Upload
duongdung
View
219
Download
0
Embed Size (px)
Citation preview
Region IX Postharvest Development Plan 1
D. REGIONAL LEVEL AGREEMENTS/IMPLEMENTATION
PLAN/STRATEGIES
This section contains the regional agreements made during the regional postharvest
workshop of Region IX. In the regional postharvest workshop, the proposed interventions of
the provinces and city were validated and some of the locations for proposed projects at the
provincial level have been cancelled. Participants were keener on the components of the
proposed project rather than the cost. Thus, some projects have been renamed based on its
components. Locations of the proposed projects were changed and some provinces added
more locations for the proposed projects. They based their validation on the on-going
projects and the necessity of the project in the locality. Other proposed locations that are for
consideration of Office of the Provincial Agriculturist (OPAg) or Office of the City
Agriculturist (OCAg) in the Provincial/City Postharvest Development Plans have been
identified. In addition, during the regional postharvest workshop the participants have also
come up with new proposed projects or priority development projects to address the major
development concerns of the region.
These lists of proposed projects will also serve as an input in the planning or
decision making of the DA- Regional Field Unit IX for agricultural development. It will also
serve as reference to interested investors, be it local or private and to collaborators who
provide grants or financial assistance from the local government, private entities and even
foreign agencies.
Realization and proper implementation of these proposed projects in the region will
definitely improve its agricultural environment. Their existence will provide farmers access
of adequate and appropriate production and postproduction facilities and technologies that
would empower them to become more productive, competitive and to develop their
capability to become entrepreneurs.
Economic impact of these projects upon operationalization in the long run include
employment generation, reduced postharvest losses, improved status of living of farmers,
enhancement of local economy, entrepreneurial development and farm mechanization,
among others.
The following are the new project proposals and priority agricultural development
programs identified during the regional postharvest workshop to address the major
development concerns at the regional level. These projects need further analysis in order to
determine the factors to be considered for the implementation of such project.
a. Provision of Postharvest Facilities for Rice and Corn
Region IX Postharvest Development Plan 2
b. Establishment of Small Scale Storage Facility for Seeds (Rice and Corn)
c. Establishment of Banana Processing Facility
d. Establishment of Minimal Processing and Packaging Plant for Fruits and
Vegetables
e. Establishment of Coffee Processing Center
f. Establishment of Abaca Processing Facility
g. Establishment of Agricultural Tramline for Cassava
h. Establishment of Fish Landing Site with Ice Plant and Cold Storage
i. Establishment of Multi-Commodity Solar Tunnel Dryer
j. Establishment of Fish Processing Plant
k. Establishment of Seaweed Noodle Processing Center
Region IX Postharvest Development Plan 3
Table 52. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX
List of Projects Brief Description Proposed Locations Regional Level Agreement
RICE AND CORN
Establishment of
Community
Based Drying
Center for Rice
and Corn
The center shall serve as a service
provider, and will showcase different
technologies for drying grains
COMPONENT:
MODULE 1- Maligaya Flatbed Dryer (1 unit)
Drying shed (1 unit)
Moisture Meter (1 unit)
MPDP (2 units)
Tarpaulin sheet (1 unit)
Weighing Scale (1 unit)
Hauling Tractor (1 unit)
MODULE II – Maligaya Flatbed Dryer (2 units)
Drying shed (1 unit)
Moisture Meter (1 unit)
MPDP (1 unit)
Tarpaulin Sheet (1 unit)
Weighing Scale (1 unit)
Hauling Tractor (1 unit)
MODULE III – MPDP (4 units)
Moisture Meter ( 1 unit)
Tarpaulin sheet (1 unit)
Temporary Storage (1 unit)
Weighing Scale (1 unit)
Hauling Tractor (1 unit)
Zamboanga City: Vitali District, Ayala District,
Culianan District
Zamboanga del Norte: District I: Sergio Osmeña, Polanco
District II: Dipolog City, Siayan,
Katipunan, Manukan
District III: Salug, Liloy, Gutalac
Zamboanga del Sur: District I: Mahayag, Molave,
Dumingag
District II: San Pablo, San Miguel,
Kumalarang
Zamboanga Sibugay: District I: Payao, Alicia, Diplahan
District II: Titay, RT Lim,
Tungawan, Siay (2 units)
ADDITIONAL LOCATIONS
Zamboanga City: Brgy Manicahan, Brgy Quinipot & Brgy
Talabaan
Zamboanga del Sur:
(w/ Recirculating Dryer) District I: Tambulig, Ramon
Magsaysay, Midsalip
District II: Guipos, Dimataling, Bayog,
Tigbao
Zamboanga Sibugay: (Village Type Level)
District I: Malangas
District II: Ipil, Naga, Titay
Region IX Postharvest Development Plan
4
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
RICE AND CORN
Establishment of
Farmers Service
Center for Rice
and Corn
The center is either a service provider
or a business enterprise engage in
delivering postharvest operations like
drying, warehousing, hauling, milling,
and marketing.
