1 Curriculum Vitae Personal Information First name: Ayman Second name: Issa Father: Samir Birth day: 1975 A.D. Marital status: Married Number of Children: 2 Citizenship: Syrian Permanent Address: Syria Homs Current Address: Saudi Arabia Al-Jubail Mobile: 0592857242 Email: [email protected] [email protected] Educational background Certificate: Civil Engineering Specialization: Engineering Management and construction University: Aleppo Graduation Year: 1997 Graduate degree: Good Additional languages English: Good Computer Skills Program Level Program Level Program Level M.S.Office Very Good AutoCAD Very Good Primavera 6 Very Good Primavera 6 Very Good SP 2000 Very Good Photoshop Good

Curriculum Vitae end to start 19-7-2016

Embed Size (px)

Citation preview

Page 1: Curriculum Vitae end to start 19-7-2016

1

Curriculum Vitae

Personal Information

First name: Ayman

Second name: Issa

Father: Samir

Birth day: 1975 A.D.

Marital status: Married

Number of Children: 2

Citizenship: Syrian

Permanent Address: Syria – Homs

Current Address: Saudi Arabia – Al-Jubail – Mobile: 0592857242

Email: [email protected][email protected]

Educational background

Certificate: Civil Engineering

Specialization: Engineering Management and construction

University: Aleppo

Graduation Year: 1997

Graduate degree: Good

Additional languages

English: Good

Computer Skills

Program Level Program Level Program Level

M.S.Office Very Good AutoCAD Very Good Primavera 6 Very Good

Primavera 6 Very Good SP 2000 Very Good Photoshop Good

Page 2: Curriculum Vitae end to start 19-7-2016

2

Experiences

In Saudi Arabia Kingdom:

23/03/2014 – Up to date:

Company: Rawabi Fayfa for Agriculture and Contracting Co.

Project and it's description: "Developed Khaled & Almasjeed Road" which is

including: site preparation and earthwork, Irrigation system, decorative lighting,

landscaping and hardscape. All of that are in a distance of about 10 Km.

Position: Project Manager

Scoop of work:

Oversee the preparation of project plans.

Determine the relationships between the parties involved in the

implementation of the project.

Take the necessary measures to manage the resources needed for the

project.

Organization the acts of subordinates in the project and supervising them

and making coordination among themselves.

Follow up the implementation of the project activities and take appropriate

decisions to reform the execution paths.

Cost control and take measures to abide by the plan costs.

Attend the strategy meeting and progress meeting of the project.

Follow up the safety procedures in the project.

Make sure that all subcontractors are qualified.

Follow up the procurements program and schedule.

Coordinate with QC manager to ensure that all activities will be

implemented in good quality.

Page 3: Curriculum Vitae end to start 19-7-2016

3

1/10/2013 – 5/3/2014:

Company: Luxurious Palaces

Project and it's description: "Al Nada Villas" which consists of twenty villas

every one content of two floor.

Position: Construction Manager

Scoop of work:

Manage and supervise the Subcontractors / Site Engineers.

Ensures that all construction works are undertaken to required designs and

specifications.

Determine labor requirements and dispatch workers to construction sites.

Obtain all necessary permits and licenses.

Study job specifications to determine appropriate construction methods.

Take actions to deal with the results of delays, bad weather, or

emergencies at construction site.

Monitor site progress including installation of required equipment against

accepted programs and 2-4 week look ahead.

Make recommendation where extra sources or alternative work processes

are required to maintain or increase performance.

Responsible for reporting progress of site works to project manager.

Monitor Project cost and provide project manager with timely identification

of deviations from project budget.

Identify problematic design issues and make recommendations for

alternative and cost effective re-design solutions.

Ensure the construction schedule is maintained.

Reports on changes and additions to contractual agreements by main

contractors, consultants, clients, suppliers and subcontractors.

Maintain accurate and detailed records are of all site activities.

Investigate damage, accidents, or delays at construction sites, to ensure

that proper procedures are being carried out.

Page 4: Curriculum Vitae end to start 19-7-2016

4

1/7/2012 – 28/09/2013:

Company: Horizon Contracting

Project and it's description: "prince Fahd Bin Salman charity association for

renal failure patient's care" which consists of two site: One of /15000 m2/

including a basement on the entire site's area and three buildings of four floors

for each one, The other of /10000 m2/ including a basement on the entire site's

area and two buildings of three floors for each one.

Position:

1. Planer in the beginning of project

2. Then: Cost Control, Q.S (quantity surveyor), and procurement.

Scoop of work:

Breakdown the project into WBS.

Input the activity and it's durations and relations in primavera.

Calculate the quantities of items in tender BOQ.

Input the quantities and costs of the activities in primavera.

Update the quantities of items as actual every month.

Make the estimation of the activities cost.

