Pembahasan

Perencanaan Drainase Analisa Hidrologi

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Januari 117 115 58 27 R 84 70 110 80 45 43 46

Februari 53 60 78 25 R 103 51 85 84 85 13 60

Maret 76 52 55 94 R 76 54 140 25 35 54 70

April 37 53 70 15 64 58 73 25 67 32 31 58

Mei 40 60 55 20 32 60 19 45 60 41 34 33

Juni 10 40 35 0 55 0 70 51 52 24 4 8

Juli 0 0 0 20 0 0 16 0 5 67 5 32

Agustus 0 0 0 R 30 0 0 5 5 61 5 0

September 0 0 0 R 2 0 27 0 5 82 9 25

Oktober 54 0 1 R 0 0 0 65 20 180 60 43

Nopember 34 54 24 25 51 0 20 43 45 71 53 22

Desember 60 41 63 0 80 121 104 78 58 125 23 23

MAKS 117 115 78 94 80 121 104 140 84 180 60 70

BulanTahun

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Januari R 169 49 37 75 0 0 84 27 28 0 6

Februari R 40 49 60 102 0 0 54 80 72 0 72

Maret 31 80 77 0 41 99 0 69 35 63 34 62

April 46 18 17 0 0 67 R 37 43 48 67 30

Mei 47 30 30 R 0 42 10 13 31 44 44 54

Juni 15 0 0 0 75 0 25 0 51 47 47 34

Juli 0 0 0 0 0 0 0 0 0 29 29 25

Agustus 0 0 0 0 0 0 0 0 0 25 32 53

September 0 0 0 0 0 0 0 0 0 24 22 24

Oktober 69 0 10 0 95 0 66 86 3 67 12 67

Nopember 20 17 25 0 21 5 56 27 11 58 31 58

Desember 68 64 35 0 21 0 42 69 17 39 39 39

MAKS 69 169 77 60 102 99 66 86 80 72 67 72

BulanTahun

2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012

Januari 96 130 52 0 15 55 5 5 7 7 5 8

Februari 67 30 40 0 45 65 5 7 9 9 5 5

Maret 96 25 24 0 50 51 10 40 6 7 6 23

April 60 30 10 0 40 56 5 30 8 5 15 6

Mei 46 0 0 0 0 30 4 3 3 4 7 6

Juni 34 0 0 0 52 0 40 2 5 2 6 4

Juli 34 0 0 0 20 0 0 0 0 3 3 6

Agustus 0 0 0 0 0 0 0 0 0 1 5 6

September 0 0 0 0 0 0 0 0 0 7 9 21

Oktober 34 0 15 0 22 0 40 3 0 9 32 13

Nopember 23 37 15 0 35 0 5 21 19 5 24 16

Desember 74 54 15 0 57 6 5 7 5 8 34 23

MAKS 96 130 52 0 57 65 40 40 19 9 34 23

BulanTahun

Sta. Hujan Socah

Sta. Hujan Labang

Sta. Hujan Kamal

Pembahasan

Perencanaan Drainase Analisa Hidrologi

7 m 2 m2 m2 m 2 m7 m 5 m

5%5% 5%

5%

5%5%

DAERAH ALIRAN SAL. KIRIDAERAH ALIRANSAL. TENGAH

DAERAH ALIRAN

SAL. TENGAH

DAERAH ALIRAN SAL. KANAN

2%5%

Gambar. Pembagian Daerah Pengaliran pada perhitungan t0

Debit saluran kiri/kanan Diketahui :

α = 1/3,6 Q = 𝜶 𝑪. 𝑰. 𝑨

= 𝟏

𝟑,𝟔× 𝟎, 𝟖𝟖𝟒 × 𝟖𝟖, 𝟎𝟖𝟏 × (𝟎, 𝟎𝟎𝟏𝟖 + 𝟎, 𝟎𝟎𝟔𝟑)

= 0,175 m3/dt Debit saluran tengah Diketahui :

α = 1/3,6 Q = 𝜶 𝑪. 𝑰. 𝑨

= 𝟏

𝟑,𝟔× 𝟎, 𝟔𝟓 × 𝟖𝟖, 𝟑𝟔𝟖 × (𝟐. 𝟎, 𝟎𝟎𝟒𝟎𝟓𝟎 + 𝟎, 𝟎𝟎𝟑𝟏𝟓𝟎 )

= 0,2585 m3/dt

Debit

periode

ulang

5th

Pembahasan

Perencanaan Drainase Analisa Hidrolika

Tipikal Saluran Tepi

0.70

0.200.20

0.90

0.50

0.50

Pembahasan

Perencanaan Drainase Analisa Hidrolika

Tipikal Saluran Tengah

Pembahasan

Perencanaan Drainase Analisa Hidrolika

Tipikal Box Culvert (Prcast)

