6
CURRICULUM VITAE 1) Personal Details : Name Suresh Chand Gupta Date Of Birth 29.08.1958 Nationality Indian Designation General Manager ( Inspection and Expediting) Experience 34 Years in Oil and Gas sector at Engineers India Limited Permanent Address H-34/50, Sector-3, Rohini, Delhi -110085 (India) Marital Status Married Contact Details Mobile : +91 9650597938 Mail id: [email protected] 2) Educational Qualification: Institute Degree Year of Passing Jodhpur University B.E (Mechanical) 1980 Baroda Productivity Council Dip. In Bus. Management 1982 3) Company - Engineers India Limited: Employed with Engineers India Ltd. (EIL) a Government of India undertaking in the field for Petroleum refining, Pipe lines, Gas processing, Off shore engineering, petrochemicals etc. Company was established in collaboration with Bechtel Corporation USA. Serving EIL since Jan 6,1981. 4) Job description is as follows:

CV SCGupta Nov 15-1

Embed Size (px)

Citation preview

Page 1: CV SCGupta Nov 15-1

CURRICULUM VITAE

1) Personal Details :

Name Suresh Chand Gupta Date Of Birth 29.08.1958Nationality IndianDesignation General Manager ( Inspection and

Expediting)Experience 34 Years in Oil and Gas sector at

Engineers India LimitedPermanent Address H-34/50, Sector-3, Rohini, Delhi -

110085 (India)Marital Status MarriedContact Details Mobile : +91 9650597938

Mail id: [email protected]

2) Educational Qualification:

Institute Degree Year of Passing

Jodhpur University B.E (Mechanical) 1980

Baroda Productivity Council Dip. In Bus. Management 1982

3) Company - Engineers India Limited:Employed with Engineers India Ltd. (EIL) a Government of India undertaking in the field for Petroleum refining, Pipe lines, Gas processing, Off shore engineering, petrochemicals etc. Company was established in collaboration with Bechtel Corporation USA. Serving EIL since Jan 6,1981.

4) Job description is as follows:

I am in procurement department of EIL wherein I have following experience:

Managing Core Expediting Group, Procurement & Develop Department, Shipping Department and Inspection team

Expediting leader of HMEL Refinery in Bhatinda Procurement and inspection coordinator for Borouge 2 Project of

Abudhabi Polymers Co. - posting at Tecnimont Italy now at Ruwais Abu Dhabi.

Sr. Coordinator for purchase for SKIKDA Project of Sonatrach Algeria and inspection of critical equipments. Posting was at CPECC China.

Inspection (vessels, columns, exchangers, piping material, pumps, pipelines etc.)

Offshore visits

Page 2: CV SCGupta Nov 15-1

Expediting ( shop ordered items for oil and gas project) , Monitoring the progress of orders for the complete Project and

maintenance of overall status of shop ordered item and expediting thereof.

Purchase (material for MGCC project of M/s IPCL and line pipes for GAIL)

Vendor Development (review of application, assessment of vendor for registration, preparation of capacity assessment reports) and inspection of shop ordered items.

This makes me a truly procurement man having in depth exposure of all aspects of procurement.

5) Chronological summary of career :

Aug 2014 till Date : General Manager ( Inspection) at New Delhi

Managing Core Expediting Group at Delhi, Procurement & Develop Department, Shipping Department and Inspection team at Delhi.

Dec 08 to Aug 2014 : At EIL DelhiExpediting Head for HMEL Refinery first and then overall head of expediting team. Responsible for expediting of Purchase order items for all the Projects handled by EIL

October 07 till Dec 08: At Tecnimont Milan Italy

Worked as procurement and inspection coordinator for Borouge II project of ADNOC Abudhabi

There are about 500 orders to be placed for Polyolefins Unit (Petrochemical Project) being executed by Tecnimont Italy. I am a member of Integrated Project Management Team and am responsible for procurement, vendor approval, inspection coordination and expediting of orders. Project is likely to continue till March 2009.

July 2007 till Sept 07: At EIL New Delhi

Monitored and expedited the progress of LLDPE/ HDPE Swing Unit of IOCL being done by our company on LSTK basis. Project is worth Rupees 9000 million and being executed under PMC Uhde India. National and international orders are being expedited.

2006- June 2007: At China as Procurement coordinator for Skikda Condensate Topping Project at Algeria of M/s Sonatrach being executed by M/s CPECC of China. Inspection of critical items.

2001-2005 : At EIL New Delhia) Vendor development : Registration of new vendors for items for which less vendors exists.

Page 3: CV SCGupta Nov 15-1

b) Assessment of capacity of vendors for linepipe projects for which huge quantity is required. c) Approval of vendors list for procurement of Project itemd) Assessing causes of problems and writing report for example causes of ovality in linepipes, Indian Experience of usage of Spiral welded line pipes etc.e) inspection of project material.f) Pojects : IOCL Panipat Refinery, GAIL, HPCL, OIL India , etc.

1997-2000 - At EIL New Delhi: Progress monitoring and expediting of vendors supplies for Essar Oil Refinery Project. Inspection of spheres, bulk material & NDT.

1993-1997 – At Baroda: Expediting of material to meet the project schedule. Inspection of fabricated equipment, bulk material, Line pipes etc. including NDT thereof. Was visiting engineer to L and T Hazira works where crical equipments are ordered.

1983-1993 – At EIL New Delhii- Expediting of material, coordination of vendors’ deviations and monitoring of project for vendor supplies. IPCL and ONGC projects were coordinated and monitored for in time supply of material to site. Inspection of mechanical items, offshore visits etc. Purchased material for a Mega Project - MGCC of IPCL now part of Reliance India. Purchased line pipes for longest pipeline project HBJ Pipe line project.

1982-1983 – Baroda – Expediting and inspection of materials like vessels, heat exchangers, pumps, valves, lining etc.. Quality control, NDT and shop visits.

11) Foreign postings :

Italy1990 ( 90 Days) : As company representative for inspection of material for Gas Lift Pipe Line project of ONGC

South Korea 1993 (90 Days) : Inspection of SHW Platform for ONGC

South Korea 1998 ( 25 Days) : Inspection of Line pipe material for GAIL

China2004 (21 Days) : Inspection of pipes

China 2006-2007 ( 1.5 Years) : Procurement Coordinator for Skikda Condensate Topping Project Algeria

Page 4: CV SCGupta Nov 15-1

Italy Oct 2007 – till date : Sr. Procurement Coordinator for Borouge II Project at Abu Dhabi

Abudhabi 2008 ( 1.5 month) : Sr. Procurement Coordinator(Part of above assignment)

Japan and South Korea ( 8days) : Expediting Japan : Problem resolution at Hitachi

USA (Six visits 6 days each) : Inspection and expediting (2009-2015)

Offshore assignments for pipe laying, NDT, Platform installation etc.

12) Experience Before Joining Eil & Job Description : Nil

13) Research Papers/Publications/Seminars : Nil

14) Training/Special Courses Attended : RT LEVEL IIISO Internal Auditors Course

15) PROFESSIONAL MEMBERSHIP : Certified Chartered Engineer by Institution of Engineers India.

(S.C. Gupta)Phone – 0091-11-47097938/ +91 [email protected]