Appendix N: Regional Capacity ProjectsTransportation 2040 as amended in 2015Note: Project costs are expressed in 2015 dollars and are sorted by sponsor.
Sponsor: AUBURNTitle: A St Trail
Description:Shared use bike pathLocation / Facility:A St Trail
From:31st St SE
To:Transit station at 1st & B St.
Project ID: 2858
Completion Year:2030
MTP Status: CandidateEstimated Cost: $2,062,420
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: Auburn Pacific Phase 2 (trail)
Description:New east-west trail connection serving the residents of Auburn and Pacific and connecting through other existing trails to the Auburn urban center.Location / Facility:0
From:Ellingson Road SW
To:Pacific Park
Project ID: 4516
Completion Year:2011
MTP Status: CompletedEstimated Cost: $180,425
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: Auburn Way South (SR 164) Corridor Improvements, Fir Street SE to Hemlock Street SEg & Non-Motorized Improvements
Description:The Auburn Way South (SR 164) Corridor Improvement project is approximately 0.14 miles in length, from Fir ST SE to Hemlock ST SE. This project will design and construct a new 5 lane section of roadway with illumination. There will be 2 through lanes in each direction and a center turn-lane with a U-turn/Wedge and transit pullouts at Hemlock ST SE. There will also be 10-foot wide sidewalks and storm drainage improvements. The project includes a new traffic signal at the intersection of Hemlock ST SE and Auburn Way South (SR 164) with ADA compliant ramps, push buttons, and signal heads.Location / Facility:Auburn Way South (SR 164)
From:Fir St SE
To:Hemlock St SE
Project ID: 1744
Completion Year:2015
MTP Status: CandidateEstimated Cost: $3,591,990
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: BNSF Pedestrian/Bicycle Undercrossing
Description:Non-motorized connection extending from the White River Trail to the Interurban Trail and all urban centers located proximate to the Interurban Trail. Location / Facility:BNSF Underpass
From:A Street SE
To:Skinner Rd
Project ID: 4515
Completion Year:2017
MTP Status: CandidateEstimated Cost: $11,279,810
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: BPA Trail
Description:New east-west trail connection from Federal Way urban center to Covington.Location / Facility:BPA Trail
From:west city limits
To:east city limits
Project ID: 4510
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $2,472,030
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: C St Trail
Description:Shared Use bike pathLocation / Facility:0
From:Interurban Trail @ 15th St SW
To:Pacific City Limits
Project ID: 2871
Completion Year:2011
MTP Status: CompletedEstimated Cost: $349,879
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: Grade Separated Crossing of BNSF Railyard
Description:Improved east-west connectivity and mitigation for potential future BNSF railyard expansion as a multimodal facility (at 6th Street SW/SE )Location / Facility:6th Street SW/SE
From:C Street SW
To:A Street SE
Project ID: 4504
Completion Year:2030
MTP Status: CandidateEstimated Cost: $34,967,411
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: Green River Trail
Description:New north-south non-motorized corridor that links to Auburn's urban center through future on-street bicycle lanes and sidewalks.Location / Facility:Green River Trail
From:S. 277th Street
To:SR 18
Project ID: 4511
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,472,030
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: M Street Widening and Underpass
Description:GRADE SEPARATE RAIL XING, WIDEN TO 4 LANES, ADD SIDEWALK, BIKE LANES, AND ROADWAY LIGHTING.Location / Facility:M St SE
From:E MAIN
To:AUBURN WAY S
Project ID: 975
Completion Year:2019
MTP Status: CandidateEstimated Cost: $26,116,619
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: S 272nd/277th St Corridor Capacity Non Motorized Trail Improvements
Description:Widen roadway between Auburn Way North and L St NE. Includes 2 new EB lanes, 1 new WB lane, separated non-motorized trail, intersection improvements, lighting, ITS improvements, and associated storm improvements.Location / Facility:52nd St NE
From:AUBURN WAY N
To:GREEN RIVER
Project ID: 976
Completion Year:2016
MTP Status: CandidateEstimated Cost: $8,293,101
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: SR 164
Description:Widen to 4 lanes - Restrict access where appropriate (Project is from Dogwood to Auburn City limits with the exception of the segment between Fir and Hemlock that has been segmented out into a Candidate project - MTP 1744)Location / Facility:SR 164
From:Dogwood
To:Auburn City Limits
Project ID: 4287
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $18,540,225
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: White River Trail
Description:A new trail connection that will link south-east Auburn residents to the Auburn urban center via travel on the future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and the Interurban Trail. Location / Facility:White River Trail
From:Pacific
To:Southeast Auburn along the White River
Project ID: 4513
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $7,416,090
Type:New Facility-RoadCounty:King County
Sponsor: AUBURNTitle: Williams Trail
Description:A new trail connection that will link south-east Auburn and Pierce County residents to the Auburn urban center via travel on the White River Trail, future BNSF Pedestrian/Bicycle Undercrossing, Auburn-Pacific Trail (Phase 2), and Interurban Trail. Location / Facility:Williams Trail
From:Kersey Way/White River Trail
To:Lake Tapps Parkway
Project ID: 4514
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $2,472,030
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: 120th Avenue NE Corridor Widening: NE 4th Street to Northup Way
Description:Improve and widen the 120th Avenue NE corridor in phases to increase connectivity between the Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen to five lanes with bike lanes and continuous sidewalk between NE 4th and NE 8th Streets; realign the roadway with sidewalks and bike lanes between NE 8th Street and Old Bel-Red Road; widen to five lanes with sidewalks and bike lanes between Old Bel-Red Road and NE 15th Street; and widen to five lanes with sidewalks and a separated multi-use path between NE 15th Street and Northup Way (this segment may primarily be implemented with four lanes on an interim basis). Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 16th Streets.Location / Facility:120th Ave NE
From:NE 4th Street (new connection at 120th Ave NE)
To:Northup Way
Project ID: 4264
Completion Year:2023
MTP Status: ApprovedEstimated Cost: $58,187,427
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Bellevue Way Trail
Description:Construct a multi-use pedestrian and bike facility. Project may be designed and constructed in coordination with Sound Transit and the implementation of the East Link project along this corridor. Location / Facility:Bellevue Way Trail
From:Parallel along Bellevue Way from SE 30th
To:SE 8th St
Project ID: 2865
Completion Year:2029
MTP Status: CandidateEstimated Cost: $1,516,547
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - 124th Ave NE
Description:Improve and widen the 124th Avenue corridor in phases to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. Widen for bike lanes between NE 8th Street and Bel-Red Road; widen to five lanes with sidewalks and bike facilities between Bel-Red Road and the planned NE 15th Street intersection; and widen to five lanes with sidewalks between NE 15th Street and Northup Way. Project to be designed and constructed in coordination with Sound Transit specifically in the segment where the East Link project will cross under roadway, between NE 14th and NE 18th Streets.Location / Facility:124th Avenue NE
From:NE 8th Street
To:Northup Way
Project ID: 4527
Completion Year:2019
MTP Status: CandidateEstimated Cost: $44,990,889
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - NE 4th St Extension
Description:Construct a four/five lane extension of NE 4th Street from 116th Ave to 120th Ave, including sidewalks, and bike lanes to increase connectivity between Downtown Bellevue and Overlake regional growth centers and the new Bel-Red TOD node. The extension will be designed to accommodate future development and uses of the BNSF corridor.Location / Facility:NE 4th Street
From:116th Avenue NE
To:120th Avenue NE
Project ID: 4523
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $46,813,017
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Bel-Red Regional Connectivity - NE 6th St Extension
Description:Construct east half of NE 6th/I-405 HOV/HOT interchange to provide transit/HOV access east of I-405. Location / Facility:NE 6th Street
From:112th Avenue NE
To:120th Avenue NE
Project ID: 4524
Completion Year:2020
MTP Status: CandidateEstimated Cost: $86,666,660
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Coal Creek Parkway
Description:Widen Coal Creek Pkwy to six lanes at the intersection between the I-405 ramps.Location / Facility:COAL CREEK PKWY
From:I-405 northbound on ramp
To:I-405 southbound off ramp
Project ID: 1100
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $3,714,693
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Downtown-Overlake Connection Trail
Description:Add a 10 to 14 foot wide off-street path on the north side of NE 12th Street from 100th Avenue NE to 116th Avenue NE. Component of priority bike corridor; Add 10-14 foot-wide off street path along the north side of NE 16th Street from 116th Avenue NE to 140th Avenue NE. Component of priority bike corridor;Location / Facility: north side of NE 12th Street
From:100th Ave NE
To:140th Ave NE
Project ID: 5497
Completion Year:2029
MTP Status: CandidateEstimated Cost: $1,219,089
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: I-90 Trail/124th Ave SE Connector
Description:Add a 10-14 foot-wide off street path from the I-90 trail to SE 38th StreetLocation / Facility:I-90 Trail/124th Ave SE Connector
From:124th Ave SE & SE 38th Pl
To:I-90 Trail at Factoria Blvd.
Project ID: 2868
Completion Year:2011
MTP Status: CompletedEstimated Cost: $1,706,725
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Lake Washington Blvd Trail
Description:Shared use bike pathLocation / Facility:Lake Washington Blvd Trail
From:Southern terminus of existing Lk WA Blvd Trail near Bagley Ln
To:Along BNSF Corridor to Bellevue/Newcastle limits
Project ID: 2888
Completion Year:2029
MTP Status: CandidateEstimated Cost: $1,238,231
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Lake-to-Lake Trail
Description:Add a 10 to 14 foot wide off street path on the south side of Main Street from Bellevue Way NE to 116th Avenue NE. Component of priority bike corridor.Location / Facility:Main St
From:Bellevue Way
To:116th Ave NE
Project ID: 5498
Completion Year:2029
MTP Status: CandidateEstimated Cost: $1,857,346
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Lake-to-Lake Trail
Description:Add a 10-14 foot-wide off street path on the north side of Lake Hills Connector from Main Street to 140th Avenue SE. Component of priority bike corridor.Location / Facility:north side of Lake Hills Connector
From:Main St
To:140th Ave SE
Project ID: 5499
Completion Year:2029
MTP Status: CandidateEstimated Cost: $1,238,231
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Lake-to-Lake Trail
Description:Add a 10-14 foot-wide off street path on the south side of SE 8th Street from 114th Avenue SE to Lake Hills Connector. Component of priority bike corridor.Location / Facility:on the south side of SE 8th Street
From:114th Ave SE
To:Lake Hills Connector
Project ID: 5500
Completion Year:2029
MTP Status: CandidateEstimated Cost: $619,115
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: Mountain to Sound Greenway
Description: A paved multiuse trail of 12 feet wide (where feasible) is proposed beginning at the current end of the trail at Factoria Blvd and running eastward along the south side of I-90 and the north side of SE 36th St to the curve near the 150th Ave SE interchange with I-90, then following a new independent alignment to the south of the interchange and north of the 150th Avenue SE/SE 37th St intersection. Eastward from 150th Ave SE, the trail will continue on the south side of I-90 and the north side of SE 37th St. Eastward from the termination of SE 37th St, the trail will continue on the south side of I-90 and the north side of private properties and/or Newport Way to the intersection of Lakemont Blvd SE and Newport Way. Location / Facility:Parallel to I-90
From:Factoria Blvd
To:Lakemont Blvd
Project ID: 5501
Completion Year:2030
MTP Status: CandidateEstimated Cost: $30,676,746
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor – Zone 1A
Description:The project includes one segment of a new multi-modal arterial street connection between 116th Ave NE to the West Abutment of West Bridge. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate storm drainage and water quality treatment. Zone 1A will include a separated wide multi-use path on the north side and sidewalk on the south side; it will also include, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, and illumination for both Zone 1A and Zone 1B.Location / Facility:NE Spring Boulevard
From:116th Ave NE
To:West Abutment of West Bridge
Project ID: 4473
Completion Year:2020
MTP Status: CandidateEstimated Cost: $12,046,583
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor -- Zone 1B
Description:The project includes one segment of a new multi-modal arterial street connection, including two travel lanes ineach direction, turn pockets and center turn lanes where appropriate, storm drainage, and water quality treatment.Zone 1B will include a separated wide multi-use path on the north side and sidewalk on the south side, and twobridges spanning the north-south Eastside Rail Corridor and Sound Transit rail tracks.Location / Facility:NE 15th Street
From:West Abutment of West Bridge
To:120th Avenue NE
Project ID: 4526
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $22,607,475
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: NE Spring Boulevard Multi-Modal Corridor – Zone 2
Description:The project includes one segment of a new multi-modal arterial street connection from 120th Ave NE to 124th Ave NE. All zones will include two travel lanes in each direction, turn pockets and center turn lanes where appropriate, new traffic signals connected to the city’s traffic adaptive control system, landscaping and irrigation, illumination, storm drainage and water quality treatment. Zone 2 will include widened outside lanes for shared bicycle use and sidewalks on both sides.Location / Facility:NE Spring Boulevard
From:120th Ave NE
To:124th Ave NE
Project ID: 4474
Completion Year:2020
MTP Status: CandidateEstimated Cost: $27,050,306
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: SR 520 Trail
Description: Add a 10-14 foot-wide off street path along the south side of NE Points Drive from the western part of the interchange area to the south side of Northup Way just east of the interchange. Component of priority bike corridor. Add a 10-14 foot-wide off street path along SR-520 connecting NE Points Drive to Northup Way over the Bellevue Way Interchange area (just north of SR-520). Component of priority bike corridor.Location / Facility:SR 520 Trail
From:Bellevue Way I/C
To:Bellevue Way
Project ID: 5495
Completion Year:2015
MTP Status: CandidateEstimated Cost: $3,657,267
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: SR 520 Trail
Description:Construct 10-14 foot-wide path from Bellevue Way / Evergreen Point Bridge to the west terminus of existing SR-520 trail at 124th Avenue NE. This facility extends east of Bellevue Way along the south side of Northup Way to 108th Avenue NE; along the east side of 108th Avenue NE; continuing east along the north side of SR-520 and eventually leading back to the proposed BNSF regional trail. East of the BNSF regional trail, completing the connection along the north side of SR-520 and south side of NE 24th Street to the existing trail system. Component of priority bike corridor; EW-1: SR-520 Trail. Location / Facility:SR 520 Trail
From:Evergreen Point Bridge
To:124th Ave NE
Project ID: 5496
Completion Year:2015
MTP Status: CandidateEstimated Cost: $14,326,046
Type:New Facility-RoadCounty:King County
Sponsor: BELLEVUETitle: West Lake Sammamish Pkwy Path
Description:Construct a ten foot multi-use path on the west side of the parkway and a four foot bike shoulder on the east side. Portions of the west side path will be separated from the vehicle travel lanes by two to five foot landscape planting. The project will include five mid-block pedestrian crossings, three intersection crossings, and rehabilitation of existing pavement throughout the corridor.Location / Facility:on the west side of West Lake Sammamish Pkwy
From:North City Limit
To:I-90
Project ID: 5502
Completion Year:2020
MTP Status: CandidateEstimated Cost: $36,572,670
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: Bothell Way NE / Bothell-Everett Hwy Improvements
Description:Widen to 4/5 lanes between NE 188th St and 240th St SE.Location / Facility:SR 527
From:NE 188th St
To:240th St SE
Project ID: 4262
Completion Year:2030
MTP Status: CandidateEstimated Cost: $36,184,339
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: Bothell Way NE: Multiway Boulevard Project
Description:Reconstruct and expand the existing 4-lane roadway between SR 522 and NE 188th St to a tree-lined boulevard with 5 travel lanes and business access lanes. Location / Facility:SR 527
From:SR 522
To:NE 188th St
Project ID: 5446
Completion Year:2017
MTP Status: CandidateEstimated Cost: $32,308,938
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: Bothell-Everett Hwy Widening: 240th St SE to 228th St SE
Description:This project will widen Bothell-Everett Hwy from two lanes to four lanes with a center dual left turn lane, bike lanes, transit stops and sidewalks, curb/gutter/plantings, minor side street improvements, interconnect and coordinate signals, provide access management, retaining walls, storm drainage facilities, landscaping and illumination.Location / Facility:SR 527
From:240th St SE
To:228th St SE
Project ID: 4271
Completion Year:2015
MTP Status: CompletedEstimated Cost: $10,537,340
Type:New Facility-RoadCounty:Snohomish County
Sponsor: BOTHELLTitle: North Creek Trail - 220th St SE to SR 524 (Woodlands Technology Campus)
Description:The North Creek Trail north of 220th St SE to SR 524 will be constructed by project developers and the City of Bothell over the next several years. The project "Woodlands Technology Campus" has completed construction of a 12-foot wide mixed-use path on their property which runs from 220th St SE north to 214th St SE at SR 527. The next piece of mixed-use path from 214th St SE north to SR 524 will be built by a City contract in 2014/2015 using grant funding.Location / Facility:North Creek
From:220th St SE
To:SR 524
Project ID: 4172
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $1,589,240
Type:New Facility-RoadCounty:Snohomish County
Sponsor: BOTHELLTitle: North Creek Trail, Section 1 Stage 1
Description:The North Creek Trail - Section 1, Stage 1 project will construct a Class I non-motorized trail (missing trail segment) on NE 195th Street between North Creek and I-405/NE 195th Street interchange in Bothell. Location / Facility:parallel to NE 195th
From: I-405 ramp/ NE 195th Street
To:North Creek (waterway)
Project ID: 4169
Completion Year:2011
MTP Status: CompletedEstimated Cost: $1,047,307
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: North Creek Trail, Section 1, Stage 2 (Schnitzer)
Description:The North Creek Trail, Section 1, Stage 2 (Schnitzer) project will construct Class I non-motorized trail segments along the North Creek levy top north of NE 195th Street to North Creek Parkway North in Bothell. Location / Facility:along the North Creek levy (still on East side of waterway)
From:NE 195th (just north of)
To:North Creek Parkway North
Project ID: 4170
Completion Year:2011
MTP Status: CompletedEstimated Cost: $1,220,896
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: North Creek Trail, Section 2, Stage 2 (Canyon Park Business Park)
Description:The North Creek Trail - Section 2, Stage 2 (Canyon Park Business Park) project will construct a Class I non-motorized trail from 228th Street SE north approximately 0.8 miles to 220th Street SE. Location / Facility:North Creek Trail ROW
From:228th Street SE
To:220th Street SE
Project ID: 4171
Completion Year:2011
MTP Status: CompletedEstimated Cost: $1,098,311
Type:New Facility-RoadCounty:Snohomish County
Sponsor: BOTHELLTitle: SR 522 - West City Limits to NE 180th Street Stage 2A Improvements
Description:The west segment of the project (M.P. 8.62 to M.P. 8.85) includes construction of an exclusive BAT lane from 91st Ave NE to 1300 feet west of 96th Ave NE, retaining walls, landscaping, curbs/gutter/sidewalk, signal interconnect and access management.Location / Facility:SR 522
From:91st Ave NE
To:1300 feet west of 96th Ave NE
Project ID: 4272
Completion Year:2015
MTP Status: CompletedEstimated Cost: $9,590,163
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: SR 522 - West City Limits to NE 180th Street Stage 2b Improvements
Description:The east segment of the project (M.P. 9.20 to M.P. 9.61) includes installation of curbs/gutter/sidewalk, signal interconnect and access management.Location / Facility:SR 522
From:750 feet east of 96th Avenue NE
To:Hall Road
Project ID: 5537
Completion Year:2019
MTP Status: ROW Conditionally ApEstimated Cost: $11,870,491
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: SR 522 West City Limits to NE 180th St. Stage 1 Improvements (at 96th Ave NE) - Wayne Curve.