Zamboanga City: Manicahan District, Culianan District,
Vitali District
Zamboanga del Norte: District I: Polanco, Sergio Osmeña,
Dapitan City
District II: Dipolog City, Sindangan,
Katipunan
District III: Siocon, Kalawit,
Labason
Zamboanga del Sur: District I: Mahayag, Tambulig,
Labangan, Molave
District II: Kumalarang, Tigbao,
Guipos, Bayog
Zamboanga Sibugay:
District I: Diplahan, Buug, Alicia,
Talusan
District II: Titay, R.T. Lim
ADDITIONAL LOCATIONS
Zamboanga City: (Village-Type w/ Combine Harvester)
Brgy. Quinipot & Brgy. Ayala
Zamboanga del Sur: (w/ 4WD Tractor)
District I: Aurora
District II: San Pablo, San Miguel,
Diñas
Zamboanga Sibugay:
(w/ Mobile Corn Mill) District II: Ipil
Region IX Postharvest Development Plan
5
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
CORN
Establishment of
Integrated Grains
Processing Center
This center will be equipped with
improved postharvest facilities and
will provide services on grain
postharvest processing and corn feed
processing.
Zamboanga City
CANCELLED
ADDITIONAL PROPOSED PROJECT for RICE AND CORN
Provision of
Postharvest
Facilities for Rice
and Corn
The facilities include rice threshers,
corn shellers with hauler, mobile rice
mill and mobile corn mill.
Zamboanga del Sur: District I: Tambulig, Midsalip,
Ramon Magsaysay,
Tukuran, Labangan,
Aurora, and Molave
District II: Guipos, Dimataling,
Kumalarang, San Pablo,
Margosatubig, Lapuyan,
Tigbao, V. Sagun
Region IX Postharvest Development Plan
6
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
ADDITIONAL PROPOSED PROJECT for RICE AND CORN
Establishment of
Small Scale
Storage Facility
for Seeds (Rice
and Corn)
The small scale storage facility will
preserve the viability of certified
seeds. This facility will also help the
farmers to gain rapid access to quality
seeds of the most profitable varieties at
an affordable price.
Zamboanga City:
Brgy Tumaga
HIGH VALUE COMMERCIAL CROPS
Provision of
Mango
Packinghouse
This establishment will provide
postharvest operations for mango such
as sorting, grading, application of hot
water treatment, labeling and
packaging.
Zamboanga del Norte
ADDITIONAL LOCATIONS
Zamboanga del Norte: District II: Sindangan, Katipunan,
Manukan, Roxas, Jose
Dalman
District III: Labasan, Liloy
Zamboanga del Sur: Dumalinao
Region IX Postharvest Development Plan
7
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
HIGH VALUE COMMERCIAL CROPS
Establishment of
“First Fry”
Processing Plant
for Banana
The facility will provide technology
and equipment to banana growers. The
farmers will also be provided with the
basic training and equipment on
postharvest handling and processing.
Zamboanga del Norte
INSTEAD OF “FIRST FRY”
CHANGED IT TO BANANA
PROCESSING FACILITY
Zamboanga del Norte:
Roxas, Dapitan City
Zamboanga del Sur:
Pitogo, Dimataling
Zamboanga Sibugay:
RT Lim, Kabasalan
Establishment of
Calamansi
Processing Center
This center envisioned to produce
good quality calamansi fruits and
process them into calamansi juice and
other calamansi products.
