5
Curb Ramp Compliance Post Construction Report instructions 1. The report must be filled out electronically. Hand written reports or scanned copies will not be accepted. 2. These reports are to be completed for curb ramps on the state trunk network – state highways and connecting highways. This is for any curb ramp installed or updated on the state trunk network which includes permit work that installs/updates curb ramps as well. 3. If a Local Program project intersects with the state trunk network then a report is to be completed for those curb ramps - information on the local road system is optional and should be kept with project records but do not need to be submited to the region bike/ped. coordinator. 4. When entering the Lat/long for a curb ramp location use decimal degrees and show to 6 decimal places (i.e. 99.999999). DO NOT use degrees-minutes-seconds. Correct Format = 43.073962,-88.913757. Note: Longitude should be a negative number. 5. The report is to be filled out after a curb ramp(s) has been constructed. 6. Save the report using the following file naming convention: Project ID_XX (ex. 9999-99-99_01), when there are multiple reports for a project, report sheets submitted need to include the Project Id and number sequence (e.g. 01, 02, 03). DO NOT send multiple reports in one file. Correct Format = 3301-01-72_01.pdf and 3301-01-72_02.pdf. 7. Curb Ramp Location – Each curb ramp location field is numbered 1, 2, 3 or 4 and corresponds to a location on the intersection graphic provided. In the intersection graphic, place the corresponding number (1, 2, 3 or 4) in the correct location. Do not use double digits or letters.

Curb Ramp Compliance Post Construction Report instructions · [email protected]) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Curb Ramp Compliance Post Construction Report instructions · Matthew.Halada@dot.wi.gov) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

Curb Ramp Compliance Post Construction Report instructions

1. The report must be filled out electronically. Hand written reports or scanned copies will not be accepted.

2. These reports are to be completed for curb ramps on the state trunk network – state highways and connecting highways. This is for any curb ramp installed or updated on the state trunk network which includes permit work that installs/updates curb ramps as well.

3. If a Local Program project intersects with the state trunk network then a report is to be completed for those curb ramps - information on the local road system is optional and should be kept with project records but do not need to be submited to the region bike/ped. coordinator.

4. When entering the Lat/long for a curb ramp location use decimal degrees and show to 6 decimal places (i.e. 99.999999). DO NOT use degrees-minutes-seconds. Correct Format =43.073962,-88.913757. Note: Longitude should be a negative number.

5. The report is to be filled out after a curb ramp(s) has been constructed.

6. Save the report using the following file naming convention: Project ID_XX (ex. 9999-99-99_01), when

the re are multiple reports for a project, report sheets submitted need to include the Project Id and number sequence (e.g. 01, 02, 03). DO NOT send multiple reports in one file. Correct Format = 3301-01-72_01.pdf and 3301-01-72_02.pdf.

7. Curb Ramp Location – Each curb ramp location field is numbered 1, 2, 3 or 4 and corresponds to a location on the intersection graphic provided. In the intersection graphic, place the corresponding number (1, 2, 3 or 4) in the correct location. Do not use double digits or letters.

Page 2: Curb Ramp Compliance Post Construction Report instructions · Matthew.Halada@dot.wi.gov) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

8. Attributes – fill in all fields, do not leave them blank. If a measurement is asked for provide a numericvalue. Only provide N/A in fields with that option.

9. The Construction Project Manager is to verify the report is complete. Email the completed report to theRegion Bike/ Pedestrian Coordinator for the project. (Regional Bike/Pedestrian Coordinator listing available athttps://wisconsindot.gov/Documents/projects/multimodal/bike/coord-map.pdf or https://wisconsindot.gov/Pages/projects/multimodal/bikeplan2020.aspx)

SW Region (Columbia, Dane, Dodge, Green, Iowa, Jefferson, Lafayette and Rock): Michelle Brokaw - ([email protected] )

orSW Region (Crawford, Grant, Juneau, Lacrosse, Monroe, Richland, Sauk and Vernon): Francis Schelfhout ([email protected])

SE Region (Kenosha, Milwaukee, Ozaukee, Racine, Walworth, Washington and Waukesha): Chris Squires - ([email protected])

NW Region (Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Washburn, Pepin, Pierce, Polk, Rusk, Sawyer, St. Croix, Taylor, Trempealeau): Dena Ryan - ([email protected])

NC Region (Adams, Florence, Forest, Green Lake, Iron, Langlade, Lincoln, Marathon, Marquette, Menominee, Oneida, Portage, Price, Shawano, Vilas, Waupaca, Waushara and Wood): Dave Meurett – ([email protected])

