Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki Current Status of Hibiki - - - - - - nada nada nada nada nada nada nada nada Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Kyuden Mirai Energy Co., Inc. July 8, 2019

Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

  • Upload
    others

  • View
    11

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

Current Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of HibikiCurrent Status of Hibiki--------nada nada nada nada nada nada nada nada

Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project Offshore Wind Farm Project

Kyuden Mirai Energy Co., Inc.

J u l y 8 , 2 0 1 9

Page 2: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

table of contentstable of contentstable of contentstable of contents

1111 Project OverviewProject OverviewProject OverviewProject Overview

2222 Project StrengthProject StrengthProject StrengthProject Strength

(1)Project Structure

(2)NEDO Demonstration

(3)Base Port for Offshore Wind

3333 Main Process of the ProjectMain Process of the ProjectMain Process of the ProjectMain Process of the Project

4444 Main Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility Study

5555 ResearchResearchResearchResearch

(1) Environmental Impact Assessment

(2) Wind Measurement

(3) Sea Area Survey

6666 Facility DesignFacility DesignFacility DesignFacility Design

7777 Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding ofnada project and Understanding ofnada project and Understanding ofnada project and Understanding of Local Local Local Local

ResidentsResidentsResidentsResidents

8888 SummarySummarySummarySummary

1

Page 3: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

9

Hibiki Wind Energy (HWE)

・selected as a priority negotiator in February 2017 to the operator of the

offshore wind power generation that Kitakyushu City has

publicly solicited as the first project at the revised Port Act

・concluded a basic agreement with Kitakyushu City in January 2018

・conducting feasibility study aiming to start construction in FY2022

1111 Project OverviewProject OverviewProject OverviewProject Overview 2

Source: “Guidebook for Green Energy Port Hibiki” published by the City of Kitakyushu

with some modification and addition ©2019 Kyuden Mirai Energy Co., Inc.

Page 4: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

Date of Date of Date of Date of

establishmentestablishmentestablishmentestablishment

April 17, 2017April 17, 2017April 17, 2017April 17, 2017

Shareholders

& ratio of

capital

contribution

Kyuden Mirai Energy 30%

Electric Power

Development (J-POWER)

40%

Hokutaku Renewable Energy

Service

10%

Saibu Gas 10%

Kyudenko 10%

2222 Project Strength Project Strength Project Strength Project Strength (1)Project Structure3

HWE consist of the five investment companies, they can proceed with the feasibility

study with the same sense of values with the following characteristics;

・Companies with a wealth of experience in wind power

・Companies that has a local office and is rooted in the area

©2019 Kyuden Mirai Energy Co., Inc.

Page 5: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

2222 Project Strength Project Strength Project Strength Project Strength (2)NEDO Demonstration4

Observation tower

(Tower top: 85 m)

Wind Power (Japan Steel Works)

Output: 2 MW Rotor diameter: 83 m

Foundation weight : 4,100t

・The offshore wind observation tower (currently owned by J-Power) installed in NEDO

demonstration can be used to measure the wind conditions of this project.

・The experience of NEDO demonstration can be utilized for this feasibility study.

Offshore Kitakyushu(2013)

Distance from the coast :1.4km

Water Depth 14m

Source: “Reference for Summary report by Study group concerning the procurement price

of offshore wind power “ (METI 2014) ©2019 Kyuden Mirai Energy Co., Inc.

Page 6: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

Storage Site for Wind Storage Site for Wind Storage Site for Wind Storage Site for Wind

Turbine ComponentsTurbine ComponentsTurbine ComponentsTurbine Components

-Temporary storage of

components and turbine

assembly

-Pre-shipping inspection

Offshore wind farmOffshore wind farmOffshore wind farmOffshore wind farm

-Site investigation

-Construction, Operation,

Maintenance and

Decommissioning

Quay side for wind turbine Quay side for wind turbine Quay side for wind turbine Quay side for wind turbine

installation vesselsinstallation vesselsinstallation vesselsinstallation vessels

-Receiving and loading of

turbine components

-Loading of turbine

foundations

Back yardBack yardBack yardBack yard

-Base for operation and

maintenance

-Manufacturing of

turbine foundations

2222 Project Strength Project Strength Project Strength Project Strength (3)Base Port for Offshore Wind5

Source : “Guidebook for Green Energy Port Hibiki” published by the City of Kitakyushu

with some modification and addition

・Kitakyushu City is considering to develop a base port that is essential for offshore wind

power construction.

