Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Ground
01726
06/07/15AB
11741
18/02/16AB
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Ground
3.4m single slide
Short twisted ladder
Low scramble net
Low tower
Low tower
01726
06/07/15AB
Climbing bridge
Low fireman's pole
11741
18/02/16AB
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Groung
1500 750 484800
750
800
750
484
445
1440
1585
750
375
750
375
684
500 square
x 855 deep
500 square
x 810 deep
450 x 450
x 375 deep
Foundations1 - 300 x 300 x 375 deep
2 - 400 x 400 x 375 deep
1
2
1
1
2
2 2
2 2
01726
06/07/15AB
11741
18/02/16AB
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Ground
1600
1650
2150
135013009001650950300
2450
2550
2450
6500
2550
6750
32m² of 40mm thick wetpourwith 22m edging
01726
06/07/15AB
1650
100 R500
R1000 R1000
R1500
R2500
R1000
R1500R1700 1
350
13505150
11741
18/02/16AB
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Ground
500
75
65007000
35 tiles 40mm thickwith 24.5m edging
01726
06/07/15AB
11741
18/02/16AB
Complied by
Date
ISSUEECNDATESIGN
CUSTOMER: FIXING:ORDER No:
AB
07/05/15
801-ESCL Esclabor Ground
75
300
29 grassmats (1m x 1.5m)
01726
06/07/15AB
900
7500
7000
400
11741
18/02/16AB
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Castle range
Low tower5124-030
800 x 800 x 2025
8 years to adult
1110mm
Approx 66.5 kg
Approx 74.5 kg
5124-030Page 1 of 3
Solid steel components to EN 10087: 1998Steel plate to EN 10025-2: 2001Steel RHS to EN 10210-2: 1997HDPE to EN ISO 14632: 1998Standard fixings to BS 3692: 2001 and BS 4190: 2001Non-standard fixings are anti-vandal and corrosion resistant
Welding to EN ISO 14341: 2011Paint to EN 13438: 2005
1 Read instructions thoroughly before commencing installation of unit
2 Excavate foundations as shown in the foundation plan
3 Position tower on bricks in the excavated foundations, ensuring it is plumb, squareand at the correct height, orientation and distance
4 When the unit is fully assembled and all fixings secure, backfill the foundationswith 0.17m³ of concrete (4 parts gravel/2 parts sand/1 part cement)
5 Allow concrete to set for 48 hours before first use
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
5124-030
Page 2 of 3
Foundation detailsCare must be taken in abnormal conditions
750750 400 square
375
1110
Brick
Brick
Loosefill
Round offconcrete
13
11
12
300
3806
80 4
00
REV
ECN
SIG.
DATE:
COMPILED
DATE:
5124-030
Page 3 of 3
AB
16/03/15
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
LOW TOWER ASSY4202-41811
DECK BOTTOM PANEL3755-96512
DECK TOP PANEL3755-96413
FIXING WASHER2900-041124
Black Poepplemann Cup2611-031_Cup245
Black Poepplemann Cap2611-031_Cap246
FIXING SPACER (15 panel)2472-009127
Wicksteed Washer2215-519128
M10 Binx Nut2191-010129
M10 x 50 Hex Head Bolt2185-0381210
FOR BARK FIX ADD
DESCRIPTIONPART NUMBERQTYITEM
BELOW GROUND ASSY5071-003311
SPRAGGING IRON3031-010312
M12 x 25 LG HEX HD SCREW2175-134613
1 6 9 5 8
7 4
5
10
6
3
2
Note - these 2 positions may berequired to fix accessories
01726AB
01/07/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Castle Range
Low scramble net5124-033
725 x 625 x 1110
8 years to adult
1110
Approx 2 kg
Approx 5 kg
5124-033Page 1 of 3
Solid steel components to EN 10087: 1998Steel CHS to EN 10255-2: 2004Welding to EN ISO 14341: 2011Standard fixings to BS 3692: 2001 and BS 4190: 2001Non-standard fixings are anti-vandal and corrosion resistantSteel-reinforced braided nylon rope with aluminium fittings
1 Read instructions thoroughly before commencing installation of unit
2 Excavate foundations as shown
3 Attach net to tower and below ground fixings as shown
4 Fit spragging irons to the below ground fixings and position on bricks in excavatedholes, ensuring the net remains taut
5 Backfill the foundations with 0.06m³ concrete (4 parts gravel/2 parts sand/1 partcement)
6 Allow concrete to set for 48 hours before first use
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
5124-033
Page 2 of 3
750750
750 484
750
484
(685
)
300square
Foundation detailsCare must be taken in abnormal conditions
1110
375
(675 for bark)
Brick
A ( 1 / 4 )
REV
ECN
SIG.
