Upload
piyush-pattnaik
View
22
Download
1
Embed Size (px)
Citation preview
RESUMEPIYUSH PATTNAIK
-Mail:[email protected]
Mobile – 09937289079 / 06742311688
Permanent Address:
S/O. – Late Sri B.C .PATTNAIK Vill. – B.J.B NAGAR PLOT 2180,P.O. – SABARSAHI LANE,P.S. – BARGARH,Dist. – KHURDA,Pin – 751014State –ORISSA
SR RF ENGINEER
Work Experiences – RF Optimization– 7.10 Years
Objective
To contribute towards the organizational growth with positive attitude, learning zeal & eagerness to take challenging endeavor no matter which atmosphere I work.
Qualification:
B.TECH. from Bharath Institute of Higher education & Research, Chennai in 2007.
Professional Synopsis
RF Planning, Optimization and Parameter Monitoring at RF OMC with MML Commands.
KPI Report, Hourly Report, Daily RF Performances Report including BBH & NBH Analysis.
Daily Taking Care of and Resolving SD & TCH Blocking, SD & TCH Drop, TASR, HOSR issues.
All types of Report & Log Extracting with Network’s Router through Reflection 7.0. & Citrix.
RF Parameters, Frequency Planning with Citrix Access Clients NetAct Optimizer & MapInfo.
Voice Call, EDGE, GPRS Handling and Problem short out with help of TNMS Logging.
Customers Network Complain analysis & resolution related to networks issue.
Signal Spectrum Analysis with Frequency Spectrum Analyser.
Drive Test with Nemo Tools, TEMS 6.0 & 8.0.3, .
IBS Planning, Walk Test, IBS Implementation Handling, IBS Survey, LOS Survey.
Proficient in Installation, Commissioning and Integration of Nokia BTS. Extensive knowledge of Ultra BTS, Flexi BTS, Metro BTS and MW operations and maintenance on Nokia Flexihopper MW.
1
Successfully completed various projects in 7.10 years nearly.
Motivated Skilled and motivated with knowledge in TDMA Technologies and can achieve proficiency in any related or specific field in a relatively short time.
Ability to perform quality work within deadlines with or without direct supervision.
Optimizing RF Related Parameters such as Neighbor list, DN, IRAT Relation (3G to 3G,3G to 2G and 2G to 3G), Antenna E Tilt , SC(Scrambling Code) and change other parameter values such as RSCP and Ec/No. By adding and deleting Neighbors for reduce Pilot Pollution, interference, addition of missing Neighbors & SC changes in order to enhance main routes performance.
Responsible for performing the drive test by DT Engineer for the network at regular intervals to check the Quality of Service & changing system parameters like Scrambling Code assignments, neighbors lists, antenna orientations & tilt to achieve better coverage, call quality & network capacity
Coordinate with Field teams to suggest physical changes at sites and for RF survey
Monitoring Daily reports to analyze the Radio network performance to verify the Radio Utilization, Drop Rate (TCH/SDCCH), Blocking (TCH/SDCCH), Assignment failures, Poor HOSR, RASR, CSR, CSSR etc.
Preparation of Nominal, RND and Detail plan for the Coverage, Capacity and New Town Site.
Responsible for Grow De-grow, Additions with fresh materials for the better performance of the network.
Tracking the Traffic Dip cases after Addition and Plan for Traffic sharing for resolution.
Responsible for Preparation of RF data, deciding the BSc w.r.t LAC Boundary for the New Sites.
Responsible for Frequency Planning, Neighbors Planning, Offloading cells for the highly Utilized cells.
Preparation and Analysis of various reports including: Capacity tracking by preparing Block Trx report, MGCEP report, TA report, MO Dump and preparation of MCOM site data.
EMF site Audit and Testing with VTM / TERM for GSM and WCDMA. Preparation of EMF reports and Calculation. Responsible for Preparation of EMF reports for new sites and Expansion Trx
cases. Monitoring performance of cell site and take corrective measures for improving
the network performance. Handling optimization of new sites and handled problems like RAB Speech drop,
interference, IRAT handover failure, handover reversion, in-building problem, antenna tilting, competitive Drive Test.
Optimizing RF Related Parameters such as Neighbor list, DN, IRAT Relation(3G to 3G, 3G to 2G and 2G to 3G), Antenna E Tilt , SC(Scrambling Code) and change other parameter values such as RSCP and Ec/No. By adding and deleting Neighbors for reduce Pilot Pollution, interference, addition of missing Neighbors & SC changes in order to enhance main routes performance.
