28
Project Partners Data vs Goliath

CyrusOne - Brochure 2016

Embed Size (px)

DESCRIPTION

 

Citation preview

Page 1: CyrusOne - Brochure 2016

Project Partners

Data vs Goliath

Page 2: CyrusOne - Brochure 2016

Data vs GoliathHow CyrusOne is dominating the data centre industry

Written by Wedaeli Chibelushi

Produced by Tom Venturo

Page 3: CyrusOne - Brochure 2016

3

Data vs GoliathHow CyrusOne is dominating the data centre industry

Written by Wedaeli Chibelushi

Produced by Tom Venturo

Page 4: CyrusOne - Brochure 2016

4

Construction Global caught up with Vice President of CyrusOne, Laramie Dorris. We discussed growth, the future of technology, and its long-awaited ‘Goliath Project’

CyrusOne’s newest 30 Megawatt Northern Virginia facility is completed

in less than six months, shattering all known data center construction timelines

Global data center provider CyrusOne (NASDAQ: CONE) recently announced the record-setting, six-month time period from ground breaking to completion of its newest 30 Megawatt facility on its Northern Virginia campus. Completed in less than six months, the project was delivered in the shortest known time to market interval for an enterprise scale data center of this size.

Driving this outstanding accomplishment was the company’s use of Massively

Modular® engineering methods and advanced manufacturing supply chain techniques which enable the company to provide for the lowest costs and fastest time to market in the data center industry.   

CyrusOne’s stated goal has been to improve its supply chain efficiency to the point whereby it can deliver a completed data center in the same timeframe that customers can order and receive the computing equipment that will reside in the data center. CyrusOne never wants its customer’s business objectives to be slowed down by the speed of their data center deployment. The record setting time it delivered the Northern Virginia facility proves CyrusOne can remove

Page 5: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 5

C O N S T R U C T I O N

Page 7: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 7

C O N S T R U C T I O N

w w w. c y r u s o n e . c o m 7

Laramie DorrisVice President of Data Center Design & Construction

Laramie Dorris is the Vice President of Data Center Design & Construction at CyrusOne, and is responsible for enterprise wide project development & execution of data center construction projects. In his years at CyrusOne, Laramie has been responsible for overseeing CyrusOne’s 2014 record-breaking 107-day Chandler I campus completion in Phoenix, Arizona, as well as the arguably more aggressive 180-day Sterling II facility completion in 2016 located in Northern Virginia.

Prior to joining CyrusOne, Laramie was a seasoned construction and design executive for mission critical construction firms. He also previously worked at J.P. Morgan and Bear Sterns on a wide range project.  Laramie has managed both domestic and international projects.

Page 8: CyrusOne - Brochure 2016

8

that uncertainty for them.  The unbridled demand for growth that cloud and social media companies are experiencing is volatile and overwhelming. Against this backdrop, companies are unsure whether they will be growing at a 50 percent, 100 percent, or 200 percent rate of growth, and the accuracy of the forecasts significantly deteriorates as the forecast horizon lengthens.

CyrusOne’s ability to deliver

large quality data centers with record-breaking speed eliminates the risk customers feel with inaccurate capacity planning, and by reducing the time it takes to deliver a data center CyrusOne is able to lower the cost of delivery, passing those savings on to its customers.

CyrusOne previously set an industry record when it delivered a 6 MW facility in Phoenix in 107 days. The newest facility

Page 9: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 9

C O N S T R U C T I O N

IES is a full-service national provider of technology services with superior resources, buying power and the best-trained people in the business. We are structured cabling

turnkey installation specialists with extensive experience in Data Center infrastructure design, installation and service.

OOur wide breadth of services, national workforce and service record means you only have to make one call to handle all your Audio Visual, Structured Cabling, Life Safety, Security

and Wi-Fi/DAS needs. Together with our customers and partners, we design, build and service solutions that empower your world.

IES Commercial, Inc.Communications Division Headquarters2810 S. Roosevelt StreetTempe, AZ 85282

Phone: 480.379.6200 / Fax: 480.379.6202Website:  www.iescomm.com

STRUCTURED CABLINGAUDIO VISUALWi-Fi/DAS

SECURITYLIFE SAFETYDATA CENTER

Total Solutions: Design.

Build.Maintain.

Page 10: CyrusOne - Brochure 2016

INTEG SYSTEMS CORPORATION22 Shelter Rock Lane, Danbury, CT 06810 | P: (203) 798-1194 | F: (203) 778-8874E: [email protected] | www.integsystemscorp.com

Working in the customer’s best interest isthe heart and soul of our business.