Description:This project includes curb, gutters and sidewalks installation on both sides of the roadway; upgrade storm water facilities; street lighting improvements; widen through lanes; realign 96th Avenue NE approach, increase intersection capacity by adding left turn lanes; enhance transit operation by adding Business Access Transit (BAT) lanes and queue jump lane at the 96th Avenue NE intersection, and enhance traffic safety through access management and median installation.Location / Facility:SR 522 @ 96th Ave NE
From:SR 522 @ 96th Ave NE
To:1300' west of 96th Ave NE
Project ID: 4002
Completion Year:2012
MTP Status: CompletedEstimated Cost: $28,415,298
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: SR 522, Stage 3
Description:The proposed project will provide corridor continuity, improve traffic flow (capacity), provide continuous westbound and eastbound BAT (Business Access and Transit) lanes and provide a continuous ADA pedestrian facility. Location / Facility:SR 522
From:83rd Ave NE
To:91st Ave NE
Project ID: 4254
Completion Year:2020
MTP Status: CandidateEstimated Cost: $46,934,926
Type:New Facility-RoadCounty:King County
Sponsor: BOTHELLTitle: SR 527
Description:Widen to 4/5 lanes between 228th St. SE and I-405.Location / Facility:SR 527
From:228th St. SE
To:I-405
Project ID: 5536
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $6,212,069
Type:New Facility-RoadCounty:Snohomish County
Sponsor: BOTHELLTitle: Transit Center and Parking Garage (Bothell)
Description:Construct a transit center/park-and-ride with up to 400 stalls in the vicinity of SR 527/Bothell Way NE and NE 185th Street in downtown Bothell.Location / Facility:Vicinity of SR 527/Bothell Way NE and NE 185th Street
From:Bothell Way NE at NE 185th Street
To:#N/A
Project ID: 4056
Completion Year:2040
MTP Status: CandidateEstimated Cost: $47,679,266
Type:New Facility-RoadCounty:Snohomish County
Sponsor: BUCKLEYTitle: Foothills Trail - White River Crossing
Description:Shared use pathLocation / Facility:Foothills Trail
From:South side of the White River
To:North side of the White River
Project ID: 2809
Completion Year:2016
MTP Status: CandidateEstimated Cost: $7,331,877
Type:New Facility-RoadCounty:Pierce County
Sponsor: BUCKLEYTitle: SR-165 Realignment, P2
Description:Phase 2 includes: realignment of SR-165 to form a T intersection with SR-410, signals at the SR-410/SR-165 intersection and at the SR-165/Ryan/112th Street intersection, the addition of a right turn lane on the west leg of the SR-410/SR165 intersection, realignment of River Avenue north of Pearl Street, realignment of the Foothills Trail north of the intersection of SR-165/Ryan/112th Street. The road improvements include curb, gutter and sidewalk north of Ryan Rd and paved shoulders south of Ryan Road. The project includes street illumination and wetland mitigation. Location / Facility:Intersection of SR-410, SR-165, Ryan Road, 112th Street
From:Intersection of SR-165,Ryan Rd,112th St
To:Intersection SR-165, SR410
Project ID: 4286
Completion Year:2015
MTP Status: CandidateEstimated Cost: $2,618,044
Type:New Facility-RoadCounty:Pierce County
Sponsor: BUCKLEYTitle: SR-410/SR-165/Ryan Rd/ 112th St E Realignment, Phase 1
Description:Phase 1 includes: realignment of Ryan and 112th to intersect with SR165, realignment of River Avenue and the Foothills Trail. Roads include curbs, gutters and sidewalks. Phase 1 includes a storm trunk line along Ryan, 112th, easements and Hinkleman. Location / Facility:Intersection of SR-410, SR-165, Ryan Road, 112th Street
From:Intersection of SR-410, SR-165, Ryan Road, 112th Street
To:Intersection of SR-410, SR-165, Ryan Road, 112th Street
Project ID: 1239
Completion Year:2012
MTP Status: CompletedEstimated Cost: $3,978,142
Type:New Facility-RoadCounty:Pierce County
Sponsor: BURIENTitle: 1st Avenue South, Phase 2 (SW 140th Street to SW 146th Street)
Description:Reconstruct 1st Avenue South from SW 140th Street to SW 146th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.Location / Facility:1st Ave S
From:SW 140th Street
To:SW 146th Street
Project ID: 5449
Completion Year:2013
MTP Status: CompletedEstimated Cost: $10,089,781
Type:New Facility-RoadCounty:King County
Sponsor: BURIENTitle: 1st Avenue South, Phase 3 (SW 128th Street to SW 140th Street)
Description:Reconstruct 1st Avenue South from SW 128th Street to SW 140th Street. Maintain two travel lanes in each direction and a center turn lane. Provide curb, gutter, sidewalks, planter strips, illumination, storm water facilities, traffic signals and interconnections, and driveway consolidation where feasible. Utility undergrounding will be completed by the respective utility companies.Location / Facility:1st Ave S
From: SW 128th Street
To:SW 140th Street
Project ID: 5450
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $20,296,217
Type:New Facility-RoadCounty:King County
Sponsor: BURIENTitle: Ambaum Boulevard SW Corridor Study (SW 116th Street to SW 153rd Street)
Description:Conduct study to determine current and projected requirements for Transit HOV/BAT capabilities, non-motorized upgrades for bicycle and pedestrian uses, center turn lane/left turn pocket additions and coordinated signalization enhancement for safety and volume improvement requirements. The study will identify locations of anticipated significant purchases of ROW and easements.Location / Facility:Ambaum Boulevard
From:SW 116th Street
To: SW 153rd Street
Project ID: 5451
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $922,555
Type:New Facility-RoadCounty:King County
Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - SR 527 Downtown Bothell to SR 526/I-5
Description: Swift II Bus Rapid Transit will be Community Transit`s 2nd line of BRT, traveling between the Canyon Park Park Ride and Paine Field/Boeing. This 12 mile corridor will have 15 stations in each direction served by 60 ft articulated buses. Swift II BRT will meet a critical need for east-west transportation options in Snohomish County, connecting a Regional Growth Center (Canyon Park) with a Regional Manufacturing and Industrial Growth Center (Paine Field). This service will be all day bi-directional service operating at a 10 min frequency during peak hours. Location / Facility:Swift Corridor
From:Canyon Park Park Ride
To:Seaway and 75th Street
Project ID: 5466
Completion Year:2019
MTP Status: ApprovedEstimated Cost: $51,286,830
Type:Transit Service ExpansionCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 20th St US 2 to SR 9
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 20th St from US 2 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:20th St
From:US 2
To:SR 9
Project ID: 5478
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 228th St Edmonds Ferry, SR 104, 228th, 236th, 228th to SR 9
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 228th St from Edmonds Ferry to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:228th St
From:Edmonds Ferry
To:SR 9
Project ID: 5476
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - 35th Ave SE Bothell to Everett
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on 35th Ave SE from downtown Bothell to Everett. Requires speed & reliability improvements and accessible transit stops.Location / Facility:35 Ave SE
From:Downtown Bothell
To:Everett
Project ID: 5480
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - I-5 Smokey Point to King County
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on I-5 from Smokey Point to King County. Requires speed & reliability improvements and accessible transit stops.Location / Facility:I-5
From:Smokey Point
To:King County
Project ID: 5482
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - Mukilteo Speedway
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on Mukilteo Speedway (SR 525) from Mukilteo Ferry to I-405 (ramp just short of I-405). Requires speed & reliability improvements and accessible transit stops.Location / Facility:Mukilteo Speedway (SR 525)
From:Mukilteo Ferry
To:I-405
Project ID: 5333
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $7,688,635
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 522 Monroe to Bothell
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 522 Monroe to Bothell. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 522
From:Monroe
To:Bothell
Project ID: 5484
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 526 from SR 525 to I-5
Description:Service hours and buses. Core service or Swift Bus Rapid Transit on SR 526 from SR 525 to I-5. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 526
From:SR 525
To:I-5
Project ID: 5312
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $4,379,234
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 528 I-5 to SR-9
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 528 from I-5 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 528
From:I-5
To:SR 9
Project ID: 5470
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 531 I-5 to downtown Arlington
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 531 from I-5 to downtown Arlington. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 531
From:I-5
To:Downtown Arlington
Project ID: 5468
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - SR 9 Bothell to Arlington
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on SR 9 from Bothell to Arlington. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 9
From:Downtown Bothell
To:Arlington
Project ID: 5474
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or BRT - US 2 Everett to Monroe (via Ave D and 2nd St in Snohomish)
Description:Service hours and buses. Core Service or Bus Rapid Transit (BRT) on US 2 from Everett to Monroe (via Ave D and 2nd St in Snohomish). Requires speed & reliability improvements and accessible transit stops.Location / Facility:US 2
From:Everett
To:Monroe
Project ID: 5472
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - 164th St
Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on 164th from SR 99 to SR 527. Requires speed & reliability improvements and accessible transit stops.Location / Facility:164th
From:SR 99
To:SR 527
Project ID: 5335
Completion Year:2030
MTP Status: CandidateEstimated Cost: $3,548,503
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - Airport Rd to Cathcart Way (Everett)
Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on Airport Rd, 128th, 132nd, Cathcart Way from SR 526 to SR 9. Requires speed & reliability improvements and accessible transit stops.Location / Facility:Airport Rd, 128th, 132nd, Cathcart way
From:SR 526
To:SR 9
Project ID: 5334
Completion Year:2030
MTP Status: CandidateEstimated Cost: $9,452,531
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - Smokey Point Corridor
Description:Service hours and buses. Core Service or Swift Bus Rapid Transit (BRT) on N Broadway (Smokey Point corridor) from Everett Station up N Broadway, SR 529, State Ave, Smokey Pt to Arlington (SR 531). Requires speed & reliability improvements and accessible transit stops.Location / Facility:Smokey Point corridor up N Broadway, SR 529, State Ave, Smokey Pt
From:Everett Station
To:SR 531
Project ID: 5332
Completion Year:2030
MTP Status: CandidateEstimated Cost: $11,718,285
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: Core or Swift BRT - SR 524 (196th)
Description:Service hours and buses. Core service or Swift Bus Rapid Transit on SR 524 (196th, Filbert) from ferry to SR 527. Requires speed & reliability improvements and accessible transit stops.Location / Facility:SR 524 (196th St and Filbert)
From:Edmonds Ferry
To:SR 527
Project ID: 5331
Completion Year:2030
MTP Status: CandidateEstimated Cost: $5,832,454
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COMMUNITY TRANSITTitle: North Snohomish Co. Park & Ride
Description:Create a new Park and Ride facility with approximately 350 stalls, bus bays and layover space, DART transfer space, platform with customer shelters, lighting, bike lockers & racks, information kiosks, driversÆ restroom/utility building, pedestrian walkways, landscaping, safety & security features, and on-site surface water detention & treatment facilities. The exact location is to be determined.Location / Facility:Arlington/Smokey Point Area, Vicinity I-5
From:172nd in Smokey Pt
To:
Project ID: 3654
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $7,753,460
Type:New Facility-RoadCounty:Snohomish County
Sponsor: COVINGTONTitle: SR 516 – Jenkins Creek to 185th Place SE
Description:This project is to widen and reconstruct a portion of SR 516 (SE 272nd St) between Jenkins Creek and 185th Place SE. This project will include the crossing of Jenkins Creek with a new structure for the stream, widening the street from 2-lanes to 5-lanes including curb and gutter, 8’ sidewalks, access control features, landscaping and provisions for u-turns.Location / Facility:SR 516
From:Jenkins Creek
To:185th Place SE
Project ID: 4288
Completion Year:2015
MTP Status: CandidateEstimated Cost: $17,896,151
Type:New Facility-RoadCounty:King County
Sponsor: DES MOINESTitle: Barnes Creek Trail
Description:Conduct prelimary design to provide a multipurpose non montorized trail connection to the regional Des Moines Creek Trail. Design will be developed in phases, from south to north, and will be used to assist in environmental assessement and identification of Right of Way requirements for the future trail as provided in the City of Des Moines Comprehensive Plan.Location / Facility:Unused SR 509 Right of Way
From:Des Moines Creek Trail
To:Kent Des Moines Road
Project ID: 4299
Completion Year:2017
MTP Status: CandidateEstimated Cost: $1,731,106
Type:New Facility-RoadCounty:King County
Sponsor: DES MOINESTitle: Connecting 28th/24th Avenue South (S 208th Street to S 216th Street)
Description:The project will complete a five lane principal arterial corridor on 24th Avenue South between S. 216th Street and S. 208th Street. The improvements include bicycle lanes, curb, gutter, sidewalks, storm drainage collection and treatment facilities, street lighting, coordination of signal improvements at S. 216th Street, channelization, landscaping, utilities, and undergrounding of aerial utilities.Location / Facility:24th Avenue South
From:S 208th Street
To:S 216th Street
Project ID: 4459
Completion Year:2014
MTP Status: ApprovedEstimated Cost: $11,330,587
Type:New Facility-RoadCounty:
Sponsor: DES MOINESTitle: S. 216th Street Segment 1A
Description:Utility coordination, finalize PS&E, acquire right of way and construct improvements as a Complete Street including widening of two additional lanes, a turn lane, transit stop improvements, bicycle lanes, curbs, gutters, sidewalks, stormwater retention and treatment, planter strips, sustainable street and pedestrian lights, utility undergrounding and signal modifications.Location / Facility:South 216th Street
From:29th Avenue South
To:24th Avenue South
Project ID: 4297
Completion Year:2016
MTP Status: CandidateEstimated Cost: $10,408,022
Type:New Facility-RoadCounty:King County
Sponsor: DUPONTTitle: DuPont-Steilacoom Rd
Description:Scope of the project has not been fully defined. Widening Improvements to DuPont-Steilacoom Rd are anticipated to be necessary to accommodate expected growth in the City of DuPont and increased traffic flows from nearby areas, such as JBLM. The existing road is two lanes with left turn pockets onto the I-5 Exit 119 Interchange (which has been identified in various corridor studies for recommended improvements.)Location / Facility:DuPont-Steilacoom Rd
From:[Not submitted]
To:
Project ID: 296
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $31,013,839
Type:New Facility-RoadCounty:Pierce County
Sponsor: EDGEWOODTitle: Interurban Trail & Trailhead Construction Project (114th St, E to 900ft S of Military Rd)
Description:Edgewood's segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". Location / Facility:Interurban Trail
From:114th St. E
To:900ft south of military road
Project ID: 2890
Completion Year:2012
MTP Status: CompletedEstimated Cost: $1,758,809
Type:New Facility-RoadCounty:Pierce County
Sponsor: EDGEWOODTitle: Interurban Trail Construction Project (114th Ave E to Edgewood/Pacific CL)
Description:Edgewood's final segment of the Interurban Trail is a "missing link" in the Interurban/Green River Trail system and will eventually provide connection between Milton and Pacific, providing the only non-motorized route on and off "the hill". The project limits for the trail will extend from 114th St. E to Edgewood/ Pacific City Limits which will provide access to pedestrians and bicyclists, the trail improvements is approximately 1mile of a multi-use non-motorized path with shoulders, with viewing areas, interpretive display and seating.Location / Facility:Interurban Trail
From:Edgewood/ Pacific City Limits
To:114th St. E
Project ID: 4285
Completion Year:2018
MTP Status: CandidateEstimated Cost: $16,097,002
Type:New Facility-RoadCounty:Pierce County
Sponsor: EDMONDSTitle: Edmonds Terminal Relocation/Expansion Phase I
Description:Bus/Rail connection, vehicle holding lanes, toll-booth, parking, ferry pier, slip and terminal relocationLocation / Facility:Edmonds Terminal Relocation/Expansion Phase I
From:[Not submitted]
To:
Project ID: 2483
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $124,055,356
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EDMONDSTitle: Edmonds Terminal Relocation/Expansion Phase II
Description:Phase II or relocation; people mover. See 4072 for the parking structure and Sounder Station.Location / Facility:Edmonds Terminal Relocation/Expansion Phase II
From:[Not submitted]
To:
Project ID: 3415
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $103,896,361
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EDMONDSTitle: Interurban Trail
Description:The project will complete the missing link of the Interurban Trail between King and Snohomish counties. The project will include two 5-foot bike lanes along 76th Ave W. between SR 104 and 228th St SW. These bike lanes will then extend east on 228th St SW to the Interurban Trail. In addition, the project will include 1.37 miles of safety improvements along 74th Ave W., of which 2500 feet will be a 12’ paved and grade-separated path. The project will also feature the Lake Ballinger Station located at the intersection of 76th Avenue and McAleer Way.Location / Facility:Interurban Trail
From:228th St
To:SR 104 (Snohomish/King county line)
Project ID: 2812
Completion Year:2012
MTP Status: CompletedEstimated Cost: $1,896,579
Type:New Facility-RoadCounty:Snohomish County
Sponsor: ENUMCLAWTitle: SR 410 Channelization: Mtn. Villa Dr. to Watson St. N.
Description: This project will provide for channelization, roadway, and pedestrian facility improvements along an existing section of the State Route 410 corridor within the City of Enumclaw. The project will modify and optimize the existing 65-foot wide, variable (2-to-4) lane channelization to a proposed 5-lane configuration; one-through lane and one general purpose (through/right turning) lane for each direction with medians, continuous two-way left turn lanes, or left turn pockets as approved by WSDOT. The project will add or upgrade curb, gutters, sidewalks, driveways, storm drainage, illumination, and curb ramps along the SR 410 corridor between mileposts 24.34 to 24.81. Location / Facility:SR 410 `Roosevelt Avenue`
From:Mtn. Villa Dr. (Monroe Ave)
To:Watson St. N.
Project ID: 361
Completion Year:2017
MTP Status: CandidateEstimated Cost: $1,944,706
Type:New Facility-RoadCounty:King County
Sponsor: ENUMCLAWTitle: SR 410
Description:Widen to 3 lanes, curb, gutter, sidewalk, Widening Project 2Location / Facility:SR 410
From:Farman St
To:E city lim
Project ID: 362
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $730,221
Type:New Facility-RoadCounty:King County
Sponsor: ENUMCLAWTitle: SR 410
Description:Widen to 3 lanes, curb, gutter, sidewalk 244th to Mt Villa/Monroe Ave. Widen to 2/5 lanes Watson to Farman.Location / Facility:SR 410
From:244th Ave SE to Mtn Villa Rd
To:Watson St N to Farman St
Project ID: 4470
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $6,317,845
Type:New Facility-RoadCounty:King County
Sponsor: EVERETTTitle: 112th St - Beverly Park Rd Corridor
Description:Widen from 2 or 3 lanes to 5 lanes with sidewalks and bike lanes on both sides in 6 phases: 1) SR 99 to 3rd Ave SE 2) SR 99 to Airport Rd 3) Airport Rd to SR 525 4) 3rd Ave SE to I-5 5) I-5 to Silver Lake Road (No HOV ramps or P&R lot as part of this project) and 6) Silver Lake Road to SR 527.Location / Facility:112th St - Beverly Park Rd Corridor
From:SR 527
To:SR 525
Project ID: 792
Completion Year:2013
MTP Status: ApprovedEstimated Cost: $69,597,117
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: Broadway Corridor Improvements
Description:Widen to 5 lanes with bike lanes, sidewalks, new bridge. Transit signal priority.Location / Facility:Broadway Ave
From:SR 526
To:37th St.
Project ID: 5517
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $42,024,510
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: Everett Arterial Access Improvements
Description:Arterial access improvements to US 2 and I-5 in Everett Location / Facility:Vicinity of Walnut and Chestnut on various streets
From:Everett Avenue
To:Pacific
Project ID: 4005
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $38,813,777
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: I-5 @ 41st Street Interchange Access Improvements
Description:41st St Interchange improvement, improvement of arterial approaches and connectionsLocation / Facility:41st Street
From:Colby
To:3rd Ave
Project ID: 547
Completion Year:2009
MTP Status: CompletedEstimated Cost: $70,935,523
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: Interurban Trail
Description:Shared use bike pathLocation / Facility:Interurban Trail
From:Northern terminus of existing trail at Beverly Blvd
To:41st St
Project ID: 2834
Completion Year:2010
MTP Status: CompletedEstimated Cost: $2,887,388
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: Riverfront Walkway
Description:Complete Phase I of Riverfront Walkway non-motorized improvements and construct overcrossing of BNRR.Location / Facility:Riverfront Walkway
From:Lenora Street
To:Pacific Avenue
Project ID: 1885
Completion Year:2011
MTP Status: CompletedEstimated Cost: $85,288
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: Riverfront/Interurban Connector
Description:Shared use bike path Not in local plansLocation / Facility:Riverfront/Interurban Connector
From:Everett City limits
To:Interurban Trail at 84th St
Project ID: 2680
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,997,291
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: SR 526 Hardeson Road Half Interchange
Description:This proposed project would improve access to the Paine Field Manufacturing and Industrial Center, a key commercial, aerospace, and industrial area in southwest Everett. Improving access and travel time to this area will benefit the local businesses and regional businesses who are vendors or customers of businesses in SW Everett. Businesses in this area work in local, regional and international markets. The proposed project will construct access ramps on SR 526 at Hardeson Road to improve traffic flow on SR 526 and local streets within the SW Everett industrial area. Access will be provided for SR 526 traffic to/from the east. The westbound off ramp will access 80th Street SW instead of Hardeson Road due to the location of the Federal Post Office Facility.Location / Facility:SR 526
From:Milepost 2.60
To:Milepost 3.00
Project ID: 4467
Completion Year:2020
MTP Status: CandidateEstimated Cost: $53,545,110
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: SR 99/ Evergreen Way
Description:Widen Evergreen Way from 5 to 7 lanes, with curb, gutters and sidewalks and drainage improvements.Location / Facility:SR 99/ Evergreen Way
From:115th Street
To:Airport Road
Project ID: 1879
Completion Year:2012
MTP Status: CompletedEstimated Cost: $803,044
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETTTitle: SR 99/ Evergreen Way Transit HOV Treatments
Description:Construct BAT lanes on Evergreen Way / Highway 99 from 115th Street SW to 46th Street. Location / Facility:Evergreen Way Transit HOV Treatments
From:115th St
To:46th Street
Project ID: 621
Completion Year:2019
MTP Status: UnprogrammedEstimated Cost: $1,606,087
Type:New Facility-RoadCounty:Snohomish County
Sponsor: EVERETT TRANSITTitle: Everett Station Parking Structure
Description:Everett Transit Project that provides structured parking for up to 900 vehicles at Everett Station. Providing additional parking on the East side of Rail tracks and close to the bus platforms. Location / Facility:Smith Street
From:33rd Street
To:35th Street
Project ID: 4007
Completion Year:2020
MTP Status: CandidateEstimated Cost: $29,444,934
Type:New Facility-RoadCounty:Snohomish County
Sponsor: FEDERAL WAYTitle: 21st Ave SW
Description:Major Widening (5 lanes). Provides sidewalks; Bikes provided for on parallel route per Comp PlanLocation / Facility:21st Ave SW
From:SW 344th St
To:SW 356th St
Project ID: 2103
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $3,094,918
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: BPA Trail Phase IV
Description:Class 1 bike trailLocation / Facility:BPA Trail
From:51st Ave S
To:32nd Av S
Project ID: 3351
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,474,904
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: City Center Access Phase 3C--32nd Ave S.