No. Kode Q Hhitung Hpakai Bpakai A P R I

1 GG I 0.829 0.74 1 1 1 3 0.33 0.0016

2 GG II 0.745 0.70 1 1 1 3 0.33 0.0016

3 GG III 0.699 0.68 1 1 1 3 0.33 0.0016

4 GG IV 1.095 0.85 1 1 1 3 0.33 0.0016

5 GG V 0.636 0.65 1 1 1 3 0.33 0.0016

6 GG VI 0.637 0.65 1 1 1 3 0.33 0.0016

7 GG VII 1.131 0.87 1 1 1 3 0.33 0.0016

8 GG VIII 0.678 0.67 1 1 1 3 0.33 0.0016

Sumber : Hasil Perhitungan

CONSTRUCTIONcost

Pembahasan

Analisa Anggaran Biaya Volume Pekerjaan

LUAS PENAMPANG GALIAN

PERMUKAAN TANAH RENCANA

PERMUKAAN TANAH EKSISTING

Volume Galian 48247746,44 m3

PERMUKAAN TANAH EKSISTING

PERMUKAAN TANAH RENCANA

LAPISAN PERKERASAN

LUAS PENAMPANG TIMBUNAN

Volume Timbunan 160462,395 m3

Laston Ms 744 (AC/WC) = 71698,01 Ton Base Course (Agg. B) = 40651,268 m3 Sub Base Course (Sirtu Kelas A) = 70433,8 m3

Subgrade (Soil Improvement) = 78656,34 m3

Prime Coat = 285162, 55 liter Tack Coat = 81475,016 liter

Pembahasan

Analisa Anggaran Biaya Volume Pekerjaan

Saluran Tepi

0.70

0.200.20

0.90

0.50

0.50

Sal. Batu Kali 13843,54 m3

Plesteran 69218 m2

Saluran Tengah

Sal. Precast 12124 buah

Box Culvert (Prcast)

Box Culvert Precast 176 m

Pembahasan

Analisa Anggaran Biaya Volume Pekerjaan

Dinding Penahan (Beton) 198,2 m3

0.50

2.50

H

0.20

Pengaman Talud (Tipe I)

184,65 m3

LASTON MS744 10cm

BATU PECAH KELAS B 20cm

SIRTU PITRUN KELAS A 20cm

DINDING PENAHAN TIPE III

Pengaman Talud (Tipe II)

4705,42 m3

5 m 8 m 5 m

0.12 m

Marka Jalan

1396,70 m2

Pembahasan

Analisa Anggaran Biaya Biaya Konstruksi

Upah/Hari

(Rp)

1 Mandor O.H 85000 10625

2 Operator 125000 15625

3 Pembantu Operator O.H 75000 9375

4 Supir 75000 9375

5 Pembantu Supir O.H 67500 8437.5

6 Pekerja/Pembantu Tukang O.H 70000 8750

7 Tukang Besi O.H 75000 9375

8 Kepala Tukang Besi O.H 80000 10000

9 Kepala Tukang Batu O.H 80000 10000

10 Tukang Batu O.H 75000 9375

No. Uraian Satuan Upah/Jam

UPAH PEKERJA

No. Uraian Kode Satuan Harga (Rp)

