Intent of Work- To tie and bond separated facing stone to brick backup construction using Helefix Tie reinforcement and a solidifying injected grout. Suitability- The work described herein is best suited for conditions where the collar joint mortar bonding behind the outer leaf of stonework has deteriorated to a degree that all bond has been lost it can be removed and replaced, but the condition of the outer leaf is sufficiently sound that will allow tie-back with frequently Helefix Ties without the need for a supplemental dunnage system. Required Materials, Products and Equipment- VoidSpan 600 Series PHLc70 Injection Grout Masonry mortar materials and potable water VoidSpan 1200 Series Jetting Wands VoidSpan H1000 Series Helifix Ties VoidSpan 3000 Series Standpipe Piezometers VoidSpan 4000 Series Pressure Pot (or equivalent pressure regulating pump) with feed lines Scope of work- 1. DEEPLY CUT AND BACK-POINT MASONRY. 2. DRILL PILOT HOLES 3. INSTALL HELIFIX WALL TIES- SEE INSTALLATION GUIDE "H1" 4. BEND OVER TIES TO HOOK ONTO BACK POINTING 5. JET CLEAN WALL CAVITIES 6. SEAL FLEX TUBE PORTS IN PLACE 7. INSERT PORTS INTO PIEZOMETER AND HOOK UP PUMP OR POT 8. GROUT INJECT UNTIL PIEZOMETER OVER-TOPPED- SEE INSTALLATION GUIDE "G2" 9. CLAMP TUBES AFTER INJECTION 10. REMOVE TUBES AFTER GROUT HARDENED 11. FINISH POINT MASONRY AS NEEDED Responsibility- It is the responsibility of the Specifying Engineer to determine the specifics of the structural design and use of the VoidSpan Reinforcement System and to confirm its appropriateness for the application. Note that the details and suggested methods are presented herein as schematic representations only, and actual field conditions will vary. It is the responsibility of the System Installer to understand the requirements of the installation and execute the installation in a safe and correct manner. S P A N I D V O © 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800-966-VOID / www.voidspan.com VOIDSPAN INSTALLATION GUIDE #S12 FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES- Installation Guide # S12 PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization. OUTLINE SPECIFICATION (See DETAILS on second page)

D FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES · FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES Installation Guide #

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: D FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES · FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES Installation Guide #

Intent of Work­To tie and bond separated facing stone to brick backup construction using Helefix Tie reinforcement and asolidifying injected grout.

Suitability­The work described herein is best suited for conditions where the collar joint mortar bonding behind the outer leafof stonework has deteriorated to a degree that all bond has been lost it can be removed and replaced, but thecondition of the outer leaf is sufficiently sound that will allow tie­back with frequently Helefix Ties without the needfor a supplemental dunnage system.

Required Materials, Products and Equipment­VoidSpan 600 Series PHLc70 Injection GroutMasonry mortar materials and potable waterVoidSpan 1200 Series Jetting WandsVoidSpan H1000 Series Helifix Ties VoidSpan 3000 Series Standpipe PiezometersVoidSpan 4000 Series Pressure Pot (or equivalent pressure regulating pump) with feed lines

Scope of work­1. DEEPLY CUT AND BACK­POINT MASONRY.2. DRILL PILOT HOLES3. INSTALL HELIFIX WALL TIES­ SEE INSTALLATION GUIDE "H1"4. BEND OVER TIES TO HOOK ONTO BACK POINTING5. JET CLEAN WALL CAVITIES6. SEAL FLEX TUBE PORTS IN PLACE7. INSERT PORTS INTO PIEZOMETER AND HOOK UP PUMP OR POT8. GROUT INJECT UNTIL PIEZOMETER OVER­TOPPED­ SEE INSTALLATION GUIDE "G2"9. CLAMP TUBES AFTER INJECTION10. REMOVE TUBES AFTER GROUT HARDENED11. FINISH POINT MASONRY AS NEEDED

Responsibility­It is the responsibility of the Specifying Engineer to determine the specifics of the structural design and use of theVoidSpan Reinforcement System and to confirm its appropriateness for the application. Note that the details andsuggested methods are presented herein as schematic representations only, and actual field conditions will vary.

It is the responsibility of the System Installer to understand the requirements of the installation and execute theinstallation in a safe and correct manner.

S P A NID

VO

© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800­966­VOID / www.voidspan.com

VOIDSPAN INSTALLATION GUIDE #S12FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES

FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES­ Installation Guide # S12PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization.

OUTLINE SPECIFICATION (See DETAILS on second page)

Page 2: D FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES · FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES FACE STONE TO BRICK REBONDING w/ BENT HELEFIX TIES Installation Guide #

FACE STONE TO BRICK REBONDINGw/ BENT HELEFIX TIES

© 2017/ VoidSpan Technologies, LLC / 60 Washington St., Salem, MA 01970 / 800­966­VOID / www.voidspan.com

S P A NID

VO

FACE STONE TO BRICK REBONDING w/ BENT HELEIX TIES­ Installation Guide # S12PLEASE NOTE: The information presented herein is the intellectual property of VoidSpan Technologies, LLC and may not be reproduced or distributed without prior authorization.

Deeply cut andback­point the head bedjoints between stones

Create open gaps inhead and T­joints forcleaning and groutinjection

Install helefix ties in heador bed joints to extend 2"to 2 1/2" out of face

Allow debris to flowout of lower ports

Clean out wallcavities withVoidSpan J­3Pressure WasherJetting Wand

Bend Helefix tiesover onto mortarjoint with VoidSpanTie­Bender

VoidSpanStandpipePiezometer

Flexible feed tubefrom VoidSpanPressure Pot Kit

Grout levelfollowsPiezometer level

Seal temporaryinjection tubesinto head jointgaps

Crimp orclampInjection Tubesafter groutingto preventback flow.

Removeinjection tubesafter grout set,finish pointmasonry

Step­ 6. SEAL FLEX TUBE PORTS IN PLACE7. INSERT PORTS INTO PIEZOMETER ANDHOOK UP PUMP OR POT8. GROUT INJECT UNTIL PIEZOMETEROVER­TOPPED

Finish­ 9. CLAMP TUBES AFTER INJECTION10. REMOVE TUBES AFTER GROUTHARDENED11. FINISH POINT MASONRY AS NEEDED

Step­1. DEEPLY CUT AND BACK­POINT MASONRY.2. DRILL PILOT HOLES3. INSTALL HELIFIX WALL TIES

Step­ 4. BEND OVER TIES TO HOOK ONTOBACK POINTING5. JET CLEAN WALL CAVITIES