Description:Extend and widen 32nd Ave S to 3 lane collector from Military Rd S to S 320th St and 3 intersection signal improvements at Military Rd S, S 312th St and S 320th S. The new facility to be constructed with bike lanes and sidewalksLocation / Facility:32nd Ave S
From:Military Rd S
To:S 320th St
Project ID: 3659
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $9,159,667
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: City Center Access Phase 4A: S 320th St @ I-5 I/C HOV lanes
Description:Add two HOV lanes and widen existing bridge structure to the south with HOV lanes on S 320th St from 25th Ave S to 32nd Ave S, retrofit to current standards existing HAL loop ramp, modify existing ramps, add CD lane.Location / Facility:S 320th St @ I-5 I/C
From:S 320th St @ I-5 I/C
To:
Project ID: 3660
Completion Year:2025
MTP Status: CandidateEstimated Cost: $120,615,838
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: Federal Way Trail to Transit Center
Description:Class 1 bike trailLocation / Facility:Trail to Transit Center
From:28th Ave S
To:S 288th St
Project ID: 3350
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,953,872
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: S 348th St
Description:HOV - Widen to a 6 lane cross section, 2 GP, 1 HOV each direction.Location / Facility: S 348th St
From:1st Ave S
To:9th Ave S
Project ID: 2019
Completion Year:2030
MTP Status: CandidateEstimated Cost: $10,961,167
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: S 356th St
Description:Major Widening to 5 lanes. Provides sidewalks and bike lanes; improves freight movement; fixes bottlenecks at SR 161/S 356 StLocation / Facility:S 356th St
From:SR 99
To:SR 161
Project ID: 2023
Completion Year:2015
MTP Status: CandidateEstimated Cost: $7,710,214
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: S Park-and-Ride Trail
Description:Shared use bike pathLocation / Facility:S Park-and-Ride Trail
From:S 348th St
To:S 352nd St
Project ID: 2863
Completion Year:2020
MTP Status: CandidateEstimated Cost: $575,307
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: SR 99
Description:Add HOV lanes, sidewalks, street lighting, raised medians, access management, construct new traffic signal at S 344th Street, add southbound left-turn lane at SR 18.Location / Facility:SR 99
From:S 359th St
To:S 340th St
Project ID: 2061
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $19,214,281
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: SR 99 Phase IV
Description:CONSTRUCT HOV LANESLocation / Facility:SR 99
From:S 312TH ST
To:SR 509 (S 297th vicinity)
Project ID: 1200
Completion Year:2012
MTP Status: CompletedEstimated Cost: $25,455,371
Type:New Facility-RoadCounty:King County
Sponsor: FEDERAL WAYTitle: Steel Lake Trail
Description:Class 1 Bike pathLocation / Facility:Steel Lake Trail
From:28th Ave S
To:S 290th Pl
Project ID: 3352
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,953,872
Type:New Facility-RoadCounty:King County
Sponsor: FIFETitle: Puyallup Riverfront Trail
Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail
From:Fife/Tacoma city limits
To:Fife/Pierce Co limits
Project ID: 2897
Completion Year:2025
MTP Status: CandidateEstimated Cost: $2,550,888
Type:New Facility-RoadCounty:Pierce County
Sponsor: FIFETitle: Valley Ave E
Description:Widen and reconstruct existing two-lane roadway to major arterial standards (to four lanes), including non-motorized plan elements.Location / Facility:Valley Ave E
From:Freeman Rd E
To:70th Ave E
Project ID: 122
Completion Year:2008
MTP Status: CompletedEstimated Cost: $17,265,439
Type:New Facility-RoadCounty:Pierce County
Sponsor: GIG HARBORTitle: Cushman Trail (phase 3 and 4)
Description:Shared Use pathLocation / Facility:new
From:96th Street NW
To:Borgen Boulevard NW
Project ID: 5520
Completion Year:2015
MTP Status: CandidateEstimated Cost: $3,747,504
Type:New Facility-RoadCounty:Pierce County
Sponsor: GIG HARBORTitle: Cushman Trail (Phase 4)
Description:Shared use pathLocation / Facility:Cushman Trail
From:Borgen Blvd NW
To:Purdy
Project ID: 5504
Completion Year:2040
MTP Status: CandidateEstimated Cost: $3,551,912
Type:New Facility-RoadCounty:Pierce County
Sponsor: ISSAQUAHTitle: 12th Ave NW/SR900/NW Sammamish Rd Widening
Description:Widen 12th Avenue NW at SR900/NW Sammamish Road to provide for an additional westbound left-turn lane that will provide dual left-turn lane capacity. In addition, add a northbound right turn lane approaching 12th Ave NW. Right of way will be required and the cost and amount necessary is undertermined at this time.Location / Facility:SR-900 and 12th Ave NW
From:SR-900
To:Lake Drive
Project ID: 4113
Completion Year:2015
MTP Status: UnprogrammedEstimated Cost: $7,134,529
Type:New Facility-RoadCounty:King County
Sponsor: ISSAQUAHTitle: E Lake Sammamish Pkwy
Description:Design and roadway widening construction to provide for an additional south bound lane widening, constructing curb, gutter, bike lanes, street lights, sidewalks, landscaping and drainage system.Location / Facility:E. Lake Sammamish Pkwy
From:SE 56th St
To:Issaquah-Fall City Rd
Project ID: 265
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $9,657,716
Type:New Facility-RoadCounty:King County
Sponsor: ISSAQUAHTitle: I-90 High Point Trail
Description:Shared use bike pathLocation / Facility:I-90 Trail
From:Planned E Lake Sammamish Trial
To:Easterly End of 1st Ave NE
Project ID: 2883
Completion Year:2007
MTP Status: CompletedEstimated Cost: $1,856,951
Type:New Facility-RoadCounty:King County
Sponsor: ISSAQUAHTitle: I-90 HOV Direct Access Ramp
Description:Will improve speed and reliability of transit and other HOV modes and, therefore, increase ridership and decrease SOV travel. Van- and car-pools, jitneys and buses all can use this to complement and support HCT and to provide smaller transit and HOV usage to activity centers that are too small to support HCT but of which there are many in King County. This project was identified in the I-90 Corridor Study.Location / Facility:I-90 @ SR 900
From:I-90 @ SR 900
To:
Project ID: 4543
Completion Year:2019
MTP Status: UnprogrammedEstimated Cost: $74,590,158
Type:New Facility-RoadCounty:King County
Sponsor: ISSAQUAHTitle: Newport Way
Description:Widen Southbound direction to 2 lanes from Maple Street to south of Holly Street then transition to one lane each direction to Sunset Way. Northbound will continue to be one lane from Sunset Way to Maple St. Includes 3 roundabout intersections, bike lanes, sidewalk on one side, shared use facility with landscaping buffer on other side and stormwater system.Location / Facility:Newport Way
From:NW Maple St
To:W. Sunset Way
Project ID: 2270
Completion Year:2016
MTP Status: CandidateEstimated Cost: $12,080,205
Type:New Facility-RoadCounty:King County
Sponsor: ISSAQUAHTitle: SR 900 Pedestrian/Non-Motorized Improvement
Description:New non-motorized multi-use trail along SR 900Location / Facility:SR 900
From:I-90 Eastbound Ramps
To:12th Avenue NW/NW Sammamish Rd
Project ID: 4112
Completion Year:2012
MTP Status: CompletedEstimated Cost: $7,785,642
Type:New Facility-RoadCounty:King County
Sponsor: KENMORETitle: 68th Ave NE
Description:Widen to add additional GP lanes - estimated additional NB laneLocation / Facility:68th Ave NE
From:NE 175th St
To:NE 170th St.
Project ID: 2292
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $3,690,221
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: 212th Street
Description:Grade Separated Railroad CrossingLocation / Facility:212th St
From:BNSF railroad crossing
To:BNSF railroad crossing
Project ID: 1563
Completion Year:2019
MTP Status: CandidateEstimated Cost: $37,295,079
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: East Valley Highway (84th Ave. S.) Improvement Project
Description:This project will widen East Valley Highway (84th Ave. S.) between SR 167 and S. 212th St by providing: Continuous SB GP lane from S. 216th St. to SR 167; Continuous NB GP lane from SR 167 to S. 212th St.; New deceleration lane SB at 216th St.; Complete sidewalk system on the E side of road with new curb, gutter, sidewalk where not currently existing; new sidewalk on W side of roadway from S. 212th to S. 224th where missing currently; overlay of entire roadway; upgrades to existing traffic signal system at S. 212th, S. 216th, S. 220th, and S. 224th streets as needed to accommodate widening.Location / Facility:East Valley Highway (84th Ave. S.)
From:SR 167
To:S. 212th St.
Project ID: 3612
Completion Year:2012
MTP Status: CompletedEstimated Cost: $9,168,082
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: S 228th St Grade Separation
Description:Grade separation of the roadway from the Union Pacific Railroad tracks. A bridge will be constructed at the track locations, and the road will run over the tracks and the adjacent Interurban Trail.Location / Facility:S 228th St
From:500 ft west of the Union Pacific Railroad tracks
To:500 ft west of the Burlington Northern Santa-Fe railroad tracks
Project ID: 3643
Completion Year:2018
MTP Status: ApprovedEstimated Cost: $29,911,563
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: S 228th St Grade Separation
Description:Grade separation of the roadway from and BNSF railroad tracks. Bridges will be constructed at the track locations and the road will run under the tracks.Location / Facility:new
From:S 228th / BNSF railroad
To:
Project ID: 5538
Completion Year:2009
MTP Status: CompletedEstimated Cost: $28,428,345
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: S 272nd St
Description:Major Widening Phase I (including HOV, sidewalks and bike lanes)Location / Facility:S 272nd St
From:Military Road
To:Pacific Highway South
Project ID: 2007
Completion Year:2019
MTP Status: CandidateEstimated Cost: $9,471,766
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: South 212th Street
Description:Grade Separated Railroad Crossing in Kent - Fast Phase IILocation / Facility:212th St
From:UPRR crossing
To:UPRR crossing
Project ID: 1564
Completion Year:2020
MTP Status: CandidateEstimated Cost: $31,967,211
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: West Valley Highway
Description:Major Widening including Complete Streets, three lanes each direction and center left-turn laneLocation / Facility:W Valley Hwy
From:West Meeker Street
To:Vicinity of South 218th Street
Project ID: 2026
Completion Year:2023
MTP Status: UnprogrammedEstimated Cost: $23,679,415
Type:New Facility-RoadCounty:King County
Sponsor: KENTTitle: Willis Street Grade Separations
Description:Provides a critical, grade-separated link through the commercial/industrial center of Kent. Links the valley warehouse/industrial center to SR 167 and I-5.Location / Facility:Willis St
From:SR 167
To:Central Avenue South
Project ID: 5289
Completion Year:2021
MTP Status: CandidateEstimated Cost: $55,646,626
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Kenmore-UW
Description:Passenger Only Ferry - new route: Kenmore-UW This future King County Ferry District passenger-only ferry route is a 8.3 nautical mile route serving Tracy Owen Station Park in Kenmore to the University of Washington. Location / Facility:POF route
From:Kenmore
To:UW
Project ID: 5375
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $10,135,323
Type:New Facility-RoadCounty:Multicounty
Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Kirkland-UW
Description:Passenger Only Ferry - new route: Kirkland-UW This future King County Ferry District passenger-only ferry route is a 6.0 nautical mile route serving Marina Park in downtown Kirkland to the University of Washington. Location / Facility:POF route
From:Kirkland
To:UW
Project ID: 5368
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $494,406
Type:New Facility-RoadCounty:Multicounty
Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (MARINE)Title: Passenger Only Ferry: Renton-Leschi
Description:Passenger Only Ferry - new route: Renton-Leschi This future King County Ferry District passenger-only ferry route is a 7.1 nautical mile route serving the City of RentonÆs Gene Coulon Memorial Beach Park to Leschi Park on Lakeside Avenue South.Location / Facility:POF route
From:Renton
To:Leschi Park in Seattle
Project ID: 5374
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $10,135,323
Type:New Facility-RoadCounty:Multicounty
Sponsor: KING COUNTY DEPT. OF TRANSPORTATION (ROADS)Title: East Lake Sammamish Trail, South Sammamish Segment A
Description:Develop a 1.3 mile-long paved regional trail segment within the City of Samammish. The trail will be constructed from SE 43rd Way to SE 33rd Street.Location / Facility:County Owned ROW
From:SE 43rd Way
To:SE 33rd Street
Project ID: 4471
Completion Year:
MTP Status: ApprovedEstimated Cost: $5,747,954
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: 140th/132nd Avenue SE
Description:Provide continuity in the north/south corridor by capacity, operational, and safety improvements. Will add additional lanes in the south portion of the corridor.Location / Facility:140/132nd Ave SE
From:SE Petrovitsky Road
To:SE 240th St
Project ID: 4551
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $23,774,749
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Atlantic / Central Base Expansion
Description:Pre-design and property acquisition toward expanding the Phase One bus base capacity in the North Duwamish area of Seattle to cost effectively repair, service and dispatch buses for transit service planned by both King County METRO and Sound Transit for King County. This three phase will increase area capacity by approximately 385 buses. Phase One is estimated at approximately $58 million and will add capacity for approximately 100 buses to the existing bases.Location / Facility:Atlantic / Central Base Expansion
From:1270 Sixth Ave S
To:
Project ID: 3418
Completion Year:2011
MTP Status: CompletedEstimated Cost: $73,074,865
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Aurora Village Rapid Ride BRT (E line)
Description:Bus Rapid Transit between Aurora Village and Downtown Seattle, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks (in coordination with SWIFT).Location / Facility:SR 99 (Aurora Avenue)
From:Aurora Village
To:Downtown Seattle
Project ID: 4026
Completion Year:2013
MTP Status: CompletedEstimated Cost: $64,235,530
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Avondale Rd
Description:Widen to 4 lanes, 2-way L turn, traffic signal, replace bridge, bike lane, curb, gutter, sidewalkLocation / Facility:0
From:Avondale Pl NE
To:NE 132nd St
Project ID: 423
Completion Year:2000
MTP Status: CompletedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Avondale Road
Description:Capacity and pedestrian improvements will aid traffic flow in the Avondale Corridor. (Avondale ITS Phases I and II have been funded.)Location / Facility:Avondale Road
From:City of Redmond
To:Woodinville Duvall Road
Project ID: 4554
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $51,992,906
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Burien Transit Oriented Development/ Park and Ride Expansion
Description:117 additional stalls. This project will assist in meeting the City's goals by constructing a 550-stall transit-oriented development (TOD) Facility that will occupy 50% less land than the present 385-stall park and ride surface lot. $12.5m contribution Location / Facility:Burien P & R
From:Burien P & R
To:
Project ID: 3601
Completion Year:2011
MTP Status: CompletedEstimated Cost: $25,231,273
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Cedar River to Sammamish Trail
Description:Acquisition, design, and construction of paved off-road multi-purpose facility linking the Cedar River Trail with East Lake Sammamish TrailLocation / Facility:Off-road
From:Cedar River Trail (Renton)
To:East Lake Sammamish Trail (Issaquah)
Project ID: 4029
Completion Year:2018
MTP Status: CandidateEstimated Cost: $23,205,827
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Cedar River Trail - Landsburg to Cedar Falls
Description:Design and construct paved regional trail from southern terminus of Cedar River Trail at Landsburg to southern terminus of Snoqualmie Valley Road at Rattlesnake Lake. Change of current land use would be required for development.Location / Facility:Abandoned railway alignment.
From:Existing terminus of Cedar River Trail at Landsburg Road SE.
To:Rattlesnake Lake at junction of Snoqualmie Valley Trail and John Wayne Trail.
Project ID: 4596
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $49,726,772
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Chief Sealth Trail Extension
Description:Shared use bike path. Not in local plans Continuation of Seattle's Chief Sealth Trail from south Seattle CL through Unincorporated King County to Renton CLLocation / Facility:Chief Sealth Trail Extension
From:Southern terminus of planned Chief Sealth Trail
To:Renton City Limits
Project ID: 2672
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $1,780,194
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Des Moines Creek Trail
Description:Lake to Sound Trail corridor - complete paving of Des Moines Creek Trail as part of the Lake to Sound corridorLocation / Facility:0
From:Near 13th Ave S at treatment plant
To:Western terminus of Des Moines Creek Trail
Project ID: 4630
Completion Year:2011
MTP Status: CompletedEstimated Cost: $2,670,334
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - Issaquah Segment
Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation.Location / Facility:County Owned ROW
From:Gilman Blvd
To:Vicinity of SE 43rd Way
Project ID: 4038
Completion Year:2014
MTP Status: CompletedEstimated Cost: $10,549,821
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - North
Description:Design and construct paved regional trail link between northern terminus of the East Lake Sammamish Trail at SR520 and Bear Creek Trail at Bear Creek Parkway in Redmond; incorporates grade separation between trail and SR520. Location / Facility:Abandoned railway alignment, dedicated trail right-of-way.
From:East Lake Sammamish Trail at SR 520.
To:Bear Creek Trail near SR 520.
Project ID: 4598
Completion Year:2015
MTP Status: CandidateEstimated Cost: $4,143,898
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail – Redmond Segment
Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking at NE 70th St.Location / Facility:0
From:187th Ave NE
To:Vicinity of SR 520
Project ID: 4290
Completion Year:2011
MTP Status: CompletedEstimated Cost: $4,448,685
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Lake Sammamish Trail - Sammamish Segment
Description:The project will provide a 12-foot-wide paved facility with 2-foot-wide soft surface shoulders. The project will include related drainage improvements, site amenities and sensitive areas mitigation. The project includes parking near Inglewood Hill Rd and SE 33rd St.Location / Facility:County Owned ROW
From:SE 33rd Street
To:187th Ave NE
Project ID: 4289
Completion Year:2019
MTP Status: CandidateEstimated Cost: $24,206,506
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Plateau Trail - Klahanie to Soaring Eagle Park
Description:Design and construct paved regional trail from existing East Plateau Trail at Issaquah-Beaver Lake Road at SE Duthie Hill Road to Soaring Eagle Park via Trossachs community in Sammamish.Location / Facility:Dedicated trail right-of-way, Duthie Hill Road, Trossachs Boulevard SE.
From:Existing East Plateau Trail at SE Duthie Hill Road at Issaquah-Beaver Lake Road.
To:Soaring Eagle Park n/o SE 9th Way.
Project ID: 4599
Completion Year:2018
MTP Status: CandidateEstimated Cost: $10,774,134
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: East Plateau Trails - Issaquah Highlands to Duthie Hill Park
Description:Develop regional trail between Duthie Hill Park at Duthie Hill Road and Issaquah-Preston Trail near High Point.Location / Facility:Dedicated trail right-of-way.
From:Existing Issaquah-Preston Trail e/o Sunset interchange.
To:SE Issaquah-Fall City Road at Duthie Hill Park.
Project ID: 4600
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $22,377,047
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Eastside ERC Trail, Woodinville Spur (NE 124th Street to Woodinville)
Description:Paved bike path to AASHTO standards Connecting Totem Lake to the Sammamish River Trail in WoodinvilleLocation / Facility:BNSF Corridor
From:Woodinville rail junction@rail spur and SR 202
To:NE 124th Street
Project ID: 4011
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,083,884
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: ERC Trail, Main Line, North Bellevue
Description:Design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)
From:NE 8th Street, Bellevue
To:108th Avenue NE, Bellevue
Project ID: 4444
Completion Year:2020
MTP Status: CandidateEstimated Cost: $11,392,608
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: ERC Trail, Mainline, Woodinville
Description:Design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)
From:132nd Place NE, Kirkland
To:Woodinville rail junction@rail spur and SR202
Project ID: 4445
Completion Year:2020
MTP Status: CandidateEstimated Cost: $20,021,663
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: ERC, Main Line South
Description:Acquisition, design, and construction of a paved and soft-surface regional trailLocation / Facility:Eastside Rail Corridor (BNSF)
From:Eastside Rail Corridor @ north end of Coulon Park in Renton
To:Eastside Rail Corridor @ Interstate 90 in south Bellevue
Project ID: 4040
Completion Year:2020
MTP Status: CandidateEstimated Cost: $33,125,551
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: ERC, Main Line, Central Bellevue
Description:Design, and construction of a paved and soft-surface regional trail.Location / Facility:Eastside Rail Corridor (BNSF)
From:Eastside Rail Corridor @ Interstate 90 in south Bellevue
To:Eastside Rail Corridor @ NE 8th Street, Bellevue
Project ID: 4443
Completion Year:2020
MTP Status: CandidateEstimated Cost: $15,002,147
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - Central
Description:Design and construct new paved regional trail segment between Enumclaw and Nolte State Park along BNSF rail line near Veazie-Cumberland Road.Location / Facility:Abandoned railway corridor.
From:Chinook Avenue, Enumclaw.
To:304th Avenue SE; Nolte State Park.
Project ID: 4601
Completion Year:2020
MTP Status: CandidateEstimated Cost: $19,535,518
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - North
Description:Design and construct new paved regional trail segment between Nolte State Park along BNSF rail line near Cumberland-Kanaskat Road to southern terminus of the Landsburg-Kanaskat Trail in Kanaskat .Location / Facility:Abandoned railway alignment, dedicated trail right-of-way.
From:304th Avenue SE; Nolte State Park; Foothills Trail - Central (RTNR ID FH-4).
To:Cumberland-Kanaskat Road at the Green River; southern terminus of Landsburg-Kanaskat Trail (RTNR ID LK-1), Kanaskat.
Project ID: 4602
Completion Year:2022
MTP Status: UnprogrammedEstimated Cost: $17,877,959
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - South
Description:Develops 0.9-mile paved regional trail to continue Foothills Trail south of Enumclaw to White River.Location / Facility:Railway corridor
From:252nd Avenue SE, Enumclaw
To:Mud Mountain Road
Project ID: 4603
Completion Year:2016
MTP Status: CandidateEstimated Cost: $4,617,486
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Foothills (Enumclaw Plateau) Trail - White River Bridge
Description:Design and construct a pedestrian/regional trail bridge over the White River between Enumclaw and Pierce County to link Foothills Trail between King County and Pierce County.Location / Facility:Railway corridor
From:Terminus of Foothills Trail (RTNR ID FH-1) at Mud Mountain Road
To:Terminus of Foothills Trail at City of Buckley
Project ID: 4604
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $7,103,825
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River 2.2 (S. 259th St)
Description:Design and construct new paved regional trail link along S. 259th Street between Interurban Trail and Green River Trail Phase 2.Location / Facility:S. 259th Street
From:Green River Trail at Interurban Trail at S. 259th Street
To:Green River Trail Phase 2 (RTNR ID GR-1) at S. 259th Street
Project ID: 4605
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,302,368
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail - North
Description:Continues Green River Trail north from current terminus at S. 102nd Street to Seattle CL. Acquisition, design, and construction of a paved regional trailLocation / Facility:Off-road
From:North Terminus of Green River Trail at S. 102nd Street
To:Seattle City boundary
Project ID: 4032
Completion Year:2015
MTP Status: CandidateEstimated Cost: $1,183,971
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 2
Description:Construction of paved regional trailLocation / Facility:Off-road and on S. 259th St
From:S. 259th Street (Kent)
To:Near Central Avenue S. (Kent)
Project ID: 4033
Completion Year:2020
MTP Status: CandidateEstimated Cost: $1,070,725
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 3
Description:Design and construction of paved regional trail link between cities of Kent and Auburn. Location / Facility:Off-road
From:Green River Bridge (86th Avenue S. - Kent)
To:Brannan Park (Auburn)
Project ID: 4034
Completion Year:2018
MTP Status: CandidateEstimated Cost: $11,247,722
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail - Phase 4
Description:Acquisition, design, permitting, and construction of paved regional trail Location / Facility:Off-road
From:Brannan Park (Auburn)
To:SR-18
Project ID: 4035
Completion Year:2020
MTP Status: CandidateEstimated Cost: $19,535,518
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail Bridge
Description:Construction of multi-purpose (non-vehicular) Bridge across Green RiverLocation / Facility:Off-road
From:86th Avenue S. (Kent)
To:86th Avenue S. (Unincorporated King County)
Project ID: 4036
Completion Year:2018
MTP Status: CandidateEstimated Cost: $3,196,721
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green River Trail Phase 5 (Upper)
Description:Develop paved regional trail along Green River from intersection of Auburn-Black Diamond Road at SE Green Valley Road to Green-to-Cedar Rivers Trail near Flaming Geyser State Park.Location / Facility:Dedicated trail right-of-way along Green River and SE Green Valley Road.
From:SR18.
To:SE Green Valley Road near 227th Avenue SE at Flaming Geyser State Park.
Project ID: 4606
Completion Year:2025
MTP Status: CandidateEstimated Cost: $33,624,770
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Green-to-Cedar Rivers Trail
Description:Design and construct paved regional trail between existing terminus at Kent-Kangley Road in Maple Valley to Green River Trail at SE Green Valley Road.Location / Facility:Dedicated trail right-of-way.
From:Green-to Cedar River Trail at Kent-Kangley Road, Maple Valley.
To:SE Green Valley Road near 227th Avenue SE.