DATE:
COMPILED
DATE:
5124-033
Page 3 of 3
AB
17/03/15
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
BELOW GROUND FIXING ASSY5071-02421
LOW NET ASSY4141-16312
RAPID LINK4061-12523
SPRAGGING IRON3031-01024
Wicksteed Washer2215-51925
M10 Spring Washer2212-20326
M10 x 50 Pent Button Head2176-12927
M6x6 Grub Screw2171-10128
A
For Bark - Replace item 1 5071-024 with 5071-026
41
2
8
7 6
5
3
Against HDPEpanel
Behind curveddeck edge
01726AB
30/06/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Castle RangeShort twisted ladder
5124-034
600 x 500 x 1110
8 years to adult
1110
Approx 12.7 kg
Approx 13 kg
5124-034Page 1 of 3
Solid steel components to EN 10087: 1998Steel plate to EN 10025-2: 2004Steel CHS to EN 10255-2: 2004Welding to EN ISO 14341: 2001Paint to EN 13438: 2005
Standard fixings to BS 3692: 2001 andBS 4190: 2001Non-standard fixings are anti-vandaland corrosion resistant
1 Read instructions thoroughly before commencing installation of unit
2 Excavate foundations as shown in foundation plan
3 Stand ladder on bricks in excavated holes and attach to tower as shown
4 Backfill foundations with 0.07m³ concrete (4 parts gravel/2 parts sand/1 partcement)
5 Allow concrete to set for 48 hours before first use
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
5124-034
Page 2 of 3
800
750750
800450450 x
1110
375
400
300
3806
80
Foundation detailsCare must be taken in abnormal conditions
Bricks8
7
9
Round offconcrete
Bark
REV
ECN
SIG.
DATE:
COMPILED
DATE:
5124-034
Page 3 of 3
AB
17/03/15
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
SHORT LADDER FRAME4202-53811
Black Poepplemann Cup2611-031_Cup42
Black Poepplemann Cap2611-031_Cap43
Wicksteed Washer2215-51924
M10 Binx Nut2191-01025
M10 x 55 Hex Head Bolt2185-03926
FOR BARK FIX ADD
DESCRIPTIONPART NUMBERQTYITEM
BELOW GROUND ASSY5071-00327
SPRAGGING IRON3031-01028
M12 x 25 LG HEX HD SCREW2175-13449
1
01726AB
30/06/15
425
3
2 6 3
11741AB
18/02/16
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Castle Range
Low fireman's pole5124-036
800 x 495 x 2515
8 years to adult
1110
Approx 21.5 kg
Approx 22 kg
5134-036Page 1 of 3
Steel plate to EN 10025-2: 2004Steel CHS to EN 10255-2: 2004Welding to EN ISO 14341: 2011Paint to EN 13438: 2005Non-standard fixings are anti-vandal and corrosion resistant
1 Read instructions thoroughly before commencing installation of unit
2 Excavate foundations as shown in foundation plan
3 Place pole on a brick in the excavated foundation and secure to tower as shown,ensuring pole is vertical
4 Backfill foundation hole with 0.03m³ concrete (4 parts gravel/2 parts sand/1 partcement)
5 Allow concrete to set for 48 hours before first use
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
5124-036
Page 2 of 3
375
375
445
300 square
1110
(441)
Foundation detailsCare must be taken in abnormal conditions
(2512)
375
300
3806
80 4
00
Brick8
7
9
BarkRound offconcrete
REV
ECN
SIG.
DATE:
COMPILED
DATE:
5124-036
Page 3 of 3
AB
17/03/15
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
WELDED MONKEY POLE SLIDER90156-0211
LOW POLE ASSY4202-43312
Wicksteed Washer2215-51943
M10 Safety Fastener2177-00214
M10 x 35 Pent Button Head2176-12715
M10 x 25 Pent Button Head2176-12646
FOR BARK FIX ADD
DESCRIPTIONPART NUMBERQTYITEM
BELOW GROUND ASSY5071-00317
SPRAGGING IRON3031-01018
M12 x 25 LG HEX HD SCREW2175-13429
3
6
01726AB
30/06/15
1
2
4
5
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Castle Range
Climbing bridge5124-038
800 x 1450 x 1088
8 years to adult
See sht 2
Approx 10 kg
Approx 25 kg
5124-038Page 1 of 3
Solid steel components to EN 10087: 1998Steel plate to EN 10025-2: 2004Steel CHS to EN 10255-2: 2004Welding to EN ISO 14341: 2011Paint to EN 13438: 2005
Standard fixings to BS 3692: 2001 andBS 4190: 2001Non-standard fixings are anti-vandaland corrosion resistantSteel-reinforced nylon braided rope withaluminium fittings
1 Read instructions thoroughly before commencing installation of unit
2 Support bridge frame and fit to towers as shown
NOTEThe climbing bridge can be fitted to either low towers or to high towers
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
5124-038
Page 2 of 3
1500 centre to centre
750
1450 face to face1110
(432)
1665
Low tower
High tower
REV
ECN
SIG.
