CURRICULUM VITAE
Personal Information :
Name : Matta Nacim Basit
Date of birth : 1969
Nationality : Egyptian.
Marital status : Married
Languages : Arabic and English.
MobileNumber: +971503405927-00971557296091"UAE" – 00201282362890-
00253467830”Egypt “Email : [email protected]
Education and Personal Qualifications :
B.Sc. [May,1992] of Civil Engineering . Minia University- Egypt .
General Grade : VeryGood
Project : Concrete Structures Project
Project Grade : Excellent
UAE Driving License available
-----------------------------------------------------------------------------------------------------
COMPUTER SKILES-: AUTOCAD 2011
MICROSOFT OFFICE EXCEL 2010
MICROSOFT OFFICE WORD 2010
Sap V8
-----------------------------------------------------------------------------------------------------------
Experience :
June 2012 till Now: (UAE)
Project: Construction of New 900mm DI pipeline Primary Main from Al Falah to
East Bananas along Graveyard Road) Contract No.D101712/ADDC
Client: Abu Dhabi Distribution Company (ADDC)
Consultant: ITALCONSULT
Company: SEDE (Societe Egyptienne D’Entreprises)
Budget : 140 million Dirhams.
Duration: 24 months.
Position : project manager at SEDE Company
Responsibilities: - Administer overall project execution to ensure successful delivery as per the project contract and
planning.
- Perform scheduling, budget, risk, change opportunity and resource management activities.
-Lead, Coordinate and communicate with Subcontractors, Project Team, Venders and Customer on various
project activities
-Administer contractual, financial and legal aspects of customer contract, subcontracts and purchase orders,
to ensure profitable project execution
6من 2صفحة
-Set up project processes, project logs, project plan, Quality Standards and Project Safety; including review
and validation.
-Regular update to Management on project progress, potential risks and risks mitigation measures to avoid
losses.
-Responsible for Health, Safety & Environment aspects of project and personnel involved on projects
-Ensure successful project close out by managing subcontractor closeout, transfer of liabilities, customer
training, and punch list closeout and establishing warranties.
-Responsible for the full financial forecasting & controlling of project
-Managing , Supervising and controlling all project activities including:Planing,Budgeting, Supervising
installation and laying of about 36 km length of DI Pipes (DN900mm,600 mm ,500mm), associated fittings
and special parts with all associated Washout chambers, line valve chamber and air valve chambers, valve
chambers , line anchor , thrust block for bends & tees , installation of fittings , water proofing for concrete ,
finishing, of bund and Supervising and managing construction of (12 NDRC) under the asphaltic roads and
gases pipelines.
------------------------------------------------------------------------------------------------------------------------------
May 2009 till June 2012: ( UAE )
Project : Tap off 9A(FWTS) Pipeline to Al Hayer Tank ( Lot P1)
Contract No.4381A-Al Ain Water Transmission scheme
Client : TRANSCO
Consultant : Tebodin Middle East
Company : SEDE ( Societe Egyptienne D’Entreprises )
Budget : 532 million Dirhams.
Duration : 20 monthes.
Position : construction manager at SEDE company Responsibities: 1- Managing, Supervising and controlling all project activities including: Planning, Budgeting,
Monitoring, to ensure Completion on time and within the budget, Day to day monitoring of the site as
per the schedule and priorities. Maintain productive relationship with the external stakeholders at site
Providing timely data to billing and planning engineers regarding extra items, joint measurements,
holds, additions, alterations and Supervising the construction of (2 steel tank - 25 million gallon
each),its finishing and land scaping works .
2- Supervising installation and laying of about 13.40 km length of CS Pipes (DN1600mm 1200 mm
,800mm, 400 mm), associated fittings and special parts with all associated Washout chambers, line
valve chamber and air valve chambers .
3-Supervising of Bund with Gatch material , excavation in bund , bedding with sand&surround .
4-Supervising of washout chambers , valve chambers , line anchor , thrust block for bends & tees ,
installation of fittings , water proofing for concrete , finishing of bund.
5-Supervising and managing construction of (2 NDRC ) under the asphaltic roads and gases pipelines .
6-Supervising all pressure tests , concrete activities and all associated works along the pipelines .