Project ID: 4607
Completion Year:2018
MTP Status: CandidateEstimated Cost: $21,548,268
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Highline Community College Intermodal Transit Facility and Parking Garage
Description:Construct a Transit Center with bus layover to facilitate a potential Bus Rapid Transit route on SR 99 in south King County. In addition, the project will construct a parking garage with up to 500 stalls that will provide commuter parking, vanpool and carpool stalls as well as joint use parking for Highline Community College students and staff.Location / Facility:SR 99
From:South 240th Street@SR 99 South
To:
Project ID: 4128
Completion Year:2020
MTP Status: CandidateEstimated Cost: $28,106,528
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Interurban Trail (south) Extension
Description:Construction of paved regional trail extension of the Interurban TrailLocation / Facility:Off-road facility
From:Terminus of Interurban Trail in Pacific at 3rd Ave SW (Pacific)
To:Pierce County Boundary (Edgewood)
Project ID: 4031
Completion Year:2018
MTP Status: CandidateEstimated Cost: $9,945,354
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Issaquah Fall City / Duthie Hill Road
Description:Widen 4 lane arterial to 5 lanes with turn pockets, bicycle and pedestrain faciltities and ITS. Location / Facility:Issaquah Fall City/Duthie Hill Road
From:Issaquah Pine Lake Road
To:SR 202
Project ID: 4555
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $43,728
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Issaquah Hobart Road
Description:Operational, ITS and safety improvements to congested corridor used as an Urban Connector between the Maple Valley/SR-18 area and Issaquah Plateau.Location / Facility:Issaquah-Hobart Road
From:I-90
To:SR-18
Project ID: 4556
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $123,623
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Issaquah-Preston Trail - High Point to Preston (WSDOT Lead)
Description:Design and construct new regional trail along I-90 and Issaquah Creek between High Point Way interchange and Preston-Snoqualmie Trail near the Preston Park and Ride in Preston.Location / Facility:Dedicated trail right-of-way, High Point Way
From:High Point Way interchange on I-90
To:High Point Way approx. 07 mile from Preston-Snoqualmie Trail
Project ID: 4609
Completion Year:2010
MTP Status: CompletedEstimated Cost: $2,879,915
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Issaquah-Snoqualmie Corridor - Preston-Snoqualmie Trail Extension
Description:Construction of paved trail, including new bridge facilities; easternmost segment provides a link between urban areas and cross-state trail system.Location / Facility:Off-road
From:Preston-Snoqualmie Trail terminus 1 mile east of Lake Alice Road
To:Junction of SR202 at Snoqualmie Parkway
Project ID: 4027
Completion Year:2018
MTP Status: CandidateEstimated Cost: $11,247,722
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Kennydale P&R
Description:400 new stallsLocation / Facility:Kennydale P&R
From:I-405
To:
Project ID: 2665
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $22,081,853
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 1
Description:Acquisition, design, and construction of paved regional trail or in-road track from Cedar River Trail to Black River Forest at Naches Ave S.Location / Facility:On-road and off-road
From:Cedar River Trail (Renton)
To:Naches Ave S (Renton)
Project ID: 4030
Completion Year:2016
MTP Status: CandidateEstimated Cost: $13,197,378
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 2 (Segment A)
Description:Acquisition, design, and construction of paved regional trail from Naches Ave S. through Black River Forest to Green River Trail.Location / Facility:Off-road
From:Naches Ave S (Renton)
To:Green River Trail (Tukwila)
Project ID: 4441
Completion Year:2017
MTP Status: CandidateEstimated Cost: $4,703,681
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 3
Description:Design and construction of a paved regional trail from Green River Trail in Tukwila to trail on S 154th Street in SeaTacLocation / Facility:Alignment along South Center Blvd and 154th Ave S
From:Green River Trail (Tukwila)
To:S 154th Street (SeaTac)
Project ID: 4628
Completion Year:2018
MTP Status: CandidateEstimated Cost: $2,030,366
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 4 (Segment B)
Description:Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S 156th Street in SeaTac to 8th Ave S in Burien Location / Facility:SW 7th Street, Green R. Trail, Southcenter Blvd, S. 154th Street, S. 156th Way, Des Moines Memorial Dr., Des Moines Creek Trail.
From:Cedar River Trail at I-405
To:Eastern terminus of Des Moines Creek Trail.
Project ID: 4629
Completion Year:2016
MTP Status: CandidateEstimated Cost: $7,636,431
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail 5
Description:Acquisition, design, and construction of paved regional trail along Des Moines Memorial Drive from S Normandy Road to 8th Ave S in Burien Location / Facility:Des Moines Memorial Drive
From:S Normandy Road (Burien)
To:8th Ave S (Burien)
Project ID: 4442
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,127,981
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake to Sound Trail Trail 6
Description:Acquisition, design, and construction of paved regional trail from 8th Ave S in SeaTac to Des Moines Creek Trail (S 200th Stree) in Des Moines.Location / Facility:SW 7th Street, Green R. Trail, Southcenter Blvd, S. 154th Street, S. 156th Way, Des Moines Memorial Dr., Des Moines Creek Trail.
From:8th Ave S (Burien)
To:Des Moines Creek Trail (S 200th Street) (Des Moines)
Project ID: 4627
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,255,962
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Lake Youngs to Cedar River Trail (Soft-Surface)
Description:Develop regional trail between Lake Youngs Trail near intersection of SE Lake Youngs Road at 184th Avenue SE to Cedar River Trail in Maple Valley near junction of Cedar River Trail at SR18. Location / Facility:Pipeline corridor.
From:Lake Youngs Trail near South Lake Youngs Road..
To:Junction of Cedar River Trail at Green-to-Cedar Rivers Trail, Maple Valley.
Project ID: 4611
Completion Year:2020
MTP Status: CandidateEstimated Cost: $13,378,870
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Landsburg-Kanaskat Trail
Description:Develop paved regional trail between terminus of existing Cedar River Trail at Landsburg to intersection of Kanaskat Kangley Road and Retreat Kanaskat Road in Kanaskat.Location / Facility:Dedicated trail right-of-way, abandoned railway alignment.
From:Eastern terminus of Cedar River Trail at Landsburg Road SE
To:Cumberland-Kanaskat Road at the Green River; northern terminus of Foothills Trail (RTNR ID FH-5), Kanaskat.
Project ID: 4612
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $34,453,549
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Laughing Jacobs Creek Trail Segment
Description:Design and construct new regional trail segment between East Lake Sammamish Trail on East Lake Sammamish Parkway SE in Issaquah and existing trail terminus w/o 229th Place SE in Sammamish.Location / Facility:Abandoned railway alignment.
From:East Lake Sammamish Trail (RTNR ID ELS-2) at E. Lake Sammamish Parkway at SE 43rd Way.
To:Western terminus of East Plateau Trail near Providence Point Place SE.
Project ID: 4613
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $2,131,147
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Madison Street Corridor
Description:Transit Priority and Speed improvements on Madison StreetLocation / Facility:Madison Street
From:Alaskan Way
To:Madison Park
Project ID: 4447
Completion Year:2020
MTP Status: CandidateEstimated Cost: $5,639,905
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Military Rd S
Description:Reconstruct the road to urban standards with facilities for bicyclists and pedestrians. In the north where Military Rd intersects with S 272 St, partner with the City of Federal Way to add travel lanes.Location / Facility:Military Rd
From:south King County line
To:S 272 St
Project ID: 4559
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $25,552,849
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Milton-Edgewood Interurban Trail
Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail
From:Milton city limits near Hylebos Ave
To:Edgewood city limits
Project ID: 2891
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $1,302,581
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Montlake Flyer Bike Station
Description:Construct a bicycle commuter stationLocation / Facility:Montlake Flyer Bike Station
From:SR 520
To:
Project ID: 3364
Completion Year:2010
MTP Status: CompletedEstimated Cost: $593,115
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: NE 132nd/NE 128th St
Description:Widen NE 128 St for right-turn lane and shoulder. Widen Avondale Rd and add right-turn lane. Modify signals at NE 132 St and NE 128 St. Widen NE 132 St from 3 to 4 lanes. Insall a new signal at Bear Creek Rd.Location / Facility:NE 132nd/NE 128th St
From:184th Ave NE
To:196th Ave NE
Project ID: 447
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $11,376,452
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Novelty Hill Road
Description:Capacity, ITS and operational improvements will improve flow through this heavily used commuting corridor in the Bear Creek area between Duvall area and Redmond. Project results in additional lanes, operational, and safety improvements between the UPDs and Redmond.Location / Facility:Novelty Hill Road; 196th Ave NE
From:Union Hill Rd
To:West Snoqualmie Road NE
Project ID: 4562
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $122,852,757
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Parking Garage at South Kirkland Park-and-Ride
Description:Construct parking garage for a 850 stalls upon completion.Location / Facility:South Kirkland Park-and-Ride
From:NE 38th St @ 108th Ave NE
To:
Project ID: 4059
Completion Year:2027
MTP Status: CandidateEstimated Cost: $64,086,379
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Puget Power (PSE) Trail - East Segment
Description:Design and construct regional trail segment between Ferrel-McWhirter Park and Redmond Watershed Preserve and between Preserve and Novelty Hill Road at Redmond Ridge. Continues existing regional trail east.Location / Facility:Power line corridor.
From:Eastern terminus of existing trail at Ferrel-McWhirter Park near 196th Avenue NE.
To:Novelty Hill Road near Redmond Ridge Drive.
Project ID: 4614
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $8,287,795
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Rapid Ride (BRT) - A line (K Co Metro) - Pacific Hwy S
Description:Bus Rapid Transit between Federal Way and SeaTac, providing more frequent service, transit signal priorty, enhanced bus zones, queue jumps and rider information kiosks. Rapid Ride - Bus Rapid Transit (A line) along Pacific Highway S. Corridor from existing Link Light Rail station in Tukwila to the Federal Way Transit Center.Location / Facility:SR 99 (Pacific Hwy S)
From:Federal Way Transit Center
To:Tukwila Light Rail Station
Project ID: 4025
Completion Year:2010
MTP Status: CompletedEstimated Cost: $33,261,619
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: Ballard to Downtown (D line)
Description:Bus Rapid Transit between Ballard and Downtown Seattle via lower Queen Anne, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Routing alternatives on 15th Ave NW or 24th Ave NW and is Route 15 Rapid Ride or E line).Location / Facility:via lower Queen Anne (exact alignment TBD)
From:Ballard
To:Downtown Seattle
Project ID: 4022
Completion Year:2012
MTP Status: CompletedEstimated Cost: $51,847,242
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: Redmond TC to Bellevue TC (B line)
Description:Bus Rapid Transit between Bellevue and Redmond, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. From the Redmond Transit Center (NE 90th to 148th Ave NE) to Overlake Transit Center then (along 156th Ave NE and NE 8th ST) to the Bellevue Transit Center.Location / Facility:NE 90th, 148th Ave NE, NE 40th, 156th Ave NE, NE 8th
From:Redmond Transit Center
To:Bellevue Transit Center
Project ID: 4024
Completion Year:2012
MTP Status: CompletedEstimated Cost: $36,215,668
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Rapid Ride BRT: West Seattle to Downtown (C line)
Description:Bus Rapid Transit between West Seattle and Downtown Seattle. Station, providing more frequent service, transit signal priority, enhanced bus zones, queue jumps and rider information kiosks. Westwood Village in West Seattle to Seattle CBD bia Fauntleroy and Alaska Junction. This is the Route 54 Rapid Ride or Bus Rapid Transit C line.Location / Facility:Fauntleroy and Alaska junction
From:West Seattle
To:Downtown Seattle
Project ID: 4023
Completion Year:2012
MTP Status: CompletedEstimated Cost: $38,294,672
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: RapidRide BRT: Burien to Renton (F line)
Description:Provide a direct East/West routing between Burien and Renton via Tukwila International Blvd Link Station, Southcenter Mall, Tukwila Sounder Station and South Renton P&R. 10 minute peak, 15 minute off-peak midday and early evening, 30 minute night. Span 5:30AM-12:00AM. 1/2 mile stop spacing.Location / Facility:S 156 St to 24th Ave S to S 154th St onto Southcenter Blvd to 66 Ave S (serve Link station) to Tukwila Parkway to Andover Parkway to Strander Blvd to SW Grady Way (serve Sounder Station) to S Renton P&R to Renton TC
From:Burien Transit Center
To:Renton Transit Center
Project ID: 5526
Completion Year:2013
MTP Status: CompletedEstimated Cost: $43,624,401
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: SE 212th Way/SE 208th Street
Description:Capacity, ITS, operational and pedestrian improvements will provide access to the business district and link two regional trails.Location / Facility:SE 212th Way/SE 208th Street
From:SR 167
To:148th Ave SE
Project ID: 4569
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $59,733,840
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Seattle South End Transit Pathways
Description: Establish transit pathway between 1st and 3rd Avenues, includes reconstruction of two-way Columbia Street between 1st and 3rd Avenues, including turn radius improvements, curb ramps, signal modifications, and potential bus stop improvements. Location / Facility:Columbia Street
From:1st Avenue
To:3rd Avenue
Project ID: 4451
Completion Year:2018
MTP Status: CandidateEstimated Cost: $7,600,000
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Shoreline Park and Ride TOD
Description:Replace existing 385 , and add additional 200, for a total of 585 stalls in parking structure supporting new mixed use housing development. In King County TOD Work plan to issue 2010 RFP seeking development.Location / Facility:Shoreline P&R
From:Shoreline P&R at 18821 Aurora Ave. N.
To:
Project ID: 3597
Completion Year:2020
MTP Status: CandidateEstimated Cost: $28,783,726
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Snoqualmie Regional Connector
Description:Design and construct paved regional trail from eastern terminus of Preston-Snoqualmie Trail near intersection of Snoqualmie Parkway at SR202 to Snoqualmie Valley Trail near Tokul Road. Location / Facility:Dedicated trail right-of-way.
From:Snoqualmie River Bridge (RTNR ID PS-2) at SR202.
To:Snoqualmie Valley Trail at Tokul Road.
Project ID: 4616
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $3,078,324
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Snoqualmie River Bridge at SR202, Snoqualmie
Description:Design and construct regional trail/pedestrian bridge across Snoqualmie River at or near SR202 in Snoqualmie. (Partner with WSDOT)Location / Facility:SR202.
From:Eastern terminus of Preston-Snoqualmie Trail at Snoqualmie Parkway/SR202/Snoqualmie River.
To:North side of Snoqualmie River at SR202; terminus of Snoqualmie Regional Connector (RTNR ID PS-3).
Project ID: 4617
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,894,353
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Snoqualmie Valley Trail - Snoqualmie Mill Segment
Description:Acquisition, design, and construction of soft-surface regional trail link.Location / Facility:Off-road
From:Tokul Road
To:Reinig Road
Project ID: 4028
Completion Year:2016
MTP Status: CandidateEstimated Cost: $7,222,222
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Snoqualmie Valley Trail (North)
Description:Design and construction of regional trail Location / Facility:Off-road
From:Woodinville-Duvall Road
To:Snohomish County boundary
Project ID: 4042
Completion Year:2012
MTP Status: CandidateEstimated Cost: $13,260,473
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 6 (Petro - CRT)
Description:Continue development of paved Soos Creek regional trail from Petrovitsky Road to Cedar River Trail at SR 169.Location / Facility:Parkland corridor, utility corridor
From:Cedar River Trail near intersection of 140th Way SE at SR169
To:Petrovitsky Road
Project ID: 4619
Completion Year:2018
MTP Status: CandidateEstimated Cost: $4,585,616
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 7 (To SR18)
Description:Design and construct continuation of paved Soos Creek Trail from southern terminus of existing trail to SR18.Location / Facility:Dedicated trail right-of-way.
From:Southern terminus of existing Soos Creek Trail near 148th Avenue SE at SE 266th Street.
To:SR18.
Project ID: 4620
Completion Year:2016
MTP Status: UnprogrammedEstimated Cost: $3,315,118
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Soos Creek Trail Phase 8 (SR18-GRT)
Description:Develop paved regional trail from SR18 to Green River Trail near intersection of Auburn-Black Diamond Road at SE Green Valley Road. Bridge/underpass at SR18.Location / Facility:Dedicated trail right-of-way, railway right-of-way, road right of way, power line corridor.
From:SR18.
To:Green River Trail Phase 4 (RTNR ID GR-4) near SR18 at SE Green Valley Road.
Project ID: 4621
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $2,723,133
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Soos Creek Trail to Lake Youngs Trail
Description:Design and construct on-road and off-road connector trail between Soos Creek and Lake Youngs Trails via SE 216th Street.Location / Facility:SE 116th Street alignment, power corridor.
From:Soos Creek Trail at SE 116th Street.
To:Lake Youngs Trail at SE 116th Street/148th Avenue SE.
Project ID: 4622
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $473,588
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Soos Creek Trail, Phase 5 (192nd to Petro)
Description:Design and construct a regional trail from SE 192nd Street to Petrovitsky RoadLocation / Facility:Parkland corridor, utility corridor
From:Petrovitsky Road
To:SE 192nd Street, Kent
Project ID: 2273
Completion Year:2016
MTP Status: CandidateEstimated Cost: $4,341,937
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: SR 18 Trail (Auburn to Snoqualmie Trail)
Description:Shared use bike pathLocation / Facility:Auburn to Snoqualmie Trail
From:Interurban Trail
To:Auburn eastern city limits
Project ID: 2860
Completion Year:2018
MTP Status: CandidateEstimated Cost: $103,597,442
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail (East Extension)
Description:Extend regional trailLocation / Facility:Off-road
From:NE Big Rock Road
To:NE North Fork Road
Project ID: 4045
Completion Year:2016
MTP Status: UnprogrammedEstimated Cost: $1,539,162
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail (West)
Description:Design and construct an approach to Tolt Pipeline Trail Location / Facility:Off-road
From:Sammamish River Trail (near W. Riverside Drive)
To:104th Avenue NE
Project ID: 4044
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $4,143,898
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Tolt Pipeline Trail Bridge - Snoqualmie River
Description:Design and construct regional trail crossing of Snoqualmie River near alignment of NE 165th Street west of SR203.Location / Facility:Existing pipeline corridor.
From:Tolt Pipeline at Snoqualmie River.
To:Tolt Pipeline at Snoqualmie River.
Project ID: 4624
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $4,617,486
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Tolt River Trail
Description:Develop paved regional trail along Tolt River from Snoqualmie Valley Trail in Carnation to Moss Lake.Location / Facility:Dedicated trail right-of-way along Tolt River.
From:Snoqualmie Valley Trail at Tolt River.
To:Moss Lake, junction with Tolt Pipeline Trail (RTNR ID TP-4).
Project ID: 4625
Completion Year:2032
MTP Status: UnprogrammedEstimated Cost: $26,994,533
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Transit priority infrastructure for RapidRide BRT: Burien to Renton (F line)
Description:Improve RapidRide corridor - 10 stations, real-time info sighs, transit signal priority and fiber communications - realize approx 10-15% running time improvement Location / Facility:S 156 and S 154 st. Andover Parkway to Strander to Grady Way to S. Renton P&R to Renton TC
From:Burien Transit Center
To:Renton Transit Center
Project ID: 5524
Completion Year:2013
MTP Status: CompletedEstimated Cost: $42,806,566
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: W Sammamish River Trail (Soft-Surface)
Description:Develop soft-surface regional trail along west bank of Sammamish River from Redmond to 102nd Avenue NE in Bothell.Location / Facility:River levee, abandoned railway right-of-way.
From:Sammamish River Trail at Leary Way NE.
