Upload
others
View
4
Download
0
Embed Size (px)
Citation preview
SAARINEN CIRCLE
PROPELLER COURT MAIN TERMINAL
DAILY GARAGE 1
DA
ILY
GA
RA
GE
2
AU
TO
PIL
OT
DR
IVE
DULLES ACCESS ROAD
COCKPIT COURT
AR
IAN
E W
AY
RUDDER ROAD
3
4
DU
LLES T
OLL R
OAD (267)
RUDDER ROAD
CA
RG
O D
RIV
E
SU
LLY
RO
AD
SU
LLY
RO
AD
WIN
DS
OC
K D
RIV
E
AVIATION DRIVE
COMMERCIAL DRIVE
DU
LL
ES
AC
CE
SS
RO
AD
DU
LLES
AC
CE
SS
RO
AD
XX
13
24
OVERFLOWCONTRACTORSTAGING &PARKING AREA
AIRSIDE ACCESSTHROUGH GATE 118VIA RUDDER ROAD
LANDSIDE ACCESSVIA AVIATION DRIVE
ACCESS ROUTE TOOVERFLOWCONTRACTORPARKING
AOA ACCESSGATE 118
CARGOBUILDINGS 3 + 4
CARGOBUILDINGS 1 + 2
ALSO SEE SPECSECTION 007300
WAREHOUSE
CONTRACTORSTAGING AREASEE 2/GN02.0001COORD. FINALLOCATION W/ COTR
CA
RG
O D
RIV
E
AVIATION DR
BLD
G 1
BLD
G 2
BLD
G 3
BLD
G 4
CONTRACTORPARKING AREA
A101
1SIM
0
1
A101
SIM
CALLOUT REFERENCE
BUILDING, WALL, OR DETAILSECTION REFERENCE
GRID LINE
LEVEL
SPOT ELEVATION
LEVEL NAME
0' - 0"
0' - 0"
1
A303 EXTERIOR ELEVATION
DETAIL REFERENCEA101
1SIM
MATCHLINE
/MATCHLINE: 1 A101
REVISION
1
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
0 500 1000 5000 0 50 100 200 500
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:41:0
7 P
M
As indicated
DRAWING INDEX, GENERALNOTES, LOCATION MAP
GN01.0001
RDHRCY
1 : 7200AR06.0001 GN01.0001
1 LOCATION AND ACCESS PLAN
1" = 200'-0"AR06.0001 GN01.0001
2 SITE KEY PLAN
SHEET NO. SHEET NAME SHEET TITLE
1 OF 33 GN00.0001 COVER SHEET 2 OF 33 GN01.0001 DRAWING INDEX, GENERAL NOTES, LOCATION MAP 3 OF 33 GN02.0001 WORK PLAN PARAMETERS
4 OF 33 ST00.0001 GENERAL STRUCTURAL NOTES, ABBREVIATIONS AND LEGEND
5 OF 33 AR00.0002 LAYOUT PLANS 6 OF 33 AR02.0001 DEMO ROOF PLAN - BLDGS 1 + 2 7 OF 33 AR02.0002 DEMO ROOF PLAN - BLDGS 3 + 4 8 OF 33 AR03.0001 FIRST FLOOR PLAN - BUILDINGS 1 + 2 9 OF 33 AR03.0002 FIRST FLOOR PLAN - BUILDINGS 3 + 410 OF 33 AR03.0003 ROOF PLAN - BUILDING 111 OF 33 AR03.0004 ROOF PLAN - BUILDING 212 OF 33 AR03.0005 ROOF PLAN - BUILDING 313 OF 33 AR03.0006 ROOF PLAN - BUILDING 414 OF 33 AR06.0001 ENLARGED PLANS AND SECTIONS15 OF 33 AR06.0002 ELEVATIONS16 OF 33 AR08.0001 DETAILS
17 OF 33 EL00.0001 ELECTRICAL - SYMBOLS, NOTES, AND ABBREVIATIONS18 OF 33 EL01.0001 EXISTING ELECTRICAL FLOOR PLANS - BUILDINGS 1, 2, 3, & 419 OF 33 EL02.0001 DEMOLITION ROOF PLAN - BUILDING 120 OF 33 EL02.0002 DEMOLITION ROOF PLAN - BUILDING 221 OF 33 EL02.0003 DEMOLITION ROOF PLAN - BUILDING 322 OF 33 EL02.0004 DEMOLITION ROOF PLAN - BUILDING 423 OF 33 EL03.0001 REFLECTED LIGHTING PLAN - BUILDING 124 OF 33 EL03.0002 REFLECTED LIGHTING PLAN - BUILDING 225 OF 33 EL03.0003 REFLECTED LIGHTING PLAN - BUILDING 326 OF 33 EL03.0004 REFLECTED LIGHTING PLAN - BUILDING 427 OF 33 EL07.0001 SCHEDULES
ABV ABOVEAD AREA DRAINAFF ABOVE FINISHED FLOORALUM ALUMINUMANOD ANODIZEDAOA AIRPORT OPERATIONS AREAAPPROX APPROXIMATELYARCH ARCHITECTURALBM BEAMBLK'G BLOCKINGBLDG BUILDINGBO BOTTOM OFBOT BOTTOMBYND BEYONDCHAN/CHNL CHANNELCJ CONTROL JOINTCFMF COLD-FORMED METAL FRAMINGCLR CLEARCOL COLUMNCONC CONCRETECONT CONTINUOUSCOTR CONTRACTING OFFICER TECHNICAL REPRESENTATIVECU CONDENSING UNITDBL DOUBLEDIA DIAMETERDIM(S) DIMENSION(S)DN DOWNDR DOORDTL DETAILDWGS DRAWINGSEA EACHEL ELEVATIONELEC ELECTRICALEOS EDGE OF SLABEQUIP EQUIPMENTEXIST/EXIST'G EXISTINGEXP JT EXPANSION JOINTFND FOUNDATIONFIN FINISHFIXT FIXTUREFD FLOOR DRAINFLR FLOORFRMG FRAMINGFRT FIRE RETARDANT TREATEDGA GAUGEGALV GALVANIZEDHORIZ HORIZONTALHP HIGH POINTHR HOURHT HEIGHTINFO INFORMATIONINSUL INSULATION/ INSULATEDINT INTERIORLVR LOUVERMACH MACHINEMAT'L MATERIALMAX MAXIMUMMECH MECHANICALMEP MECHANICAL, ELECTRICAL, PLUMBINGMIN MINIMUMMIR MIRRORMO MASONRY OPENINGMTD MOUNTEDMTL METALN/A NOT APPLICABLENIC NOT IN CONTRACTNO NUMBERNTS NOT TO SCALEOC ON CENTEROD OVERFLOW DRAINOH OPPOSITE HANDOHD OVERHEAD DOORPLUMB. PLUMBINGPLWD, PLYWD PLYWOODPT PRESSURE TREATEDPTD PAINTEDRCP(S) REFLECTED CEILING PLAN(S)REQD REQUIREDRD ROOF DRAINRF ROOFRM ROOMRTU ROOF TOP UNITRWC RAINWATER CONDUCTORSIM SIMILARSOH SIMILAR OPPOSITE HANDSPEC SPECIFIEDSPK SPRINKLERSTL STEELSTOR STORAGESTRUCT STRUCTURALSUSP SUSPENDEDSYS SYSTEMTHK THICKTO TOP OFTOC TOP OF CONCRETETOS TOP OF STEELTYP TYPICALUNO UNLESS NOTED OTHERWISEUL UNDERWRITER LABORATORYVERT VERTICALVIF VERIFY IN FIELDVP VISION PANELW/ WITHWD WOODW/O WITHOUTWP WEATHERPROOFWPFG WATERPROOFING
ABBREVIATIONS SYMBOLS
DRAWING LIST GENERAL NOTES
ENVIRONMENTAL WORK NOTES:
1.1 THE CONTRACTOR SHALL REFERENCE THE PART B ENVIRONMENTALDOCUMENTS FOR THE REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING ROOFING MATERIAL.
1.2 ALL PAINTED SURFACES ARE ASSUMED TO CONTAIN LEAD-BASEDPAINT. THE CONTRACTOR SHALL MAINTAIN THE NECESSARY HEALTH ANDSAFETY REQUIREMENTS FOR ALL PERSONNEL IN ACCORDANCE WITHOSHA REGULATIONS TO WORK IN THESE CONDITIONS. CONTRACTOR AIRMONITORING ACTIVITIES AND EMPLOYEE PROTECTION AND MONITORING ISPART OF THIS CONTRACT. NO ADDITIONAL PAYMENT WILL BE MADE FORDEMOLITION OR RENOVATION WORK THAT DISTURBS LEAD-BASED PAINTEDSURFACES. THE CONTRACTOR SHALL COMPLY WITH THE OSHA LEADCONSTRUCTION STANDARD 29 CFR 1926.62. THE CONTRACTOR SHALLREFERENCE THE PART B ENVIRONMENTAL DOCUMENTS FORADDITIONAL LEAD-BASED PAINT REQUIREMENTS.
1.3 THE CONTRACTOR IS RESPONSIBLE FOR REMOVING, STORING,TRANSPORTING, AND RECYCLING ALL FLUORESCENT LIGHT TUBESENCOUNTERED DURING THIS PROJECT. THE BULBS SHALL BE REMOVEDAND STORED INTACT. CRUSHING OR BREAKING BULBS IS STRICTLYPROHIBITED. THE TRANSPORTER AND RECYCLING FACILITY SHALL BEAPPROVED BY THE COTR PRIOR TO THE START OF WORK.
1.4 THE CONTRACTOR SHALL BE RESPONSIBLE FOR VISUALLY INSPECTING ALLLIGHT BALLASTS FOR THE PRESENCE OF PCBs. THE BALLASTS AREASSUMED TO CONTAIN PCBs UNLESS THEY ARE LABELED "NO PCBs". ALLPCB-CONTAINING LIGHT BALLASTS SHALL BE STORED AND LABELED INACCORDANCE WITH 40 CFR 761. THE CONTRACTOR SHALL BERESPONSIBLE FOR REMOVING, STORING, AND RECYCLING THE PCB-CONTAINING LIGHT BALLASTS. THE TRANSPORTER AND RECYCLINGFACILITY SHALL BE APPROVED BY THE COTR PRIOR TO THE START OFWORK.
1.5 ALL SCRAP METAL/STEEL COATED WITH LEAD-BASED PAINT SHALL BERECYCLED AT A FACILITY CAPABLE OF ACCEPTING THIS MATERIAL. THECONTRACTOR SHALL OBTAIN APPROVAL FROM THE RECYCLING FACILITYPRIOR TO STARTING ANY DEMOLITION ACTIVITIES. THE PROPOSEDRECYCLING FACILITY AND APPROVAL LETTER SHALL BE SUBMITTED TO THECOTR FOR APPROVAL.
