3P, 15A MCP 7.5 hp AIR COMPRESSOR #1 3P, SIZE 1 CL. 10 3P, 15A MCP 7.5 hp AIR COMPRESSOR #2 3P, SIZE 1 CL. 10 ASD LOAD FILTER WASTE DISCHARGE PUMP #1 5 hp 3P, 15A MCP ASD LOAD FILTER WASTE DISCHARGE PUMP #2 5 hp 3P, 15A MCP 3P, 60A CB XFMR 45KVA, 600V/120-208V 42-CIRCUIT LIGHTING PANEL 'A' ASD LOAD FILTER 2nd STAGE UF FEED PUMP #1 5 hp 3P, 15A MCP ASD LOAD FILTER 2nd STAGE UF FEED PUMP #2 5 hp 3P, 15A MCP 3P, 30A CB HYPOCHLORITE GENERATION HOT WATER 3P, 20A CB HYPOCHLORITE GENERATION RECTIFIER 3P, 60A CB XFMR 45KVA, 600V/120-208V 42-CIRCUIT LIGHTING PANEL 'B' ASD LOAD FILTER EAF-1 EXHAUST FAN FOR AHU 3 hp 3P, 7A MCP 3c#12TECK90 $ (FROM MCC #1) MCC #3 (SHEET 3/4) SINGLE-LINE DIAGRAM 600A CU BUS 3P, 30A DS 3P, 30A DS 3P, 30A DS 3P, 30A DS 3P, 30A DS 3P, 30A DS 3P, 30A DS EAF-1 EXHAUST FAN FOR AHU (3HP) AIR COMP. #1 (7.5HP) AIR COMP. #2 (7.5HP) SPACE WASTE DISCHARGE PUMP #1 (5 HP) WASTE DISCHARGE PUMP #2 (5 HP) DISTRIBUTION PANELBOARD 'A' 45kVA DISTRIBUTION 60A FEEDER 20A HYPO GEN FEEDER 2ND STAGE UF FEED PUMP #1 (5HP) 2ND STAGE UF FEED PUMP #2 (5HP) DISTRIBUTION PANELBOARD 'B' 45kVA DISTRIBUTION 60A FEEDER 1:20 MCC #3 ELEVATION 25A HYPO GEN HW FEEDER 635 3050 635 635 510 635 1:1 0 20 10 30 70 40 50 60 80 90 100 mm @ ANSI D Approved Revision Date Revision Amendment R0 PRELIMINARY DESIGN - INTERNAL REVIEW - 01/23/14 Plot Date 17 Jun 2014 @ 4:36 PM Path G:\D&K CAD Drawings\DKSERVER P Share\Drawings\SICAMOUS\D-94102.00\Current Working Folder\Electrical\WTP\D-94102 E3-E9.dwg E5 200 100 50 10 0 mm 300 mm Scale Project No. Drawing No. Sheet. No. Project Sheet Revision Original Sheet Size ANSI D [22"x34"] Drawn Approved Revision Date Designed North Vancouver Office 210-889 Harbourside Drive North Vancouver BC V7P 3S1, Canada 604-990-4800 DISTRICT OF SICAMOUS MARA LAKE WTP UPGRADE ELECTRICAL MCC #3 SINGLE LINE DIAGRAM AND LAYOUT NV D-94102.00 E5 R0 D-94102.00 NTS PRELIMINARY GV/RB - 01/23/14 GV

D-94102 E5

Embed Size (px)

DESCRIPTION

lkjnm

Citation preview

Page 1: D-94102 E5

3P, 15A MCP

7.5

hp

AIR

COMPRESSOR

#1

3P, SIZE 1

CL. 10

3P, 15A MCP

7.5

hp

AIR

COMPRESSOR

#2

3P, SIZE 1

CL. 10

ASD

LOAD

FILTER

WASTE

DISCHARGE

PUMP #1

5

hp

3P, 15A MCP

ASD

LOAD

FILTER

WASTE

DISCHARGE

PUMP #2

5

hp

3P, 15A MCP3P, 60A CB

3Ø,

XFMR

45KVA,

600V/120-208V

42-CIRCUIT

LIGHTING

PANEL 'A'

ASD

LOAD

FILTER

2nd STAGE

UF FEED

PUMP #1

5

hp

3P, 15A MCP

ASD

LOAD

FILTER

2nd STAGE

UF FEED

PUMP #2

5

hp

3P, 15A MCP3P, 30A CB

HYPOCHLORITE

GENERATION

HOT WATER

3P, 20A CB

HYPOCHLORITE

GENERATION

RECTIFIER

3P, 60A CB

3Ø,

XFMR

45KVA,

600V/120-208V

42-CIRCUIT

LIGHTING

PANEL 'B'

ASD

LOAD

FILTER

EAF-1

EXHAUST

FAN FOR

AHU

3

hp

3P, 7A MCP

3c#12TECK90

(20A, Ø20)

(FROM MCC #1)

MCC #3

(SHEET 3/4)

SINGLE-LINE DIAGRAM

600A CU BUS

3P, 30A DS 3P, 30A DS

3P, 30A DS 3P, 30A DS 3P, 30A DS 3P, 30A DS

3P, 30A DS

EAF-1

EXHAUST

FAN FOR

AHU

(3HP)

AIR COMP.

#1 (7.5HP)

AIR COMP.

#2 (7.5HP)

SPACE

WASTE

DISCHARGE

PUMP #1

(5 HP)

WASTE

DISCHARGE

PUMP #2

(5 HP)

DISTRIBUTION

PANELBOARD

'A'

45kVA

DISTRIBUTION

60A

FEEDER

20A

HYPO

GEN

FEEDER

2ND STAGE

UF FEED

PUMP #1

(5HP)

2ND STAGE

UF FEED

PUMP #2

(5HP)

DISTRIBUTION

PANELBOARD

'B'

45kVA

DISTRIBUTION

60A

FEEDER

1:20

MCC #3 ELEVATION

25A

HYPO

GEN HW

FEEDER

635

3050

635 635 510 635

1:10 2010 30 7040 50 60 80 90 100 mm@ ANSI D

Approved Revision DateRevision Amendment

R0 PRELIMINARY DESIGN - INTERNAL REVIEW - 01/23/14

Plot Date 17 Jun 2014 @ 4:36 PM Path G:\D&K CAD Drawings\DKSERVER P Share\Drawings\SICAMOUS\D-94102.00\Current Working Folder\Electrical\WTP\D-94102 E3-E9.dwg E5

200

100

5010

0mm

300

mm

ScaleProject No. Drawing No. Sheet. No.

Project

Sheet

Revision

Original Sheet Size ANSI D [22"x34"]

Drawn Approved Revision DateDesigned

North Vancouver Office 210-889 Harbourside DriveNorth Vancouver BC V7P 3S1, Canada604-990-4800

DISTRICT OF SICAMOUSMARA LAKE WTP UPGRADE

ELECTRICALMCC #3 SINGLE LINE DIAGRAM AND LAYOUT

NV D-94102.00 E5 R0D-94102.00 NTS

PRELIMINARY

GV/RB - 01/23/14GV