DATE:
COMPILED
DATE:
5124-038
Page 3 of 3
AB
27/03/15
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
BRIDGE END FRAME4202-47121
CLIMBING BRIDGE ROPE ASSY4141-16812
Wicksteed Washer2215-51983
M10 Spring Washer2212-203104
M8 Short Safety Fastener2177-004105
M8 x 25 Pent Button Head2176-152106
M10 x 30 Pent Button Head2176-13287
3
7
5
4
1
6
2
01726AB
10/07/15
SPECIFICATION
INSTALLATION INSTRUCTIONS
Note
Note
PROD. CODE
SIZE
AGE RANGE
F/ FALL HEIGHT
HEAVIEST PART
TOTAL WEIGHT
Tropica3.4m SINGLE SLIDE
90106/90406
800x2100x3118
Up to 8 years
1200mm
Approx 42 kg
Approx 67.5 kg
90106/90406Page 1 of 5
Chute: Made from 2mm stainless steel sheetGuardrail: Made from 32 Nominal bore tube to BS1387Pedestals: Made from circular hollow section to BS4848Fixings: Anti-vandal and corrosion resistantWelds: Copper-free conforming to 2901AIB for mild steelFinish: Low lead polyester powder paint to BSEN71
Note:- In accordance with 6.1.3 EN1176-1:2008 we recommend that slides do notface south or near due south due to heat build up
1 Read installation instructions through before commencing erection of unit2 Do NOT tighten fastenings until the unit is completely assembled3 Excavate foundations as shown in the diagram on page 24 Place pedestals in the foundations and prop up in position5 Ensuring pedestals are plumb, square and upright, and at the correct height and
centre of the dimensions, backfill foundations with concrete6 Allow 48 hours drying time before fixings slide to pedestals
M8 bolts to be torqued to 18Nm (13lbft). M10 bolts to be torqued to 34Nm (25lbft)M12 bolts to be torqued to 55Nm (40lbft). All protruding screw threads to be peened over toremove sharp edges. Lifting aid will be required when installing this piece of equipment
ENSURE ALL INSTALLATION AIDS ARE REMOVED BEFORE FIRST USE
90106/90406
Page 2 of 5
Foundations detail(Care must be taken under abnormal conditions)
1446 1591
Tower
875
875
400
475
Underside of slide runout tofinished surface shall be amaximum dimension of 200mm
Underside of slide runout tofinished surface shall be amaximum dimension of 200mm
Brick
Brick
Foundation detailGround fixed 500 x 500 x 875
Foundation detailBark fixed 500 x 500 x 475
2° RUN-OFF
2° RUN-OFF
90106/90406
Page 3 of 5
R1500 R1500
R1000
Surfacing & free space detail
Free space
7
7
12
4
5
7
7
123
5
2
Fixing pedestals to chute1 To fit pedestals to chute use M12 x 25 pent
button head screw, placing an M12 fibrewasher either side of the pedestal top plate
2 Ensure spragging iron is in place before backfilling the foundations
90106/90406
Page 4 of 5
6
1
End plug detail1 Insert the two plastic plugs into slide barrier
spigots before securing to slide and tower
8
14
11
9
10
2
1
13
Fixing detail to tower1 Attach slide and barrier to tower using M10 x 25 pent button head screws
and Wicksteed washers2 Drill through tower uprights to fit M10 x 50 pent button head screw, M10
and M12 washers and M10 safety fastener to prevent possible traps
REV
ECN
SIG.