28 OF 33 PL00.0001 PLUMBING - SYMBOLS, NOTES AND ABBREVIATIONS29 OF 33 PL03.0001 FIRST FLOOR PLAN - BUILDING 130 OF 33 PL03.0002 FIRST FLOOR PLAN - BUILDING 231 OF 33 PL03.0003 FIRST FLOOR PLAN - BUILDING 332 OF 33 PL03.0004 FIRST FLOOR PLAN - BUILDING 433 OF 33 PL07.0001 STORM WATER RISER DIAGRAMS AND DETAILS
CONTRACTOR ACCESS, HAUL ROUTE AND STAGING NOTES:
4.1 THE CONTRACTOR STAGING AREA IS AVAILABLE AS SHOWNON THE DRAWING.
4.2 GATE 118 SHALL BE THE ACCESS POINT FOR ALL AOACONSTRUCTION TRAFFIC. ACCESS VIA OTHER AOA GATESIS PROHIBITED, UNLESS OTHERWISE APPROVED BY THECONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE.(COTR).
4.3 THE CONTRACTOR’S EMPLOYEES SHALL PARK IN THEDESIGNATED PARKING CONTRACTOR’S STAGING AREAS.PERSONAL VEHICLES ARE NOT PERMITTED IN THE AOA.
4.4 THE CONTRACTOR SHALL BE RESPONSIBLE TO PROVIDEEMPLOYEE TRANSPORTATION BETWEEN THE WORK SITEAND STAGING AREAS IF NECESSARY.
4.5 ALL CONSTRUCTION TRAFFIC SHALL TRAVEL ON THE ROUTESINDICATED ON THIS DRAWING OR AS APPROVED BY THEAIRPORT OPERATIONS.
4.6 AIRPORT EMERGENCY VEHICLES MUST HAVEUNRESTRICTED USE OF THE EXISTING ON-SITE HAULROUTES AT ALL TIMES; THE CONTRACTOR USE OF THEONSITE HAUL ROUTE SHALL BE SUCH THAT THE EMERGENCYRESPONSE VEHICLES CAN OPERATE ON THESE ROADSWITHOUT DELAYS TO THE EMERGENCY RESPONSE TIME.
4.7 THERE SHALL BE NO ACCESS TO ACTIVE AIRFIELDPAVEMENT. CONTRACTOR SHALL STAY WITHIN THECONSTRUCTION WORK AREAS.
4.8 UNLESS NOTED OTHERWISE, ALL CONTRACTOR EQUIPMENTMUST BE TAKEN BACK TO THE STAGING AREA UPON THECOMPLETION OF WORK EACH DAY.
4.9 CONTRACTORS ARE RESPONSIBLE FOR SECURING THEIREQUIPMENT, MATERIALS, AND VEHICLES.
SAFETY NOTES:
3.1 FOR PURPOSES OF THIS PROJECT, THE AIR OPERATIONS AREA (AOA) SHALL BEALL AIRPORT PROPERTY ACCESSED VIA GATES 118 AND INSIDE THE CARGOBUILDING LANDSIDE WALL.
3.2 EACH PERSON ENTERING THE AOA OF THE AIRPORT IS REQUIRED TO CARRY ANAIRPORT IDENTIFICATION BADGE ISSUED BY THE AUTHORITY AUTHORIZING ACCESSTO THE AOA, OR TO BE ESCORTED AT ALL TIMES BY A PERSON CARRYING ANAUTHORITY-ISSUED ESCORT BADGE.
3.3 VEHICLES AND PERSONS ENTERING THE AOA ARE SUBJECT TO SEARCH ANDINSPECTION PRIOR TO ENTERING. CONTRACTORS ARE EXPECTED TO FAMILIARIZETHEMSELVES WITH AND COMPLY WITH THESE PROCEDURES.
3.4 VEHICLES ENTERING THE SIDA MUST DISPLAY ALL NECESSARY IDENTIFICATIONMATERIALS OUTLINED IN THE AUTHORITY’S ORDERS AND INSTRUCTIONS. NO. 3- 2-2AAND AN AUTHORITY-ISSUED STICKER AUTHORIZING THE VEHICLE FOR USE WITHIN THESIDA. ONLY PERSONS HOLDING VALID SIDA DRIVER’S PERMITS MAY DRIVEUNESCORTED WITHIN THE SIDA. UNAUTHORIZED VEHICLES MAY ENTER ONLY UNDERESCORT FROM AUTHORIZED VEHICLES.
3.5 FAILURE TO COMPLY WITH THESE RULES IS GROUNDS FOR IMMEDIATE REMOVALFROM THE AIRPORT AND FURTHER DISCIPLINARY ACTION.
3.6 AIRPORT BULLETIN IAD 4/8.1 REQUIRES ALL VEHICLE DELIVERIES TO BECOORDINATED IN ADVANCE WITH THE COTR, SO THAT THE GATE GUARDS MAY BENOTIFIED. VEHICLE OPERATORS MUST HAVE IN THEIR POSSESSION A COMMERCIALMANIFEST IDENTIFYING THE CONTENTS OF THE VEHICLE AND/OR TRAILER WHENARRIVING AT THE AOA GATE.
3.7 REQUESTS FOR EXCEPTIONS TO THE POLICIES AND PROCEDURES OF THISDOCUMENT SHALL BE COORDINATED IN ADVANCE THROUGH THE COTR.
3.8 SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
GENERAL CONSTRUCTION NOTES:
2.1 THIS PROJECT SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS.THE PROJECT IS SUBJECT TO INSPECTION BY REPRESENTATIVES OF THE METROPOLITANWASHINGTON AIRPORTS AUTHORITY (THE AUTHORITY) REPRESENTATIVES OF THE VIRGINIADEPARTMENT OF ENVIRONMENTAL QUALITY, AND THE VIRGINIA DEPARTMENT ON CONSERVATIONAND RECREATION. THE CONTRACTOR SHALL PROVIDE UNRESTRICTED ACCESS TO THE SITE FORINSPECTION PURPOSES DURING THE ENTIRE CONSTRUCTION PERIOD.
2.2 CONTRACTOR ACCESS TO THE WORK SITE SHALL BE AS SHOWN ON SHEET GN01.0001 UNLESSOTHERWISE APPROVED BY THE COTR. THE CONTRACTOR SHALL AT ALL TIMES ENSURE AGAINSTUNAUTHORIZED ENTRY OR ACCESS TO THE SECURE AREAS OF THE AIRFIELD
2.3 ALL CONTRACTOR SUBCONTRACTOR PERSONNEL, VEHICLES, EQUIPMENT, AND OTHER MATERIALSSHALL REMAIN WITHIN THE LIMITS OF CONSTRUCTION AND WITHIN THE SITE ACCESS AND HAULROUTES DESIGNATED ON THE PLANS.
2.4 ALL MATERIAL AND EQUIPMENT, WHEN NOT IN USE, SHALL BE RESTORED OR PARKED IN THECONTRACTOR STAGING AREAS, AND SHALL NOT INTERFERE WITH AIRPORTS OPERATIONS. STAGINGAREA LOCATION IS SHOWN ON SHEET GN02.0001.
2.5 IT SHALL BE THE CONTRACTOR’S RESPONSIBILITY TO COORDINATE OFFAIRPORT HAUL ROUTESWITH THE APPROPRIATE AUTHORITIES. ON-AIRPORT HAULING SHALL NOT INTERFERE WITH AIRPORTOPERATIONS.
2.6 CONTRACTOR TO VERIFY LOCATION OF THE EXISTING UTILITIES PRIOR TO COMMENCEMENT OFWORK. IF ANY OF THE EXISTING UTILITIES CONFLICT WITH THE PROPOSED WORK SHOWN ON THEDRAWINGS, THE CONTRACTOR SHALL NOTIFY THE COTR IMMEDIATELY TO EXPEDITE RESOLUTION.
2.7 THE CONTRACTOR SHALL RESTORE ALL AREAS DISTURBED DURING THE PROJECT TO ORIGINALCONDITION. THESE AREAS INCLUDE, BUT ARE NOT LIMITED TO, THE STAGING AREA, WORK AREAS,AND ANY ACCESS ROADS.
2.8 ALL WORK, MOVEMENT, AND PARKING OF EQUIPMENT SHALL, IN ADDITION TO THE REQUIREMENTSOF THESE SPECIFICATIONS AND ORDERS OF THE CONTRACTING OFFICER, BE IN ACCORDANCE WITHTHE REQUIREMENTS OF THE METROPOLITAN WASHINGTON AIRPORTS AUTHORITY CONSTRUCTIONSAFETYMANUAL.
2.9 PROJECT LIMITS ARE LOCATED PARTIALLY WITHIN THE AIR OPERATION AREA (AOA). POSSESSIONAND DISPLAY OF PROPER AND CURRENT AIRPORT IDENTIFICATION BADGE IS REQUIRED FOR ALLCONTRACTOR PERSONAL ENTERING THE AOA OR ON THE LANDSIDE CANOPY. REFER TO SECTION007300 FOR ADDITIONAL REQUIREMENTS.
2.10 GENERAL CONTRACTOR IS RESPONSIBLE FOR OBTAINING A SINGLE PERMIT THROUGH THE COTR
2
CJR
- 2009 UNIFORM STATEWIDE BUILDING CODE (USBC) VIGINIA- 2009 INTERNATIONAL BUILDING CODE (IBC)- 2009 INTERNATIONAL PLUMBING CODE- 2009 INTERNATIONAL MECHANICAL CODE- 2009 NFPA 70; NATIONAL ELECTRIC CODE (NEC)- 2009 INTERNATIONAL PRIVATE SEWAGE DISPOSAL CODE- 2009 CABO A117.1, ACCESSIBLE AND USABLE BUILDING AND FACILITIES- ALSO SEE SPECS FOR ADDITIONAL CONSTRUCTION REFERENCES
APPLICABLE DESIGN CODES AND STANDARDS
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
2.11 ALL REFERENCES TO 'ADD ALTERNATE' SIGNIFIES 'OPTION'
1.1 1.5 1.9 1.13
A
D
1.17 2.3 2.7 2.11 2.15 2.19 3.1
BUILDING 1 BUILDING 2AIRSIDE
LANDSIDE
AIRSIDE
LANDSIDE
BE
LL
AT
LA
NT
IC
VACANT DULLES DUTYFREE
AIRSERV GSI USPS SPECIAL OPS UNIT- VIRGINIA STATE
POLICE
TUG TECH/ SOUTH-
WEST GSEMAINT.