NE Region (Brown, Calumet, Door, Fond du Lac, Kewaunee, Manitowoc, Marinette, Oconto, Outagamie, Sheboygan and Winnebago): Matt Halada - ([email protected])

10. Regional Bike/Ped Coordinators will upload the reports to SharePoint.

For additional questions contact:

Gary Corcoran, NW Region Design Oversight Engineer, [email protected] Mrotek Glenzinski, State Bike and Pedestrian Coordinator, [email protected] Smith, WisDOT ADA Coordinator, [email protected]

Page 3: Curb Ramp Compliance Post Construction Report instructions · Matthew.Halada@dot.wi.gov) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

Project ID Project Name Region

STH/USH (include hwy no.) Intersecting Highway/Road

Date Inspected By

Curb Ramp Lat./Long. (Show to 6 decimal places) Location TypeCurb Ramp Type

Curb Ramp Attributes

Ramp Opening Width (48” minimum)

Ramp Running Slope (8.33% maximum)

Ramp Cross Slope (2% maximum)

LT. Flare Slope (10% max., 6:1 max. for graded)RT. Flare Slope (10% max., 6:1 max. for graded)

Detectable Warning Field Attributes

Depth (48” minimum)

Detectable Warning Field Spans Ramp Width?

Transition Details

Curb ramp built to plan specs?

Gutter Flowline Slope at Ramp (2% maximum*)Gutter Counter Slope (4% maximum)

Rollover (11% maximum)

Curb Ramp CompliancePost Construction Report

Email completed copy of this report to WisDOT Region Bike/Ped. Coordinator for project. Also include copy of this report in final project records.

PhoneEmail

Level Landing Attributes

4' Clear Space at Ramp Bottom? (Diagonal only)

Width (48” minimum)

Cross Slope (2% max. both dir.) (Enter largest )

Radial Panels?Warning Field Color (Yellow, White, Patina)

Yes No Yes No Yes No Yes No Yes No

Yes No Yes No Yes No Yes No

Yes Yes No Yes No Yes No

% % % %

% % % %% % % %% % % %% % % %

" " " "

" " " "" " " "

% % % %

% % % %% % % %

Page 1 of 3

*Slope at street crossings without yield or stop control and at mid-block street crossings shall be permitted to equal the road grade.

Sept. 2020

NA Yes No NA Yes No NA Yes No NA

Curb Ramp Location(s) Ramp Location 1 Ramp Location 4Ramp Location 2 Ramp Location 3

NA No NA NA NA

Ramp Location Ramp LocationRamp Location Ramp Location Yes No Yes No Yes No Yes No

Documentation

Comments (limited to 255 characters)

Lip less than ¼ inch? (if present)

NOTE: Fields with measurement must have numeric values. Only use N/A in fields with that option.

DOTG1C
Stamp
Page 4: Curb Ramp Compliance Post Construction Report instructions · Matthew.Halada@dot.wi.gov) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

Page 2 of 3

Ramp measurements required at locations marked with smart level below

Perpendicular Curb Ramp (Types 2 & 3)

Tur

Rollover (gutter counter slope + ramp slope <= 11%)

Ramp Slope

(8.33% Max.)Gutter Counter Slope (4% Max.)

Sidewalk Sidewalk

Level Landing

Parallel Curb Ramp (Types 7A & 7B)

Landing (Turning Space)

Ramp Ramp

Gutter Flowline

Gutter Counter Slope

Ramp Transition location,no lip >1/4”should be present

Detectable Warning

(Truncated Domes)

Sept. 2020

(8.33% Max. Slope)(8.33% Max. Slope)

(4% Max.)

(2% Max.)

Page 5: Curb Ramp Compliance Post Construction Report instructions · Matthew.Halada@dot.wi.gov) 6. Regional Bike/Ped Coordinator s will upload the reports to SharePoint . For additional

Directional Curb Ramp (Types 4A & 4B)

Page 3 of 3Sept. 2020

Ramp

(8.33% Max. Slope)

Lower Landing

(1.5% Max. Slope)

Detectable Warning

(Truncated Domes)

Upper Landing

(1.5% Max. Slope)Gutter Counter Slope

(4% Max.)

Ramp Transition location, no lip >1/4”should be present

Gutter Flowline

(2% Max.)

(Non-terraced version shown)

Island Curb Ramp (Type 6)

Detectable Warning

(Truncated Domes)

Detectable Warning

(Truncated Domes)

Detectable Warning

(Truncated Domes)

DOTG1C
Pencil
DOTG1C
Pencil
DOTG1C
Pencil
DOTG1C
Line
DOTG1C
Line
DOTG1C
Line
DOTG1C
Line
DOTG1C
Line
DOTG1C
Line