Mechanical Space Environment

1 2 3 4 5

Page 35: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Use LED based lighting where continuous

light is required

Providing high energy efficient UPS system

with pure IGBT technology to improve

power factors and save power

Providing highly efficient isolation

transformers

Provide bus bar trunking system to reduce

power transmission losses in power networks

Implement VFD system for secondary pumps

and cooling tower fans for energy

optimization during variable loadPower

Power

Page 36: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Cooling

Provide water cooled heat exchangers instead of air cooled in HVAC system.

Using FRP cooling tower blade for better energy efficiency

Selecting high approach cooling tower to save powers

Selecting higher chilled water leaving temperature to increase chiller efficiency

Providing highly energy efficient centrifugal

chillers with VSD to reduce the IKW/TR

value on part load

Providing VFD based pumps for all variable load applications in the facility

Provide thermal zoning in server room with large cold aisle containment for

better energy efficiency

Pressurization unit to provide uniform air pressure across DC to eliminate hot spots

and efficient utilization of air

High energy efficient PAHU's with backward curve EC fan with

microprocessor based controller and efficient humidification system

Providing ceiling void as return air plenum for laminar air flow for better

energy efficiency

Damper controlled access floor grill for optimum using of air

Special PAHU with fresh air induction to lower concentration of air

Cooling

Page 37: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Provide 100% waste water recovery plant

Rain water harvesting to increase underground water

yield

Hydro pneumatic system for water pumping in the facility with automatic

water level controller

Natural ventilation for lift room and machine

room

VFD controlled lift operation for better energy

efficiency

Solar and wind based power plants at terrace to reduce carbon foot print by using renewable energy and optimum

utilization of spaces

All pumps with mechanical seal to

reduce water leakage

Automatic water treatment plant for producing soft

water

Intelligent automatic chemical dosing plant for condenser water

Mechanical

Mechanical

Page 38: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Space

Windowless external wall

to minimize heat

Double layered external wall to reduce heat

transmission "U" value in the datacenter

Dedicated and secured shaft for services to

improve DC efficiency

Autoclave bricks to reduce heat transmission "U"

value in the datacenter

Space

Page 39: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Sewage water recycling and

using for public road

plantation

PlantationSocial awareness program on energy

& water

Environment

Page 40: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Sewage water recycling and using for public road plantation/gardening along with awareness programs

Page 41: CtrlS Presentation...Replacing theexiting old systems with latest technology to reduce Co2 Emissions/Eco friendly. 2. Upgraded to latest LED system from convectional type of illumination

Thank you very muchwww.ctrls.in