Owner RepresentativeSite CommissioningConceptual DesignSite SurveysInstallation SupervisionComprehensive Service

SERVICES

Static Uninterruptible PowerSupply SystemsDiesel and Turbine GeneratorsParalleling GearElectrical Distribution SwitchgearPower Distribution UnitsMMedium Voltage Rotary UPS (DRUPS Systems)

PRODUCTS

Data Processing CentersTelecommunication FacilitiesNetwork OperationsMedical Imaging

APPLICATIONS

Since 1996, Integ has provided one source responsibility for the conceptual design, sales, installation management and coordination for the support/service of critical electrical back up systems. Integ was formed to provide integrated power protection solutions for mission critical data, communication, medical imaging and industrial facilities nationally. Our Company’s mission is to be the leader in critical electrical support systems by integrating the most reliable products available in today’s marketplace. We look forward to supporting your mission critical needs.

Conceptual DesignConceptual DesignIntegInteg Systems collaborates with business partners offering a myriad of services. Integ will often provide conceptual designs that allow a project to move on the required fast track. The conceptual design also allows critical electrical/mechanical equipment to be pre-purchased, ensuring a timely delivery and on-time project completion. The process continues by working closely with Engineers, Architects, Construction Managers, General, Mechanical, and Electrical Contractors to ensure that the project proceeds on schedule. Working in the customer’s best interest is the heartheart and soul of our business. Whether that interest is an owner’s representative or as a team player with other business partners, Integ maintains the customer’s goals as the driving force behind our designs and decisions. The basis behind our design process is a system concept philosophy that not only offers Built-In Redundancy, when required, but also ensures Built-In Maintainability. Without both concepts working in harmony, the system uptime can be severely impaired.

Page 11: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 1 1INTEG SYSTEMS CORPORATION22 Shelter Rock Lane, Danbury, CT 06810 | P: (203) 798-1194 | F: (203) 778-8874E: [email protected] | www.integsystemscorp.com

Working in the customer’s best interest isthe heart and soul of our business.

Owner RepresentativeSite CommissioningConceptual DesignSite SurveysInstallation SupervisionComprehensive Service

SERVICES

Static Uninterruptible PowerSupply SystemsDiesel and Turbine GeneratorsParalleling GearElectrical Distribution SwitchgearPower Distribution UnitsMMedium Voltage Rotary UPS (DRUPS Systems)

PRODUCTS

Data Processing CentersTelecommunication FacilitiesNetwork OperationsMedical Imaging

APPLICATIONS

Since 1996, Integ has provided one source responsibility for the conceptual design, sales, installation management and coordination for the support/service of critical electrical back up systems. Integ was formed to provide integrated power protection solutions for mission critical data, communication, medical imaging and industrial facilities nationally. Our Company’s mission is to be the leader in critical electrical support systems by integrating the most reliable products available in today’s marketplace. We look forward to supporting your mission critical needs.

Conceptual DesignConceptual DesignIntegInteg Systems collaborates with business partners offering a myriad of services. Integ will often provide conceptual designs that allow a project to move on the required fast track. The conceptual design also allows critical electrical/mechanical equipment to be pre-purchased, ensuring a timely delivery and on-time project completion. The process continues by working closely with Engineers, Architects, Construction Managers, General, Mechanical, and Electrical Contractors to ensure that the project proceeds on schedule. Working in the customer’s best interest is the heartheart and soul of our business. Whether that interest is an owner’s representative or as a team player with other business partners, Integ maintains the customer’s goals as the driving force behind our designs and decisions. The basis behind our design process is a system concept philosophy that not only offers Built-In Redundancy, when required, but also ensures Built-In Maintainability. Without both concepts working in harmony, the system uptime can be severely impaired.

is almost twice the size of the Phoenix facility, offers 500 percent more power capacity, and only took twice as long to deliver, further highlighting the company’s continuing focus on supply chain efficiency.    

“Completing a data center of this magnitude in this short time frame is a monumental accomplishment and it continues to prove out CyrusOne’s ability to meet even the shortest customer deadlines. This level of breakneck speed to market helps eliminate the risks executives face when making IT capacity planning decisions,” said Laramie Dorris, vice president, data center design and construction, CyrusOne. “We are incredibly proud of our strong team of architects, engineers, and contractors for

their hard work and ingenuity in bringing this project to completion in a record-setting time.

