D. Attié, P. Colas, E. Delagnes, M. RiallotM. Dixit, J.-P. Martin,
S. Bhattacharya , S. Mukhopadhyay
Linear Collider Power Distribution & Pulsing Workshop
May 10th, 2011
i r f u
yalcas
i r f u
yalcas
Power pulsing of AFTER Power pulsing of AFTER in magnetic fieldin magnetic field
IntroductionIntroductionIntroductionIntroduction
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
•Proposal:
– Use existing electronics and adapt it for power pulsing to read out the detector pads:
• Integrated T2K electronics• Having a two power states: low and nominal • Switching between state as fast as possible
– In parallel, use constant current charging circuits to readout the detector mesh (see J.-P. Martin’s talk)
– Using an 55Fe source to monitor the signal and gain
– Operating in 5T magnet in DESY
AFTER-based electronicsAFTER-based electronicsAFTER-based electronicsAFTER-based electronics
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
• AFTER chip (72 channels/chip) from T2K experiment:
– low-noise (700 e-) pre-amplifier-shaper– full wave sampling by SCA (511 time bins)– 120 fC to 600 fC tunable gain– 100 ns to 2 μs tunable peaking time– pulser for calibration– 25 W, 5V at 5 A (0,5 W/chip)
• 1 FEM, 6 FECs, 24 chips :1728 ch
– 12-bit ADC, 6 channels multiplexed
– Zero Suppression capability (FPGA)
– ~14-25 mW/channel
FEC
AFTER chip wire bonded
Front-End Mezzanine (FEM)Front-End Mezzanine (FEM)Front-End Mezzanine (FEM)Front-End Mezzanine (FEM)
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
30 pinsconnector
FPGAXilinx V5
ADC
SRAM
Test Pulser
XilinxProm
Opticalconnector
AFTER
Design of the integrated electronicsDesign of the integrated electronicsDesign of the integrated electronicsDesign of the integrated electronics
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
•Picture and events taken last week in DESY with electron beam
•1726 pads read out by the AFTER-based electronics
•Power consumption of 25W was measured and confirmed
Electronics in DESY 1T magnetElectronics in DESY 1T magnetElectronics in DESY 1T magnetElectronics in DESY 1T magnet
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
Large prototype TPC
3 GeV electron Beam
Project designProject designProject designProject design
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
•DESY 5T magnet has to be reinstalled
•Endplate ø 32 cm
•Field cage length not yet defined
•1 FEM and 4 FEC to readout 1136 pads of 3,7×3,7mm²
E
B
Readout PadsReadout PadsReadout PadsReadout Pads
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
16 independent HV connections read out by
constant current charging system
•Specific firmware of the for the FPGA Xilink 5 will be done
•Switch on and off the regulator TPS70402 for powering 3.3 V: t<1 ms
Low power state conditionsLow power state conditionsLow power state conditionsLow power state conditions
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop
•Try power switching on both the (segmented) mesh readout as studied by Jean-Pierre Martin (see the next talk) and the T2K electronics
•For T2K electronics, power switching might be done on the mezzanine card (FEM) developed for the 7-module configuration of the Large Prototype Micromegas TPC
•The test will consist in checking the properties of known X-ray lines with and without pulsing
•The mechanical effects will be studied by having a large enough number of channels (1200) and a large magnetic field (5T) close to realistic conditions
Summary of the planSummary of the planSummary of the planSummary of the plan
[email protected] May 10, 2011 - LC Power Distribution and Pulsing Workshop