JET BLUE AMERICANAIRLINES
JET BLUE UPS JOHN S. CONNOR
SW
ISS
PO
RT
FU
EL
ING
UPS SUPPLYCHAIN
AIR WISCONSIN DELTAGLOBAL
SERVICES
RE
ST
RO
OM
S
BAY42
BAY41
BAY46
BAY44
BAY43
BAY45
BAY50
BAY48
BAY47
BAY49
BAY54
BAY52
BAY51
BAY53
BAY57
BAY55B
BAY56
BAY62
BAY60
BAY59
BAY61
BAY66
BAY64
BAY63
BAY65
BAY68
BAY67
BAY69
BAY58
BAY70
BAY71
BAY36
BAY37
BAY38
BAY40
BAY39
BAY1
BAY2
BAY3
BAY4
BAY5
BAY6
BAY7
BAY8
BAY9
BAY10
BAY11
BAY12
BAY13
BAY14
BAY15
BAY16
BAY17
BAY18
BAY19
BAY20
BAY21
BAY22
BAY23
BAY24
BAY25
BAY26
BAY27
BAY28
BAY29
BAY30
BAY31
BAY32
BAY33
BAY34
BAY35
BAY55A
BUILDING3
AT WORK AREA: DO NOTBLOCK ACTIVE TENANTDOORS DURING INDIVIDUALTENANTS' BUSINESS HOURS
TEMPORARYBARRICADES AT ACTIVEWORK AREA ONLY,COORD WITH COTR
AOA BOUNDARY(EXISTING FENCE)
BASE BID: LANDSIDE CANOPY ROOF
ADD ALTERNATE NO. 1: AIRSIDE CANOPY ROOF
AOA BOUNDARY
EE
E EE
E E
RWCRWC
RWC
RWC
RWC
RWC
RWC RWC
RWC RWC
RWC
RWC
RWC
AOA BOUNDARY
VA
CA
NT
EDGE OF CANOPY
EDGE OF CANOPY
LANDSIDE
A
D
2.193.1 3.5 3.9 3.13 3.17 3.21 4.3 4.7 4.11 4.15 4.19
BUILDING 3 BUILDING 4AIRSIDE
LANDSIDE
AIRSIDE
LANDSIDE
DELTAAIRLINES
WORLDWIDEFLIGHT
SERVICES
SW
ISS
PO
RT
FU
EL
ING VISION
AIRLINES EXPRESS JET VACANT MWAAPIPEFITTERS
CAS AIRSCHOTT MWAAWAREHOUSE
STORAGE
VACANT SWISSPORTUSA
VACANT
BAY111
BAY113
BAY112
BAY115
BAY114
BAY117
BAY116
BAY119
BAY118
BAY121
BAY120
BAY123
BAY122
BAY125
BAY124
BAY127
BAY126
BAY129
BAY128
BAY131
BAY130
BAY133
BAY132
BAY135
BAY134
BAY137
BAY136
BAY139
BAY138
BAY141
BAY140
BAY143
BAY142
BAY145
BAY144
BAY147
BAY146
BAY149
BAY148
BAY151
BAY150
BAY73
BAY72
BAY75
BAY74
BAY77
BAY76
BAY79
BAY78
BAY81
BAY80
BAY83
BAY82
BAY85
BAY84
BAY87
BAY86
BAY89
BAY88
BAY91
BAY90
BAY93
BAY92
BAY95
BAY94
BAY97
BAY96
BAY99
BAY98
BAY101
BAY100
BAY103
BAY102
BAY105
BAY104
BAY107
BAY106
BAY109
BAY108
BAY110
BUILDING 2
TEMPORARY BARRICADES ATADJACENT/CONCURRENTSTAGING AREA, COORD WORKIN THIS AREA WITH COTR
AOA BOUNDARY(EXISTING FENCE)
ADD ALTERNATE NO. 2: AIRSIDE CANOPY ROOF
BASE BID: LANDSIDE CANOPY ROOFAOA BOUNDARY
E E
RWC
RWC
RWC
RWC
RWC
RWC
RWC
RWC RWC
RWC
E
RWC
RWC RWC
RWC
E
RWC
RWC
E
CONTRACTOR INTERIOROFFICE/STORAGE AREALOCATION SUBJECT TOCHANGE DURING THECOURSE OF THE PROJECT
90
' - 0
"
12 CONTRACTOR PARKING SPACES
CONTRACTORSTAGING AREA
10' - 0"
EDGE OF CANOPY
EDGE OF CANOPY
CONTRACTOR MATERIALSMUST BE KEPT 10 FEETFROM AOA SECURITYFENCE
COORD. FINALLOCATION WITHCOTR
AIRSIDE
AT WORK AREAS: DO NOTBLOCK ACTIVE TENANTDOORS DURING INDIVIDUALTENANTS' BUSINESS HOURS
TEMPORARY BARRICADESAT CURRENT WORK AREASONLY, COORD WITHTENANTS/COTR
0 5
101
20
40
0 5
101
20
40
BLOCKED/INOPERABLE
CONTINUOUSLY ACTIVE
TENANT-PROPOSEDACTIVE ALTERNATE
OVERHEADDOORLEGEND
SYMBOLSLEGEND
EXISTING RAINWATERCONDUCTOR
EXISTING ELEC PANEL
RWC
E
VDOT APPROVEDORANGE CONE ANDFLASHERS TYPE 3
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:41:1
1 P
M
1/32" = 1'-0"
WORK PLAN PARAMETERS
GN02.0001
RDHRCY
1/32" = 1'-0"AR06.0001 GN02.0001
1 PHASING PLANS - BUILDINGS 1 + 2
1/32" = 1'-0"AR06.0001 GN02.0001
2 PHASING PLANS - BUILDINGS 3 + 4
WORK AREA NOTES:
1. FINAL WORK PLAN SUBJECT TOREVIEW BY COTR
2. OVERHEAD DOOR INFORMATION ISFOR REFERENCE ONLY AND SHOULDBE RECONFIRMED IN FIELD
3. CONTRACTOR MUST COORDINATEWITH EACH TENANT AND THROUGHCOTR TO DEVELOP A WORK PLANTHAT DOES NOT IMPEDE TENANTACTIVITY
4. COORDINATE WORK AREA SO THATLANDSIDE AND AIRSIDE WORK DOESNOT OCCUR SIMULTANEOUSLY FOR AGIVEN TENANT
5. WORKERS ON LANDSIDE CANOPYROOF MUST BE BADGED.
6. ACCESS TO HIGH ROOF IS PROHIBITED
CONSTRUCTION WORK PLAN NOTES:
3.1 WORK SHALL COMMENCE AT LANDSIDE CANOPY ON CARGO BUILDING NO. 4. WORK ON LANDSIDEBUILDING NO. 4 NEW ROOF MUST BE WATERTIGHT PRIOR TO ROOFING AT LANDSIDE BUILDING NO. 1 AND 2.
3.2 CONFIRM EXISTING ELECTRICAL PANEL CIRCUITING, PLUMBING LOCATIONS AND DETAILS. TESTWIRING AS OUTLINED BY DOCUMENTS.
3.3 COORDINATE DETAIL WORK PLAN FOR GENERAL WORK AREAS, INCLUDING SAFETY MEASURES.
3.4 INSTALL TEMPORARY PROTECTION MEASURES APPROPRIATE FOR TYPE OF WORK BEINGPERFORMED.
3.5 PROVIDE TEMPORARY SIGNAGE, CAUTION TAPE, CONE, ETC. TO ALERT AND SAFEGUARD DRIVERS,BUILDING USERS AND THE PUBLIC AT ACTIVE WORK AREAS.
3.6 PERFORM DEMOLITION WORK AT ACTIVE DOORWAYS ONLY ONCE TEMPORARY PROTECTIONMEASURES ARE IN PLACE.
3.7 OFF-HOURS (10PM - 4:30AM) WORK SHALL BE ANTICIPATED FOR CONSTRUCTION WORK WHENPROPER PROTECTION OF OCCUPANTS, WORKERS, VEHICLES, OR DELIVERIES ARE PRACTICALLYINFEASIBLE. COORDINATE WITH TENANTS THROUGH COTR AT LEAST TWO WEEKS PRIOR TO THE START OFWORK.
3.8 CONTRACTOR IS RESPONSIBLE TO COORDINATE “PART B WORK” AS OUTLINED IN SPECIFICATIONS.
3.9 ACCESS FOR FIREFIGHTING MUST BE PROVIDED AT ALL TIMES.
3.10 AT LEAST ONE MAN DOOR SHALL BE MAINTAINED FOR ACCESS/EGRESS WHEN THE RELATEDSPACE IS OCCUPIED.
3.11 PROVIDE WEATHER PROTECTION OF EXISTING WORK TO REMAIN IMMEDIATELY UPON REMOVAL OFROOFING.
3.12 CONTRACTOR SHALL INSTALL VDOT APPROVED CONCRETE BARRIERS, VDOT APPROVED ORANGECHANNELIZER DRUMS, AND SIGNAGE AROUND THE LIMITS OF THE ACTIVE WORK AREA PRIOR TOCONSTRUCTION. TEMPORARY BARRICADES SHALL INCLUDE TYPE II BARRICADES AND ORANGE CONES.