・The construction plan of this project can be optimized near the base port.

©2019 Kyuden Mirai Energy Co., Inc.

Page 7: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027

Sea Area Survey

Environmental Impact

Assessment

Wind Measurement

Facility Design, etc

Construction Works

※ It is planned at the present time, and there is a possibility of change by result of future investigation and related party discussion

Submarine boring

Submarine boring

Marine topography survey / Submarine geological survey

Basic design Detailed design

Making document and report

・Wind measurement is started in June 2017, Sea Area Survey in July, and EIA in August.

・After EIA, a business plan will be compiled in FY 2021.

・Target year to start construction is FY 2022.

ConsiderationMethod

Pre-construction works (obtaining of permissions, etc.)

Field survey

Commencement of construction works and sequential start of operation

3333 Main Process of the ProjectMain Process of the ProjectMain Process of the ProjectMain Process of the Project6

©2019 Kyuden Mirai Energy Co., Inc.

Page 8: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

74444 Main Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility StudyMain Events of the Feasibility Study

<<<<FY 2017FY 2017FY 2017FY 2017>>>>

2017, April Hibiki Wind Energy Co., Ltd. was established

June Wind condition observation was started

July Sea area survey (FY2017) was started

August Consideration documentation of EIA was submitted

November Minister’s Opinion to Consideration of EIA was received

2018, January Basic agreement "Installation and operation of the Hibiki-nada

Offshore Wind Farm Project“ was concluded with Kitakyushu City

March Method documentation of EIA was submitted

<<<<FY 2018FY 2018FY 2018FY 2018>>>>

2018, April Field survey of EIA was started

April Sea area survey (FY2018) was started

July Kitakyushu Mayor’s Opinion to Method of EIA was received

September Minister’s Advice to Method of EIA was received

November Grant of NEDO subsidy to Hibiki-nada Project was decided

<<<<FYFYFYFY 2019201920192019>>>>

2019, May Sea area survey (FY2019) was started

June Submarine cable survey (FY2019) was started

©2019 Kyuden Mirai Energy Co., Inc.

Page 9: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

5555 ResearchResearchResearchResearch (1) Environmental Impact Assessment

Primary Environmental

Impact Consideration

Minister’s Advice to Assessment Method of EIA was received in FY 2018,

Field Survey is conducted.

Noise measurement

Bird survey

Survey of the landscape

8

Planning of Project

Assessment Method

Environmental Impact

Statement

Implementation of Project

Field Survey,

Forecast, Evaluation

EIA

©2019 Kyuden Mirai Energy Co., Inc.

Page 10: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

95555 ResearchResearchResearchResearch (2) Wind Measurement

In addition to wind observation at the offshore observation tower, a Doppler Lidar was

installed at the offshore observation tower and horizontal wind conditions was observed.

・ Offshore Observation Tower :Vertical observation

・ Doppler Lidar : Horizontal observation

Doppler Lidar

【 Observation Image】

Offshore

observation tower

currently owned

by J-Power

【 Observation point 】

Source : “Guidebook for Green Energy Port Hibiki” published

by the City of Kitakyushu

©2019 Kyuden Mirai Energy Co., Inc.

Laser

tower

Doppler

Lidar

Page 11: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

・ The boring survey is underway to obtain submarine geology data necessary for

foundation design.

・ In addition, in order to make the wind turbine arrangement for excluding the habitat of

seaweed, the seaweed survey is also carried out.

5555 ResearchResearchResearchResearch (3) Sea area Survey 10

A

B

C

D

Source of information: “Guidebook for Green Energy Port Hibiki” published by the City of

Kitakyushu

Image of boring survey

©2019 Kyuden Mirai Energy Co., Inc.