7-Supervising filling ,disinfiction,flushing and commissioning for the pipeline, steel tanks
and maintenance during guarantee period .
--------------------------------------------------------------------------------------------------------
6من 3صفحة
From October 2007 till May 2009 : ( UAE )
Project : Taweelah-Unit III – umm Al Nar Water Transmission
Scheme (Lot 1 & Lot 2 )
Client : TRANSCO
Consultan : Tebodin Middle East
Company : SEDE ( Societe Egyptienne D’Entreprises )
Budget : 760 million Dirhams.
Duration : 20 months.
Position : construction manager at SEDE company
Responsibilities :-
1- Managing, Supervising and controlling all project activities including: Planning, Budgeting,
Monitoring, to ensure Completion on time and within the budget, Day to day monitoring of the site as
per the schedule and priorities. Maintain productive relationship with the external stakeholders at site
Providing timely data to billing and planning engineers regarding extra items, joint measurements,
holds, additions, alterations and supervising the construction of (4 reservoirs - 45,000 m3 each), Pump
Station, Switch gear , hypochlorination,fire fighthing buildings ,its finshing and land scaping works .
2- Supervising installation and laying of about 62 km length of DI Pipes (DN1600mm 1200 mm , 400
mm), associated fittings and special parts with all associated Washout chambers, line valve chamber
and air valve chambers .
4-Supervising of washout chambers , valve chambers , line anchor , thrust block for bends & tees ,
installation of fittings , water proofing for concrete , finishing of bund. 5-Supervising and managing construction of (22 NDRC- pipe Jacking and Thrust boring Tunnels ) under
the asphaltic roads and gases pipelines .
6-Supervising all pressure tests , concrete activities and all associated works along the pipelines .
7-Supervising filling ,disinfiction and flushing for the pipeline, reservoirs and maintenance
during guarantee period .
--------------------------------------------------------------------------------------------------------------------------------
Jan 2006 till October 2007 : ( EGYPT )
Project : Embaba Water Treatment Plant ( Capacity 200000 m3 / day )
Client : Potable Water & Waste Water National Authority
Consultan : Arab Consulting Engineer ( Moharam – Bakhoum ) .
Company : SEDE ( Societe Egyptienne D’Entreprises )
Budget : 210 million Egyptian Pounds.
Duration : 20 months.
Positio : Construction manager at SEDE company .
Responsibilities:
1- Managing, Supervising and controlling all project activities including: Planning, Budgeting,
Monitoring, to ensure Completion on time and within the budget, Day to day monitoring of the site as
per the schedule and priorities. Maintain productive relationship with the external stakeholders at site
Providing timely data to billing and planning engineers regarding extra items, joint measurements,
holds, additions, alterations and Supervising of installation of Main water pipe line of diameter 1000
mm DI from EMBABA to ELHARAM length 28 Km associated fittings and special parts with all
associated Washout chambers, line valve chamber and air valve chambers, valve chambers, .
2-Supervising the constructing of 2 pipe jacking tunnels of length 130 m-R.C pipes
2800mm Diameter .
6من 4صفحة
3-Supervising the constructing of Row water tanks, Pumping clorination building , clarifiers & filters
building , treated water pumping station .
4-Supervising of stopping water leakage from water tanks by injection using polyrethane
--------------------------------------------------------------------------------------------------
May 2003 Till Jan 2006 : ( EGYPT )
Project : Infra structure of smart village project
Client : Ministry of communication and data technology .
Consultant : ECG ( Engineering consultant group )
Company : SEDE ( Societe Egyptienne D’Entreprises )
Budget : 120 milion Egyptian pounds
Duration : 18 months
Position : Construction manager at SEDE company Responsibities :-
1- Managing, Supervising and controlling all project activities including: Planning, Budgeting,
Monitoring, to ensure Completion on time and within the budget, Day to day monitoring of the site as
per the schedule and priorities. Maintain productive relationship with the external stakeholders at site
Providing timely data to billing and planning engineers regarding extra items, joint measurements,
holds, additions, alterations and Supervising installation and laying of about 13 km length for Supply
water network , irrigation network, main force line , and fire network , associated fittings and special
parts with all associated Washout chambers, valve chamber and air valve chambers . 2-Supervising installation and laying of about 13 km length for waste water network , storm drainage
network , associated fittings and special parts with all associated manholes .