3.13 CONTRACTOR SHALL MAINTAIN TWO LANES OF TRAFFIC AT PARKING LOT AT ALL TIMES.
3.14 SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
3.15 CONTRACTOR TO PROVIDE 2 WEEKS NOTICE TO COORDINATE WITH TENANTS THROUGH COTRTHROUGHOUT THE PROJECT
3.16 COORDINATE TEMPORARY DUMPSTER LOCATIONS WITH COTR
TENANT BAYS WORK DAYS TENANT WORK HOURS TENANT REQUESTED WORK RESTRICTIONS
BUILDINGS 1 + 2
BELL ATLANTIC 1 * * *VACANT 2-6 - - -DULLES DUTY FREE 7-13 MON-SAT 0600-1330 NO WORK 0430-2200AIRSERV 14-16 - 0900-1900 -GSI 17-20 - 0900-2300 -RESTROOMS 21 - - -USPS 22-25 ALL 0430-1800 NO WORK 0600-0900SPECIAL OPS UNIT VA STATE POLICE 26-30 * * *TUG TECHNOLOGIES 31-33 MON-FRI/SAT-SUN OPEN 24 HRS -JET BLUE 34-36 * * *AMERICAN AIRLINES 37-40 ALL 0430-1330 -JET BLUE 41-44 * * *UPS 45-50 MON-FRI/SAT-SUN 0400-2300/0500-1400 NO WORK 0430-0900 AND 1700-2300/0530-0930JOHN S. CONNOR 51-54 * * *SWISSPORT FUELING 55A-55B * * *UPS SUPPLY CHAIN 56-59 MON-FRI 0700-1800 NO WORK 0900-1400AIR WISCONSIN 60-67 * * *VACANT 68 - - -DELTA GLOBAL SERVICES 69-70 - 0430-2200 NO WORK 0430-2200
BUILDINGS 3 + 4
DELTA AIRLINES 72-74 * * *WORLDWIDE FLIGHT SERVICES 75-79 * * *SWISSPORT FUELING 80-81 * * *VISION AIRLINES 82-85 * * *EXPRESS JET 86-89 ALL 0630-0000 -VACANT 90-93 - - -MWAA PIPEFITTERS 94-97 * * *CAS 98-115 ALL 0700-2300 NO WORK PREFERRED 0700-2300 (MUST NOT FROM 1400-2000)AIRSCHOTT 116-119 MON-FRI 0800-1700 -MWAA WAREHOUSE STORAGE 120-131 - - -VACANT 132-141 - - -SWISSPORT USA 142-145 - 0230-2230 NO WORK 0230-2230VACANT 146-151 - -
3
CJR
* NO RESPONSEALL RESPONSES SUBJECT TO CHANGEALL TENANTS AND TENANT LOCATIONS ARE SUBJECT TO CHANGE
TENANT SURVEY CHART
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
1.1 1.5 1.9 1.13
A
D
1.17 2.3 2.7 2.11 2.15 2.19 3.1
9 17 25 33 41 49 56 64 71BAY72
BAY1
AR03.0003
1
AR03.00032
AR03.0004
1
AR03.0004
2
BUILDING 1 BUILDING 2
+/-
7'
+/-
61
'+
/- 7
'
AIRSIDE
LANDSIDE
50' - 0"
EDGE OFBUILDING 3
ADD ALTERNATE NO. 1: AIRSIDE CANOPY ROOF
BASE BID: LANDSIDE CANOPY ROOF
A
D
2.193.1 3.5 3.9 3.13 3.17 3.21 4.3 4.7 4.11 4.15 4.19
71BAY72 80 88 96 104 112 122 130 138 146 151
AR03.0005
1AR03.0005
2
AR03.0006
1
AR03.00032
BUILDING 3 BUILDING 4
AIRSIDE
LANDSIDE
50' - 0"
EDGE OFBUILDING 2
ADD ALTERNATE NO. 2: AIRSIDE CANOPY ROOF
BASE BID: LANDSIDE CANOPY ROOF
0 5
101
20
40
0 5
101
20
40
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:3
9 P
M
1/32" = 1'-0"
LAYOUT PLANS
AR00.0002
RDHRCY
1/32" = 1'-0"AR06.0001 AR00.0002
1 LAYOUT ROOF PLANS - BUILDINGS 1 + 2
1/32" = 1'-0"AR06.0001 AR00.0002
2 LAYOUT ROOF PLANS - BUILDINGS 3 + 4
5
CJR
NO ROOFING WORK IS ANTICIPATED ATHIGH/MAIN ROOF EXCEPT FOR DRAININSPECTIONS
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15
A
B
C
D
1.16 1.17 1.18 1.19 2.2 2.3
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
25' - 0" TYP
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
REMOVE EXISTING ROOFING, FLASHING,LIGHTING, AND SIGNAGE. COORDINATEINSPECTION OF EXISTING ROOF DECK, SOFFIT,AND CANOPY STEEL FRAMING WITH COTR.REMOVE DECK AND SOFFIT AS DETERMINEDWITH COTR AND REPLACE
BAY1
BAY2
BAY3
BAY4
BAY5
BAY6
BAY7
BAY8
BAY9
BAY10
BAY11
BAY12
BAY13
BAY14
BAY15
BAY16
BAY17
BAY18
BAY19
BAY20
BAY21
BAY22
BAY23
BAY24
BAY25
BAY26
BAY27
BAY28
BAY29
BAY30
BAY31
BAY32
BAY33
BAY34
BAY35
BAY36
BAY37
BAY38
BAY40
BAY39
3
AR02.0001
Sim
3
AR02.0001
Sim
CARGO BUILDING 1 AIRSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
CARGO BUILDING 1 LANDSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
TEMPORARILY REMOVE AND STOREEXISTING RTU OR ROOF MOUNTEDEQUIPMENT DURING CONSTRUCTION.REINSTALL WITH CURB DETAILS PERNRCA AS SOON AS ROOF WORK IN THEAREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIREPROJECT SCOPE/ON THE CANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIRE PROJECTSCOPE/ON THE CANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIRE PROJECTSCOPE/ON THE CANOPY ROOF)
AOA FENCE
PROVIDE PORTABLE ACUNIT TO MAINTAIN 78DEGREES IN COMM RM
A
B
C
D
2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
25' - 0" TYP
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
REMOVE EXISTING ROOFING, FLASHING, LIGHTING, ANDSIGNAGE. COORDINATE INSPECTION OF EXISTING ROOFDECK, SOFFIT, AND CANOPY STEEL FRAMING WITH COTR.REMOVE DECK AND SOFFIT AS DETERMINED WITH COTRAND REPLACE
BAY42
BAY41
BAY46
BAY44
BAY43
BAY45
BAY50
BAY48
BAY47
BAY49
BAY54
BAY52
BAY51
BAY53
BAY57
BAY55B
BAY56
BAY62
BAY60
BAY59
BAY61
BAY66
BAY64
BAY63
BAY65
BAY68
BAY67
BAY69
BAY58
BAY70
BAY71
3
AR02.0001
Sim
3
AR02.0001
Sim
CARGO BUILDING 2 AIRSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
CARGO BUILDING 2 LANDSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
TEMPORARILY REMOVE AND STOREEXISTING RTU OR ROOF MOUNTEDEQUIPMENT DURING CONSTRUCTION.REINSTALL WITH CURB DETAILS PER NRCAAS SOON AS ROOF WORK IN THE AREA ISCOMPLETE (TYPICAL ALL RTU/EQUIPMENTWITHIN THE ENTIRE PROJECT SCOPE/ONTHE CANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIREPROJECT SCOPE/ON THE CANOPY ROOF)
AOA FENCE
AOA FENCE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
D
TO Steel Canopy298' - 10"
REMOVE EXISTINGROOFING, FLASHING,ROOF EDGE, AND ROOFDRAINS
INSPECT AND REMOVEEXISTING METAL DECK (SEEPLANS FOR % OF REMOVAL)
EXISTING INSULATEDMETAL WALL PANEL
REMOVE FLASHINGAT INSULATEDMETAL PANEL
REMOVE EXISTINGLIGHTING FIXTURES
INSPECT AND REMOVE EXISTINGMETAL SOFFIT PANELS (SEE PLANSFOR % OF REMOVAL)
REMOVE EXISTINGLIGHTING AND SIGNAGE
COORDINATE INSPECTION OF EXISTING STEELCANOPY FRAMING WITH COTR.EXISTING TO REMAIN UNLESS COTR DETERMINESSTEEL IS FAILING
0 5 101 20 40
0 2'1'6"
0 5 101 20 40
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:4
2 P
M
As indicated
DEMO ROOF PLAN - BLDGS 1 + 2
AR02.0001
RDHRCY
1/16" = 1'-0"AR06.0001 AR02.0001
1 ROOF DEMO PLAN - BUILDING 1
1/16" = 1'-0"AR06.0001 AR02.0001
2 ROOF DEMO PLAN - BUILDING 2
1 1/2" = 1'-0"AR02.0001 AR02.0001
3 DEMOLITION CANOPY ROOF DETAIL
NOTES:
THE CONTRACTOR SHALL REFERENCE THE PART B ENVIRONMENTALSPECIFICATIONS AND PLANS FOR THE REMOVAL AND DISPOSAL OFASBESTOS-CONTAINING ROOFING MATERIAL, LEAD-BASED PAINT, LIGHTTUBES, AND LIGHT BALLAST REQUIREMENTS. ALL SCRAP STEEL/METAL SHALLBE RECYCLED AT A FACILITY PREAPPROVED BY THE COTR.
6
CJR
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCRA
No. 012713
DAVID NELSON SCHEUERMANN
A
B
C
D
3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
25' - 0" TYP 25' - 0" TYP
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
REMOVE EXISTING ROOFING, FLASHING,LIGHTING, AND SIGNAGE. COORDINATEINSPECTION OF EXISTING ROOF DECK,SOFFIT, AND CANOPY STEEL FRAMING WITHCOTR. REMOVE DECK AND SOFFIT ASDETERMINED WITH COTR AND REPLACE
BAY73
BAY72
BAY75
BAY74
BAY77
BAY76
BAY79
BAY78
BAY81
BAY80
BAY83
BAY82
BAY85
BAY84
BAY87
BAY86
BAY89
BAY88
BAY91
BAY90
BAY93
BAY92
BAY95
BAY94
BAY97
BAY96
BAY99
BAY98
BAY101
BAY100
BAY103
BAY102
BAY105
BAY104
BAY107
BAY106
BAY109
BAY108
BAY111
BAY110
3
AR02.0001
Sim
3
AR02.0001
Sim
CARGO BUILDING 3 AIRSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
CARGO BUILDING 3 LANDSIDEREPLACE 100% OF STEEL DECKINGREPLACE 100% OF SOFFIT
TEMPORARILY REMOVE AND STORE EXISTING RTUOR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURB DETAILSPER NRCA AS SOON AS ROOF WORK IN THE AREAIS COMPLETE (TYPICAL ALL RTU/EQUIPMENTWITHIN THE ENTIRE PROJECT SCOPE/ON THECANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTING RTUOR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURB DETAILSPER NRCA AS SOON AS ROOF WORK IN THE AREAIS COMPLETE (TYPICAL ALL RTU/EQUIPMENTWITHIN THE ENTIRE PROJECT SCOPE/ON THECANOPY ROOF)
8' -
0"
AOA FENCE
A
B
C
D
3.21 3.22 3.23 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"8
' - 0
"
25' - 0" TYP
REMOVE EXISTING ROOFING, FLASHING,LIGHTING, AND SIGNAGE. COORDINATEINSPECTION OF EXISTING ROOF DECK,SOFFIT, AND CANOPY STEEL FRAMING WITHCOTR. REMOVE DECK AND SOFFIT ASDETERMINED WITH COTR AND REPLACE
BAY113
BAY112
BAY115
BAY114
BAY117
BAY116
BAY119
BAY118
BAY121
BAY120
BAY123
BAY122
BAY125
BAY124
BAY127
BAY126
BAY129
BAY128
BAY131
BAY130
BAY133
BAY132
BAY135
BAY134
BAY137
BAY136
BAY139
BAY138
BAY141
BAY140
BAY143
BAY142
BAY145
BAY144
BAY147
BAY146
BAY149
BAY148
BAY151
BAY150
3
AR02.0001
Sim
3
AR02.0001
Sim
CARGO BUILDING 4 AIRSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
CARGO BUILDING 4 LANDSIDEREPLACE 25% OF STEEL DECKINGREPLACE 25% OF SOFFIT
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIREPROJECT SCOPE/ON THE CANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIREPROJECT SCOPE/ON THE CANOPY ROOF)
TEMPORARILY REMOVE AND STORE EXISTINGRTU OR ROOF MOUNTED EQUIPMENT DURINGCONSTRUCTION. REINSTALL WITH CURBDETAILS PER NRCA AS SOON AS ROOF WORKIN THE AREA IS COMPLETE (TYPICAL ALLRTU/EQUIPMENT WITHIN THE ENTIREPROJECT SCOPE/ON THE CANOPY ROOF)
AOA FENCE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
0 5 101 20 40
0 5 101 20 40
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:4
4 P
M
As indicated
DEMO ROOF PLAN - BLDGS 3 + 4
AR02.0002
RDHRCY
1/16" = 1'-0"AR06.0001 AR02.0002
1 ROOF DEMO PLAN - BUILDING 3
1/16" = 1'-0"AR06.0001 AR02.0002
2 ROOF DEMO PLAN - BUILDING 4
7
CJR
NOTES:
THE CONTRACTOR SHALL REFERENCE THE PART B ENVIRONMENTALSPECIFICATIONS AND PLANS FOR THE REMOVAL AND DISPOSAL OFASBESTOS-CONTAINING ROOFING MATERIAL, LEAD-BASED PAINT, LIGHTTUBES, AND LIGHT BALLAST REQUIREMENTS. ALL SCRAP STEEL/METAL SHALLBE RECYCLED AT A FACILITY PREAPPROVED BY THE COTR.