1 Motor Grader 125-140 pk Jam 261250

2 Truck Tangki Air Hari 470250

3 Walles Jam 100320

4 Asphalt Mixing Plant Jam 3762000

5 Generator Set Unit 522500

6 Wheel Loader 10-15 HP Jam 543400

7 Dump Truck 8-10 m3 (5T) Jam 61750

8 Asphalt Finisher Jam 992750

9 Tandem Roller Jam 250800

10 Pneumatic Tire Roller Jam 209000

11 Alat Bantu Pembuatan Aspal Emulsi Unit 19000

12 Asphalt Spayer Jam 26125

13 Compessor 400 - 600 L/M Jam 88825

14 Excavator (6m3) Jam 123500

15 Vibrator Roller Jam 128250

16 BullDozer Jam 385695

17 Tandem Roller (min 5 jam) Jam 250800

18 Pneumatic Tire Roller Jam 209000

19 Alat Bantu Pembuatan Aspal Emulsi Unit 19000

20 Road Marking Machine Jam 19000

SEWA ALAT

No. Uraian Kode Satuan Harga (Rp) Keterangan

1 Pasir Beton (Kasar) M01a m3 151525

2 Pasir Pasang m3 151525

3 Pasir Urug M01d m3 120175

4 Agregat Kasar M03 m3 167200

5 Agregat Halus M04 m3 161975

6 Filler M05 Kg 1568

7 Kayu meranti bekisting m3 1966500

8 Kayu Kamper balok 3/5 m3 5700000

9 Plywood tebal 9 mm lembar 84170

10 Paku Usuk Kg 15675

11 Minyak Bekisting ltr 6270

12 Thermoplastic Kg 21898

13 Glass Beed Kg 40945

14 Batu Kali m3 125400

15 Batu Pecah Mesin 1/2cm m3 271700

16 Batu Pecah Mesin 2/3cm m3 175085

17 Batu Pecah Mesin 0,5/1cm m3 155705

18 Batu Krikil Beton m3 130625

19 Tanah Urug m3 120175

20 Sirtu M16 m3 130625

21 Aspal Curah Kg 7315

22 Tack Coat Liter 12540

23 Geotextile M30 m2 15200

24 Minyak Tanah liter 8360

25 Semen Portland (40kg) Zak 49685

26 Air (Biaya Air Tawar) Liter 25

27 Besi Beton Kg 8645

28 Kawat Beton Kg 15675

29 U Gutter U/1000/1000-2400 Bh 2448435

30 U Gutter U/1200/1200-2400 Bh 2938122

31 U Gutter U/1500/1500-2400 Bh 3672652

32 Kayu Meranti Bekisting m3 1966500

33 Katu Kamper Balok 3/5 m3 5700000

34 Plywood 9mm Lembar 84170

35 Paku Usuk Kg 15675

36 Minyak Bekisting Liter 6270

37 Box Culvert 1500X1500X1200 Bh 6880000

38 Box Culvert 2400x2400x1200 Bh 11257000

39 Box Culvert 4500x2500x1200 Bh 17635000

40 Box Culvert 4300x2500x1200 (t = 200mm) Bh 15330000

41 U-Ditch 600x600x1200 Bh 1317000

42 U-Ditch 600x800x1200 Bh 1530000

43 U-Ditch 800x800x1200 Bh 1591000

44 U-Ditch 1000x1000x1000 Bh 1910000

45 U-Ditch 1000x1000x1200 (t=150mm) Bh 1602000

46 U-Ditch 1000x1500x1200 Bh 2646000

47 U-Ditch 1000x1200x1200 Bh 2579500

48 U-Ditch 1200x1200x1200 Bh 2175000 Be

rda

sark

an

ha

rga

da

ri P

T.

Bo

ral

Pip

eli

ne

an

d P

reca

st I

nd

on

esi

a |

Su

mb

er

:htt

p:/

/eso

urc

ing

.su

rab

aya

.go

.id

/pro

fil/

bo

r

al?