Zamboanga Sibugay: District I: Imelda, Alicia
District II: Siay, Kabasalan, Naga
ADDITIONAL LOCATION
Zamboanga del Sur:
Tambulig
Region IX Postharvest Development Plan
8
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
HIGH VALUE COMMERCIAL CROPS
Establishment of
Rubber
Processing Plant
The plant will engage in processing
different rubber products and by-
products to meet local and foreign
demands.
Zamboanga Sibugay: District I: Imelda, Alicia, Buug
District II: Siay, Kabasalan,
Naga,Ipil
ADDITIONAL LOCATIONS
Zamboanga del Sur: Lake Wood, Dumalinao, Dumingag
Zamboanga del Norte; Sindangan, Roxas, Siayan, Piñan
Establishment of
Cold Chain
System for
Vegetables
This facility will keep the appropriate
temperature of perishable crops at
every chain to preserve its quality and
prolong its shelf life.
Zamboanga del Sur
ONLY FOR TOMATOES
Zamboanga del Sur: Dumingag, Dumalinao
Region IX Postharvest Development Plan
9
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
HIGH VALUE COMMERCIAL CROPS
Establishment of
Cassava
Processing Center
The center is either a service provider
or a business enterprise engage in
delivering postharvest operations like
chipping, drying and marketing.
Zamboanga Sibugay: District I: Malangas, Payao, Buug
District II: Ipil, RT Lim, Titay,
Tungawan
Zamboanga del Sur: Lake Wood, Dumalinao, Dumingag
ADDITIONAL LOCATIONS
Zamboanga del Sur: (w/ MPDP, Chipping facility &
Granulator)
One unit per municipality
Zamboanga del Norte: Katipunan, Roxas, Manukan
Zamboanga City: Brgy Vitali & Brgy Curuan
ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS
Establishment of
Coffee
Processing Center
The project will establish a home industry
processing of coffee for farmers to augment
their income. The farmers will be provided
with the basic training and equipment on
postharvest handling and processing of coffee.
COMPONENT:
Coffee pulper Coffee cleaner
Fermentation tank
Coffee dryer (mechanical or MPDP)
Harvesting machine
Coffee storage
Roaster
Coffee mill and/or grinder
Coffee huller
Floatation tank
Zamboanga del Norte: Roxas
Region IX Postharvest Development Plan
10
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS
Establishment of
Minimal
Processing and
Packaging Plant
for Fruits and
Vegetables
A processing plant with complete facilities
for minimally processed fruits and
vegetables. To increase sustainable supply
of safe and quality minimally processed
fruits and vegetables at reasonable prices.
COMPONENT;
Building
Refrigerated Trucks
Cold Storages
Re-usable Plastic Crates
Stroller
Automatic Platform Scale
Table Scale
Automatic Continuous Washer
Automatic Continuous Spin Dryer
Automatic Weighing Machine
Vacuum Cooler
MAP applicator (with sealer)
Zamboanga City: Brgy Sta. Cruz
Zamboanga del Norte: Sergio Osmeña, Roxas, Sindangan,
Piñan, Mutia, Dipolog City
Establishment of
Agricultural
Tramline for
Cassava
A tramline is an alternative transport system in
production areas under extremely difficult
conditions. It is a hauling facility using cables
and pulleys to transport agricultural products.