To:102nd Avenue NE at E. Riverside Drive
Project ID: 4626
Completion Year:2030
MTP Status: CandidateEstimated Cost: $17,641,164
Type:New Facility-RoadCounty:King County
Sponsor: KING COUNTY/METROTitle: Woodinville-Duvall Road
Description:Operational, safety, nonmotorized, ITS and capacity improvements in this congested corridor heavily used by regional traffic.Location / Facility:Woodinville-Duvall Road
From:SR-522
To:SR-203
Project ID: 4571
Completion Year:2030
MTP Status: ApprovedEstimated Cost: $54,906,419
Type:New Facility-RoadCounty:King County
Sponsor: KIRKLANDTitle: 124th Ave NE Roadway Improvements (North)
Description:Widen to 5 lanes n. of NE 116th St with ped/bike facilitiesLocation / Facility:124th Ave NE
From:NE 116th
To:NE 124th Ave
Project ID: 2293
Completion Year:2022
MTP Status: CandidateEstimated Cost: $11,839,707
Type:New Facility-RoadCounty:King County
Sponsor: KIRKLANDTitle: 124th Ave NE Roadway Improvements (South)
Description:Widen to 3 lanes s. of NE 116th St with ped/bike facilitiesLocation / Facility:124th Ave NE
From:NE 85th
To:NE 116th
Project ID: 4469
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,932,328
Type:New Facility-RoadCounty:King County
Sponsor: KIRKLANDTitle: Cross Kirkland Corridor
Description:The project will be completed in phases. The first phase of the project, an interim trail is currently underway. Subsequent phases include facilities for pedestrians and bicycles, and in the future, transit.Location / Facility:BNSF Corridor
From:108th Ave
To:Northern Kirkland City Limits
Project ID: 4041
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $58,091,022
Type:New Facility-RoadCounty:King County
Sponsor: KITSAP COUNTYTitle: Bethel Road/Bethel Ave SE
Description:Widen the roadway from 2 lanes to 5 lanes (center lane likely to be median interspersed with turn lanes) with bike lanes, street lighting, and sidewalksLocation / Facility:Bethel Road/Bethel Ave SE
From:Lincoln Ave SE
To:Bay St
Project ID: 3647
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $8,335,536
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Bucklin Hill Rd Estuary Enhancement and Road Widening
Description:Widen to 4/5 lanes, new bridgeLocation / Facility:Bucklin Hill Rd
From:Mickelberry Road + 300'
To:Clear Creek Crossing
Project ID: 485
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $18,286,335
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Kitsap County Regional Trail
Description:2.8 mile segment of Shared Use PathLocation / Facility:WSDOT Hwy 3 Corridor ROW, Kitsap County
From:Mountain View Rd
To:Sherman Heights Road
Project ID: 4465
Completion Year:2018
MTP Status: CandidateEstimated Cost: $3,000,000
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Newberry Hill Rd
Description:Widen to 4 lanesLocation / Facility:Newberry Hill Road
From:Chico Way NW
To:SR 3 SB on Ramp
Project ID: 1264
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,072,451
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Silverdale Way
Description:Widen to 4 lanesLocation / Facility:Silverdale Way
From:Byron
To:Chico Way NW
Project ID: 491
Completion Year:2020
MTP Status: CandidateEstimated Cost: $6,202,768
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail
Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept on Bainbridge would include a shared use path on one side of the highway if safe and efficient crossing can be provided.Location / Facility:Sound to Olympics Trail
From:WSF Bainbridge ferry terminal in Winslow
To:Agate Pass Bridge
Project ID: 4518
Completion Year:2020
MTP Status: CandidateEstimated Cost: $1,236,015
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail
Description:a) Separated grade crossings would be preferable at intersections. Overhead bicycle/pedestrian bridges could be adapted to existing terrain in places. Microtunnels might be feasible in places. Location / Facility:Sound to Olympics Trail
From:-
To:
Project ID: 4519
Completion Year:2020
MTP Status: CandidateEstimated Cost: $12,405,500
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail
Description:b) A separated non-motorized facility should be constructed at the Agate Pass Bridge, either by cantilever off the existing bridge, or separate construction (possibly in conjunction with constructing a new facility for rapid transit).Location / Facility:Sound to Olympics Trail
From:-
To:
Project ID: 4520
Completion Year:2020
MTP Status: CandidateEstimated Cost: $12,405,500
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail
Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept connect Kingston to Port GambleLocation / Facility:Sound to Olympics Trail
From:Kingston
To:Port Gamble
Project ID: 5292
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,802,788
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: Sound to Olympics Trail
Description:The basic concept of this plan is to develop a shared use path from the WSF Bainbridge ferry terminal in Winslow to connect with the Discovery Trail in Jefferson County. Components of this concept north of Bainbridge Island would extend the trail from the Agate Pass Bridge to the Hood Canal Bridge (via Poulsbo)Location / Facility:Sound to Olympics Trail
From:Agate Pass Bridge
To:Hood Canal Bridge
Project ID: 5503
Completion Year:2020
MTP Status: CandidateEstimated Cost: $12,405,500
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP COUNTYTitle: SR 305 Trail (Sound to Olympics)
Description:Shared use bike pathLocation / Facility:SR 305 Trail
From:Winslow ferry terminal
To:High School Rd
Project ID: 2820
Completion Year:2016
MTP Status: CandidateEstimated Cost: $1,085,484
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Annapolis Ferry Terminal
Description:Improve existing passenger-only dock owned by the Port of Bremerton. Extend the dock, provide ADA accessibility and build a larger float to accommodate both Bremerton ferries and smaller, fast POFs to Seattle. Connections to Port Orchard Pedestrian Pathway.Location / Facility:Annapolis Ferry Terminal
From:Bay Street/Marine Drive
To:#N/A
Project ID: 3436
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,495,802
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Bainbridge Island Multimodal Center
Description:Replace old ferry terminal with a new multimodal terminal in the same location.Location / Facility:Bainbridge Island Multimodal Center
From:Olympic Dr
To:
Project ID: 3308
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,550,692
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Bremerton POFF Terminal Expansion
Description:Outfit the large multi-berth float to the initial passenger-only ferry (POF) float, to serve multiple POF vessels and provide utility, moorage and fueling services.Location / Facility:Bremerton POFF Terminal Expansion
From:Bremerton Transportation Center
To:#N/A
Project ID: 2480
Completion Year:2015
MTP Status: CandidateEstimated Cost: $2,819,953
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: BRT on SR 303 Silverdale POF to Bethel
Description:Bus Rapid Transit on SR 303 from Silverdale to Bremerton POF to Bay Street, Port Orchard and Bethel to SR 160. This route was identified in the Transit Competitive Index (PSRC Index)Location / Facility:SR 303 and Viking
From:Central Kitsap
To:South Kitsap
Project ID: 5318
Completion Year:2025
MTP Status: CandidateEstimated Cost: $13,426,191
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: BRT on SR 305 (matching congested corridor) to Bainbridge Ferry Dock
Description:Bus Rapid Transit on SR 305 from SR 3 to Bainbridge Ferry Dock. This route was identified in the Transit Competitive IndexLocation / Facility:SR 305
From:SR 3 (Poulsbo)
To:Bainbridge Ferry Dock
Project ID: 5319
Completion Year:2030
MTP Status: CandidateEstimated Cost: $12,335,849
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: East Bremerton Bus Transit Center
Description:Relocated and improved intermodal transit center and park n ride (250 stalls)Location / Facility:East Bremerton Bus Transit Center
From:Wheaton Way
To:#N/A
Project ID: 3310
Completion Year:2018
MTP Status: CandidateEstimated Cost: $6,202,768
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Bremerton-Downtown Seattle
Description:Passenger Only Ferry - new route: Bremerton-Downtown SeattleLocation / Facility:POF route
From:Bremerton
To:Downtown Seattle
Project ID: 5365
Completion Year:2018
MTP Status: CandidateEstimated Cost: $16,933,406
Type:New Facility-RoadCounty:Multicounty
Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Kingston-Downtown Seattle
Description:Passenger Only Ferry - new route: Kingston-Downtown SeattleLocation / Facility:POF route
From:Kingston
To:Downtown Seattle
Project ID: 5366
Completion Year:2020
MTP Status: CandidateEstimated Cost: $10,073,522
Type:New Facility-RoadCounty:Multicounty
Sponsor: KITSAP TRANSITTitle: Passenger Only Ferry: Southworth-Downtown Seattle
Description:Passenger Only Ferry - new route: Southworth-Downtown SeattleLocation / Facility:POF route
From:Southworth
To:Downtown Seattle
Project ID: 5367
Completion Year:2023
MTP Status: CandidateEstimated Cost: $16,686,203
Type:New Facility-RoadCounty:Multicounty
Sponsor: KITSAP TRANSITTitle: Phase I Poulsbo SR 3/ SR 305 Hub (Olhava II) P&R
Description:Development of a 250-300 stall park and ride at the intersection of SR 3 and SR 305. Located in Poulsbo, Kistap Co., the park and ride will consist of 4.7 acres near the Olhava Master Plan development.Location / Facility:Viking Ave
From:SR 3/ SR 305
To:SR 305 / SR 307 / SR 3
Project ID: 2589
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $3,433,515
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Phase II and Phase III SR305 Corridor P&Rs
Description:This is a placeholder project for the remaining 500-550 stalls for the SR305 P&R's from the city of Poulsbo to Suquamish to Bainbridge Island. Location / Facility:TBD
From:SR3
To:Bainbridge Island Ferry Terminal
Project ID: 4294
Completion Year:2025
MTP Status: CandidateEstimated Cost: $5,571,793
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: Silverdale P&R
Description:250 new stalls in the Regional CenterLocation / Facility:Newberry Hill Road
From:Central Kitsap
To:SR 3
Project ID: 2576
Completion Year:2018
MTP Status: CandidateEstimated Cost: $4,652,076
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 104 Kingston Park and Ride Expansion
Description:100 additional stalls (350 total) AKA George's Corner Park and Ride, behind the George's Corner PUDLocation / Facility:Kingston P & R
From:SR 104@Hansville Rd
To:#N/A
Project ID: 3602
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,163,019
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 16 P&R (Mullenix)
Description:250 new stalls Location / Facility:SR 16 P&R (Mullenix)
From:South Kitsap
To:SR 16
Project ID: 2582
Completion Year:2025
MTP Status: CandidateEstimated Cost: $3,489,057
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 16/SR 160 Port Orchard Park and Ride Expansion
Description:up to 250 Stalls totalLocation / Facility:Port Orchard P & R
From:SR 16/SR 160@Port Orchard
To:
Project ID: 3604
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,163,019
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 303 (North of Bremerton/Riddell) P&R
Description:250 new stallsLocation / Facility:SR 303 (North of Bremerton) P&R
From:Central Kitsap
To:SR 303
Project ID: 2575
Completion Year:2020
MTP Status: CandidateEstimated Cost: $3,489,057
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 303 P&R (N Silverdale)
Description:250 new stalls (near NE Silverdale)Location / Facility:SR 3 / SR 303 P&R
From:Central Kitsap
To: SR 303
Project ID: 2585
Completion Year:2025
MTP Status: CandidateEstimated Cost: $3,489,057
Type:New Facility-RoadCounty:Kitsap County
Sponsor: KITSAP TRANSITTitle: SR 304 (Bremerton) P&R (Gateway)
Description:250 new stalls at SR310 (6th) and Montgomery in surface lot and parking structureLocation / Facility:SR 304 (Bremerton) P&R
From:Central Kitsap
To:SR 304
Project ID: 2574
Completion Year:2020
MTP Status: CandidateEstimated Cost: $23,260,379
Type:New Facility-RoadCounty:Kitsap County
Sponsor: LAKEWOODTitle: Bridgeport Way
Description:Widen roadway to accommodate continuous 2-way center turn lane. Add 5 foot bike lanes OR widen outside travel lane to be a shared bike/vehicle facility. Add curb, gutter, sidewalks, streetlights, landscaping, and upgraded storm drainage. Signal upgrades as required to accommodate improvements.Location / Facility:Bridgeport Way
From:Steilacoom Blvd
To:N. City Limits
Project ID: 5523
Completion Year:2014
MTP Status: UnprogrammedEstimated Cost: $8,347,059
Type:New Facility-RoadCounty:Pierce County
Sponsor: LAKEWOODTitle: City Water Ditch Bike Trail
Description:Shared use bike path or dedicated bicycle lanes and sidewalks along South Tacoma Way to tie into Tacoma's Water Ditch Trail.Location / Facility:City Water Ditch Bike Trail
From:Tacoma city limits
To:84th St S
Project ID: 2806
Completion Year:2019
MTP Status: CandidateEstimated Cost: $2,255,962
Type:New Facility-RoadCounty:Pierce County
Sponsor: LYNNWOODTitle: 44th Ave. W. (SR 524 Spur)
Description:Widen roadway to 7 lanes with 8 lanes just south of 196th St. SW. The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.Location / Facility:44th Ave.
From:194th St.
To: I-5
Project ID: 4119
Completion Year:2020
MTP Status: CandidateEstimated Cost: $19,406,888
Type:New Facility-RoadCounty:Snohomish County
Sponsor: LYNNWOODTitle: I-5/44th Avenue Interchange Improvements
Description:Completion of existing half diamond interchange by adding access to the north. Project includes two braided ramps.Location / Facility:I-5 @ 44th Ave W
From:196th St SW
To:220th St SW
Project ID: 4631
Completion Year:2020
MTP Status: CandidateEstimated Cost: $157,324,981
Type:New Facility-RoadCounty:Snohomish County
Sponsor: LYNNWOODTitle: Interurban Regional Trail - Missing Link
Description:Completion of a multi-use trail that provides direct access to a designated urban centers and a high capacity transit stationLocation / Facility:PUD Right of Way
From:212th St SW
To:52nd Ave W
Project ID: 4634
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $988,812
Type:New Facility-RoadCounty:Snohomish County
Sponsor: LYNNWOODTitle: Interurban Trail Missing Link Pedestrian Bridge at I-5/44th Ave W
Description:This project will complete the 'missing link' in Lynnwood's Interurban Trail by constructing a Class I bicycle/ pedestrian trail and bridge over 44th Ave W and the southbound on-ramp to I-5 and a missing section of the Interurban trail. Location / Facility:0
From:Lynnwood P&R
To:Landmark Inn/PUD ROW
Project ID: 3442
Completion Year:2010
MTP Status: CompletedEstimated Cost: $5,294,025
Type:New Facility-RoadCounty:Snohomish County
Sponsor: LYNNWOODTitle: SR 524 (196th St SW) Widening
Description:Increase capacity of existing major east-west 5 lane arterial by increasing roadway section to 7 lanes, curb, gutter and sidewalk (12 feet). The City of Lynnwood is proposing BAT lanes on this corridor but this is still subject to public process.Location / Facility:SR 524 (196th St SW)
From:48th Ave W
To:37th Ave W
Project ID: 4009
Completion Year:2016
MTP Status: CandidateEstimated Cost: $22,835,617
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MAPLE VALLEYTitle: SR 169
Description:SR 169 Widening to 4 lanes, center turn lanes or left turn pockets and Bike Lanes (SE 270th to SE 290th) Location / Facility:SR 169
From:SE 270th St
To:SE 290th St
Project ID: 5445
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $5,376,249
Type:New Facility-RoadCounty:King County
Sponsor: MAPLE VALLEYTitle: SR 516 (Kent-Kangley Road), 213th Place SE to SR 169
Description:SR 516 Widening from 2 to 4 lanes, center turn lane/ left turn pockets, bike lanes and sidewalks (from 213th SE to SR 169)Location / Facility:SR 516 (Kent-Kangley Road)
From:213th Place SE
To:SR 169
Project ID: 4118
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $5,065,700
Type:New Facility-RoadCounty:King County
Sponsor: MARYSVILLETitle: 156th St NE Widening to 3/5 lanes: State Ave to 51st St NE Vic.
Description:Widen to 3 to 5 lanes w/ curb gutter and sidewalkLocation / Facility:156th/152nd St NE
From:State Ave
To:51st Ave
Project ID: 5528
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $15,867,951
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: 156th St. NE Interchange
Description:The project would complete the Interchange Justification Report for converting the 156th St. NE Overcrossing (currently under construction) to a full Single Point Urban Interchange.Location / Facility:156th St. NE
From:Twin Lakes Blvd
To:State Ave.
Project ID: 4411
Completion Year:2020
MTP Status: CandidateEstimated Cost: $31,838,817
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: 1st St Bypass: 3/5 lane new alignment
Description:3/5 lane new alignment Location / Facility:First St or new parallel alignment
From:SR 529
To:Sunnyside Blvd
Project ID: 5527
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $13,100,285
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: 40th St NE - 3/5 lanes on existing and new alignment: Sunnyside Blvd to SR9
Description:3/5 lane on existing and new alignmentLocation / Facility:40th St NE/87th Ave NE/35th St NE
From:Sunnyside Blvd
To:SR9 at SR 92
Project ID: 5532
Completion Year:2015
MTP Status: UnprogrammedEstimated Cost: $22,141,327
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: 88th St NE
Description:Upgrade existing 2 lane roadway to 5 lanes, upgrade State Ave. intersection.Location / Facility:88th St NE
From:State Avenue
To:67th Avenue NE
Project ID: 4123
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $34,820,580
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: 88th St NE new WB lane: Quil Ceda Crk Bridge to I-5
Description:Add new westbound laneLocation / Facility:88th St NE
From:Quil Ceda Crk Bridge
To:I-5 NB on ramp
Project ID: 5533
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $2,337,140
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: Ingraham Boulevard
Description:New 3/4 lane arterial to finish 88th Street NE Corridor between I-5 and SR 9Location / Facility:Ingraham Boulevard
From:67th Ave. NE
To:83rd Ave. NE
Project ID: 4127
Completion Year:2011
MTP Status: CompletedEstimated Cost: $6,057,653
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: Lakewood Triangle Access/156th St NE Overcrossing
Description:New I-5 overcrossing 2/4 laneLocation / Facility:156th St. NE
From:Twin Lakes Blvd
To:State Ave
Project ID: 5529
Completion Year:2012
MTP Status: CompletedEstimated Cost: $18,943,532
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: SR 529 Interchange
Description:Complete the current half interchange by constructing a new Interstate 5 northbound off-ramp onto SR 529 and new southbound on-ramps from SR 529 to Interstate 5Location / Facility:I-5
From:SR 529
To:I-5
Project ID: 4410
Completion Year:2017
MTP Status: CandidateEstimated Cost: $46,782,911
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: SR528/I-5 additional lanes under I-5 interchange
Description:Add one new east and west bound lane under I-5 at the interchangeLocation / Facility:SR 528
From:I-5 SR 528 NB ramps
To:I-5 SR 528 SB ramps
Project ID: 5534
Completion Year:2015
MTP Status: UnprogrammedEstimated Cost: $14,760,885
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: State Ave. 116th St. NE to 136th St. NE
Description: Widening the segment of State Avenue between 116th Street NE and 136th Street NE from three lanes to five. Other elements include installation of sidewalk on the east side of the road, improvements to the "Arlington Spur" railroad crossing, and upgrade of the traffic signal at 128th Street NE.Location / Facility:State Avenue
From:116th St. NE
To:136th St. NE
Project ID: 4124
Completion Year:2015
MTP Status: CandidateEstimated Cost: $4,279,440
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: State Avenue
Description:Upgrade existing 2 lane roadway to 5 lanesLocation / Facility:0
From:136th St. NE
To:152nd St. NE
Project ID: 4125
Completion Year:2010
MTP Status: CompletedEstimated Cost: $11,144,078
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: State Avenue
Description:Upgrade existing 3 lane roadway to 5 lanesLocation / Facility:State Avenue
From:100th St. NE
To:116th St. NE
Project ID: 4126
Completion Year:2016
MTP Status: UnprogrammedEstimated Cost: $26,719,852
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MARYSVILLETitle: Sunnyside Blvds Widening: 47th Ave NE to 52nd St NE
Description:Widen to 5 lane on existing alignment and connect to 1st St BypassLocation / Facility:Sunnyside Blvd
From:47th Ave NE
To:52nd St NE
Project ID: 5531
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $16,298,477
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MILTONTitle: Milton Way
Description:Road widening / sidewalk installLocation / Facility:Milton Way
From:28th Ave
To:20th St E
Project ID: 1958
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $1,662,342
Type:New Facility-RoadCounty:Pierce County
Sponsor: MILTONTitle: Milton-Edgewood Interurban Trail
Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail
From:Milton city limits at 70th Ave E
To:northeast to city limits at King Co limits
Project ID: 2892
Completion Year:2010
MTP Status: CandidateEstimated Cost: $1,335,146
Type:New Facility-RoadCounty:Pierce County
Sponsor: MONROETitle: Centennial Trail
Description:Shared use bike pathLocation / Facility:Centennial Trail
From:Terminus of existing trail
To:Monroe city limits (by SR 203)
Project ID: 2829
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $5,313,661
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MONROETitle: SR 522 Trail
Description:Shared use bike pathLocation / Facility:SR 522 Trail
From:City Limits
To:Proposed Centennial Trail
Project ID: 2826
Completion Year:2030
MTP Status: CandidateEstimated Cost: $3,962,040
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MONROETitle: US Hwy 2 Trail Extension
Description:Shared use bike path Location / Facility:US Hwy 2 Trail Extension
From:Planned Hwy 2 trail terminus at Monroe city limits
To:Planned Centennial Trail at SR 203
Project ID: 2687
Completion Year:2025
MTP Status: UnprogrammedEstimated Cost: $3,116,211
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MUKILTEOTitle: Ferry Holding Lanes
Description:Mitigation measure for traffic congestion associated with Ferry traffic backup on SR 525.Options include off-street storage, traffic warning measures, signals at 5th, Goat Trail Rd, 76th St SW, 84th St SW.Location / Facility:Ferry Holding Lanes
From:Mukilteo Ferry Terminal
To:
Project ID: 807
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $7,361,234
Type:New Facility-RoadCounty:Snohomish County
Sponsor: MUKILTEOTitle: Mukilteo Lane Waterfront Access
Description:Construct Parking Lot (80-100 stalls) and Pedestrian Access Bridge connecting Mukilteo with Mukilteo Multi-modal TerminalLocation / Facility:Mukilteo Lane
From:Park Ave
To:Mt. Baker Crossing
Project ID: 4010
Completion Year:2020
MTP Status: CandidateEstimated Cost: $8,298,118
Type:New Facility-RoadCounty:Snohomish County
Sponsor: NEWCASTLETitle: Coal Creek Pkwy (Phase I, II & III)
Description:Widen to 4/5 lanes + CGS, bike lanes, traffic signals; (PSRC ID No. NC-5)Location / Facility:Coal Creek Pkwy
From:Newcastle Way
To:SE 95th Way
Project ID: 2313
Completion Year:2010
MTP Status: CompletedEstimated Cost: $61,123,755
Type:New Facility-RoadCounty:King County
Sponsor: PACIFICTitle: Interurban Trail
Description:Shared use bike pathLocation / Facility:Interurban Trail
From:8th St E
To:southern terminus of existing Interurban Trail at 3rd Ave SW
Project ID: 2884
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,085,484
Type:New Facility-RoadCounty:King County
Sponsor: PACIFICTitle: Stewart Rd (8th St E.)
Description:Widen existing two-lane roadway to 5 lanes. East 0.69 mile is within City of Pacific jurisdiction and is a joint project with City of Pacific. Includes replacement of Br #1204-A over the White River. May include construction of Br #1204-B over the BNSFRR tracks. Includes non-motorized facilities.Location / Facility:Stewart Rd (8th St E.)