Page 12: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

Selecting a wind turbine in consideration of Hitachi's production withdrawal and global

wind turbine production and development trends

【 Hitachi's production withdrawal 】

・Press release on production

withdrawal in January 2019

・In response to this, Hitachi was

excluded from candidates

【 Global trend 】

・Three years ago, the line-up of

wind turbine mainly consisted of

4 or 5 MW

・Since then, with the expansion of

offshore wind power development

plans in Europe, the size of wind

turbines has rapidly increased

・In recent years, each wind turbine

maker has announced production

of turbines for Japan (class T)

【 Wind Turbine Development Trends 】

6666 Facility Facility Facility Facility DesignDesignDesignDesign (1)Wind turbine 11

©2019 Kyuden Mirai Energy Co., Inc.

Page 13: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

6666 Facility Facility Facility Facility DesignDesignDesignDesign (2) Foundation

Planning to select a foundation type based on the results of the sea area surveys and

the results of reviews on European consultants, etc.

TypeTypeTypeTypeMonopile Jacket Gravity-based Structure

FoundationFoundationFoundationFoundation

ImageImageImageImage

Source:NEDO Renewable energy technology Report (2th edition)

12

©2019 Kyuden Mirai Energy Co., Inc.

Page 14: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

137777 Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding of Local Residentsnada project and Understanding of Local Residentsnada project and Understanding of Local Residentsnada project and Understanding of Local Residents

Seminars and briefing sessions were held to promote Hibiki-nada project and

understanding of local residents

■■■■ promotion of Hibiki-nada project

ooooECOECOECOECO----TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018TECHNOLOGY EXHIBITION 2018

Period:10th

-12th

, October 2018

Venue :West Japan General Exhibition Center (in Kitakyushu)

Date Contents

10th

-12th

Exhibition Booth

10th

Offshore Wind Basics Seminar

11th

-12th

Consultation meeting between wind turbine

manufacturers and Local companies

Photo of Seminar and Consultation meeting

in ECO-TECHNOLOGY EXHIBITION

Photo of Exhibition Booth in WIND EXPO 2019

ooooWINDWINDWINDWIND EXPOEXPOEXPOEXPO 2019201920192019

Period:27th

February – 1th

March 2019

Venue : Tokyo Big Site (in Tokyo)

Contents:Exhibition Booth

■■■■ promotion of understanding of local residents

ooooGlobal Wind Day Global Wind Day Global Wind Day Global Wind Day ((((SponsoredSponsoredSponsoredSponsored bybybyby KitakyushuKitakyushuKitakyushuKitakyushu CityCityCityCity))))

Period:29th

July 2018

Venue : Nippon Roballo Hibiki factory(at Wakamatsu)

Contents: Briefings on business plans for children and parents

Photo of Global Wind Day

©2019 Kyuden Mirai Energy Co., Inc.

Page 15: Current Status of Hibiki ----nada Offshore Wind Farm Project · 66 Facility Facility Facility Design DesignDesign (2) Foundation Planning to select a foundation typebased on the

148888 SummarySummarySummarySummary

oooo Environmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact AssessmentEnvironmental Impact Assessment

The procedure of Assessment Method is completed, and field survey is

conducted.

oooo Wind MeasurementWind MeasurementWind MeasurementWind Measurement

Wind condition data for 2 years are obtained from offshore observation towers,

and the way to apply data from Doppler Lidar is considered.

oooo Sea Area SurveySea Area SurveySea Area SurveySea Area Survey

Seaweed survey is conducted for determining the placement of wind turbines,

and boring survey is carried out for determining the foundation type.

oooo Facility DesignFacility DesignFacility DesignFacility Design

Wind turbine models and foundation type will be selected based on each

survey result etc.

o Promotion ofPromotion ofPromotion ofPromotion of HibikiHibikiHibikiHibiki----nada project and Understanding ofnada project and Understanding ofnada project and Understanding ofnada project and Understanding of Local ResidentsLocal ResidentsLocal ResidentsLocal Residents

The contents of the previous year is continued.

©2019 Kyuden Mirai Energy Co., Inc.