Control the expenses of the project by calculating the EV.

Make the subcontractors extracts as their works and contracts.

Submitting the payments to the Client as the actual executed works.

Breakdown the activities to their materials for control the procurement.

Making the purchase requests and follow up it.

lifting weekly and monthly reports about cost index of the project.

22/8/2008 – 30/6/2012:

Company: Horizon Contracting

Project and it's description: "courts and notaries complex in Buraidah". This

project included main building of seven blocks: The two front blocks consist of

basement and three floors, the sides are basement and seven floors, the middle

one is basement and ten floors, and the remaining two blocks are ramps of the

basement. In addition of that there were a landscape of /24000 m2/ included a

mosque, soldier house, electric rooms, guard rooms, ground tank, green areas,

pavements, streets, and the fence.

Position: Construction Manager

Page 5: Curriculum Vitae end to start 19-7-2016

5

Scoop of work:

Manage and supervise the Subcontractors / Site Engineers.

Ensures that all construction works are undertaken to required designs and

specifications.

Determine labor requirements and dispatch workers to construction sites.

Obtain all necessary permits and licenses.

Study job specifications to determine appropriate construction methods.

Take actions to deal with the results of delays, bad weather, or

emergencies at construction site.

Monitor site progress including installation of required equipment against

accepted programs and 2-4 week look ahead.

Make recommendation where extra sources or alternative work processes

are required to maintain or increase performance.

Responsible for reporting progress of site works to project manager.

Monitor Project cost and provide project manager with timely identification

of deviations from project budget.

Identify problematic design issues and make recommendations for

alternative and cost effective re-design solutions.

Ensure the construction schedule is maintained.

Reports on changes and additions to contractual agreements by main

contractors, consultants, clients, suppliers and subcontractors.

Maintain accurate and detailed records are of all site activities.

Investigate damage, accidents, or delays at construction sites, to ensure

that proper procedures are being carried out.

In Syria:

15/2/2007 – 21/8/2008:

Company: Drinking water establishment in Homs

Project and it's description:

1. Al-Hazza village Feeding project with drinking water, which included

the addition to the drinking water network implement a ground water

reservoir, guard buildings and the perimeter fence and pumping

rooms.

2. Implementation of pumping water line of / 300 mm / diameter and /11

km/ length from pumping station in Hesyaa city to higher reservoir

near the village of the Sadad.

Position: Chairman of the oversight committee

Page 6: Curriculum Vitae end to start 19-7-2016

6

Scoop of work:

Save project files and documents with the classification and arrangement.

Receipt of two copies of the contract documents (the contract - general and

special conditions - Specifications - BOQ) and a copy is saved in a special

file, and the other version at the project site.

Participate in the site delivery committee to the contractor on schedule and

prepare the record on the form prepared for that.

Technical knowledge of a contractor and make sure the qualifications and

experience of the scientific process and then adoption.

Follow up the setting up of the implementation schedule of the contractor to

study it and make any notes on it (if any).

Follow up Contractor's Equipment used for work after the verification and

approval of efficiency.

Follow up the work of leveling network and in the presence of retinal

engineer or surveyor before starting work.

Follow up tests of the soil.

Study the (SHOP DRAWINGS) of the various parts of the project and

comment upon (if any) and propose appropriate amendments and approval.

Review and matching architectural plans at all other schemes and review

the quantities mentioned in the contract with charts and modify what it

takes.

Planning and overall supervision and development of programs and policies

in order to avoid any delay in the completion of the project.

Overseeing the implementation of the project at various stages in

accordance with the conditions, specifications and drawings.

Coordination between the contractor and the employer.

Follow up the implementation schedule and updated.

Give permission for the work of casting yet ready after make sure they

conform to specifications.

Lifting the administrative point of any irregularities or problems occur during

implementation.

Give the orders to the contractor to remove any acts of violation and re-

implemented according to plans and specifications.

Follow up the Contractor to provide samples and catalogs before supply of

materials sufficiently in advance to allow a study of the right ones according

to the contract and conformity with the conditions and specifications.

Adoption of daily reports and stomach knowing observer and lifted to the

director of administration and save a copy of the file of the project.

Preparation of periodic reports on the project and submit it to the Director of

Administration and save a copy of the file of the project.

Page 7: Curriculum Vitae end to start 19-7-2016

7

Preparation book site conditions and record daily notes it, and notice the

contractor in writing of any Notes.

Preview Procurement and make sure they conform to the approved

samples and stored in the appropriate places and the right way.

Overseeing quality control programs and conduct experiments on materials

and work to verify the quality and conformity to specifications.

Contractor guidance and advice and technical advice that help him

complete the project at the required level and in the time when the work

requires it.

Contractor direct manner the correct execution and warned of errors before

the fall when so requested.

Observation Contractor artistic device and its employment and verification

of competence and sufficiency of doing works.