pa

ge

=5

No. Uraian Kode Satuan Harga (Rp) Keterangan

1 Pasir Beton (Kasar) M01a m3 151525

2 Pasir Pasang m3 151525

3 Pasir Urug M01d m3 120175

4 Agregat Kasar M03 m3 167200

5 Agregat Halus M04 m3 161975

6 Filler M05 Kg 1568

7 Kayu meranti bekisting m3 1966500

8 Kayu Kamper balok 3/5 m3 5700000

9 Plywood tebal 9 mm lembar 84170

10 Paku Usuk Kg 15675

11 Minyak Bekisting ltr 6270

12 Thermoplastic Kg 21898

13 Glass Beed Kg 40945

14 Batu Kali m3 125400

15 Batu Pecah Mesin 1/2cm m3 271700

16 Batu Pecah Mesin 2/3cm m3 175085

17 Batu Pecah Mesin 0,5/1cm m3 155705

18 Batu Krikil Beton m3 130625

19 Tanah Urug m3 120175

20 Sirtu M16 m3 130625

21 Aspal Curah Kg 7315

22 Tack Coat Liter 12540

23 Geotextile M30 m2 15200

24 Minyak Tanah liter 8360

25 Semen Portland (40kg) Zak 49685

26 Air (Biaya Air Tawar) Liter 25

27 Besi Beton Kg 8645

28 Kawat Beton Kg 15675

29 U Gutter U/1000/1000-2400 Bh 2448435

30 U Gutter U/1200/1200-2400 Bh 2938122

31 U Gutter U/1500/1500-2400 Bh 3672652

32 Kayu Meranti Bekisting m3 1966500

33 Katu Kamper Balok 3/5 m3 5700000

34 Plywood 9mm Lembar 84170

35 Paku Usuk Kg 15675

36 Minyak Bekisting Liter 6270

37 Box Culvert 1500X1500X1200 Bh 6880000

38 Box Culvert 2400x2400x1200 Bh 11257000

39 Box Culvert 4500x2500x1200 Bh 17635000

40 Box Culvert 4300x2500x1200 (t = 200mm) Bh 15330000

41 U-Ditch 600x600x1200 Bh 1317000

42 U-Ditch 600x800x1200 Bh 1530000

43 U-Ditch 800x800x1200 Bh 1591000

44 U-Ditch 1000x1000x1000 Bh 1910000

45 U-Ditch 1000x1000x1200 (t=150mm) Bh 1602000

46 U-Ditch 1000x1500x1200 Bh 2646000

47 U-Ditch 1000x1200x1200 Bh 2579500

48 U-Ditch 1200x1200x1200 Bh 2175000 Be

rda

sark

an

ha

rga

da

ri P

T.

Bo

ral

Pip

eli

ne

an

d P

reca

st I

nd

on

esi

a |

Su

mb

er

:htt

p:/

/eso

urc

ing

.su

rab

aya

.go

.id

/pro

fil/

bo

r

al?

pa

ge

=5

HARGA BAHAN

Pembahasan

Analisa Anggaran Biaya Biaya Konstruksi

No. Volume SatuanHarga Satuan

PekrjaanJumlah Harga

1 Pekerjaan Tanah

1.1 Pembersihan Lahan 407375.08 m2 32,655.28Rp 13,302,948,117.17Rp

1.2 Galian Tanah 48247746.44 m3 20,942.05Rp 1,010,406,597,714.44Rp

1.3 Timbunan Tanah 160462.395 m3 169,477.83Rp 27,194,817,698.89Rp

2 Perkerjaan Perkerasan

2.1 Lapis Permukaan (AC-WC) 71698.01 Ton 880,342.93Rp 63,118,836,431.59Rp

2.2 Lapis Pondasi Atas (Agregat B) 40651.268 m3 310,309.67Rp 12,614,481,491.62Rp

2.3 Lapis Pondasi Bawah (Sirtu Pitrun Kelas B) 70433.8 m3 202,863.89Rp 14,288,474,471.72Rp

2.4 Perbaikan Tanah (Soil Improvement) 78656.34 m3 169,477.83Rp 13,330,505,425.66Rp

2.5 Lapis Resap Perekat (Prime Coat) 285162.55 liter 13,113.47Rp 3,739,471,528.36Rp

2.6 Lapis Perekat (Tack Coat) 81475.016 liter 12,925.99Rp 1,053,145,242.07Rp

3 Pekerjaan Drainase

3.1 Saluran Tepi (Batu Kali Belah) 13843.54 m3 621,358.21Rp 8,601,797,234.46Rp

3.2 Plesteran (1 pc : 4 ps) 69218 m2 48,904.86Rp 3,385,096,779.45Rp

3.3 Saluran Tengah (U-Ditch Precast) 12124 m' 1,259,413.01Rp 15,269,123,310.39Rp

3.3 Gorong-Gorong Precast (1500 x 1500 x 1200) 176 m' 6,358,625.70Rp 1,119,118,122.87Rp

4 Pekerjaan Pengaman Longsor

4.1 Dinding Penahan Beton (Tipe I) 198.2 m3 5,087,333.35Rp 1,008,309,469.97Rp

4.2 Dinding Penahan Batu Kali (Tipe II) 184.65 m3 621,358.21Rp 114,733,793.48Rp

4.3 Dinding Penahan Batu Kali (Tipe III) 4705.42 m3 621,358.21Rp 2,923,751,348.50Rp

5 Pekerjaan Minor

5.1 Marka Menerus (Solid) 1745.89 m2 648,099.51Rp 1,131,510,457.88Rp

5.2 Marka Putus-putus 1396.7 m2 648,099.51Rp 905,200,589.11Rp

1,193,507,919,227.61Rp

119,350,791,922.76Rp

1,312,858,711,150.38Rp

Terbilang

Satu Triliun Tiga Ratus Dua Belas Miliar Delapan Ratus Lima Puluh Delapan Juta Tujuh Ratus Sebelas Ribu Seratus Lima Puluh Ribu Rupiah

PPN (10%)

TOTAL

Uraian Pekerjaan

Jumlah

Total Biaya Konstruksi

Rp. 1.312.858.711.150,-

Terbilang :