DATE:
COMPILED
DATE:
90106/90406
Page 5 of 5
AB
24/02/16
PARTS LIST
DESCRIPTIONPART NUMBERQTYITEM
SINGLE SLIDE BARRIER90106-0211
SINGLE SLIDE CHUTE ASSY90106-0112
PEDESTAL SUPPORT LEG - RUNOUT4013-03813
PEDESTAL SUPPORT LEG - MIDDLE4013-03714
SPRAGGING IRON3031-01125
END PLUG (1¼ NB)2611-00526
M12 Fibre Washer2571-013167
Wicksteed Washer2215-51948
M12 Plain Washer2215-50929
M10 Washer2215-508210
M10 Safety Fastener2177-002211
M12 x 25 Pent Button Head2176-176812
M10 x 50 Pent Button Head2176-129213
M10 x 25 Pent Button Head2176-126414
3minor
AB24/02/16
Product: Date of Issue: 13/08/15
Issue: A
Item Unit Qty Part No. Checked
1 2 4202-418
2 2 3755-965
3 2 3755-964
4 2 5071-024
5 1 4141-163
6 1 4202-538
7 1 4202-433
8 2 4202-471
9 1 4141-168
10 1 90106-02
11 1 90106-01
12 1 4013-038
13 1 4013-037
14 1 90156-02
15 1
Picked By: Checked By:
COMPILED REV 0 1
BY: AB ECN No. 1726 1741
DATE 13/08/15 29/02/16
DATE: 13/08/15 SIGN AB AB
Order No:
Low tower assembly
Deck top panel *
Bridge end frame
Items marked * to be fitted before despatch
Climbing bridge rope assy
Welded monkey pole slider
Fixing pack
Pedestal support leg - runout
Pedestal support leg - middle
Single slide chute assy
Sheet 1 of 1
Single slide barrier
Low pole assy
DESPATCH LIST
Below ground fixing assy
Low net assy
Short ladder frame
Deck bottom panel *
Description
801-ESCL Esclabor
Total No. of Items
Product: Date of Issue: 13/08/15
Issue: A
Item Unit Qty Part No. Checked
1 24 2900-041
2 48 2611-031
3 48 2611-031
4 24 2472-009
5 24 2215-519
6 24 2191-010
7 24 2185-038
8 2 4061-125
9 2 3031-010
10 2 2215-519
11 2 2212-203
12 2 2176-129
13 2 2171-101
14 4 2611-031
15 4 2611-031
16 2 2215-519
17 2 2185-039
18 2 2191-010
Picked By: Checked By:
COMPILED REV 0 1 2
BY: AB ECN No. 1726 minor 1741
DATE 13/08/15 26/02/16 29/02/16
DATE: 13/08/15 SIGN AB AB AB
Total No. of Items
M10 x 55 hex head bolt
M10 binx nut
Items marked * to be fitted before despatch
Wicksteed washer
Black Poepplemann cap
Sheet 1 of 3
Rapid link
M10 x 50 hex head bolt *
FIXINGS LIST
Fixing spacer (15 panel) *
Black Poepplemann cup
Low scramble net
M6 x 6 grub screw
Short twisted ladder
Low tower
Wicksteed washer *
M10 binx nut *
Black Poeppelmann cup *
Description
Fixing washer *
M10 x 50 pent button head screw
Spragging iron
M10 spring washer
Wicksteed washer
Black Poeppelmann cap *
Order No:
801-ESCL Esclabor
Product: Date of Issue: 13/08/15
Issue: A
Item Unit Qty Part No. Checked
19 4 2215-519
20 4 2176-519
21 1 2177-002
22 1 2176-127
23 8 2215-519
24 10 2212-203
25 10 2177-004
26 10 2176-152
27 8 2176-132
28 2 3031-011
29 16 2571-013
30 4 2215-519
31 8 2176-176
32 4 2176-126
33 2 2176-129
34 2 2215-508
35 2 2215-509
36 2 2177-002
37 2 2611-005
Picked By: Checked By:
COMPILED REV 0 1 2
BY: AB ECN No. 1726 minor 1741
DATE 13/08/15 26/02/16 29/02/16
DATE: 13/08/15 SIGN AB AB AB
M12 washer
M10 safety fastener
End plug (1¼NB)*
3.4m single slide
M12 fibre washer
Wicksteed washer
M12 x 25 pent button head screw
M10 x 25 pent button head screw
M10 x 50 pent button head screw
M10 washer
M10 spring washer
M8 short safety fastener
M8 x 25 pent button head screw
M10 x 30 pent button head screw
Spragging iron
FIXINGS LIST Sheet 2 of 3
801-ESCL Esclabor
Order No:
Description
Climbing bridge
Wicksteed washer
Items marked * to be fitted before despatch
Total No. of Items
Low fireman's pole
Wicksteed washer
M10 x 25 pent button head screw
M10 safety fastener
M10 x 35 pent button head screw
Product: Date of Issue: 13/08/15
Issue: A
Item Unit Qty Part No. Checked
38 2 2372-003
39 2 2372-008
Picked By: Checked By:
COMPILED REV 1 2
BY: AB ECN No. minor 1741
DATE 26/02/16 29/02/16
DATE: 26/02/16 SIGN AB AB
Items marked * to be fitted before despatch
Total No. of Items
M8 pent key
M10 pent key
FIXINGS LIST Sheet 3 of 3
801-ESCL Esclabor
Order No:
Description