COMPONENT:
Powerhouse
Loading & unloading platforms
Cables & pulleys
Carriers
Posts & Anchors
Zamboanga del Sur: Josefina, Dumingag
Region IX Postharvest Development Plan
11
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
ADDITIONAL PROPOSED PROJECT for HIGH VALUE COMMERCIAL CROPS
Establishment of
Banana Processing
Facility
The project will establish a home industry
processing of banana for farmers to augment
their income. The farmers will be provided
with the basic training and equipment on
postharvest handling and processing
COMPONENT:
Mixer Blender
Chipper Dryer
Frying pan Slicer
Screen Cotton towels
Chula Thermometer
Cooling Trays/racks
Steam Jacketed Kettle
Stainless Working Table
Plastic Sealer/Bag sealer
Assorted Kitchen Utensils
Trolleys/Handling Equipment
Triple Beam balance
Zamboanga del Norte:
Roxas, Dapitan City
Zamboanga del Sur:
Pitogo, Dimataling
Zamboanga Sibugay:
RT Lim, Kabasalan
Establishment of
Abaca Processing
Facility
The abaca processing center will provide
services to the farmers/growers such as
stripping and storage at reasonable cost
Zamboanga del Norte:
Mutia, La Libertad, Godod, Roxas,
Manukan
Zamboanga del Sur:
Dumingag, Lapuyan
Zamboanga Sibugay:
Kabasalan, Alicia
Region IX Postharvest Development Plan
12
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
NEW PROPOSED PROJECTS for FISHERIES
Establishment of
Fish Landing Site
with Ice Plant and
Cold Storage
The project will establish common
service facilities that will supply ice to
the fisher folks and cold storage that
will serve as temporary storage to
preserve the quality of their fishes at a
reasonable cost and/or rental fee.
COMPONENT:
Cold storage
Ice block molders
Ice block lifter
Thawing pit
Temperature device and data logger
Ice crusher/ice slicer
Water sinks
Pallets
Sensors
Ice container
Ice conveyor
Working gears
Plastic pallets
Generator set
Refrigerated Van/Truck
Mobile Ice Maker
Zamboanga City: Barangays: Lugpond, Tictapul
Dungcaan,Manguso
Manicahan
Arena Blanco
Sangali (East Coast)
Baliwasan(West Coast)
Zamboanga del Norte: Sibutad, Rizal, Sindangan, Roxas,
Liloy
Zamboanga del Sur: Pitogo, Tabina, Margosatubig,
Kumalarang, Dumalinao, Vicenzo
Sagun
Zamboanga Sibugay:
Alicia, Ipil, Naga, Talusan, Mabuhay,
Olutanga, Tungawan,
Region IX Postharvest Development Plan
13
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
NEW PROPOSED PROJECTS for FISHERIES
Establishment of
Multi-Commodity
Solar Tunnel
Dryer
The MCSTD will be owned and
operated by either a cooperative or by
the LGU. Fish drying services will be
offered to interested clients for a fee.
Zamboanga City: Barangay Tugbungan
Zamboanga del Norte: Jose Dalman, Sindangan, Manukan,
Rizal, Sibutad
Zamboanga del Sur: Kumalarang, Margosatubig, Vicenzo
Sagun, Dimataling, Diñas, San Pablo,
Dumalinao, Labangan, Lapuyan
Zamboanga Sibugay: Talusan, Mabuhay, Payao, Tungawan,
RT Lim, Ipil
Establishment of
Seaweed Noodles
Processing Center
Provision of equipment (with vacuum
sealer and other facilities) and
establishment of processing center
(display area) for the expansion of the
seaweed noodles processing project.
Zamboanga City: Barangay Mampang
Zamboanga del Norte: Jose Dalman, Sindangan, Sibutad
Zamboanga del Sur: Dimataling, Dumalinao, San Pablo,
Labangan, Margosatubig, Diñas
Region IX Postharvest Development Plan
14
(Continuation of Table 56. Changes in the Postharvest Development Program (CY 2010-2020) by Province/City of Region IX)
List of Projects Brief Description Proposed Locations Regional Level Agreement
NEW PROPOSED PROJECTS for FISHERIES
Establishment of
Fish Processing
Plant
The project will establish a processing
plant for fish, to augment fisher folks’
income. Finished products will be dried,
smoked, canned, fillets and other fish
products.
COMPONENT:
Grading machine (mechanical)
Slicing machine/slicer
Slime removing machine
Filleting machine/equipment
Washer
Beheading machine/cutter
Skinning machine
Containers
Gutting machine
Smoking chamber
Smoking trays
Equipment for cutting fins
Fish Dryer (MCSTD)
Meat separator (meat-bone separator)
Packing and labeling equipment
Drying trays or panels
Kitchen utensils/paraphernalia
Chiller, freezer, refrigerated storage
Zamboanga del Sur: Pitogo, Tabina, Margosatubig,
Kumalarang, Dumalinao, Vicenzo
Sagun