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCRA
No. 012713
DAVID NELSON SCHEUERMANN
UP
UP
UP
UP
UP
UP
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11 1.12 1.13 1.14 1.15
A
B
C
D
1.16 1.17 1.18 1.19
ATLANTIC
BELL VACANT DULLES DUTY FREE AIRSERVE GSI RESTROOM USPS SPECIAL OPS UNIT - VIRGINIA STATE POLICE
(SW GSE MAINT.)
TUG TECH JET BLUE
MA
TC
HLIN
E
MWAATELECOMROOM
SP
RIN
KL
ER
RM
FORMERELEC ROOM#2A
JAN
MENS
WOMENS
SWITCHGEAR/UTILITYROOM
SPRINKLERROOM
BAY36
BAY37
BAY1
BAY2
BAY3
BAY4
BAY5
BAY6
BAY7
BAY8
BAY9
BAY10
BAY11
BAY12
BAY13
BAY14
BAY15
BAY16
BAY17
BAY18
BAY19
BAY20
BAY21
BAY22
BAY23
BAY24
BAY25
BAY26
BAY27
BAY28
BAY29
BAY30
BAY31
BAY32
BAY33
BAY34
BAY35
1
1-A
1-B
1-C2 3
4 5
4-A 5-A
4-B 5-B
5-C
5-D
4-C
4-D
6 7 8 9 10 11
12
12-A
12-B
12-C
13 14 15 16 17 18
19
19-A
19-B
19-C
20-A
20-B
21
21-A
21-B
21-C
22-C
22
22-A
22-B
22-C23 24
25
25-A
26
26-A
26-B 26-C
26-D
26-E
27
27-A
28
28-A
29
29-A
30
30-A
30-B
31
31-A
31-B
32 33 34 35 36
37
37-A
37-B
38
38-A
38-B
38-C
A
B
C
D
1.19 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19
AMERICAN AIRLINES JET BLUE UPS JOHN S. CONNOR SWISSPORT FUELING UPS SUPPLY CHAIN AIR WISCONSIN DELTA GLOBAL SERVICES
MA
TC
HLIN
E
ELECTRICROOM
BAY42
BAY41
BAY46
BAY44
BAY43
BAY45
BAY50
BAY48
BAY47
BAY49
BAY54
BAY52
BAY51
BAY53
BAY57
BAY55B
BAY56
BAY62
BAY60
BAY59
BAY61
BAY66
BAY64
BAY63
BAY65
BAY68
BAY67
BAY69
BAY58
BAY70
BAY71
BAY36
BAY37
BAY38
BAY40
BAY39
BAY35
AR06.00013
35 36
37
37-A
37-B
38
38-A
38-B
38-C
39 40 41 42 43
44
44-A
44-B
45
45-A
45-B
45-C
45-D
46 47
46-A
46-B
46-C
48 49 50
51
51-A
51-B
53
54
53-A
55
55-A
55-B
55-C
55B
55B-A
55B-C
7170696867666564
63
63-A
63-B
62
6160
60-A5958
57
56
56-A
56-B
56-C57-A
56-D
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
0 5 101 20 40
0 5 101 20 40
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:4
7 P
M
As indicated
FIRST FLOOR PLAN - BUILDINGS1 + 2
AR03.0001
RDHRCY
1/16" = 1'-0"AR06.0001 AR03.0001
1 BUILDING 1 FIRST FLOOR LAYOUT PLAN
1/16" = 1'-0"AR06.0001 AR03.0001
2 BUILDING 2 FIRST FLOOR LAYOUT PLAN
8
CJR
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCRA
No. 012713
DAVID NELSON SCHEUERMANN
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
A
B
C
D
3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23
DELTA AIRLINES WORLDWIDE FLIGHT SERVICE SWISSPORT FUELING VISION AIRLINES EXPRESS JET ATLANTIC SOUTHEAST VACANT MWAA PIPEFITTERS MWAA PIPEFITTERS CAS
TELE
ELECROOM
MWAASPRINKLERROOM
BAY111
BAY113
BAY112
BAY115
BAY114
BAY117
BAY116
BAY73
BAY72
BAY75
BAY74
BAY77
BAY76
BAY79
BAY78
BAY81
BAY80
BAY83
BAY82
BAY85
BAY84
BAY87
BAY86
BAY89
BAY88
BAY91
BAY90
BAY93
BAY92
BAY95
BAY94
BAY97
BAY96
BAY99
BAY98
BAY101
BAY100
BAY103
BAY102
BAY105
BAY104
BAY107
BAY106
BAY109
BAY108
BAY110
72
72-A
72-B 73 74
75
75-A
75-B
75-C
75-D
76
76-A
77 78 79 80 81
81-A
82
82-A
82-B
82-C
83 84 85
86
86-A
86-B
87
87-A
88 89 90 91
92
92-A 93 94 95
96
97
97-A
96-A
96-B
97-B
98 99 100 101 102 103 104 105 106 107 108 109
109-A
110 111 112 113
114
114-A
115
115-A
115-B
115-C
116 117
A
B
C
D
3.23 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19
AIRSCHOTT MWAA WAREHOUSE STORAGE VACANT SWISSPORT USA VACANT
UTILITYROOM
UTILITYROOM
BAY115
BAY117
BAY116
BAY119
BAY118
BAY121
BAY120
BAY123
BAY122
BAY125
BAY124
BAY127
BAY126
BAY129
BAY128
BAY131
BAY130
BAY133
BAY132
BAY135
BAY134
BAY137
BAY136
BAY139
BAY138
BAY141
BAY140
BAY143
BAY142
BAY145
BAY144
BAY147
BAY146
BAY149
BAY148
BAY151
BAY150
114 115
115-A
115-B
115-C
116 117 118
119
119-A
119-B
119-C
119-D
118-A
118-B
120 121 122 123 124 125 126 127 128 129 130
131
131-A
132
132-A 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
0 5 101 20 40
0 5 101 20 40
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:5
0 P
M
As indicated
FIRST FLOOR PLAN - BUILDINGS3 + 4
AR03.0002
RDHRCY
1/16" = 1'-0"AR06.0001 AR03.0002
1 BUILDING 3 FIRST FLOOR LAYOUT PLAN
1/16" = 1'-0"AR06.0001 AR03.0002
2 BUILDING 4 FIRST FLOOR LAYOUT PLAN
9
CJRAI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 1.10 1.11
A
B
C
D
20
' - 0
"2
0' -
0"
20
' - 0
"
25' - 0" TYP
RD1A
RD1L
HP
HP
NET CRICKETSLOPE 1/2"/FTMIN, TYP
CRICKET HIGH POINT CANOPY ROOF SLOPE:1/2 / FT MIN, TYP
HP
HP
EXISTING RD @HIGH ROOF, TYP.
BAY1
BAY2
BAY3
BAY4
BAY5
BAY6
BAY7
BAY8
BAY9
BAY10
BAY11
BAY12
BAY13
BAY14
BAY15
BAY16
BAY17
BAY18
BAY19
BAY20
VIF
8' -
0"
VIF
8' -
0"
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD1A
OD1L
EXIST AOA FENCE
SIGN LIGHT FIXTURE
LIGHT FIXTURE
TY
P.
5'
1.11 1.12 1.13 1.14 1.15
A
B
C
D
1.16 1.17 1.18 1.19 2.2 2.3
20
' - 0
"2
0' -
0"
20
' - 0
"
25' - 0" TYP
RD3A
RD2A
RD3L
RD2L
HP
HP
SIM.AR06.0001
2
BAY21
BAY22
BAY23
BAY24
BAY25
BAY26
BAY27
BAY28
BAY29
BAY30
BAY31
BAY32
BAY33
BAY34
BAY35
BAY37
BAY38
BAY40
BAY39
BAY36
BAY41
VIF
8' -
0"
VIF
8' -
0"
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP. EXISTING RD @
HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD2A
OD2L
OD3A
OD3LC
AN
OP
Y
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
SIGN LIGHT FIXTURE
LIGHT FIXTURE
5'
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
0 8 161 24
0 8 161 24
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:5
3 P
M
As indicated
ROOF PLAN - BUILDING 1
AR03.0003
RDHRCY
1/8" = 1'-0"AR00.0002 AR03.0003
1 ROOF PLAN A
1/8" = 1'-0"AR00.0002 AR03.0003
2 ROOF PLAN B
10
CJR
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
A
B
C
D
2.13 2.14 2.15 2.16 2.17 2.18 2.19
20' -
0"
20' -
0"
20' -
0"
25' - 0" TYP
RD5A
RD6A
RD5L
RD6L
HP HP
HP HP
TYP.
AR06.0001
2BAY62
BAY60
BAY59
BAY61
BAY66
BAY64
BAY63
BAY65
BAY68
BAY67
BAY69
BAY70
BAY71
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD5A
OD5L
OD6L
OD6A
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
VIF
8' -
0"
VIF
8' -
0"
LIGHT FIXTURE
LIGHT FIXTURE SIGN
5'
EXISTING AOA FENCE
A
B
C
D
2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13
VIF
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
VIF
8' -
0"
25' - 0" TYP
RD4A
RD4L
HPHP
HPHP
BAY42
BAY41
BAY46
BAY44
BAY43
BAY45
BAY50
BAY48
BAY47
BAY49
BAY54
BAY52
BAY51
BAY53
BAY57
BAY55B
BAY56
BAY60
BAY59
BAY58
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD4L
OD4A
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
VIF
8' -
0"
VIF
8' -
0"
LIGHT FIXTURE
SIGN LIGHT FIXTURE
TY
P.
