4
Name Jamie Allen DOB 09.08.1985 Address: 07414 477933 Profile Moved to JSM from another civil company in August 2013; I been working within the substation environment for over 9 years and has predominately worked for Western Power Distribution on various projects. I have worked my way up from a ganger to site foreman, supervisor and now Field Engineer / Project Manager; I would consider myself to have great knowledge on civil works and has excellent knowledge on the installation of HV cables and understands all aspects of the HV installation process, I would consider myself able to solve any issues that may arise during the day to day operations within the business. Qualifications NVQ (QCF) Level 2 DIPLOMA Occupations Construction EUSR – SHEA Power PASMA NRSWA Supervisor CPCS 360 Operator CPCS Dumper Operator NPORS SSSTS First Aid WPD authorized person – Document & key holder SSE authorized person – Document & key holder BESC MEWPS for managers Key skills and experience 12 years construction experience, of which 9 have been within the electrical industry 2015 Page 1 Jamie Allen

CV_Jamie Allen - Field Engineer

Embed Size (px)

Citation preview

Page 1: CV_Jamie Allen - Field Engineer

Name Jamie Allen

DOB 09.08.1985

Address: 07414 477933

Profile

Moved to JSM from another civil company in August 2013; I been working within the substation environment for over 9 years and has predominately worked for Western Power Distribution on various projects. I have worked my way up from a ganger to site foreman, supervisor and now Field Engineer / Project Manager; I would consider myself to have great knowledge on civil works and has excellent knowledge on the installation of HV cables and understands all aspects of the HV installation process, I would consider myself able to solve any issues that may arise during the day to day operations within the business.

Qualifications

NVQ (QCF) Level 2 DIPLOMA Occupations Construction EUSR – SHEA Power PASMA NRSWA Supervisor CPCS 360 Operator CPCS Dumper Operator NPORS SSSTS First Aid WPD authorized person – Document & key holder SSE authorized person – Document & key holder BESC MEWPS for managers

Key skills and experience

12 years construction experience, of which 9 have been within the electrical industry Analytical approach to problem solving Able to work to stringent timescales and manage the team proficiently Good communication skills

Relevant Projects

2015 Page 1 Jamie Allen

Page 2: CV_Jamie Allen - Field Engineer

Western Power Distribution – Presteigne 11/33/66kV built new substation and was involved with new circuit installment.

Western Power Distribution – Shrewsbury 132kV, built an new switching house and installed trough work and pulled in new cable to switch room

Western Power Distribution – Corby 132Kv, Decommissioning of oil filled 132kV cable and installment of new 132kV XLPE x 2 Circuits

Western Power Distribution – Bixhead 33kV, 3 x circuits running from new switch room through the forest of dean and terminated and newly installed H poles.

Scottish Southern Electric – Stoke Poges lane, Installing new 132/33/11kV and LV circuits through new railway bridge, working alongside Network Rail

National Grid – Shrewsbury 275kV – Decommissioning and overlay inside substation

Western Power Distribution/ Mercia waste – New 66kV circuit through Kidderminster into incinerator plant.

Oldbury Power Station – Part of the decommissioning of the site team – Phase 1 & 3

Western Power Distribution – Hartlebury 66Kv cable installation (6km) and construction of a Sealing End Platform on a 66Kv Tower

Western Power Distribution – Various oil filled cable decommissioning works from 33/66/132kV

Specific Project role and responsibilities

Current Role Description:

To provide support both to the client and the team designated on the project, to ensure all employees are fully aware of the works due to be undertaken and are competent to do so, I ensure all Risk Assessments and Method Statements conform to the clients and company needs and are approved prior to work commencing. Organise the site set up alongside the site manager/supervisor and ensure its set up correctly to CDM / CPP regulations, Problems solve as and when any may arise and ensure a solution is put forward to the client to resolve the issue.

2015 Page 2 Jamie Allen

Page 3: CV_Jamie Allen - Field Engineer

Project Duties Interface management with the client High standard of professionalism of any civil or associated works for the project works Delivering high productivity in a safe and efficient manner, ensuring that all work is conducted

safely and in compliance with company policies Overview of day-to-day operations Recruitment of any specialist skilled personnel required Procurement of specialist plant & equipment Supply Chain Management; developing supplier relationships Identifying training requirements for OU staff and operatives Preparation of operational reports Cost management & financial reporting Promote a professional image on the site Proactively motivate and develop the workforce encouraging good communication and team

work Work closely with the project delivery team to ensure that all processes and activities are

carried and completed in accordance with the approved procedures Prioritise own workload in order to meet project deadline without comprising quality standards Create and maintain good communication and relationships with, client, suppliers, councils,

staff and members of the public and any agencies Understand the scope of works, programme of works with the activities to meet delivery

timescales Assess the level of risk and identify any health and safety risks! financial risks and the

development of the associated contingency plans Assist the team to produce method statements and risk assessment as required Ensure that all accidents, dangerous occurrences and near miss incidents are reported as per

the company procedures Accept full responsibility for the compliance with the Construction Design and Management

Regulation (CDM) 2007 for the personal safety, safety of all project team members and safety of the general public within project work area

Complying with all Safety rules, site rules and procedures instructed by others when working on 3'" party sites

Provide support to ensure that the jointing/cabling related records and as builts are completed, accurate and up to date

Maintain a strong customer focus and provide a positive customer experience

All References Available upon requet.

2015 Page 3 Jamie Allen