Observation contractor equipment and compare the statements which

made himself and check the efficiency of doing works.

Monitor subcontractors and check their competence when so requested.

Directing the assistant team (of observers - Surveyors ...... etc.) and define

the role and functions of each of them.

Weekly meetings with a contractor to study the progress of work and to find

appropriate solutions to any problems or obstacles may appear during

execution.

Review executed quantities calculation step by step.

Study and evaluate the needs of the change and the development of

business items and preparing orders so special, and review the implications

of the amendments in the specification and drawings, and evaluation of the

contractor's prices and opinion in preparation for approval, taking into

account the application of value engineering methods.

Review and audit the payments due to the contractor.

Prepare the minutes of the preview at the end of the implementation period

of the business.

Supervision of the operating tests.

Participate in the work of primary receipt.

Review final quantities calculations.

Review and audit by implementation plans (AS BUILT DRAWINGS).

Final payment preparation.

Participate in the work of final acceptance.

Page 8: Curriculum Vitae end to start 19-7-2016

8

1/3/2006 – 1/3/2007:

Company: Drinking water establishment in Homs

Project and it's description:

1. Feeding the village of Nasiriyah included drinking water reservoir high

altitudes / 16 m / Capacity / 150 m3 /, water network in the village with a

total length / 25 km /.

2. Construction project of a municipal building in the village of Al-Forqulos

which consist of three roles in addition of the replacement of the water

network in the village with the expansion of the network.

Position: Chairman of the oversight committee

Scoop of work:

The same work of 2007 - 2008 projects.

15/1/2005 - 15/6/2006:

Company: Drinking water establishment in Homs

Project and it's description:

1. Construction project of a pumping station for drinking water in the village

of Futtaim Al-Aernouk with the creation of a ground reservoir capacity of

500 m3 of three pools with the extension of the water network in the

village.

2. Construction project of a municipal building in Arraudah village with a

pumping station for drinking water including electricity rooms, a high-rise

tank / 9 m height / with a capacity of /100 m3/ and the extension of the

new water network in the village.

Position: Chairman of the oversight committee

Scoop of work:

The same work of 2007 - 2008 projects.

1/2/2004 - 30/11/2004:

Company: Dar Aleemar contracting

Project and it's description:

Implementing of concrete works for a commercial building consisting of six

floors and a floor area of 600 m 2 in the city of Homs.

Position: Site engineer

Page 9: Curriculum Vitae end to start 19-7-2016

9

Scoop of work:

Study of the project contract, the terms and conditions of the

implementation of business and plans.

Design and the adoption of concrete mix to be used.

Secure samples of all the materials used and approved by the Owner.

Surveying work for the entire site and draw his retina levels.

Calculate the amount of drilling or backfill according to the retina and the

levels of design.

Topography install of the building accurately.

Follow up all the concrete work of the all elements in the building, starting

with the work of the wood to the steel, ending with the casting and concrete

curing.

Calculate the quantities of each executed work directly.

Lifting weekly reports about the work to the construction manager.

2/1/2001 – 30/1/2003:

Company: Drinking water establishment in Homs

Project and it's description:

New building of drinking water establishment: construction project which

consisted of basement and six floors.

Position: Site engineer

Scoop of work:

Study of the project contract, the terms and conditions of the

implementation of business and plans.

Design and the adoption of concrete mix to be used.

Secure samples of all the materials used and approved by the Owner.

Surveying work for the entire site and draw his retina levels.

Calculate the amount of drilling or backfill according to the retina and the

levels of design.

Topography install of the building accurately.

Follow up all the concrete work of the all elements in the building, starting

with the work of the wood to the steel, ending with the casting and concrete

curing.

Calculate the quantities of each executed work directly.

Lifting weekly reports about the work to the construction manager.

Page 10: Curriculum Vitae end to start 19-7-2016

11

1/11/1998 – 25/12/2000:

I had worked as designer and executive engineer of some soldier's dormitories and

buildings during my military service.

15/9/1997 – 22/8/1998:

I had worked as supervisor of some soil works in Zeta dam project, like fill,

compaction, and cement injection. But not more than some months because I

started anther work in Drinking Water establishment.

1997:

I had made a structural study of Concorde Hotel in Deir al-Zour city as graduation

project. The building consisted of three blocks construction permitting, separated by

commas extended. The three blocks are different in elevations, included different

types of structural elements. The obtained on this project 98% mark.

Eng. Ayman Issa

Page 11: Curriculum Vitae end to start 19-7-2016

11

Page 12: Curriculum Vitae end to start 19-7-2016

12

Page 13: Curriculum Vitae end to start 19-7-2016

13

Page 14: Curriculum Vitae end to start 19-7-2016

14

Page 15: Curriculum Vitae end to start 19-7-2016

15