3-Supervising of Bund with Gatch material , excavation in bund , bedding with sand&surround .
4-Supervising of washout chambers , valve chambers , thrust block for bends & tees , installation of
fittings , water proofing for concrete , finishing of bund.
5-Supervising all pressure tests , concrete activities and all associated works along the pipelines .
6-Supervising of building including ( concrete works – water proofing – finish works “tiles , paints ,
plumbing and electricity ) .
7-Supervising of stopping water leakage from water tanks by injection using polyrethane.
-----------------------------------------------------------------------------------------------------------
FROM 2000 Till 2003 : ( EGYPT )
Project : Zoser Hotel
Client : Irini Pasi Company
Architectural Consultant : Doctor Abdel naser Abd Alla.
Structural Consultant : Doctor Ebrahim Gatas
Position : Supervisor Engineer Doctor Ebrahim Gatas Office
Budget : 68 million Egyptian Pounds
Duration : 36 months
Responsibilities :- 1-Supervising all project activities including all concrete works,finishing ,landscaping,pluming, to ensure
the complition of the project according to specification which consists of five star hotel of area 6200
m2 consists of (eigth floor of 410 rooms , swimming pool of area 1150 m2 , laundry , main kitchen ,
basement floor and conference room)
2-Supervising of construction for landscaping and parking area works .
3-Supervising of installation of domestic water supply ( propylene pipe ) of dia. From 20 mm to 150 mm.
4-Supervising of installation of sewage network ( UPVC) of dia. From50mm to200 mm
-----------------------------------------------------------------------------------------------------------
6من 5صفحة
From 1997 Till Feb 2000: ( EGYPT )
Project : Abo Alnomros Sewage Station
Client : Ministry of Water Resourses
Consultant : Doctor Hatab Office
Company : SEDE ( Societe Egyptienne D’Entreprises
Budget : 48 million Egyptian Pounds
Duration : 36 months
Position : Site Engineer at SEDE Company. Responsibities:
1- Supervising of the Construction of main station of cylindrical walls underground at 25 m deep with
diameter 23 m .
2- Supervising of the Construction of additional building ( office building - mosque – workshop -
service building – land scaping – finishing works ) .
3-Experince at stopping water leakage from water tanks by using injection with polyurethane .
4- Supervising of the Installing sewage network include ( clay pipe of dia. From 225 : 1000 mm, main
force line of dia. 1000 mm DI, P.C square manholes 1.2 x 1.2 ).
5-Supervising of stopping water leakage from water tanks by injection using polyrethane
-----------------------------------------------------------------------------------------------------------
1995 Till Feb 1997: ( EGYPT )
Project : Sewage Station for Manshiat Albakare at Alharam
Consultant : Doctor Hatab Office
Company : SEDE ( Societe Egyptienne D’Entreprises
Budget : 43 million Egyptian Pound
Duration : 24 monthes
Position : Site Engineer at SEDE Company.
Responsibities:
1-Supervising of the Construction of main station of cylindrical walls underground at 25 m deep with
diameter 23 m .
2- Supervising of the Construction of additional building ( office building - mosque – workshop -
service building – land scaping – finishing works ) .
3-Experince at stopping water leakage from water tanks by using injection with polyurethane .
4- Supervising of the Installing sewrage network include ( clay pipe of dia. From 600 : 1200 mm, main
force line of dia. 1000 mm DI, R.C square manholes 2 x 2 m ).
----------------------------------------------------------------------------------------------------------------------------
From 1992 Till 1995: ( EGYPT )
Project : Hilton Village in noubaa – South Sinai
Consultant : Doctor Ali Azam Office
Company : Elabd Contracting Company
Budget : 85 million Egyptian Pound
Duration : 36 monthes
Position : Supervisor Engineer at Doctor Ali Azam Consultant Office .
Responsibities:
1-Supervising of construction for Nueba Hilton Village at area 500000 m2 consisting of:-
Main hotel of 4 floors, 40 shalleh , main laundry , restruant , swimming pool ,its concrete
construction and its finishing works ,
landscaping works :- Main roads and gardining works
Water supply of dia . from 50 mm : 200 mm DI .
Sewage network of dia . from 200 mm : 315 mm upvc .