Responsible for performing the drive test by DT Engineer for the network at regular intervals to check the Quality of Service & changing system parameters like Scrambling Code assignments, neighbors lists, antenna orientations & tilt to achieve better coverage, call quality & network capacity.
Troubleshooting of the network based on customer complaints KPI monitoring.
Troubleshooting of IRAT
2
Present Company
Company name
ERICSSON INDIA GLOBAL SERVICES PVT.LTD
Designation SR RF Optimization Engineer.
Working Period 1 YR & 8 Months running to till date
Job Location Kolkata (West Bengal)
Job Profiles
DTAC-THAILAND
RF Planning, Optimization.
KPI Report, Hourly Report, Daily RF Performances Report Analysis.
Cluster kpi,Customer complain.
Daily Looking After KPI related to Accessibility, Retainability & Mobility issues.
Customers Network Complain analysis & resolution related to networks issues.
PAT report preparation.
SSV report preparation.
Daily working on WCL and sharing the analysis result to customer.
Worked in Thailand for 6 months for Rollout New 3G site for Tuning optimization.
Previous Company
Company name
ZTE TELECOM (TTSL PROJECT)
Designation RF Optimization Engineer.
Working Period 2 yrs 10 month.
Job Location Bhubaneswar (Orissa).
Job Profiles
TTSL_DOCOMO
RF Planning, Optimization & Parameter Monitoring at RF OMC.
KPI Report, Hourly Report, Daily RF Performances Report Analysis.
KPI SIGN OFF .
Daily Looking After SD & TCH Blocking, SD & TCH Drop, TASR, HOSR
3
issues.
All types of Report & Log Extracting with TIVOLI( MINOS) TOOL
KPI SIGN Off with daily working on Exclusion..
Customers Network Complain analysis & resolution related to networks issues.
Using Net Numen Tool for changes to be done in parametric level.
Past Company
Company name
Nokia Siemens Network
Designation RF Engineer.
Working Period
February 2009 to February 2011
(1 Year and 11 Months).
Job Location Bhubaneswar (Orissa).
Job Profiles
Nokia-Bharti
RF Planning, Optimization & Parameter Monitoring at RF OMC.
KPI Report, Hourly Report, Daily RF Performances Report Analysis.
Daily Looking After SD & TCH Blocking, SD & TCH Drop, TASR, HOSR issues.
All types of Report & Log Extracting with Network’s Router through Reflection 7.0.
RF Parameter Planning with Citrix Access Clients NetAct Optimizer & MapInfo.
Voice Call, EDGE, GPRS Handling and Problem short out with TNMS Logging.
Customers Network Complain analysis & resolution related to networks issues.
Past Company
Company name ADA Cellworks Wireless Engineering Pvt. Ltd. (GTL Limited.).
Designation JR RF Engineer.
Working Period August 2007 to February 2009 (1year and 6 months).
Job Location KOLKATTA CIRCLE,R.O.B CIRCLE(REST OF BENGAL)
Job Profiles
Nokia-Bharti
RF Planning & Optimization.
Drive Test(TEMS) , Walk Test, Analysis Logfiles.
Survey , LOS Survey.
Tools, Software, Equipments Used
Planning & Opti. Citrix Access Clients NetAct Optimizer.
DT & Walk Test Nemo Tools, TEMS Investigation 6.0 & 8.0.3.
GISMapInfo Professional 8.5 SCP & 9, Global Mapper 9, Google Earth,MCOM
4
Site Survey GPS, Digital Camera, Binocular, Altimeter, Compass.
Measurement Frequency Analyser, VSWR, Net Monitor, Measuring Tape.
EquipmentsNokia BTS (UltraSite, Flexi BTS, Metro BTS),
. Microwaves Equipments, GSM Equipment. Repater
Strengths Positive attitude and energetic nature. Hard work and dedicated to work. Willing to learn and adapt to new opportunities & challenges.
Personal Information
Guardian Late Sri B.C.PATTNAIKDate Of Birth 24 / 02 / 1985Passport No. L6179066PAN Card No. AYQPP6113MSex MaleNationality/ Religion / Caste
Indian / Hindu / khatriya
Languages Known English, Hindi, OriyaHobbies Painting, Playing Football, Watching Movies.
Declaration
I here by declare that all the information furnished above is true to the best of my knowledge and belief.
Place: Bhubaneswar
Date: 06/07/2015
(Piyush Pattnaik)
5