From:E Valley Hwy E
To:W Valley Hwy
Project ID: 127
Completion Year:2020
MTP Status: CandidateEstimated Cost: $28,508,050
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 112th St E/S
Description:Widen and reconstruct existing (two-lane in sections) roadway to 5 lanes, improve intersections and provide non-motorized features.Location / Facility:112th St E/S
From:86th Avenue E
To:Steele Street
Project ID: 116
Completion Year:2030
MTP Status: ApprovedEstimated Cost: $16,258,206
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 160th St E
Description:Widen and reconstruct existing arterial roadway including NMFLocation / Facility:160th St E
From:56th Ave Ct E
To:70th Ave E
Project ID: 1937
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $14,183,272
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 176th St E
Description:Widen and reconstruct existing 2/4-lane road to 5 lanes. Provide non-motorized features.Location / Facility:176th St E
From:SR 161 (Meridian E)
To:SR 7 (Pacific Avenue)
Project ID: 115
Completion Year:2014
MTP Status: CompletedEstimated Cost: $73,019,029
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 176th St E
Description:Construct the eastern two miles of 176 St E to provide for the future connection of SR-704 to SR-162 and to provide evacuation route from the Orting Valley. Construct urban section with 4-5 lanes and NMF. Construct rural section with 2-3 lanes and NMF (sidewalks, bicycle facilities, and a raised median).Location / Facility:176th St E
From:130th Ave E
To:Calistoga Ave
Project ID: 1938
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $56,356,415
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 224th St E
Description:Widen and reconstruct existing arterial to 3 lanes including NMFLocation / Facility:224th St E
From:SR 7
To:SR 161
Project ID: 522
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $93,319,133
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 72nd St E
Description:Reconstruct existing arterial roadway including NMF, add center left turn laneLocation / Facility:72nd St E
From:Tacoma City Limits
To:Fruitland Avenue E
Project ID: 1473
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $43,260,525
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: 96th St E
Description:Reconstruct existing arterial roadway including NMF, add center left turn laneLocation / Facility:96th St E
From:SR 7
To:Fruitland Ave E
Project ID: 1474
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $78,795,957
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Br #36193-A / 176th St E
Description:Widen to 4 lanes with NMF and replace bridge to eliminate the bottleneck caused by this being the only two-lane section of 176 St E.Location / Facility:Br #36193-A / 176th St E
From:176th St E over Tacoma Eastern Railroad
To:
Project ID: 1489
Completion Year:2012
MTP Status: CompletedEstimated Cost: $8,652,105
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd E
Description:Widen and reconstruct existing 2/4-lane roadway to provide 7 through lanes, turn lanes, wider curb lanes, curbs, gutters, and sidewalks; signal modifications included. Location / Facility:Canyon Rd E
From:106th St E
To:192nd St E
Project ID: 113
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $89,884,863
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd E
Description:Southerly Ext. Extend Major arterial roadway from 192nd Street E to SR-7 in two phases. The proposed roadway will be 4 to 5 lanes wide with paved shoulders and sidewalks to accommodate nonmotorized modes in the first phase to 224th Street E. The roadway would narrow to 2-lane with paved shoulders south of 224th Street E.Location / Facility:Canyon Rd E
From:Mountain Hwy (SR 7)
To:192nd Street E
Project ID: 134
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $68,907,837
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd E
Description:Northerly Ext. Extend major arterial roadway from it's current northerly terminus to connect with the planned completion of SR-167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would link the planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)Location / Facility:Canyon Rd E
From:Pioneer Way E
To:52nd St E / 62nd Ave E
Project ID: 135
Completion Year:2026
MTP Status: ROW Conditionally ApEstimated Cost: $52,009,335
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd E
Description:Widen to 5 lanes, reconstruct existing arterial including NMF.Location / Facility:Canyon Rd E
From:84th St. E
To:99th St Ct E
Project ID: 528
Completion Year:2020
MTP Status: CandidateEstimated Cost: $17,097,028
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd E
Description:Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add auxiliary lane where appropriate, and provide non-motorized features.Location / Facility:Canyon Rd E
From:72nd St E
To:Pioneer Wy E
Project ID: 4439
Completion Year:2030
MTP Status: CandidateEstimated Cost: $22,684,343
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Rd East Corridor Improvements
Description:Widen and reconstruct existing roadway to provide additional lanes, add turn lane(s) at intersections, add center turning lane where appropriate, and provide non-motorized features.Location / Facility:Canyon Rd E
From:84th St E
To:72nd St E
Project ID: 4438
Completion Year:2030
MTP Status: ROW Conditionally ApEstimated Cost: $8,778,504
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Canyon Road East Northerly Extension
Description:Extend major arterial roadway from its current northerly terminus to connect with the planned completion of SR-167, crossing over 2 railroads and the Puyallup River. The project would be a four-lane roadway with paved shoulders (to accommodate non-motorized modes). This roadway would linkthe planned employment center in Frederickson with the Port of Tacoma and destinations northward (e.g. Seattle)Location / Facility:Canyon Road E
From:52nd st E/62nd Ave E Intersection
To:70th Ave E
Project ID: 4475
Completion Year:2025
MTP Status: CandidateEstimated Cost: $63,320,331
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Cushman Trail (phase 2)
Description:Shared use pathLocation / Facility:Cushman Trail
From:Pierce Transit Park and Ride (Kimball Dr NW)
To:96th Street NW
Project ID: 2851
Completion Year:2011
MTP Status: CompletedEstimated Cost: $6,180,075
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Fennel Creek Trail – Segment 2
Description:Shared use pathLocation / Facility:Fennel Creek corridor
From:Fennel Creek Park
To:Sumner-Buckley Highway (SR 410)
Project ID: 5522
Completion Year:2018
MTP Status: CandidateEstimated Cost: $3,910,050
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Foothills Trail – South Prairie, East Segment
Description:The East Segment includes construction of 1.3 miles of 12 foot wide porous asphalt multi-use trail. A shoulder composed of natural materials will vary in width from 0 to 5 feet depending on topographic restrictions. The project will extend from approximately 1,900 ft. south of Borell Road East to 268th Avenue Court East where it will connect to the already complete Middle Segment.Location / Facility:Foothills Trail
From:1,900 ft. south of Borell Road East
To:268th Avenue Court East
Project ID: 4472
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $3,477,533
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Foothills Trail-Carbonado
Description:Design and construct the Cascade Jct. to Wilkeson/Carbonado section of Foothills Trail. Pierce County owns about half of this 7 mile section. The design portion will include engineering and all environmental requirements.Location / Facility:Foothills Trail
From:Cascade Junction
To:Carbonado
Project ID: 3439
Completion Year:2022
MTP Status: CandidateEstimated Cost: $7,781,407
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Foothills Trail-S. Prairie
Description:Design and construct the remaining 2.7 mile sections of Foothills Trail that will complete the 19.2 mile trail from east Puyallup to Buckley. The design portion will include engineering and all environmental requirements. Location / Facility:Foothills Trail
From:South Prairie city limits
To:268th Ave Ct East
Project ID: 2835
Completion Year:2015
MTP Status: CandidateEstimated Cost: $2,999,467
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Military Rd S/152nd St E
Description:Widen and reconstruct 2-3 lane existing road (east of SR-7) to provide 2 additional general purpose lanes and non-motorized features along entire length.Location / Facility:Military Rd S/152nd St E
From:Waller Rd E
To:Spanaway Loop Rd
Project ID: 125
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $63,988,497
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Milton-Edgewood Interurban Trail
Description:Shared use bike pathLocation / Facility:Milton-Edgewood Interurban Trail
From:70th Ave E
To:Milton City Limits
Project ID: 2894
Completion Year:2008
MTP Status: CompletedEstimated Cost: $651,291
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: Spanaway Loop Rd
Description:Southerly Ext. Widen existing roadway and construct new roadway on new alignment including non-motorized features. Location / Facility:0
From:Pacific Avenue S (SR 7)
To:10th Ave S
Project ID: 131
Completion Year:2006
MTP Status: CompletedEstimated Cost: $9,234,368
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: SR 302 Trail
Description:Shared use pathLocation / Facility:SR 302 and/or Tacoma Utility ROW
From:Mason County
To:SR 16
Project ID: 5505
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $13,950,871
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE COUNTYTitle: WOLLOCHET DR NW
Description:Widen existing road between Fillmore Dr NW and Artondale Dr NW to five lanes and between Artondale Dr NW and 40 St NW to 3 lanes to accommodate existing traffic. Construct NMF that will complete the nonmotorized route between the heart of Fox Island and SR-16 and the nonmotorized trail systems in Gig Harbor and Tacoma.Location / Facility:WOLLOCHET DR NW
From:FILLMORE DR NW
To:40TH ST NW
Project ID: 880
Completion Year:2014
MTP Status: CompletedEstimated Cost: $14,500,196
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE TRANSITTitle: BRT - Meridian / SR 161
Description:Bus Rapid Transit on SR 161 from 176th Street to Downtown PuyallupLocation / Facility:SR 161
From:176th St.
To:Downtown Puyallup
Project ID: 5489
Completion Year:2030
MTP Status: CandidateEstimated Cost: $60,673,315
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE TRANSITTitle: BRT (Route 1) on SR 7 from Roy Y to Downtown Tacoma (PC Congested Corridor)
Description:Bus Rapid Transit from on SR 7 from Roy Y to downtown Tacoma. This route was identified in the Transit Competitive IndexLocation / Facility:SR 7/ Pacific/ Commerce
From:Roy Y
To:Downtown Tacoma
Project ID: 5320
Completion Year:2020
MTP Status: CandidateEstimated Cost: $15,674,713
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE TRANSITTitle: Fife I-5 P&R
Description:1000 new stallsLocation / Facility:I-5 / Fife P&R
From:I-5 Central
To:
Project ID: 2606
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $47,683,777
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE TRANSITTitle: South Hill P & R
Description:433 new stallsLocation / Facility:South Hill P & R
From:Valley
To:SR 512 / SR 161
Project ID: 2596
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $9,428,207
Type:New Facility-RoadCounty:Pierce County
Sponsor: PIERCE TRANSITTitle: SR 512 / SR 7 (Parkland) P&R
Description:550 new stallsLocation / Facility:Parkland P&R
From:Vicinity SR 512@SR 7
To:
Project ID: 2602
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $14,654,039
Type:New Facility-RoadCounty:Pierce County
Sponsor: PORT OF SEATTLETitle: E MARGINAL WAY GRADE SEPARATION
Description:GRADE SEPARATION OF ON/OFF RAMPS AT SR 99 OVER UP LEAD TRACK FROM HARBOR ISLANDLocation / Facility:E MARGINAL WAY
From:Duwamish Ave S & East Marginal Way S
To:SW Spokane St
Project ID: 1224
Completion Year:2009
MTP Status: CompletedEstimated Cost: $47,245,735
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: Grade separation at Atlantic St. - South End Viaduct local access: Holgate to King stage 3
Description:This new grade separation is the local access portion of the Alaskan Way Viaduct Holgate to King street project at Atlantic. It allows a grade separated roadway to get traffic from East Marginal Way to Colorado St and the freeway system east when the at-grade Atlantic roadway is blocked by a train.Location / Facility:U tube road (looping underneath Viaduct between Atlantic and S. Royal Brougham Way
From:East Marginal Way north-west of S Atlantic St
To:S Atlantic St east of SR-99
Project ID: 5347
Completion Year:2013
MTP Status: CandidateEstimated Cost: $497,927
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: Hanford & Main SIG's Entry Gate Improvements
Description:Add a center turn lane and, if warranted, a traffic signal for east-to-north bound truck traffic entering the Main SIG Yard entrance on HanfordLocation / Facility:S. Hanford St.
From:Colorado Ave S
To:East Marginal Way
Project ID: 5348
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $356,807
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: North Argo Truck Roadway
Description:Create a new southbound one-way truck-only street from the south-east end of Duwamish Ave S to the north-west end of Colorado Ave S just east of East Marginal Way/ Alaskan Way viaduct. Project grade-separates truck traffic headed fro the Argo Rail Yard from mainline SR-99 and eliminates a difficult weaving maneuverLocation / Facility:North Argo Truck Roadway
From:south-east end of Duwamish Ave S
To:north-west end of Colorado Ave S
Project ID: 5346
Completion Year:2014
MTP Status: UnprogrammedEstimated Cost: $497,927
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: South Access
Description:New construction of a two-lane, limited access arterial connecting the planned South Airport Link roadway to the planned extension of SR 509 to I-5.Location / Facility:New Alignment
From:SR 509 extension to I-5
To:S 188th St
Project ID: 5512
Completion Year:2025
MTP Status: CandidateEstimated Cost: $247,203,001
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: South Airport Link Project
Description:New Construction of a south airport expressway to connect the existing north airport expressway and airport terminal drives to the planned South Access roadway and extension of SR 509 to I-5. The project would close the existing south airport entrance at S 182nd Street and International Boulevard and create a new at grade connection to the local roadway network at S. 188th Street and 28th Ave S.Location / Facility:South Airport Link Project
From:S 188th St
To:Airport
Project ID: 2074
Completion Year:2025
MTP Status: CandidateEstimated Cost: $465,208
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF SEATTLETitle: West Marginal Way/Chelan Street/Spokane Street intersection
Description:Re-stripe & change the signal timing at West Marginal Way/Chelan Street/Spokane Street intersection to maintain freight flows during commute hours (particularly morning commute) but using existing lanes to designate current left/through lane on northwest-bound West Marginal Way and eastbound Chelan Avenue as left turn only lanes. Also, need to change signal phasing to provide for concurrent through movements on these same two approaches.Location / Facility:West Marginal Way/Chelan Street/Spokane Street intersection
From:West Marginal Way/Chelan Street/Spokane Street intersection
To:
Project ID: 5350
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $694,628
Type:New Facility-RoadCounty:King County
Sponsor: PORT OF TACOMATitle: Port of Tacoma Road/Rail/Infrastructure
Description:The project supports anticipated marine terminal development by eliminating at-grade railroad crossings; provides new Port-owned rail support infrastructure including new arrival/dispatch tracks and intermodal support tracks to facilitate efficient and reliable freight movement.Location / Facility:I-5/54th Avenue East I/C Ramps; 54th Avenue East; 54th Avenue East/SR509/Taylor Way intersection; Taylor Way; East 11th Street
From:Milwaukee Way and SR 509, City of Tacoma
To:Taylor Way and SR 509, City of Tacoma
Project ID: 4639
Completion Year:2020
MTP Status: CandidateEstimated Cost: $446,516,768
Type:New Facility-RoadCounty:Pierce County
Sponsor: PORT ORCHARDTitle: Bay Street Pedestrian Path
Description:Design approximately one mile of curb, sidewalk and bike lane along Bay Street.Location / Facility:Shared use bike path
From:city limits
To:city limits
Project ID: 2832
Completion Year:2013
MTP Status: CandidateEstimated Cost: $2,312,082
Type:New Facility-RoadCounty:Kitsap County
Sponsor: PORT ORCHARDTitle: Bethel Road SE
Description:Widen the roadway from 2 lanes to 3/4/5 lanes with a planted median island, bike lanes, street lighting, and sidewalks separated from the roadway by a planting strip. Bus pullouts will be constructed at major intersections, traffic signals will be installed at the intersections of Blueberry/Bethel Road and Salmonberry/Bethel Road. The existing signals at Sedgwick Road, Wal-Mart, and Lund Ave will be retrofitted to accommodate the additional traffic lanes. The intersection of Bethel Mitchell/Lund Rd will be replaced with a roundabout. Blueberry and Salmonberry Rd will be widened at the intersection to provide right and left turn lanes and U-turn movements. Property purchase will be approximately 60 acquisitions. Of the 60 acquisitions approximately 55 are 10'-20' wide frontage strips and 5 are total takes with relocation assistance.Location / Facility:Bethel Road
From:Lincoln Ave SE
To:Ives Mill Rd SE
Project ID: 3646
Completion Year:2025
MTP Status: ApprovedEstimated Cost: $28,938,202
Type:New Facility-RoadCounty:Kitsap County
Sponsor: PUYALLUPTitle: 31st Ave SW
Description:Widen 31st Ave SW between S Meridian/SR 161 to SR-512 westbound ramp including widening 31st Avenue SW overpass across SR-512, signal modifications, addition of curb, gutter, sidewalks, and shared bike lanes, and add transit signal priority.Location / Facility:31st Ave SW
From:SR 512 off ramp
To:S Meridian/SR 161
Project ID: 141
Completion Year:2005
MTP Status: ApprovedEstimated Cost: $6,667,975
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: East Puyallup Riverfront Trail
Description:Shared use pathLocation / Facility:Foothills Trail
From:Terminus of Existing Foothills Trail at 134th Ave E
To:Puyallup Riverfront Trail at easterly Puyallup city limits
Project ID: 2844
Completion Year:2011
MTP Status: ApprovedEstimated Cost: $1,476,088
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: Puyallup Riverfront Trail
Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail
From:western terminus of existing Puyallup Riverfront Trail
To:Puyallup city limits
Project ID: 2899
Completion Year:2010
MTP Status: CompletedEstimated Cost: $1,139,759
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: Puyallup Riverfront Trail
Description:Shared use bike pathLocation / Facility:Puyallup Riverfront Trail
From:Eastern terminus of existing Puyallup Riverfront Trail
To:Sumner city limits at river
Project ID: 2900
Completion Year:2010
MTP Status: CompletedEstimated Cost: $2,496,614
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: S Meridian (SR 161)
Description:This three phase project will reconstruct S Meridian with new infrastructure, curb, gutter and sidewalk. Interconnect signals, improve road base to support truck traffic and provide improved pedestrian friendly environment with street scape items.Location / Facility:0
From:7th Ave
To:Stewart St
Project ID: 138
Completion Year:2000
MTP Status: CompletedEstimated Cost: $4,768,378
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: Shaw Rd
Description:Widen Shaw Road from 2 lanes to 5 lanes to include curb, gutter, sidewalk, shared bike lanes, transit signal priority, and street lighting. This project is critical as the other portion of Shaw Road connecting E Main and E Pioneer is currently under construction and will be completed by 2010. As a parallel route to S Meridian/SR 161, Shaw Road improvements would also help ease the traffic congestion along S Meridian/SR 161.Location / Facility:Shaw Rd
From:E Pioneer
To:39th Ave SE
Project ID: 494
Completion Year:2004
MTP Status: CandidateEstimated Cost: $3,644,126
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: Shaw Rd E
Description:Conduct corridor study and environmental documentation for proposed north-south arterial roadway. Widen, and realign as needed, the existing two-lane roadway and/or construct new roadway (in portions) to include non-motorized features. Location / Facility:Shaw Rd E
From:SR 410
To:Orting-Kapowsin Hwy
Project ID: 129
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $38,767,299
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUPTitle: Shaw Rd Extension in Puyallup
Description:The extension is a grade-separated crossing of the BNSF railway tracks, connecting Shaw road directly to E Main. This project also includes the addition of pedestrian and bicycle facilities and direct access to from E. Pioneer Ave. and Shaw Rd to E. Main.Location / Facility:
From:E MAIN AVE
To:E. PIONEER AVE
Project ID: 1222
Completion Year:2010
MTP Status: CompletedEstimated Cost: $28,370,079
Type:New Facility-RoadCounty:Pierce County
Sponsor: PUYALLUP TRIBETitle: Lister Gulch Bicycle-Pedestrian Improvements
Description:Design and construction of 500 LF pedestrian and bicycle path, lighting and 40 LF bridge over Lister Gulch linking the Portland Avenue area neighborhood of Tacoma to the Puyallup Tribal campus thereby decreasing traffic at the I-5 and Hwy 167 interchange.Location / Facility:Lister Gulch Bicycle-Pedestrian Improvements
From:Tribal Administrative Center
To:Portland Ave area
Project ID: 3443
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $71,798
Type:New Facility-RoadCounty:Tribal Nations
Sponsor: REDMONDTitle: 148th Ave NE
Description:Create third northbound through lane on 148th Ave NE from NE 22nd St to SR 520 eastbound on-ramp using primarily existing right turn lanes and modify SR 520 eastbound on-ramp to allow HOV access. At NE 24th St and 148th Ave NE intersection add second left turn lane on the eastbound and westbound approaches, add right turn lane on northbound approach, and extend right turn lane on westbound approach.Location / Facility:148th Ave NE
From:NE 22nd St
To:SR 520 eastbound on-ramp
Project ID: 5516
Completion Year:2022
MTP Status: CandidateEstimated Cost: $12,300,737
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Bear and Evans Creek Trail
Description:Shared use bike pathLocation / Facility:Bear and Evans Creek Trail
From:South of Union Hill Rd at Avondale Way
To:Puget Sound Energy Trail and East Lake Sammamish Trail
Project ID: 2862
Completion Year:2035
MTP Status: ApprovedEstimated Cost: $11,391,899
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Bear Creek Trail Connector, Redmond Town Center to Marymoor Park
Description:Construct paved multi-use trail that would cross over Bear Creek on a new bridge and pass under SR 520 on the east side of the Sammamish River.Location / Facility:Bear Creek Trail
From:Bear Creek Trail
To:Sammamish River Trail
Project ID: 5513
Completion Year:2025
MTP Status: CandidateEstimated Cost: $2,164,930
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Bel-Red Rd
Description:Widen Bel-Red Rd. Improvements include 4-5 lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, right-of-way and easement acquisition. (exist- 2NB, 1SB)Location / Facility:Bel-Red Rd
From:NE 30th ST
To:NE 40th ST
Project ID: 836
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $22,073,478
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Cleveland St
Description:Convert Cleveland St to 1 through lane in each direction. Improvements include parking, curb bulbouts, widened sidewalks, pedestrian amenities and realignment of street at eastern connection to Redmond Way to improve traffic flow.Location / Facility:Cleveland St
From:Redmond Way
To:Redmond Way (SR 202)
Project ID: 4116
Completion Year:2015
MTP Status: CandidateEstimated Cost: $9,294,582
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: East Lake Sammamish Pkwy
Description:Widen East Lake Sammamish Pkwy from Redmond Way to 187th Ave NE. Improvements include 1 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power, and right-of-way. (exist- 1NB, 1SB)Location / Facility:East Lake Sammamish Pkwy
From:Redmond Way
To:187th AVE NE
Project ID: 840
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $22,513,063
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Puget Sound Energy Trail Improvements
Description:Improve existing soft surface trail with newly paved multi-use trail that meets AASHTO standards. The trail corridor will also include a parallel soft surface trail.Location / Facility:Puget Sound Energy Trail
From:Sammamish River Trail
To:Avondale Rd
Project ID: 5518
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $6,150,369
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Puget Sound Energy Trail, Rose Hill Extension
Description:Extend Puget Sound Energy Trail from its terminus west of Willows Road to 132nd Avenue NE and 142nd Ave NE. Trail project would also design and construct a new crossing of Willows Road in the vicinity of the trail crossing. Provides a connection to Kirkland.Location / Facility:Puget Sound Energy Trail
From:Willows Rd
To:132nd Ave NE/NE 142nd St
Project ID: 4115
Completion Year:2030
MTP Status: CandidateEstimated Cost: $6,692,030
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Redmond Central Connector
Description:Shared use bike pathLocation / Facility:Redmond Central Connector
From:NE 124th St
To:E Lake Sammamish Bike Trail @ SR 520
Project ID: 2919
Completion Year:2025
MTP Status: CandidateEstimated Cost: $31,696,314
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Redmond Way
Description:Convert Redmond Way from 159th Pl NE to 170th Ave NE to 1 through lane in each direction and center turn lane except at west end where there would be two westbound through lanes from 159th Ave NE to 160th Ave NE. Improvements include curb bulbouts, sidewalk improvements, pedestrian amenities and parking.Location / Facility:Redmond Way
From:159th Pl NE
To:170th Ave NE
Project ID: 4117
Completion Year:2015
MTP Status: CandidateEstimated Cost: $8,670,398
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: Redmond Way Widening
Description:Widen Redmond Way bridge at Bear Creek. Improvements would include 2 through lanes in each direction, 2 eastbound left turn lanes to NE 76th St, 1 eastbound right turn lane to westbound SR 520 on-ramp, sidewalks, Bear Creek and E Lake Sammamish Trail connectionsLocation / Facility:Redmond Way
From:Bear Creek (171st Ave NE Vicinity)
To:SR 520 Westbound on-ramp
Project ID: 3662
Completion Year:2030
MTP Status: CandidateEstimated Cost: $23,260,379
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: REDMOND-WOODINVILLE RD
Description:Widen Red-Wood Rd from intersection with new 160th Ave NE Extension near the Puget Power trail north to NE 124th St. Improvements include 1 through lane in each direction, left turn and extended right turn lanes if appropriate, access management, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way acquisition. Redmond and WSDOT will coordinate a planning process to finalize final design for segment between 116th and 124th; the latter might not be widened. See also WSDOT project 1755.Location / Facility:REDMOND-WOODINVILLE RD