By accomplishing this feat, we have completely revolutionized the dynamics of building out new infrastructure for the industry, and established a new norm for rapid deployment and expansion of customers’ critical infrastructure.” 

Completion of the new facility dramatically expands the scope of the Northern Virginia campus, providing an additional 30 megawatts of critical power capacity. The new facility represents the second phase of construction for the campus. Occupancy of leasable space is currently over 75 percent. Phase three of construction on the Northern Virginia campus is scheduled to

“We are incredibly proud of our strong team of architects, engineers, and contractors for their hard work and ingenuity in bringing this project to completion in a record-setting time.”

Page 12: CyrusOne - Brochure 2016

“By accomplishing this feat, we have completely revolutionized the dynamics of building out new infrastructure for the industry, and established a new norm for rapid deployment and expansion of customers’ critical infrastructure”

Page 13: CyrusOne - Brochure 2016

“By accomplishing this feat, we have completely revolutionized the dynamics of building out new infrastructure for the industry, and established a new norm for rapid deployment and expansion of customers’ critical infrastructure” - Laramie Dorris, Vice President of Data Center Design & Construction

Page 14: CyrusOne - Brochure 2016

1 4

commence in the near future.“In Northern Virginia, CyrusOne

made an educated decision to go with an all-precast structural concrete building, with modular power and cooling units,” Dorris explains. “This enabled us to set up advanced supply-chain operations to manufacture or pre-fabricate the components we needed for the data center, which gave us significant savings in time and costs.

“For example, a normal data center building has tilt-up concrete walls, which are cast on-site at the construction site. But for the Sterling II data center, we set up a separate off-site facility where we could cast pre-fabricated concrete wall panels. We then brought those panels to the construction site on trucks and used them to set up the data center building. It saved time because we didn’t have to stop work at the building site while the concrete walls were being cast.

“Also, we decided to use pre-fabricated concrete supports in the data center building, which we could also cast off-site. This saved additional time and money because we didn’t have to buy a reinforced steel framework for the building or wait for it to be delivered to us. Using pre-cast concrete walls and supports shaved a couple of months off our time to market for Sterling II.”

The Northern Virginia data center campus is also part of CyrusOne’s National Internet

BIGGER

STERLING II DATA CENTER (Completed June 2016)

• 180 day completion

• 220,000 square foot building

• 120,000 square feet of data hall

• 30 megawatts of critical power

CHANDLER II DATA CENTER (Completed October 2014)

• 107 day completion

• 120,000 square foot building

• 30,000 square feet of data hall

• 6 megawatts of critical power

180DAYS

107DAYS

CYRUSONE SHATTERS KNOWN DATA CENTER BUILD RECORDS

©2016 CyrusOne. All rights reserved.

Page 15: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 1 5

C O N S T R U C T I O N

Computer Raised Access Flooring, our specialty, is a type of floor that is used throughout mission critical facilities, server rooms, and general offices because it can be various heights above the original floor it has many purposes.

The most common purpose is to cover up all the mechanical, electrical & plumbing infrastructure that it takes to operate a data center and to utilize the space under that raised floor as a plenum for the delivery of cold conditioned air to the servers.

Raising the level of your business

• Computer Raised Access Floors

• VCT Tile• Resilient Conductive• Carpet & Ceramic Tile• Drywall Services

Toll Free: 1-800-796-8195 | Tel: 214 630 2626Email: [email protected]

www.alliedinteriors.com

"Providing services and material to customers within the continental

U.S. for over 30 years"

Page 16: CyrusOne - Brochure 2016

Phone: 973-983-1120 | Fax: 973-983-1125 | E-mail: [email protected]

• Nationwide Coverage for rapid response.• Trained on all VRLA and VLA battery types• Documented procedures for safety and

reliability• SMOP/MOP Support• Full 3-year product and service warranty

Premier Products / Service

• Robust Real Time Monitoring Hardware• Predictive Analysis to identify failing

batteries before a crisis occurs• Notification of critical problems and

maintenance issues.•• Personal service from battery experts

watching your batteries 24 / 7

Premier Remote Monitoring

• Manufacturing• Systems Installation• Commissioning• Monitoring• Battery Maintenance Replacements Services•• Manage Battery Manufacturer Relationships

Supplying Quality Batteries and Services at Lowest Possible Cost

• Enhanced Warranty Coverage and Replacement Services for Three Years

• Reduce risk of Unplanned Downtime from battery

Maximize Battery System Life with Our Comprehensive Battery Management System

BATTERY ASSET MANAGEMENT

Page 17: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 1 7

Exchange (IX) to enable interconnection to other CyrusOne data centers. The CyrusOne National IX marries low-cost robust connectivity with massively scaled data centers, and it creates a data center platform that virtually links more than a dozen of CyrusOne’s enterprise facilities and third-party locations in numerous metropolitan markets. 