5'
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN LANDSIDE
AIRSIDE
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN LANDSIDE
AIRSIDE
0 8 161 24
0 8 161 24
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:5
5 P
M
As indicated
ROOF PLAN - BUILDING 2
AR03.0004
RDHRCY
1/8" = 1'-0"AR00.0002 AR03.0004
2 ROOF PLAN D
1/8" = 1'-0"AR00.0002 AR03.0004
1 ROOF PLAN C
CJR
11
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
A
B
C
D
3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11
VIF
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
VIF
8' -
0"
25' - 0" TYP
RD7A
RD8A
RD7L
RD8L
HP
HP
HP
HP HP
HP
BAY73
BAY72
BAY75
BAY74
BAY77
BAY76
BAY79
BAY78
BAY81
BAY80
BAY83
BAY82
BAY85
BAY84
BAY87
BAY86
BAY89
BAY88
BAY91
BAY90
BAY92
EXISTING RD @ HIGHROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @ HIGHROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING VENT EXISTING VENT EXISTING VENT EXISTING VENT EXISTING VENT
OD7L
OD8L
OD7A
OD8A
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
LIGHT FIXTURE
LIGHT FIXTURE SIGN
TY
P.
5'
EXISTING AOA FENCE
A
B
C
D
3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21
VIF
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
VIF
8' -
0"
25' - 0" TYP
RD9A
RD10A
RD9L
RD10L
HP
HP
AR06.00012
HP
HP HP
HP
BAY91
BAY93
BAY92
BAY95
BAY94
BAY97
BAY96
BAY99
BAY98
BAY101
BAY100
BAY103
BAY102
BAY105
BAY104
BAY107
BAY106
BAY109
BAY108
BAY111
BAY110
BAY112
SIM.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING VENT EXISTING VENT EXISTING VENT EXISTING VENT EXISTING VENT
OD9L
OD9A
OD10A
OD10L
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
LIGHT FIXTURE
LIGHT FIXTURE SIGN
5'
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN LANDSIDE
AIRSIDE
0 8 161 24
0 8 161 24
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:40:5
8 P
M
As indicated
ROOF PLAN - BUILDING 3
AR03.0005
RDHRCY
1/8" = 1'-0"AR00.0002 AR03.0005
1 ROOF PLAN E
1/8" = 1'-0"AR00.0002 AR03.0005
2 ROOF PLAN F
CJR
12
AI
NIG
RIV
FOHTLAEWN
OMMOC
TCETIHCRA
No. 012713
DAVID NELSON SCHEUERMANN
A
B
C
D
3.21 3.22 3.23 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9
VIF
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
VIF
8' -
0"
25' - 0" TYP
RD11A
RD11L
RD11A
RD11L
HP
HP
HP
HP
HP
HP
BAY112
BAY113
BAY115
BAY114
BAY117
BAY116
BAY119
BAY118
BAY121
BAY120
BAY123
BAY122
BAY125
BAY124
BAY127
BAY126
BAY129
BAY128
BAY131
BAY130
BAY132
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD11A
OD11A
OD11L OD
11L
CA
NO
PY
AC
CE
S R
ES
TR
ICT
ED
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
LIGHT FIXTURE
LIGHT FIXTURE SIGN
TY
P.
5'
A
B
C
D
4.9 4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19
VIF
8' -
0"
20
' - 0
"2
0' -
0"
20
' - 0
"
VIF
8' -
0"
25' - 0" TYP
RD12A
RD13A
RD12L
RD13L
HP
HP
SIM.
AR06.0001
2
HP
HP
HP
HP
BAY133
BAY132
BAY135
BAY134
BAY137
BAY136
BAY139
BAY138
BAY141
BAY140
BAY143
BAY142
BAY145
BAY144
BAY147
BAY146
BAY149
BAY148
BAY151
BAY150
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
EXISTING RD @HIGH ROOF, TYP.
OD12A
OD13A
OD12L
OD13L
CA
NO
PY
AC
CE
SS
RE
ST
RIC
TE
D
HIG
H R
OO
F N
OT
IN
CO
NT
RA
CT
, T
YP
.C
AN
OP
Y
EXIST AOA FENCE
LIGHT FIXTURE
SIGN LIGHT FIXTURE
5'
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
NNO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLANLANDSIDE
AIRSIDE
0 8 161 24
0 8 161 24
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:41:0
0 P
M
As indicated
ROOF PLAN - BUILDING 4
AR03.0006
RDHRCY
1/8" = 1'-0"AR00.0002 AR03.0006
1 ROOF PLAN G
1/8" = 1'-0"AR06.0001 AR03.0006
2 ROOF PLAN H
CJR
13
AINIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
First Floor286' - 0"
TO Steel Roof306' - 8"
ABCD
TO Steel Canopy298' - 10"
AR08.00011
AR08.0001
1Sim
OVERHEAD DOORTRACKS (TYP)
OVERHEAD DOORTRACKS (TYP)
AIRSIDE
LANDSIDE
OVERFLOW RWC TO BE PAINTED WITH AHIGH PERFORMANCE COATING SYSTEMOVERFLOW RWC TO BE PAINTED
WITH A HIGH PERFORMANCECOATING SYSTEM
A
2.18 2.19
NET SLOPE:1/2" PER FOOTTYP. AT CRICKETS
PRIMARY CANOPY ROOFSLOPE:1/2" PER FOOTTAPERED INSUL
CRICKET,TYP.
CRICKETVALLEY
OVERFLOWDRAIN AT ROOF
SIDEWALL SCUPPER ROOF DRAINSEE PLUMBING DWGS
CONTINUE WALL FLASHING & CANTINTO 2" RECESS AT COLUMN, TYP.
LIGHT FIXTURESIGN
1
AR08.0001
Sim
1
AR08.0001
SimSIMEDGE
A
2.2
OVERFLOW RWC BELOW SOFFIT,TERMINATE AT GRADE
RWC TO BE PAINTED WITH AHIGH PERFORMANCE COATINGSYSTEM
EXISTING STL COLUMN
EXISTING OVERHEAD DOOR
EXISTING MTLPANEL WALL
OVERFLOWDRAIN ATROOF LEVEL
EDGE OF EXISTINGLOADING DOCK
0 5 101 15
0 2 41
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:41:0
2 P
M
As indicated
ENLARGED PLANS ANDSECTIONS
AR06.0001
RDHRCY
1/4" = 1'-0"AR06.0002 AR06.0001
1 TRANSVERSE SECTION
1/2" = 1'-0"AR03.0003 AR06.0001
2 ENLARGED TYPICAL CANOPY ROOF PLAN
1/2" = 1'-0"AR03.0001 AR06.0001
3 TYP. PLAN OF OVERFLOW RWC
CJR
14
AINIG
RIV
FOHTLAEWN
OMMOC
TCETIHCRA
No. 012713
DAVID NELSON SCHEUERMANN
First Floor286' - 0"
TO Steel Roof306' - 8"
1.1 1.2 1.3 1.41
AR06.0001
Loading Dock Slab282' - 2"
TO Steel Canopy298' - 10"
OVERFLOW RWC ANDFASTENINGS TO BE PAINTEDWITH A HIGH PERFORMANCECOATING SYSTEM
LIGHTING FIXTURE SEEELECTRICALDRAWINGS, TYP
1
AR08.0001
Sim
PREFINISHED ALUM SIGN PLATE
EXISTING 'BAY' SIGNREMOVE, STORE AND REINSTALL ASNECESSARY
EXISTING RECESSEDMETAL PANEL ATCOLUMN, TYP.
PREFINISHED METALFLASHING AT WALL
First Floor286' - 0"
TO Steel Roof306' - 8"
TO Steel Canopy298' - 10"
4.164.174.184.19
OVERFLOW RWC ANDFASTENINGS TO BE PAINTEDWITH A HIGH PERFORMANCECOATING SYSTEM
LIGHTING FIXTURE SEEELECTRICAL DWGS, TYP
1
AR08.0001
Sim
EXISTING MAN DOORINSTALLED INOVERHEAD DOOR
EXISTINGRECESSEDMETAL PANELAT COLUMN,TYP.
EXISTING 'BAY' SIGNREMOVE, STORE ANDREINSTALL AS NECESSARY
REWORK SOFFITPANELS TO INSTALLOVERFLOW RWC
PREFINISHED METALFLASHING AT WALL
0 5 101 15
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\jchizacky\Documents\EXTERIOR REHAB_Central_jchizacky.rvt
5/3
1/2
012 4
:41:0
3 P
M
1/4" = 1'-0"
ELEVATIONS
AR06.0002
RDHRCY
1/4" = 1'-0"AR06.0002
1 PARTIAL EAST ELEVATION - TYPICAL
1/4" = 1'-0"AR06.0002
2 PARTIAL WEST ELEVATION - TYPICAL
CJR
15
AINIG
RIV
FOHTLAEWN
OMMOC
TCETIHCR
A
No. 012713
DAVID NELSON SCHEUERMANN
D
TO Steel Canopy298' - 10"
V.I.
F.10
"
PREFINISHED ALUM ROOFEDGE FLASHING W/CONCEALED SPLICE PLATES
ROOF EDGE FLASHING
WHITE KEE ROOF MEMBRANE,ADHERE TO RIGID INSULATION
TAPERED INSUL TO CREATESLOPE TO DRAIN, 1/2" PER FOOTMIN SLOPE1 1/2" MIN INSUL THICKNESS
EXISTING INSULATEDMETAL WALL PANEL
LEVEL TERM. BAR WITHSEALANT
MEMBRANE FLASHING,
PT WOOD BLOCKING AT SIDEWALLSCUPPER TYPE ROOF DRAINSEE PLUMBING DWGS
EXISTING RWC
CONNECT ROOF DRAIN TOEXISTING RWC,SEE PLUMBING DWGS. PRE-INSPECT AND COORDINATEWITH EXISTING OVERHEADSECTIONAL DOOR SPRINGS,TRACKS, ETC.
INSTALL LIGHT FIXTURE ATEXISTING LOCATIONSSEE ELECTRICAL DRAWINGS
EXISTING BEAM AND DOORHEAD
EXISTING OVERHEADSECTIONAL DOOR
PREFINISHED METALPANEL SOFFIT
1 1/2" METAL DECKCOORD. INSPECTION W/ COTR
PREFINISHED ALUM FASCIAWITH DRIP EDGEAND CONCEALED SPLICEPLATES
EXISTING STEEL FRAMINGCOORD. INSPECTION WITH COTR,
V.I.F.2' - 10"
8" M
IN.
1 1/
2"
COORD. CONDUITLOCATIONSEE ELECTRICALDRAWINGS
5 1/
2" M
IN.
PT WOOD BLOCKINGSEE SPECIFICATIONS FOR FASTENERS
PT WOOD SHIM
TAPERED INSULCRICKET BEYOND
EXISTING BAY NUMBERSIGNSREMOVE, STORE, ANDREINSTALL ASNECESSARY TOPERFORM WORK
MIN
3 1/
2"
TACK WELD ENDS OF NEW SOFFIT PANELS
PROVIDE CLIPS, SUSP. FRAMING TOMATCH EXISTING U.N.O.