“Satu Triliun Tiga Ratus Dua Belas Miliar Delapan Ratus Lima Puluh Delapan Juta Tujuh Ratus Sebelas Ribu Seratus Lima Puluh Ribu Rupiah”

projectCONCLUSION

Pembahasan

KESIMPULAN Kesimpulan dan Saran

3. Perkerasan jalan

Segmen I dan III

- Lapis permukaan = 16 cm (Laston Ms744 AC-WC)

- Lapis pondasi atas = 20 cm (Agregat Kelas B)

- Lapis pondasi bawah = 60 cm (Sirtu pitrun Kelas A)

- Soil Improvement = 100 cm (CBR 5%)

Segmen II

- Lapis permukaan = 16 cm (Laston Ms744 AC-WC)

- Lapis pondasi atas = 20 cm (Agregat Kelas B)

- Lapis pondasi bawah = 60 cm (Sirtu pitrun Kelas A)

1. Jalan direncanakan dengan tipe 4/2

D, dengan dimensi :

- Lebar lajur = 3,5 meter

- Lebar Jalur = 7 meter

- Lebar Median = 5 meter

- Lebar Bahu = 2 meter

- Kecepatan rencana : 80 km/jam

2. Geometrik jalan

Alinyemen Horisontal : 11 PI S-C-S

3 PI S-S

Alinyemen Vettikal : 14 PVI

(Cembung)

11 PVI (Cekung)

Superelevasi : Maksimum 10%

Pembahasan

KESIMPULAN Kesimpulan dan Saran

4. Desain Geometrik Persimpangan Simpang Suramadu - Burneh Approach : Wa = 10,5m; We = 10,5m; WLTOR = 3,5m; Wx = 7m. - Akses Approach : Wa = 10,5m; We = 10,5m; WLTOR = 3,5m; Wx = 7m. - Sampang Approach : Wa = 7m; We = 7m; WLTOR = 3,5m; Wx = 7m. - Suramadu Approach : Wa = 10,5m; We = 10,5m; WLTOR = 3,5m; Wx = 7m. Simpang Suramadu - Bangkalan Approach : Wa = 7m; We = 7m; WLTOR = 3,5m; Wx = 7m. - Akses Approach : Wa = 10,5m; We = 10,5m; WLTOR = 3,5m; Wx = 7m. - Kamal Approach : Wa = 7m; We = 7m; WLTOR = 3,5m; Wx = 7m. - Pelabuhan Approach : Wa = 10,5m; We = 10,5m; WLTOR = 3,5m; Wx = 7m.

5. Desain Drainase Pada desain drainase terdapat beberapa tipe dimensi saluran, yaitu : Saluran Tepi (Pasangan Batu Kali) Tipe SS I = (40cm x 80cm); Waking = 20cm Tipe SS II = (40cm x 90cm); Waking = 20cm Tipe SS III = (30cm x 70cm); Waking = 20cm Tipe SS IV = (40cm x 70cm); Waking = 20cm Tipe SS V = (30cm x 60cm); Waking = 20cm Tipe SS VI = (20cm x 50cm); Waking = 20cm Saluran Tengah (Precast) Tipe ST I = 60cm x 60cm Gorong-gorong (Precast) Tipe A = (100cm x 100cm)

Pembahasan

KESIMPULAN Kesimpulan dan Saran

6. Biaya Konstruksi

Rp. 1.312.858.711.150,- Terbilang :

“Satu Triliun Tiga Ratus Dua Belas Miliar Delapan Ratus Lima Puluh Delapan Juta Tujuh Ratus

Sebelas Ribu Seratus Lima Puluh Ribu Rupiah”

Pembahasan

SARAN

Dalam perencanaan tugas akhir kali ini hendaknya memperhatikan

beberapa hal berikut :

1. Perencanaan jalan sebaiknya menggunakan data selengkap mungkin,

khususnya data pengukuran langsung baik itu data cross section maupun

long section lokasi rencana. Hal ini dimaksudkan untuk mendapatkan

hasil perhitungan yang lebih optimal, khusunya pada perhitungan dimensi

dan biaya konstruksi.

2. Perlunya beberapa alternatif trase yang disediakan, agar dapat

memperoleh trase yang terbaik nantinya.

3. Perlunya dilakukan studi lebih lanjut tentang metode pelaksanaan

pembangunan konstruksi.

4. Perlunya pengawasan yang baik pasa saat masa konstruksi berlangsung,

agar hasil perencanaan dapat terealisasi secara optimal

5. Perlunya studi lanjut tentang perkuatan lenreng dan dinding penahan

longsor.

6. Perlunya studi lanjut pada bagian detail konstruksi jembatan.

SEKIAN WASSALAMUALAIKUM