CyrusOne operates more than 30 carrier-neutral data center facilities across the United States,

Europe, and Asia. The company provides customers with the flexibility and scale to match their specific IT growth needs. CyrusOne facilities are engineered to include the power-density infrastructure required to deliver excellent availability, including an architecture with the highest available power redundancy (2N). 

Renowned for exceptional service, building enduring customer relationships, and high customer satisfaction levels,

Page 18: CyrusOne - Brochure 2016

1 8

CYRUSONE

CyrusOne serves nine of the Fortune 20 and more than 175 of the Fortune 1000 among its more than 945 customers.

CyrusOne Solutions’ built-to-suit data center product is the best solution for cloud, internet or enterprise customers who need quality data center facilities built in the shortest time possible. The standardized construction approach is a repeatable process employable in multiple locations to ensure rapid speed

to market for data center projects, with significant cost savings for customers.

By delivering data centers like the Sterling II and Phoenix facilities in record times, CyrusOne is continuously setting the bar higher for the data center industry. Additionally, CyrusOne is helping ensure its customers are able to scale at hyper-speed to meet

their data center capacity needs by removing the

risks of running out of space or power.

Readers can learn more about the

Number of employees at

CyrusOne

450

Page 19: CyrusOne - Brochure 2016

C O N S T R U C T I O N

T R U E S Y S T E M I N T E G R A T I O N

Tel: 214-821-6958Email: [email protected]: www.divconcontrols.com

1860 Crown Drive, Suite 1410 Farmers BranchTX 75234

• Mission Critical Controls and Monitoring • Mechanical and Electrical Systems • Design, Engineering, Installation, Project Management, Commissioning • System Analytics • Vendor Independent

Divcon Controls is driven to design and implement the best control systems in the industry.

Engineered to Outperform

Page 20: CyrusOne - Brochure 2016

info@primaryintegration.comwww.primaryintegration.com703.483.6784

CommissioningOperations Consulting

Critical Environment Program Management

“We are incredibly proud of our strong team of architects, engineers, and contractors for their hard work and ingenuity in bringing this project to completion in a record-setting time. By accomplishing this feat, we have completely revolutionized the dynamics of building out new infrastructure for the industry, and established a new norm for rapid deployment and expansion of customers’ critical infrastructure.” Laramie Dorris, vice president, data center design and construction, CyrusOne.

there’s never been a better time to break recordS.

rosendin.com

CyrusOne’s New Data Center in Northern, VA

Endless Possibilities. Always Improving. Ahead of the Current.

Powered by Rosendin Electric

220,000 square feet

30 Megawatts

180 days

Page 21: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 2 1

Arizona Phoenix – Chandler I Phoenix – Chandler II

Connecticut Norwalk Stamford

Illinois Chicago – Aurora I Chicago – Lombard

Indiana South Bend – Crescent South Bend – Monroe

Kentucky Florence

New Jersey

Totowa

New York Wappingers Falls I

Ohio Cincinnati – 7th Street Cincinnati – Blue Ash Cincinnati – Goldcoast Cincinnati – Hamilton Cincinnati – Mason Cincinnati – North Cincinnati

Texas Austin I Austin II Austin III Dallas – Carrollton

Dallas – Downtown Dallas – Lewisville Houston – Galleria Houston – Greenspoint Houston – West I Houston – West II Houston – West III San Antonio I San Antonio II

Virginia Northern Virginia – Sterling Northern Virginia – Sterling II

Singapore International Business Park

United Kingdom London – Woking

LOCAT IONS

Page 22: CyrusOne - Brochure 2016

2 2

planning and construction process of CyrusOne’s Northern Virginia data center by downloading the case study entitled, “Ability to Build

Hyper-Scale Data Centers at Hyper-Speed Helps Eliminate IT Expansion Risk and Uncertainty” here or at http://www.cyrusone.com/speed.