SEALANT
2 1/2" GALV. MTLSTUDS @ 24" O.C.MAX
SEALANT
CANT
REPLACE EXIST. SOFFIT PANELS ASREQ'D TO PERFORM WORK. SEE PLANSFOR ESTIMATED QUANTITIES ANDNOTES
PREFINISHED METALCOUNTERFLASHINGFASTENED TO METALPANELS AT 16" O.C.MAX
0 2'1'3" 6" 9"
TO Steel Canopy298' - 10"
COORD. CONDUIT ANDJUNCTION BOX LOCATIONSEE ELECTRICAL DRAWINGSPROVIDE BLOCKING
LIGHTING FIXTURE,SEE ELECTRICALDRAWINGS.
EXISTING BAY NUMBERSIGNS (BEYOND)
TO Steel Canopy298' - 10"
PREFINISHED ALUMFASCIA WITH DRIP EDGE
1' -
0"
3/4" EXTERIOR GRADE PLYWOOD
COORD. CONDUIT LOCATIONSEE ELECTRICAL DRAWINGS
PREFINISHED ALUMSIGN PLATE, 16 GAUGE,4'-0" LONG, W/CONCEALED Z CLIPST+B @ 24" O.C. MAX
SEALANT
2 1/2" MTL STUD
EXISTING BAY NUMBERSIGNS (BEYOND)
0 2'1'3" 6" 9" 0 2'1'3" 6" 9"
SOFFIT TYPE 3SOFFIT TYPE 1 SOFFIT TYPE 2
2' - 0"2' - 0" 1' - 0"
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
LANDSIDE
AIRSIDE
DETAIL 6/AR08.0001DETAIL 5/AR08.0001
BUILDING 1 BUILDING 2AIRSIDE
LANDSIDE
1.19
SOFFIT TYPE 1 SOFFIT TYPE 2
NEW LIGHT FIXTURESEE ELECTRICAL DRAWINGS (TYP)
8' -
0" C
ANO
PY R
OO
F8'
- 0"
CAN
OPY
RO
OF
BUIL
DIN
G
BUILDING 3 BUILDING 4AIRSIDE
LANDSIDE
3.23
SOFFIT TYPE 3 SOFFIT TYPE 3
NEW LIGHT FIXTURESEE ELECTRICAL DRAWINGS (TYP)
8' -
0" C
ANO
PY R
OO
F8'
- 0"
CAN
OPY
RO
OF
BUIL
DIN
G
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP, LLCwww.theshewardpartnership.com
DATEREVISIONNO.
DATE
SCALE
DESIGNEDCHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
OFFICE OF ENGINEERINGDESIGN DEPARTMENT
METROPOLITAN WASHINGTONAIRPORTS AUTHORITY
CARGO BUILDINGS 1, 2, 3, AND 4 -EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
of 33
IF1106MAY 9, 2012
WASHINGTON DULLES INTERNATIONALAIRPORT WASHINGTON, DC
BC
DRH
FDH
AMMANN & WHITNEYConsulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
C:\Users\rhallock\Documents\EXTERIOR REHAB_Central_rhallock.rvt
5/3
1/2
01
2 5
:30:4
4 P
M
As indicated
DETAILS
AR08.0001
RDHRCY
3" = 1'-0"AR06.0001 AR08.00011 TYP CANOPY ROOF DETAIL
3" = 1'-0"AR08.00012 TYP FASCIA DETAIL AT LIGHT FIXTURE
3" = 1'-0"AR06.0001 AR08.00013 TYP FASCIA DETAIL AT SIGNAGE
NOTE:
THE CONTRACTOR SHALL REFERENCE THE PART B ENVIRONMENTALSPECIFICATIONS AND PLANS FOR LEAD-BASED PAINT REMOVALREQUIREMENTS. WELDING TO PAINTED SURFACES IS PROHIBITED.
3" = 1'-0"AR08.00014 SOFFIT TYPES
CJR
16
1/4" = 1'-0"AR08.00015 BUILDING 1 AND 2 SOFFITS/PARTIAL RCP
1/4" = 1'-0"AR08.00016 BUILDING 3 AND 4 SOFFITS/PARTIAL RCP
NOTES:
ONE ROW OF EXPOSEDFASTENERS IN A REVEAL ATLAPPED PANELS IS ALLOWED ATEACH AREA BEING REPLACED.
REPLACE OR REWORK SOFFITPANELS AT NEW OVERFLOWRWCS. PROVIDE TRIM ATOPENINGS.
MATCH EXIST. SOFFIT PANELS.INSPECT AND REVIEW ALLEXISTING PROFILES ANDATTACHMENTS.
AINI
GRIVFOHTLAEWNOMMOC
TCETIHCRA
No. 012713DAVID NELSON SCHEUERMANN
ELECTRICAL - SYMBOLS, NOTES, AND
ABBREVIATIONS
EL00.0001
LINE WEIGHT TYPES
ABBREVIATIONS
SYMBOL LIST
GENERAL DEMOLITION NOTES:
GENERAL REQUIREMENTS:
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FO
RP
SPECIAL ELECTRICAL REQUIREMENTS:
UP
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
TELE
ELECROOM
MWAASPRINKLERROOM
UP
UP
UP
--
UTILITYROOM
UTILITYROOM
ELECTRICAL POWER PLAN BUILDING 1
ELECTRICAL POWER PLAN BUILDING 2
ELECTRICAL POWER PLAN BUILDING 3
ELECTRICAL POWER PLAN BUILDING 4
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
EXISTING ELECTRICAL FLOOR PLANS -
BUILDINGS 1, 2, 3 & 4
EL01.0001
DN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
ROOF DEMOLITION PLAN A - BUILDING 1
ROOF DEMOLITION PLAN B - BUILDING 1
DEMOLITION ROOF PLAN - BUILDING 1
EL02.0001
NOTES:
DN
DN
DN
DN
DN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
ROOF DEMOLITON PLAN A - BUILDING 2
ROOF DEMOLITION PLAN B - BUILDING 2
DEMOLITION ROOF PLAN - BUILDING 2
EL02.0002
NOTES:
DN
DN
DN
DN
DN
DN
DN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DEMOLITION ROOF PLAN - BUILDING 3
EL02.0003
21
ROOF DEMOLITION PLAN A - BUILDING 3
ROOF DEMOLITION PLAN B - BUILDING 3
NOTES:
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FO
RP
DN
DN
DN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DEMOLITION ROOF PLAN - BUILDING 4
EL02.0004
22
ROOF DEMOLITION PLAN A - BUILDING 4
ROOF DEMOLITION PLAN B - BUILDING 4
NOTES:
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FO
RP
DN
1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9
A
B
C
D
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FO
RP
REFLECTED LIGHTING PLAN - BUILDING 1
EL03.0001
23
REFLECTED LIGHTING PLAN A - BUILDING 1
REFLECTED LIGHTING PLAN B - BUILDING 1
NOTES:
DN
DN
DN
DN
DN
2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9
A
B
C
D
2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FOR
P
REFLECTED LIGHTING PLAN - BUILDING 2
EL03.0002
24
REFLECTED LIGHTING PLAN A - BUILDING 2
RELECTED LIGHTING PLAN B - BUILDING 2
NOTES:
DN
DN
DN
DN
DN
DN
DN
3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 3.10 3.11
A
B
C
D
3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
REFLECTED LIGHTING PLAN - BUILDING 3
EL03.0003
25
REFLECTED LIGHTING PLAN A - BUILDING 3
REFLECTED LIGHTING PLAN B - BUILDING 3
NOTES:
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FORP
DN
DN
DN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9
4.10 4.11 4.12 4.13 4.14 4.15 4.16 4.17 4.18 4.19
A
B
C
D
REFLECTED LIGHTING PLAN - BUILDING 4
EL03.0004
26
REFLECTED LIGHTING PLAN A - BUILDING 4
REFLECTED LIGHTING PLAN B - BUILDING 4
NOTES:
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FORP
LIGHTING FIXTURE SCHEDULE
SCHEDULES
EL07.0001
27
EXISITNG CARGO BUILDING 1 PANEL SCHEDULE
EXISTING CARGO BUILDING 2 PANEL SCHEDULES
EXISTING CARGO BUILDING 3 PANEL SCHEDULE
EXISTING CARGO BUILDING 4 PANEL SCHEDULE L
LIGHTING FIXTURE SCHEDULE
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
of 33
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISSE
FO
RP
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
PLUMBING - SYMBOLS, NOTES AND
ABBREVIATIONS
PL00.0001
¾
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
FIRST FLOOR PLAN - BUILDING 1
PL03.0001
BUILDING 1 FIRST FLOOR LAYOUT PLAN B
BUILDING 1 FIRST FLOOR LAYOUT PLAN A
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
FIRST FLOOR PLAN - BUILDING 2
PL03.0002
BUILDING 2 FIRST FLOOR LAYOUT PLAN A
BUILDING 2 FIRST FLOOR LAYOUT PLAN B
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISS
E
FO
RP
FIRST FLOOR PLAN - BUILDING 3
PL03.0003
BUILDING 3 FIRST FLOOR LAYOUT PLAN A
BUILDING 3 FIRST FLOOR LAYOUT PLAN B
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
N
NO. 1 NO. 2 NO. 3 NO. 4
CARGO BUILDINGS KEY PLAN
FIRST FLOOR PLAN - BUILDING 4
PL03.0004
BUILDING 4 FIRST FLOOR LAYOUT PLAN A
BUILDING 4 FIRST FLOOR LAYOUT PLAN B
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
REENI
GNELANOIS
SE
FO
RP
OVERFLOW ROOFDRAIN (TYP.)
(E)ROOFDRAIN (TYP.)
(E) VERTICAL RAINWATER LEADER (TYP.)
SCUPPER DRAIN(TYPICAL)
OVERFLOW ROOF DRAINLEADER, NOTES 2 & 3,DWG. PL00.0001 REFERTO BUILDING FLOORPLANS FOR PIPE SIZE.
(E) I-BEAM
(E) OVERHEADDOOR (TYP.)
(E)CANOPY STEELFRAMING ABOVECANOPY CEILING
OFFSET DRAIN PIPING BELOWCEILING TO CLEAR EXISTINGCANOPY STEEL FRAMING
EDGE OFCANOPY ROOF
COLUMN LINE 1.1 COLUMN LINE 1.1/1.12 COLUMN LINE 1.9
SCUPPER DRAIN1,638 SQ.FT.
OVERFLOW ROOFDRAIN 5,388 SQ.FT.
LANDSIDECANOPY
5"
5"@1/4" FALL/FT.
GRADE
RWC0.02
5"
5"@1/4" FALL/FT.
SCUPPER DRAIN1,638 SQ.FT.
OVERFLOW ROOFDRAIN 5,388 SQ.FT.
AIRSIDE CANOPY
C.O.
4"
0.01SW SW
(E)8"
(E)6"10,776SQ.FT.