From:160TH AVE NE
To:NE 124th ST
Project ID: 830
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $25,801,963
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: SR 520/Avondale Rd/Union Hill Rd Intersection
Description:heavily congestions at grade intersection. Solutions to study include: 1. High capacity continuous flow three lane roundabout. 2. Grade separation of critical movements such as: -- Westbound Union Hill Rd to Southbound SR 520 left turn, or -- Northbound and southbound through movements between SR 520 and Avondale Rd., or--All left turns at intersection. Flyover Ramp: This option would provide a flyover ramp from westbound Union Hill Road to westbound SR 520. To accommodate this flyover from center of Union Hill Road to the center of SR 520, it would be necessary to widen both roadways, modify NE 76th Street ramps, build retaining walls and potentially require additional right of way.Location / Facility:Coal Creek Pkwy
From:Novelty Hill Rd
To:Union Hill Road
Project ID: 3476
Completion Year:2030
MTP Status: CandidateEstimated Cost: $43,419,375
Type:New Facility-RoadCounty:King County
Sponsor: REDMONDTitle: West Lake Sammamish Parkway Widening
Description:Widen West Lake Sammamish Pkwy from NE 51st St to Bel-Red Rd. Improvements include 2 through lane in each direction, left turn lanes, bike lanes, curb, gutter, sidewalks, street lights, storm drainage, underground power and right-of-way.Location / Facility:West Lake Sammamish Parkway
From:NE 51st St
To:Bel-Red Rd
Project ID: 3665
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $15,227,795
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Cedar River Trail
Description:Shared use bike pathLocation / Facility:Cedar River Trail
From:Terminus of existing Cedar River Trail
To:Rainier and 88th
Project ID: 2671
Completion Year:2020
MTP Status: CandidateEstimated Cost: $334,602
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Central Renton Transit Corridor - Rainier Ave S (SR 167) S Grady Way to S 2nd St
Description:Reconfiguration of Rainier Ave S to accommodate Business Access and Transit (BAT) lanes specifically for use by transit, vehicles entering and exiting businesses and for right turn use at intersections. Location / Facility:Rainier Ave S
From:Grady Way
To:N Airport Way
Project ID: 1308
Completion Year:2018
MTP Status: ApprovedEstimated Cost: $52,568,302
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Duvall Ave NE
Description:Widen to 5 lanes, CGS (curb, gutter, and sidewalk), bike lanes, other amenities, channelization.Location / Facility:Duvall Ave NE
From:NE 4th St
To:NE Sunset Blvd (SR 900)
Project ID: 2326
Completion Year:2020
MTP Status: CandidateEstimated Cost: $14,629,068
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Duvall Ave NE
Description:Widen to 5 lanes, CGS (curb, gutter and sidewalks), add bike lanes, add amenities, channelizationLocation / Facility:Duvall Ave NE
From:NE Sunset Blvd
To:NE 25th Ct (Renton City Limit)
Project ID: 4295
Completion Year:2009
MTP Status: CompletedEstimated Cost: $18,744,786
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Lake Washington Loop Trail
Description:Shared use regional bike pathLocation / Facility:Rainier Ave N/Airport Way/Logan Ave
From:Rainier Ave N (city limits)
To:Cedar River Trail/Logan Ave Bridge
Project ID: 4296
Completion Year:2015
MTP Status: CandidateEstimated Cost: $29,599,269
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Logan Ave N
Description:Reconstruction of roadway, installation of sidewalks, HOV/Rapid Ride improvements to the Boeing Renton Plant.Location / Facility:Logan Ave N
From:Renton Transit Center
To:I-405 (NE Park Dr)
Project ID: 2347
Completion Year:2020
MTP Status: CandidateEstimated Cost: $14,629,068
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: NE Sunset Blvd (SR-900) Corridor Improvements
Description:Project involves a series of key improvements in this corridor to improve traffic operations, Transit Signal Priority (TSP) and adaptive system control improvements, pedestrian and bicycle needs. Phase 1 will construct multi-modal improvements along NE Sunset Blvd from Edmonds Ave NE to Monroe Ave NE. Improvements include access management through center medians, non-motorized improvements by adding bicycle lanes, multi-use trail, new sidewalks and landscaped buffers separating the sidewalk from the travel lanes, pedestrian ramps per current ADA standards, streetlights, traffic signal upgrades and coordination.Location / Facility:NE Park Dr and NE Sunset Blvd
From:Garden Ave
To:East City limits (148th)
Project ID: 2341
Completion Year:2020
MTP Status: CandidateEstimated Cost: $31,940,132
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: New P&R Lot-Renton Urban Center North
Description:Construct new Park and Ride lot (250-300 spaces), in conjuction with I-405/N 8th St interchange (WSDOT I-405 BRT Project).Location / Facility:I-405/N 8th St interchange vicinity
From:I-405/N 8th St interchange vicinity
To:-
Project ID: 4468
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $23,679,415
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Oakesdale Ave SW
Description:Widen Monster Rd Bridge; widen the roadway to 4/5 lanes +Bike Lanes + CGSLocation / Facility:Oakesdale Ave SW
From:Monster Rd
To:SR 900
Project ID: 2328
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $29,599,269
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Rainier Ave S Corridor Improvements – Phase 2
Description:Phase 2 improvements include installation of BAT lanes, medians, curb, gutter, wider sidewalks, planted pedestrian buffer, street lighting including pedestrian scale illumination.Location / Facility:Rainier Ave S (SR 167)
From:S 3rd St
To:N Airport Way
Project ID: 4433
Completion Year:2018
MTP Status: CandidateEstimated Cost: $21,311,474
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: SE Carr RD
Description:Widen roadway to provide capacity improvements, assume an estimated 3 lanes each direction for wideningLocation / Facility:SE Carr RD
From:108th Ave SE
To:SR 167
Project ID: 910
Completion Year:2030
MTP Status: CandidateEstimated Cost: $85,245,895
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: Springbrook/Interurban Connection (SW 27th St)
Description:Shared use bike pathLocation / Facility:Springbrook/Interurban Connection (SW 27th St)
From:Oakesdale Ave SW
To:SR 181
Project ID: 2856
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,367,942
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: SW 27th St / Strander Blvd Ph 1 Segment 2b
Description:Design and construction of the railroad bridge at the Union Pacific (UP) railroad tracks and a four lane roadway connecting SW27th St (in Renton) to Strander Blvd (in Tukwila).Location / Facility:SW 27th St connecting to Strander Blvd
From:SW 27th St
To:Strander Blvd
Project ID: 4164
Completion Year:2020
MTP Status: CandidateEstimated Cost: $30,062,202
Type:New Facility-RoadCounty:King County
Sponsor: RENTONTitle: SW 27th St/Strander Blvd Ph 2
Description:Improve the existing access along SW 27th St between Oakesdale Ave SW and East Valley Rd through signalization and/or limited channelization.Location / Facility:SW 27th St
From:Oakesdale Ave SW
To:East Valley Rd
Project ID: 4165
Completion Year:2020
MTP Status: CandidateEstimated Cost: $7,361,234
Type:New Facility-RoadCounty:King County
Sponsor: SAMMAMISHTitle: Sahalee Way NE
Description:3 lanes with raised median/turn lanes, bike lanes and sidewalks Location / Facility:Sahalee Way NE
From:NE 25th Way
To:NE 37th/City Limit
Project ID: 1978
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $30,247,978
Type:New Facility-RoadCounty:King County
Sponsor: SEATACTitle: 28th/24th Ave S
Description:It is to construct a new five lane arterial including bicycle lanes, curb, gutter, sidewalk, storm drainage, street lighting, signalization, channelization, landscaping, utilities, undergrounding of utility lines and paving.Location / Facility:28th/24th Ave S
From:S 200th St
To:S 208th Street
Project ID: 192
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $11,513,447
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Jefferson/Yesler
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:James St
From:Alaskan Way
To:First Hill / Capitol Hill Regional Growth Center
Project ID: 5164
Completion Year:2025
MTP Status: CandidateEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Pike/Pine
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Pike St
From:1st Ave
To:First Hill / Capitol Hill Regional Growth Center
Project ID: 5219
Completion Year:2024
MTP Status: CandidateEstimated Cost: $30,900,375
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Center city Priority Bus Corridor: Seattle Center East
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:3rd Ave
From:Seattle Center
To:S Jackson St
Project ID: 5095
Completion Year:2025
MTP Status: CandidateEstimated Cost: $6,180,075
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: 6th Ave Bike Path - Incorporated into 5145
Description:Shared use bike pathLocation / Facility:6th Ave Bike Path
From:Mountain to Sound Trail at Royal Brougham
To:SW Spokane St
Project ID: 2857
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,656,122
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Alaskan Way Bicycle Facility
Description:Separated bike facility in the Alaskan Way / East Marginal Way corridor.Location / Facility:Alaskan Way
From:Atlantic St
To:SW Spokane St
Project ID: 2859
Completion Year:2020
MTP Status: CandidateEstimated Cost: $1,238,231
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Burke-Gilman Trail Extension
Description:The project encompasses design and construction of a final segment of the Burke-Gilman Trail, a multi-use trail located along the north side of the Ship Canal, from 11th Ave NW to the Chittenden LocksLocation / Facility:Burke-Gilman Trail
From:11th Ave NW
To:Chittenden Locks
Project ID: 2668
Completion Year:2019
MTP Status: ApprovedEstimated Cost: $20,430,810
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Chesiahud Lake Union Loop Trail (Columbia Trail)
Description:Provides multi-use trail facilities for the Portage Bay area, connecting to the Burke-Gilman Trail.Location / Facility:NE Columbia Rd/NE Boat St
From:Montlake Bridge
To:University Bridge
Project ID: 5136
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,476,462
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--Center Segment
Description:Through a partnership between Sound Transit and the City of Seattle, will construct a multi-use, non-motorized, asphalt path within Seattle City Light ROW.Location / Facility:Chief Sealth Trail/Seattle City Light ROW
From:Beacon Ave. S. @ S. Dawson St.
To:51st Ave. S. @ S. Gazelle St.
Project ID: 3610
Completion Year:2006
MTP Status: CompletedEstimated Cost: $12,229,900
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--North Segment
Description:Regional multi-use nonmotorized trail linking south and central Seattle Location / Facility:Chief Sealth Trail/Seattle City Light ROW
From:I-90 @ I-5
To:Beacon Ave. S. @ S. Dawson St.
Project ID: 3609
Completion Year:2020
MTP Status: CandidateEstimated Cost: $3,714,693
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Chief Sealth Trail--Seattle--South Segment
Description:Regional multi-use nonmotorized trail linking south and central Seattle.Location / Facility:Chief Sealth Trail/Possibly Seattle City Light ROW
From:51st Ave. S. @ S. Gazelle
To:S. Leo St. @ 59th Ave. S.
Project ID: 3611
Completion Year:2020
MTP Status: CandidateEstimated Cost: $3,714,693
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: First Hill Streetcar Line
Description:Provides streetcar service with connections to First Hill via LINK Light Rail stations at Chinatown / International District and Capitol Hill.Location / Facility:Jackson / Boren / Broadway
From:1st Ave S
To:E Aloha St
Project ID: 5153
Completion Year:2016
MTP Status: CandidateEstimated Cost: $187,422,572
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Greenwood Avenue North Corridor Improvement
Description:Widen from an existing 4 lanes 40 ft to 5 lanes 55 ft. and include a center two-way-left turn lane. This improvement will include parking , curb, planting strip and concrete walkways on both sides of street which is a total improvement of the street right-of-way. Upgrade and interconnect two signals in project area. Upgrade street lighting, and drainage systems as needed. Transportation Improvement Board - Arterial Improvement Program funding - TIB FY05Location / Facility:Greenwood Avenue North
From:North 105th Street
To:North 112th Street
Project ID: 5448
Completion Year:2008
MTP Status: CompletedEstimated Cost: $9,649,569
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: King St Multimodal Terminal
Description:Intermodal; MIS Redevelop as inter/multimodal terminalLocation / Facility:King St Multimodal Terminal
From:[Not submitted]
To:
Project ID: 610
Completion Year:2010
MTP Status: CompletedEstimated Cost: $34,670,466
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Lake to Bay Loop Trail
Description:Figure-eight pedestrian and bicycling trail connecting Myrtle Edwards Park, Olympic Sculputre Park, Seattle Center, Lake Union Park and area neighborhoods in Uptown/Queen Anne and South Lake Union.Location / Facility:various
From:Elliott Bay Trail
To:Elliott Bay Trail
Project ID: 5167
Completion Year:2020
MTP Status: CandidateEstimated Cost: $1,114,408
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Lake Union Ship Canal Trail
Description:This project completes Phase II of a multi-use trail, extending from the Fremont Bridge to Fisherman's Terminal, just west of 15th Ave. NW. Location / Facility:West Nickerson Street
From:6th Ave W
To:15th Ave W
Project ID: 5168
Completion Year:2020
MTP Status: CompletedEstimated Cost: $3,624,119
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Mercer Corridor East Phase
Description:Improvements in the Mercer Corridor area between I-5 and Dexter Ave. Improvements include Roy St and 8th Ave reconstruction between Westlake and Dexter, Thomas St center turn lane and signals between Fairview and 5th, two-way conversion of Westlake Ave and 9th Ave between Aloha and Denny, two-way conversion of Mercer St between Yale Ave N and Dexter, two-way conversion of Valley St between Fairview and Westlake. All project activities will include Complete Street elements. Location / Facility:Roy St, 8th Ave, Thomas St, Westlake Ave, 9th Ave, Mercer St, Valley St
From:I-5
To:Dexter
Project ID: 5509
Completion Year:2012
MTP Status: CompletedEstimated Cost: $235,460,858
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Mercer Corridor West Phase
Description:Improvements in the Mercer Corridor area between Dexter and Elliott Ave. Improvements include two-way conversion of Mercer St between Dexter and 2nd Ave, widening of Mercer St between Dexter and 5th Ave, two-way conversion of Roy St between 6th and Queen Anne Ave N, extension of 6th Ave from Mercer St to Harrison St, demolition of Broad St between 9th Ave and Harrison St. All project activities will include Complete Streets elements. Incorporates prior projects 5510, 5104, 5125, 5179.Location / Facility:Mercer St, Dexter, Roy St, 6th Ave
From:9th Ave N
To:Elliott Ave W
Project ID: 5510
Completion Year:2014
MTP Status: ApprovedEstimated Cost: $107,383,792
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: MLK Jr Way Trail
Description:Construct new trail from S Massachusetts St to S McClellan St. Provides access to Mt Baker Station.Location / Facility:MLK Jr Way
From:S Massachusetts St
To:S McClellan St
Project ID: 5183
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $6,191,155
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Montlake Blvd NE HOV Lane and ITS Improvements
Description:Extend HOV lane on s/b Montlake Blvd and install ITS improvements to increase speed of HOV vehicles and encourage new transit service.Location / Facility:Montlake Boulevard
From:NE Pacific Place
To:25th Ave NE
Project ID: 5187
Completion Year:2020
MTP Status: CandidateEstimated Cost: $29,599,269
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Mountain to Sound Trail
Description:Shared use bike pathLocation / Facility:Mountain to Sound Trail
From:western terminus of existing I-90 Trail at 12th Ave
To:E Marginal Way
Project ID: 2895
Completion Year:2020
MTP Status: CandidateEstimated Cost: $7,429,386
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Northgate Multimodal Transportation Hub
Description: Make improvements to improve transfer opportunities between transit services. Provide multimodal connectivity to link to regional bus and light rail service, including but not limited to protected bike lanes, enhanced sidewalks, new pedestrian crossing and bicycle/pedestrian bridge over I-5. Location / Facility:3rd Ave NE
From:NE 103rd
To:Pinehurst
Project ID: 5212
Completion Year:2018
MTP Status: CandidateEstimated Cost: $44,496,540
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Northlake Way Trail
Description:Multi-use trail connecting Gasworks and Lake Union Parks, linking more than 35 pocket parks, street ends and waterways that ring Lake Union, and improving lake access from adjacent neighborhoods, downtown, and the University of Washington. Provides local access parallel to the Burke-Gilman Trail.Location / Facility:N/NE Northlake Way
From:University Bridge
To:Stone Way N
Project ID: 5215
Completion Year:2020
MTP Status: CandidateEstimated Cost: $2,476,462
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Puget Park Trail
Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Puget Park
From:SW Dakota St
To:SW Dawson St
Project ID: 5225
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $2,476,462
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Ravenna Ave NE Corridor Trail Improvements
Description:Improve off-street multi-use trail parallel to Ravenna Ave NE.Location / Facility:Ravenna Ave NE
From:NE 55th St
To:NE Ravenna Boulevard
Project ID: 5229
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $495,292
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 10
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NW
From:Northgate Multimodal Transportation Hub
To: Pioneer Square / Chinatown / International District
Project ID: 5091
Completion Year:2020
MTP Status: CandidateEstimated Cost: $8,652,105
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 13/13A
Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed reliability improvements. Improve accessibility of transit stops.Location / Facility:Seattle
From:32nd Ave NW
To:Children`s Hospital and UW Medical Center
Project ID: 5177
Completion Year:2024
MTP Status: CandidateEstimated Cost: $45,732,555
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 15
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops. Location / Facility:Greenwood Ave N
From:N 145th St (Seattle city limits)
To:N 38th St
Project ID: 5156
Completion Year:2024
MTP Status: CandidateEstimated Cost: $49,440,600
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 2
Description: Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:Seattle
From:Downtown Seattle
To:Seattle City Limits
Project ID: 5087
Completion Year:2024
MTP Status: CandidateEstimated Cost: $58,092,705
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Bus Priority Corridor 5
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:23rd Ave E / 24th Ave E
From:University District Link Light Rail Station
To:Rainier Beach Link Light Rail Station
Project ID: 5088
Completion Year:2020
MTP Status: CandidateEstimated Cost: $86,521,050
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Center City Connector
Description: Make capital improvements to connect South Lake Union and First Hill Streetcar lines. Provide infrastructure and expand streetcar fleet to ensure good speed and reliabilit5y and access to stations.Location / Facility:1st Ave N
From:South Lake Union
To:Pioneer Square / Chinatown/International District
Project ID: 5084
Completion Year:2020
MTP Status: CandidateEstimated Cost: $135,961,651
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Center City Priority Bus Corridor: Jackson
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Jackson St
From:1st Ave S
To:Martin Luther King Jr Way
Project ID: 5282
Completion Year:2025
MTP Status: CandidateEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 11
Description:Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Dexter / Nickerson
From:NW 65 St
To:King Street Station Multimodal Transportation Hub
Project ID: 5141
Completion Year:2020
MTP Status: CandidateEstimated Cost: $86,521,050
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 6
Description:Make capital improvements to support high capacity transit service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Madison St
From:Colman Dock Multimodal Transportation Hub
To:Martin Luther King Jr Way
Project ID: 5173
Completion Year:2020
MTP Status: CandidateEstimated Cost: $148,321,801
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle High Capacity Transit Corridor 8
Description:Make capital improvements to support rail service frequency, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:Fairview Ave E
From:Northgate Multimodal Transportation Hub
To:King Street Station Multimodal Transportation Hub
Project ID: 5152
Completion Year:2020
MTP Status: CandidateEstimated Cost: $152,029,846
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 1
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:4th Ave S
From:South Lake Union
To:White Center
Project ID: 5097
Completion Year:2020
MTP Status: CandidateEstimated Cost: $30,900,375
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 12
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NE
From:Seattle city limits
To:University District Link Light Rail Station
Project ID: 5079
Completion Year:2025
MTP Status: CandidateEstimated Cost: $6,038,251
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 14
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops.Location / Facility:15th Ave NE
From:32nd Ave NW
To:University District Link Light Rail Station
Project ID: 5075
Completion Year:2035
MTP Status: CandidateEstimated Cost: $12,360,150
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: SEattle Priority Bus Corridor 3
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops.Location / Facility:14th Ave
From:Othello Link Light Rail Station
To:University district Link Light Rail Station
Project ID: 5073
Completion Year:2035
MTP Status: CandidateEstimated Cost: $38,791,493
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 4
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed and reliability improvements. Improve accessibility of transit stops. Location / Facility:Cherry St
From:King Street Station Multimodal Transportation Hub
To:Mount Baker Transit Center
Project ID: 5165
Completion Year:2025
MTP Status: CandidateEstimated Cost: $1,854,023
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 7
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both directions. Make speed & reliability improvements. Improve accessibility of transit stops. Location / Facility:E John St
From:W Garfield St
To:23rd Ave
Project ID: 5218
Completion Year:2025
MTP Status: CandidateEstimated Cost: $12,360,150
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Seattle Priority Bus Corridor 9: Aurora Village to Downtown via SR 99
Description:Make capital improvements to support high frequency bus service, 18 hours a day, 7 days a week, in both diretions, including business, access and transit lanes, where necessary. Make speed and reliability improvements, including ITS improvements. Improve accessibility of transit stops. Corridor incorporates T2040 project 4092, 1743.Location / Facility:SR 99
From:Battery Street Tunnel
To:N 145th St.
Project ID: 4092
Completion Year:2040
MTP Status: CandidateEstimated Cost: $187,067,381
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Ship Canal Trail Extension
Description:Shared use bike pathLocation / Facility:Ship Canal Trail Extension
From:Nickerson
To:15th W
Project ID: 2902
Completion Year:2008
MTP Status: CompletedEstimated Cost: $10,974,930
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: SODO Rail Corridor Grade Separations
Description:Improve access to manufacturing and industrial center and Port facilities.Location / Facility:BNSF RR
From:S Royal Brougham Way
To:S Spokane St
Project ID: 5252
Completion Year:2030
MTP Status: CandidateEstimated Cost: $21,431,029
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: South Lander Street Grade Separation
Description:This project develops a grade separation of the Lander St. roadway and the Burlington Northern mainline railroad tracks between 1st Ave. S near the Starbucks Center and 4th Ave. S. to facilitate freight movementLocation / Facility:S Lander St
From:1st Ave S
To:4th Ave S
Project ID: 5254
Completion Year:2030
MTP Status: CandidateEstimated Cost: $213,114,737
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Spokane St.
Description:Shared use bike pathLocation / Facility:Spokane St.
From:6th Ave S
To:E Marginal Way
Project ID: 2905
Completion Year:2010
MTP Status: CompletedEstimated Cost: $705,565
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Spokane Street
Description:Widening, bridge strengthening and seismic improvements. Improve transit operations and access to the Port of Seattle by: a) removing and replacing traffic signal controllers; b) installing a full signal interconnect; c) providing loops for signal actuation; d) providing left turn lanes at 6th Ave S and at 4th Ave S; e) providing spot pavement resurfacing; f) providing transit a separate turn lane; g) installing a video system to monitor traffic in the corridor and on the viaduct; h) providing U-Turn facilities for trucks; i) improving signing to Port of Seattle facilities; j) improving x-walls; k) connecting signals to the central traffic computer, and; l) proving landscaping enhancements.Location / Facility:SPOKANE STREET VIADUCT
From:I-5
To:SR 99
Project ID: 958
Completion Year:2012
MTP Status: CompletedEstimated Cost: $177,824,767
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Spokane Street Viaduct 4th Avenue Off-Ramp
Description:Construct an off-ramp from the eastbound S. Spokane St Viaduct connecting to 4th Avenue South. The new ramp will help relieve congestion by providing a grade-separated route over three Burlington Northern-Santa Fe rail lines. The ramp will help relieve congestion by providing an alternate route over the rail lines and helping redistribute traffic across the arterial network, making more efficient use of local street capacity to help move regional traffic. The ramp will be part of a continuous HOV connection from West Seattle to the Seattle CBD and will also provide significant mitigation for the Alaskan Way Viaduct Project by providing an alternate access to I-5, I-90 and the Seattle CBD when SR 99 is closed for construction.Location / Facility:4th Ave Off-ramp
From:EB Spokane St. Viaduct
To:4th Ave S.
