Page 1: CYRIC Hyperball2

CYRIC Hyperball2

Page 2: CYRIC Hyperball2

Preparations

• FERA and Double buffer

• Analyzer

• ADC, TDC, QDC check

• Ge mounting

• Ge cabling

Page 3: CYRIC Hyperball2

FERA and Double buffer

• Successfully works.

• Cable connection and all cable are OK.

• Dead time ~20 s (single hit)

Page 4: CYRIC Hyperball2

Analyzer

• Just only for monitoring– All ADC, TDC, QDC histograms– ADC and TDC correlation

Page 5: CYRIC Hyperball2

Module check

• 11 ADCs (44 ch) are OK.

• 3 QDCs (48 ch) are OK.

• 4 TDCs (TDC1 24 ch, TDC2 12ch, TDC3 32ch, TDC4 16 ch) are OK.– One channel has large offset: ~50 ns

Page 6: CYRIC Hyperball2

Ge mounting

• Clover 1-6 : CL1,CL3,CL4,CL6

• Single 1-12: Single 1,2,3,4 7,8,9,10

• New single slot assignment

CL1CL4

CL2CL5

CL3CL6

BGOmf1BGOmf2

Slot1

Slot2

Slot3

Slot7

Slot8

Slot9

Slot4

Slot5

Slot6

Slot10

Slot11

Slot12

× × ×

Up Middle Down