(E)C.O.
(E)8"10,776 SQ.FT.
(E)MAIN ROOFDRAIN (TYP)
RWC
(E)6"7500 SQ.FT.
CARGO BUILDINGMAIN ROOF
4"
CARGOBUILDING
CARGOBUILDINGFLOOR
4"
RWC0.02
SCUPPER DRAIN2,759 SQ.FT.
OVERFLOW ROOFDRAIN 10,260 SQ.FT.
6"
6"@1/2" FALL/FT.
6"
6"@1/2" FALL/FT.
SCUPPER DRAIN2,759 SQ.FT.
OVERFLOW ROOFDRAIN 10,260 SQ.FT.
C.O.
SW SW
(E)10"
(E)8"17,518 SQ.FT.
(E)C.O.
(E)10"17,518 SQ.FT.
(E)MAIN ROOFDRAIN (TYP)
RWC(E)6"12,000 SQ.FT.
CARGOBUILDING
RWC0.02
RWC0.02
4"
5"
C.O.
4"
(E)C.O.
SW SW
(E)8"
(E)6"7,500 SQ.FT.
(E)C.O.
(E)8"7,500 SQ.FT.
(E)MAIN ROOFDRAIN (TYP)
CARGO BUILDINGMAIN ROOF
CARGOBUILDING
RWC
RWC
LANDSIDE CANOPY
GRADE
AIRSIDE CANOPY LANDSIDECANOPY
GRADE
AIRSIDECANOPY
CARGOBUILDINGFLOOR
CARGOBUILDINGFLOOR
GRADE GRADE GRADE
CARGO BUILDINGMAIN ROOF
COLUMN LINE 2.2
SCUPPER DRAIN1,859 SQ.FT.
OVERFLOW ROOFDRAIN 6,359 SQ.FT.
5"
5"@1/2" FALL/FT.
5"
3"@1/2" FALL/FT.
GRADE
SCUPPER DRAIN1,859 SQ.FT.
OVERFLOW ROOFDRAIN 6,359 SQ.FT.
SW SW
(E)5"
(E)4"4,109 SQ.FT.
(E)C.O.
(E)8"8,218 SQ.FT.
CARGOBUILDINGMAIN ROOF
(E)C.O.
(E)4"4,109 SQ.FT.
(E)ROOF DRAIN,2250 SQ.FT.
(E)ROOF DRAIN,2250 SQ.FT.
(E)4" (E)4"
3"@1/2" FALL/FT.
4"
5"@1/2" FALL/FT.
4"
(E)5"4,109 SQ.FT.
CARGOBUILDING
COLUMN LINE 2.6
SCUPPER DRAIN1,788 SQ.FT.
OVERFLOW ROOFDRAIN 7,788 SQ.FT.
5"
5"@1/2" FALL/FT.
5"
5"@1/2" FALL/FT.
SCUPPER DRAIN1,778 SQ.FT.
OVERFLOW ROOFDRAIN 7,778 SQ.FT.
SW SW
(E)6"
(E)5"4,788 SQ.FT.
(E)C.O.
(E)8"9,576 SQ.FT.
(E)C.O.
(E)5"4,788 SQ.FT.
(E)ROOF DRAIN,3000 SQ.FT.
(E)ROOF DRAIN,3,000 SQ.FT.
(E)5" (E)5"
3"@1/2" FALL/FT.
5"
3"@1/2" FALL/FT.
5"
CARGOBUILDING
COLUMN LINE 2.10
SW SW
(E)6"
(E)C.O.(E)C.O.
(E)ROOF DRAIN,3000 SQ.FT.
(E)ROOF DRAIN,3000 SQ.FT.
(E)6"
CARGOBUILDING
(E)8" (E)6"
COLUMN LINE 2.14
SCUPPER DRAIN1,788 SQ.FT.
OVERFLOW ROOFDRAIN 4,788 SQ.FT.
5"
5"@1/4" FALL/FT.
5"
5"@1/4" FALL/FT.
SCUPPER DRAIN1,788 SQ.FT.
OVERFLOW ROOFDRAIN 4,788 SQ.FT.
SW SW
(E)6"
(E)5"4,788 SQ.FT.
(E)C.O.
(E)8"9,576 SQ.FT.
(E)C.O.
(E)6"4,788 SQ.FT.
(E)ROOF DRAIN,3000 SQ.FT.
(E)ROOF DRAIN,3000 SQ.FT.
(E)5" (E)6"
3"@1/2" FALL/FT.
5"
3"@1/2" FALL/FT.
6"
CARGOBUILDING
COLUMN LINE 2.18
SCUPPER DRAIN894 SQ.FT.
OVERFLOW ROOFDRAIN 3,144 SQ.FT.
4"
4"@1/4" FALL/FT.
4"
4"@1/4" FALL/FT.
SCUPPER DRAIN894 SQ.FT.
OVERFLOW ROOFDRAIN 3,144 SQ.FT.
SW SW
(E)5"
(E)4"3150 SQ.FT.
(E)C.O.
(E)8"6,288 SQ.FT.
(E)C.O.
(E)4"3150 SQ.FT.
(E)ROOF DRAIN,2250 SQ.FT.
(E)ROOF DRAIN,2,250 SQ.FT.
(E)4" (E)4"
3"@1/8" FALL/FT.
4"
3"@1/8" FALL/FT.
4"
CARGOBUILDING
LANDSIDECANOPY
GRADE
AIRSIDE CANOPY
GRADE
AIRSIDECANOPY
GRADE
AIRSIDECANOPY
GRADE
AIRSIDE CANOPY
GRADE
AIRSIDE CANOPY
GRADE GRADE GRADE GRADE
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
LANDSIDECANOPY
LANDSIDECANOPY
LANDSIDECANOPY
LANDSIDECANOPY
(E)5"(E)5"
(E)6"
(E)6"(E)6"(E)5"
(E)6"
(E)5"
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 5,615 SQ.FT.
5"
5"@1/4" FALL/FT.
5"
3"@1/2" FALL/FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 5,615 SQ.FT.
SW SW
(E)10"
(E)4"5,615 SQ.FT.
(E)C.O.
(E)8"11,230 SQ.FT. (E)6"
(E)C.O.
(E)4"5,615 SQ.FT.
(E)ROOF DRAIN,4125 SQ.FT.
(E)ROOF DRAIN,4125 SQ.FT.
(E)4" (E)4"
3"@1/2" FALL/FT.
4"
5"@1/4" FALL/FT.
4"
CARGOBUILDING
GRADE
GRADE
AIRSIDE CANOPY
CARGOBUILDINGMAIN ROOF
LANDSIDECANOPY
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
5"
5"@1/4" FALL/FT.
GRADE5"
5"@1/4" FALL/FT.
GRADE
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
LANDSIDECANOPY
(E)6"
(E)4"4,865 SQ.FT.
C.O.C.O.
(E)4"4,865 SQ.FT.
(E)4" (E)4"
3"@1/2" FALL/FT.
4"
3"@1/2" FALL/FT.
4"
CARGOBUILDING
AIRSIDECANOPY
(E)C.O.
(E)6"
(E)6"
(E)ROOF DRAIN3,375 SQ.FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
5"
5"@1/4" FALL/FT.
5"
5"@1/4" FALL/FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
(E)4"4,865 SQ.FT.
C.O.C.O.
(E)4"4,865 SQ.FT.
(E)4" (E)4"
3"@1/2" FALL/FT.
4"
3"@1/2" FALL/FT.
4"
CARGOBUILDING
(E)ROOF DRAIN3375 SQ.FT.
(E)6"
(E)8"9,730 SQ.FT.
(E)6"
(E)10"14,595 SQ.FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
5"
5"@1/2" FALL/FT.
5"
5"@1/4" FALL/FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
(E)4"4,865 SQ.FT.
C.O.C.O.
(E)4"4,865 SQ.FT.
(E)4" (E)4"
3"@1/4" FALL/FT.
4"
3"@1/2" FALL/FT.
4"
CARGOBUILDING
(E)ROOF DRAIN3,375 SQ.FT.
(E)6"
(E)6"
(E)12"24,325 SQ.FT.
(E)10"19,460 SQ.FT.
(E)12"29,190 SQ.FT.
(E)6"(E)6"
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
5"
5"@1/4" FALL/FT.
5"
5"@1/4" FALL/FT.
SCUPPER DRAIN1,490 SQ.FT.
OVERFLOW ROOFDRAIN 4,865 SQ.FT.
(E)4"4,865 SQ.FT.
C.O.C.O.
(E)4"4,865 SQ.FT.
(E)4" (E)4"
3"@1/2" FALL/FT.
4"
3"@1/2" FALL/FT.
4"
CARGOBUILDING
(E)6"(E)6"
GRADE
GRADE
LANDSIDECANOPY
GRADE
GRADE
LANDSIDECANOPY
GRADE
GRADE
LANDSIDECANOPY
(E)C.O. (E)C.O. (E)C.O.
AIRSIDECANOPY
AIRSIDECANOPY
AIRSIDECANOPY
COLUMN LINE 4.3
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
CARGOBUILDINGMAIN ROOF
COLUMN LINE 4.6 COLUMN LINE 4.11 COLUMN LINE 4.16
(E)106" X 68"STORM WATERCULVERT
(E)ROOF DRAIN3375 SQ.FT.
(E)8"9,730 SQ.FT.
STORM WATER RISER DIAGRAMS
AND DETAILS
PL07.0001
33
TYPICAL CANOPY ROOF DRAINAGE DETAIL
DETAIL NOTES
STORM WATER RISER DIAGRAM - CARGO BUILDING NO.1
STORM WATER RISER DIAGRAM - CARGO BUILDING NO.2
STORM WATER RISER DIAGRAM - CARGO BUILDING NO.4
STORM WATER RISER DIAGRAM - CARGO BUILDING NO.3
DATEREVISIONNO.
METROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
OFFICE OF ENGINEERING
DESIGN DEPARTMENTMETROPOLITAN WASHINGTON
AIRPORTS AUTHORITY
1016 Morton StreetBaltimore, MD 21201
t. 410.850.5425f. 410.625.4790
THE SHEWARD PARTNERSHIP , LLCwww.theshewardpartnership.com
DATE
SCALE
DESIGNED
CHECKED
ACCEPTED
SUBMITTED
APPROVED
DRAWN
CARGO BUILDINGS 1, 2, 3, AND 4 -
EXTERIOR REHABILITATION
PROJECT IDENTIFIER
SHEET NAME
VOLUME NUMBER
SHEET NUMBER
1 of 1
IF1106
WASHINGTON DULLES INTERNATIONAL AIRPORT
WASHINGTON, DC
BC
DRH
FDH
Consulting Engineers, P.C.1250 23rd Street NWWashington, DC 20037FAX: 202-331-7490TEL: 202-331-1029
RE
ENI
GNELANOISSE
FO
RP