Page 23: CyrusOne - Brochure 2016

C O N S T R U C T I O N

ELECTRICALMECHANICALDCIM / MONITORINGIT / DATACENTER

Engineered Computer Rooms has served mission critical customers since 1982 as a manufacturer’s representative for the selection & application of power, cooling, monitoring systems and IT critical infrastructures.

12225 Greenville Ave, Suite 330Dallas, TX 75243

214-340-5771 [email protected]

Page 24: CyrusOne - Brochure 2016

STULZ is a TCO focused solution provider of energy efficient temperature and humidity management technology. Our expertise is listening to our customers and delivering purpose built cooling solutions for data centers and other mission critical applications. STULZ is ready to listen to you at www.stulz-usa.com

Mission Critical Environmental ControlUser driven. Purpose built.

STULZ engineers a full line of air conditioners, air handling units, ultrasonic humidifiers, and custom solutions.

STULZ is a proud strategic project partner of CyrusOne Data Centers.

Physical Address:103 E. Haning StHowe, TX 75459

Mailing/Billing Address:215 Stark LnSherman, TX 75090

Tel: 903-436-4601Mail: [email protected]: www.tldllc.net

inCONNECT WITH US:

DESIGN CONSULTING LLC

TLD is a National Technology Consulting Firm Providing Low Voltage System Design and Project Management services for Data Centers, Healthcare & Corporate Facilities.

Design services include Infrastructure, Audio Video, Access Control & Surveillance.

Simplify. Communicate. Deliver.

Page 25: CyrusOne - Brochure 2016

w w w. c y r u s o n e . c o m 2 5

Customer Demand Drives Growth Historic Timeline

July 1, 2015CyrusOne announces the completion of the Cervalis acquisition and its four data-center facilities in the New York metro area.

June 29, 2015CyrusOne announces that construction is underway on a new 120,000-square-foot shell at the company’s Phoenix data-center campus, adding an incremental 4.5 MW of power.

April 29, 2015CyrusOne announces a transaction to acquire Cervalis with a definitive agreement to acquire four data-center facilities in the New York metro area.

April 1, 2015CyrusOne purchases the Austin III data center, projected to be the company’s largest facility in Austin, Texas. Austin III has 172,000 total square feet of shell and offers 120,000 colocation square feet.

December 2014CyrusOne commissions new data center in Sterling, Virginia, as the first of a multiphase data center in northern Virginia. The 124,000-square-foot building will have 15,000 square feet of office space and up to 12 MW of critical load.

Page 26: CyrusOne - Brochure 2016

2 6

May 2014Cyrus One launches a new product line, CyrusOne Solutions, in response to growing customer demand for large-scale and innovative build-to-suit deployments.

April 2014• CyrusOne successfully attains International Organization for

Standardization (ISO) 27001 certification at 18 facilities located across six states, including Arizona, Illinois, Indiana, Kentucky, Ohio and Texas.

• CyrusOne breaks ground on its northern Virginia campus, extending its East Coast footprint to meet existing and new customer demand for data center space in the region.

December 2013CyrusOne begins its third expansion project in west Houston, making the site the largest geophysical center of excellence for seismic exploration computing.

May 2013CyrusOne launches the first national Internet Exchange (IX), created to deliver interconnection between numerous CyrusOne data centers and metro-enabled sites.

February 2013CyrusOne’s data center in Phoenix begins operations.

June 2012CyrusOne breaks ground its 57-acre Phoenix data center campus, slated to be nearly 1 million square feet of space – the largest of its kind.

Page 27: CyrusOne - Brochure 2016

Manufactured Excellence

www.unitedmetal.comwww.unitedmetal.com

Data Center Cooling

We have been engineering, building, and deploying cooling solutions for some of the largest companies in the world since 1978.

▪ Standardized CRAH Systems ▪ Advanced Adiabatic Solutions▪ Innovative IDEC Technology

Innovative indirect cooling solution to help achieve optimal PUE.

Shapiro & Duncan Inc.,A third generation family

owned Mechanical Contractor,has been serving customers inthe DC Metro area since 1976.

We are the mechanical solutions “Provider of Choice”

for complex commercial, government and institutional design-build projects

that require first-rate performance, work quality and customer service.Design. Build. Sustain.

Phone: 301-315-6260Fax: 301-315-8983Email: [email protected]

14620 Rothgeb DrRockvilleMaryland 20850 www.shapiroandduncan.com

Page 28: CyrusOne - Brochure 2016

1649 W Frankford Rd

Carrollton, Texas, US

75007

903-821-9754www.cyrusone.com