Upload
tassos
View
13
Download
0
Embed Size (px)
DESCRIPTION
CYRIC Hyperball2. Preparations. FERA and Double buffer Analyzer ADC, TDC, QDC check Ge mounting Ge cabling. FERA and Double buffer. Successfully works. Cable connection and all cable are OK. Dead time ~20 m s (single hit). Analyzer. Just only for monitoring - PowerPoint PPT Presentation
Citation preview
CYRIC Hyperball2
Preparations
• FERA and Double buffer
• Analyzer
• ADC, TDC, QDC check
• Ge mounting
• Ge cabling
FERA and Double buffer
• Successfully works.
• Cable connection and all cable are OK.
• Dead time ~20 s (single hit)
Analyzer
• Just only for monitoring– All ADC, TDC, QDC histograms– ADC and TDC correlation
Module check
• 11 ADCs (44 ch) are OK.
• 3 QDCs (48 ch) are OK.
• 4 TDCs (TDC1 24 ch, TDC2 12ch, TDC3 32ch, TDC4 16 ch) are OK.– One channel has large offset: ~50 ns
Ge mounting
• Clover 1-6 : CL1,CL3,CL4,CL6
• Single 1-12: Single 1,2,3,4 7,8,9,10
• New single slot assignment
CL1CL4
CL2CL5
CL3CL6
BGOmf1BGOmf2
Slot1
Slot2
Slot3
Slot7
Slot8
Slot9
Slot4
Slot5
Slot6
Slot10
Slot11
Slot12
× × ×
Up Middle Down