MES 1 MES 2
OBRAS PROVICIOINALES 3,594.71 3,594.71
CAMARA DE ACRGA 1,780.29 1,780.29
CAMARA DE ROMPE PRESION 4,354.93 4,354.93
RED DE DISTRIBUCION PRINCIPAL 31,678.33 15,839.17 15,839.17
MODULO 1 31,654.25 31,654.25MODULO 2 32,235.58 16,117.79
MODULO 3 29,910.45
MODULO 4 25,134.04 12,567.02
MODULO 5 22,247.36
MODULO 6 52,356.34 26,178.17
VALVULAS DE CONTROL 1,073.68 536.84
VALVULAS PASE PURGA 2,850.93
HIDRANTES 48,374.66
OBRAS COMPLEMETARIAS 1,677.18 1,677.18
CONTROL DE CALIDAD 260.00 260.00LETE TERRESTRE 18.00 6.00 6.00
MANTENIMIENTO 10,000.00 10,000.00
### 27,512.28 112,899.24
9.20 37.73
7/25/2019 Cullcuire Riego Programacion
2/2
MES 3
16,117.79
29,910.45
12,567.02
22,247.36
26,178.17
536.84
2,850.93
48,374.66
6.00
158,789.22 299,200.73