Project ID: 4263
Completion Year:2010
MTP Status: CompletedEstimated Cost: $58,348,752
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Westcrest Park Trail
Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Watercrest Park/4th Ave SW
From:SW Webster St
To:4th Ave SW
Project ID: 5274
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,476,462
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Westlake Multimodal Transportation Hub
Description:Make improvements to improve transfer opportunities between transit and other modes, create clear routes and improved wayfinding, provide real-time transit rider information and maximize fare integration. Location / Facility:2nd, 3rd, 4th Ave
From:Pine St
To:
Project ID: 5279
Completion Year:2035
MTP Status: CandidateEstimated Cost: $6,180,075
Type:New Facility-RoadCounty:King County
Sponsor: SEATTLETitle: Woodland Park Trail
Description:Pedestrian Pathway w/ Bicycles PermittedLocation / Facility:Woodland Park Ave N
From:N 50th St
To:W Green Lake Way N
Project ID: 5281
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,476,462
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: 145th Street Improvements
Description:Construct improvements that include the following: * Improvements to vehicular capacity, safety and traffic flow, transit speed and reliability and accessibility to I-5 and the future light rail station. * Upgrade existing substandard, non-ADA compliant sidewalks and construct new sidewalk for a continuous system along the corridor * Install continuous illumination and landscaping, bus stop improvements. * Upgrade existing stormwater management system to improve water quality and provide flow control. * Install bicycle facilities.Location / Facility:145th Street
From:3rd Avenue NW
To:Bothell Way NE (SR 522)
Project ID: 4434
Completion Year:2023
MTP Status: CandidateEstimated Cost: $236,794,153
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: 15th Ave NE Corridor Improvement
Description:A corridor study will be performed for this Principal Arterial to identify a preferred transportation solution for this roadway segment, which could include a lane reduction from four to three and installation of bicycle lanes. This project would construct sidewalks where needed to result in continuous sidewalks along the corridor.Location / Facility:15th Ave NE
From:NE 172nd St
To:NE 195th St
Project ID: 4435
Completion Year:2018
MTP Status: CandidateEstimated Cost: $1,889,617
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: Aurora Avenue North Multi-Modal Corridor Project (N 185th St to N 192nd St)
Description:The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 185th Street and N 192nd Street. Partners include: WSDOT, King Count Metro and TIB. Location / Facility:SR 99
From:N 185th St
To:N 192nd St
Project ID: 3569
Completion Year:2012
MTP Status: CompletedEstimated Cost: $19,057,936
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: Aurora Avenue North Multi-Modal Corridor Project (N 192nd St to N 205th St)
Description:The corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 192nd Street and N 205th Street. Partners include: WSDOT, King Count Metro and TIB.Location / Facility:SR 99
From:N 192nd St
To:N 205th St/ 244th St SW
Project ID: 4283
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $54,684,245
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: N 175th St
Description:Roadway capacity improvements (additional turn and through lanes, extension of turn pockets), sidewalks, bicycle lanes, transit transfer upgrade at Meridian Avenue N and intersection improvements at Meridican Avenue N.Location / Facility:N 175th St
From:Stone Avenue N
To:Interstate 5
Project ID: 1028
Completion Year:2018
MTP Status: CandidateEstimated Cost: $24,478,467
Type:New Facility-RoadCounty:King County
Sponsor: SHORELINETitle: SR 99--Shoreline--North Segment
Description:This corridor improvement will include access management, sidewalks, pedestrian crossings, landscaping and urban amenities, intersection improvements, congestion reduction, and Business Access and Transit (BAT) lanes. The improvements will occur on Aurora Avenue N (SR 99) between N 165th Street and N 185th Street.Location / Facility:SR 99 (Aurora Ave N)
From:N 165th St.
To:N 185th St.
Project ID: 4277
Completion Year:2011
MTP Status: CompletedEstimated Cost: $57,465,684
Type:New Facility-RoadCounty:King County
Sponsor: SNOHOMISHTitle: Riverfront Trail, Western Section
Description:Shared Use Bike Path along Snohomish RiverLocation / Facility:Riverfront alignment S. of First St.
From:Hwy 9 on the Snohomish River
To:Avenue D
Project ID: 3577
Completion Year:2020
MTP Status: CandidateEstimated Cost: $1,427,226
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISHTitle: Snohomish Centennial Trail
Description:The Centennial Trail Extension project will construct approximately 0.75 miles of 12’-wide asphalt nonmotorized trail completing the missing link between the City’s existing Centennial Trail terminus at Bowen Street and the existing Snohomish County Centennial Trail at Pine Avenue. The project includes approximately 4 acres of landscaping, five street crossings, street frontage and other improvements. The trail will be located within abandoned railroad right-of-way purchased by the City using FHWA STP(E), CMAQ and City funds.Location / Facility:Former BNSF RR route
From:Bowen Street (existing Centennial Trail)
To: intersection of Maple and Pine Avenues
Project ID: 2823
Completion Year:2011
MTP Status: CompletedEstimated Cost: $3,125,683
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: 112th Street SW/Beverly Edmonds Road
Description:Improve to 5 lanes urban standards with bicycle lanes Location / Facility:Beverly Park Rd
From:Airport Road
To:SR 525
Project ID: 1956
Completion Year:2009
MTP Status: CompletedEstimated Cost: $19,460,698
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Airport Way
Description:Widening to 2/3 lane urban standards with bicycle lanesLocation / Facility:Airport Way
From:SR 9
To:Snohomish C/L
Project ID: 584
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $13,427,159
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail
Description:Shared use bicycle pathLocation / Facility:Centennial Trail
From:Monroe southern city limits
To:High Rock Rd
Project ID: 2822
Completion Year:2025
MTP Status: CandidateEstimated Cost: $37,524,711
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail
Description:Shared use bicycle pathLocation / Facility:Centennial Trail
From:City of Snohomish city limits
To:Existing Centennial Trail at Monroe city limits
Project ID: 2842
Completion Year:2025
MTP Status: UnprogrammedEstimated Cost: $37,524,711
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Centennial Trail
Description:Shared use bicycle pathLocation / Facility:Centennial Trail
From:Snohomish/Skagit County Line
To:Arlington City limits
Project ID: 2850
Completion Year:2012
MTP Status: CompletedEstimated Cost: $24,535,388
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Eastside BNSF Trail (Segment C, Woodinville to Snohomish)
Description:Study and possibly implement acquisition, design, and construction of a paved and soft-surface regional trail. Rail freight to continue from Woodinville to BNSF main Stevens pass East-West line while trail is under consideration.Location / Facility:BNSF Corridor
From:Woodinville rail junction@rail spur coming from Redmond at Woodinville-Redmond Road/SR202
To:City of Snohomish
Project ID: 4161
Completion Year:2020
MTP Status: CandidateEstimated Cost: $5,353,624
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Granite Falls Alternative Route (Bypass)
Description:New 2-lane principal arterial Location / Facility:Granite Falls Alternative Route
From:State Route 92
To:Mountain Loop Highway
Project ID: 1950
Completion Year:2011
MTP Status: CompletedEstimated Cost: $16,679,407
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Interurban Trail--124th Street SW I-5 overcrossing
Description:Shared use bicycle path. See http://www1.co.snohomish.wa.us/Departments/Public_Works/Services/Roads/Projects/RC1022.htmLocation / Facility:Interurban Trail--124th St SW I-5 overcrossing
From:128th St SE
To:I-5
Project ID: 2805
Completion Year:2006
MTP Status: CompletedEstimated Cost: $206,242
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: North Creek Trail - Bothell to Mill Creek
Description:Regional Non-motorized trailLocation / Facility:North Creek Trail
From:North Creek Park
To:Filbert Road
Project ID: 4016
Completion Year:2025
MTP Status: CandidateEstimated Cost: $6,946,280
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: North Creek Trail Link
Description:New Class I bike/ped trail. Construct missing links in the North Creek Trail from Bothell to Everett.Location / Facility:North Creek Trail Link
From:North Creek Park
To:McCollum Pk
Project ID: 2263
Completion Year:2025
MTP Status: CandidateEstimated Cost: $5,427,422
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: Riverfront/Interurban Connector
Description:Shared use bike path Not in local plansLocation / Facility:Riverfront/Interurban Connector
From:Planned Riverfront Trail
To:Everett City Limits
Project ID: 2679
Completion Year:2025
MTP Status: CandidateEstimated Cost: $499,323
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOHOMISH COUNTYTitle: White Horse Trail
Description:Shared use bike path, currently gravel, future will be paved. Existing bridge structures will need to be decked and railed.Location / Facility:White Horse Trail
From:Intersection of White Horse Trail and the Centennial Trail north of Arlington
To:Darrington
Project ID: 2853
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $23,880,656
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SNOQUALMIETitle: Meadowbrook Farm Trail Extension
Description:Shared use bike path In local plansLocation / Facility:Meadowbrook Farm Trail Extension
From:Planned Meadowbrook Trail southern terminus
To:Snoqualmie City Boundary
Project ID: 2676
Completion Year:2012
MTP Status: UnprogrammedEstimated Cost: $911,807
Type:New Facility-RoadCounty:King County
Sponsor: SNOQUALMIETitle: SR 202/Tokul Road Roundabout
Description:Intersections of Tokul Rd/SR 202 and Mill Pond Rd/SR 202 will be reconstructed and combined into a single lane modern roundaboutLocation / Facility:SR 202
From:SR 202/Tokul Road
To:-
Project ID: 4409
Completion Year:2014
MTP Status: CandidateEstimated Cost: $5,302,511
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Auburn Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 500 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Auburn Sounder Station
From:23 A St (Auburn)
To:
Project ID: 4081
Completion Year:2023
MTP Status: CandidateEstimated Cost: $41,265,569
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Bellevue Way HOV Lanes and Transit Priority
Description:Construct an inside southbound HOV lane and transit signal priority improvements between I-90 and the South Bellevue Park and Ride. The project will be designed and constructed in coordination with Sound Transit and will be designed to accommodate the potential extension of the HOV lane between the park and ride and the “Y” intersection between Bellevue Way and 112th Avenue SE.Location / Facility:Bellevue Way
From:South Bellevue P&R
To:I-90
Project ID: 3477
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $5,327,868
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: BNSF - Eastside
Description:Utilize the Eastside BNSF rail corridor from Snohomish - Woodinville to Renton/ Tukwila for Commuter RailLocation / Facility:Eastside BNSF alignment
From:Snohomish
To:Tukwila
Project ID: 5296
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $1,650,493,801
Type:New Facility-RoadCounty:Multicounty
Sponsor: SOUND TRANSITTitle: East Link light rail extension
Description:Light rail. Extension from International District/Chinatown Station to Overlake Transit Center. Stations at Rainier Ave S/I-90 (Rainier), 77th Ave SE/I-90 (Mercer Island), Bellevue Way SE/112th Ave SE (South Bellevue), Main St/112th Ave SE (East Main), NE 4th St/110th Ave NE (Bellevue Transit Center), NE 8th St/116th Ave NE (Hospital), NE 15th St/120th Ave NE (120th), NE 16th St/130th Ave NE (130th), and 152nd Ave NE/SR520 (Overlake Village). Construct up to 2000 parking spaces at three stations.Location / Facility:HCT Extension
From:Downtown Bellevue
To:Overlake Transit Center
Project ID: 2523
Completion Year:2021
MTP Status: ApprovedEstimated Cost: $3,284,228,474
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Edmonds Station
Description:Commuter Rail Station including two platforms, shelters for weather protection, off-street bus area, short-term parking, and about 150 parking spacesLocation / Facility:Sounder Commuter Rail
From:Edmonds Way / James Street @ BNSF RR
To:
Project ID: 4050
Completion Year:2011
MTP Status: CompletedEstimated Cost: $18,428,641
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SOUND TRANSITTitle: Extension of Tacoma Link to Tacoma Community College with Tacoma Link Technology
Description:Construct a 5.5-mile at-grade extension of the existing Tacoma Link system from the 9th Street/Theater District Station in Downtown Tacoma to Tacoma Community College. Stations under consideration: stations at Stadium High School, Tacoma General Hospital (see project 5459), 6th/Sprague, the University of Puget Sound (on 6th), 6th/Stevens, 6th/Pearl, Tacoma Community College (S. 19th and Mildred in University Place). NOTE: This alignment is also subject to change, extension to Pacific Lutheran University (121st ST. S and Park Ave S in Parkland) is being considered. Undetermined which aligment will be chosen at this time but funded by ST2.Location / Facility:25th/Pacific/6th
From:Mary Bridge Children's Hospital
To:Tacoma Community College
Project ID: 4075
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $925,814,088
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: HCT Extension from South Bellevue to Issaquah
Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-90 Corridor
From:S Bellevue
To:Issaquah
Project ID: 2529
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $1,650,622,756
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: HCT Northgate to Bothell
Description:HCT (mode TBD) from Northgate to Bothell via Roosevelt, NE 125th St., SR 522Location / Facility:Roosevelt, NE 125th St., SR 522
From:Northgate
To:Bothell
Project ID: 5359
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,063,278,445
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: HCT Redmond to UW
Description:New HCT alignment (mode and exact alignment TBD) starting from Redmond TC and generally following the Link LRT Extension from Overlake to Redmond (MTP 2524) but then following SR 520 to vicinity of the UW LRT station.Location / Facility:LRT new alignment (SR 520 corridor, N 45th St)
From:Redmond
To:UW
Project ID: 5294
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,063,278,445
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: I-405 HCT Corridor from I-5 Interchange (Lynnwood) to Burien
Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027. HAS ABSORBED 2528, 2531, AND 2532. Intersects the Central Link line between the Airport and downtown Seattle but does not serve the airport directly.Location / Facility:I-405 / SR 518 Corridor
From:I-5 / I-405 Interchange (Alderwood)
To:Burien Transit Center
Project ID: 2527
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $7,221,474,558
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: I-90 Two-Way Transit & HOV Operations (Stage 2)
Description:Stage 2: This stage will design and construct (a) an eastbound HOV lane in the outer roadway between 80th Ave SE (Mercer Island) and Bellevue Way. Components of the project include: New HOV lane in the eastbound outer roadway; (b) 80th Ave SE HOV ramp modification to connect to the eastbound HOV lane; (c) Modification of Bellevue Way and I-405 HOV direct access from the eastbound HOV lane; (d) Eastbound I-90 to I-405 auxiliary lane extension west to East Mercer Way' and Variable speed limit system eastbound from 80th Ave SE to Bellevue Way. Location / Facility:I-90, I-405, Bellevue Way, Rainier Ave/I-5 in Seattle
From:80th Avenue SE (Mercer Island)
To: Bellevue Way / I-405
Project ID: 4276
Completion Year:2012
MTP Status: CompletedEstimated Cost: $48,204,585
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: I-90 Two-Way Transit & HOV Operations (Stage 3)
Description:Stage 3: This stage will design and construct eastbound and westbound HOV lanes in the outer roadway between I-5 in Seattle and 80th Avenue SE in Mercer Island. Components of the project include: Mount Baker Ridge and First Hill Lid tunnel system improvementsLocation / Facility:I-90, 80th Avenue SE (Mercer Island)
From:Rainier Ave/I-5 in Seattle
To:80th Avenue SE (Mercer Island)
Project ID: 3658
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $67,600,000
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Kent Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 450 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Kent Station P&R
From:SR 167
To:
Project ID: 2644
Completion Year:2023
MTP Status: CandidateEstimated Cost: $38,686,471
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Kirkland Transit Center(3rd Street Downtown)
Description:Provide a new transit center on 3rd Street between Central Way and Kirkland Avenue. The project will transform the existing bus facility into a regional transit hub with expanded bus capacity and routing options, improved waiting areas and passenger shelters, and enhanced pedestrian crossings. Signal, intersection, and traffic circulation improvements will increase bus speed and schedule reliability. Bicycle amenities, landscaping and public art are also elements of the project.Location / Facility:Transit Center
From:3rd Street between Central Way and Kirkland Avenue
To:
Project ID: 4160
Completion Year:2010
MTP Status: CompletedEstimated Cost: $18,477,105
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Lakewood Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Lakewood Station
From:Pacific Hwy SW near 47th Ave SW @ BNSF RR
To:
Project ID: 4086
Completion Year:2023
MTP Status: CandidateEstimated Cost: $47,713,314
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Federal Way Transit Center to South Federal Way
Description:Alignment and stations. From Federal Way TC (see #2525 for Fed Way TC info) to S 348th (vicinity: W side of I-5 and S. 348th).Location / Facility:I-5 Corridor
From:Federal Way Transit Center
To:South Federal Way
Project ID: 4088
Completion Year:2040
MTP Status: CandidateEstimated Cost: $486,517,450
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Highline Community College to Redondo/Star Lake Station
Description:Alignment and Stations: From S 272nd St to Kent-DesMoines Rd (Near Highline CC). Location / Facility:SR 99 Corridor
From:Highline Community College
To:Redondo/Star Lake
Project ID: 5391
Completion Year:2023
MTP Status: CandidateEstimated Cost: $572,559,769
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Lynnwood to Everett
Description:Light Rail extension. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-5 Corridor Link LRT
From:Everett
To:Lynnwood Transit Center (202nd St SW & 46th Ave W)
Project ID: 2519
Completion Year:2040
MTP Status: CandidateEstimated Cost: $2,888,589,823
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Overlake Transit Center to Redmond
Description:Alignment and Stations. East Link project from the Overlake Transit Center to downtown Redmond. This segment would have three stations at SR-202 @ SR-520 (SE Redmond), BNSF ROW @ ~ 165th Ave. NE (Redmond Town Center), 161st Ave. NE @ NE 83rd St. (Redmond TC)Location / Facility:Link LRT Extension
From:Overlake Transit Center
To:Redmond
Project ID: 2524
Completion Year:2030
MTP Status: CandidateEstimated Cost: $1,037,774,229
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Port of Tacoma to Tacoma Dome
Description:HCT Corridor. COST ESTIMATE ASSUMES GRADE-SEPARATED AERIAL ALIGNMENT. PER-MILE AERIAL COST ESTIMATE USED. PROJECT COMPLETION POST-2027.Location / Facility:I-5 Corridor
From:Port of Tacoma
To:Tacoma Dome
Project ID: 2526
Completion Year:2040
MTP Status: CandidateEstimated Cost: $1,111,404,796
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from Redondo/Star Lake Station to Federal Way Transit Center
Description:Alignment and Stations: Federal Way Transit Center (at S. 316/317th - track extends E from SR99 btwn 312th and 316th to meet the transit station) to S 272nd (272nd Street Station - S of 272nd to serve existing Redondo Heights P&R but opposite side of SR99 from P&R to be connected by ped bridge).Location / Facility:SR 99 Corridor
From:Redondo/Star Lake
To:Federal Way Transit Center
Project ID: 5392
Completion Year:2040
MTP Status: CandidateEstimated Cost: $541,610,592
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from SeaTac Airport to Highline Community College
Description:Alignment and Stations : Kent-DesMoines Rd (Near Highline CC) to S 200th St (Station). From 200th to SeaTac/ Airport StationLocation / Facility:SR 99 Corridor
From:SeaTac Airport Station
To:Highline Community College
Project ID: 2525
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $959,424,477
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Link LRT Extension from South Federal Way to Port of Tacoma
Description:Alignment and stations. From S 348th St. to Port of Tacoma (station in vicinity between I-5 and 58th Ave).Location / Facility:I-5 Corridor
From:South Federal Way
To:Port of Tacoma
Project ID: 4089
Completion Year:2040
MTP Status: CandidateEstimated Cost: $819,383,186
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: LRT Ballard, Seattle, W Seattle
Description:Light Rail from Ballard to Seattle CBD then to West Seattle (exact alignment TBD but potentially along previously studied monorail alignment)Location / Facility:LRT new alignment (TBD)
From:Ballard
To:West Seattle
Project ID: 5295
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,269,606,290
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: LRT UW to Ballard
Description:New LRT alignment (exact alignment TBD) generally following Pacific St. from the UW LRT station to the U District, then along N 45th St. to Ballard (at 15th) Location / Facility:New LRT alignment
From:UW
To:Ballard
Project ID: 5345
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $618,983,534
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Lynnwood Link light rail extension
Description:Light rail. Extension from Northgate to Lynnwood. Potential stations at NE 130th St, NE 145th ST or NE 155th ST along I-5 (Jackson Park/North Seattle), NE 185th St/I-5 (Shoreline), 236th St SW or 220th St SW along I-5 (Montlake Terrace), and at or adjacent to Lynnwood Transit Center (Lynnwood). Construct up to 1500 parking spaces at four stations.Location / Facility:Link LRT Extension
From:Lynnwood Transit Center (202nd St SW & 46th Ave W)
To:Northgate
Project ID: 2520
Completion Year:2023
MTP Status: CandidateEstimated Cost: $1,894,353,222
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: New Permanent Sounder Station at Edmonds Crossing
Description:This project would relocate the interim station at Edmonds to the permanent location and expand parking by up to 300 structured stalls for Sound Transit riders, in conjunction with Washington State Ferries' Edmonds Crossing multimodal terminal project.Location / Facility:Edmonds Crossing
From:11400 Block Admiral Way @ BNSF RR
To:
Project ID: 4072
Completion Year:2023
MTP Status: CandidateEstimated Cost: $33,758,921
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SOUND TRANSITTitle: New Sounder Station at Broad Street
Description:Construct new station at the north end of the downtown Seattle core in the vicinity of Broad StreetLocation / Facility:Broad Street
From:Vicinity Broad Street@BNSF tracks
To:
Project ID: 4073
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $47,873,762
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: New Station in North Sumner
Description:Construct a new Sounder station including station facilities, bus boarding area, and a surface parking lot with up to 400 stalls upon completion.Location / Facility:North Sumner Sounder Station
From:SW of East Valley Hwy / 8th St E @ BNSF RR (Sumner)
To:
Project ID: 4082
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $80,243,426
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: North Link light rail extension
Description:Light rail. Extension from University of Washington to Northgate. Stations at Brooklyn/NE 45th (U-District), 12th Ave NE/NE 65th St (Roosevelt), and Northgate Transit Center @ 1st Ave NE/NE 103rd St (Northgate). Construct up to 450 parking spaces at one station.Location / Facility:Link LRT Extension
From:Northgate
To:University of Washington Station
Project ID: 2492
Completion Year:2021
MTP Status: ApprovedEstimated Cost: $2,486,338,604
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Pacific Avenue at S.26th/South Tacoma Way Rail grade separation crossing
Description:Build a rail grade separation crossing on Pacific Avenue in Tacoma to eliminate construction of two new at-grade crossings at Pacific Avenue and South Tacoma Way and would substantially improve safety and capacity for future operating expansion of passenger train service along the rail corridor. Cost reflected in 4047.Location / Facility:Pacific Avenue@S 26th Street (downtown Tacoma)
From:S 26th St
To:S 26th St (over Pacific Ave)
Project ID: 4110
Completion Year:2010
MTP Status: CompletedEstimated Cost: $0
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Parking Garage at Mukilteo Sounder Station
Description:Joint Development of a garage at the Mukilteo Sounder station. ST to provide funding to construct up to 130 additional structured parking stalls for Sounder riders in a joint-use parking garage developed as part of Washington State Ferries' Mukilteo Landing multimodal terminal project. See 808 for main terminal project.Location / Facility:Mukilteo Sounder Station
From:First St E of SR 525 (Mukilteo)
To:
Project ID: 4071
Completion Year:2023
MTP Status: CandidateEstimated Cost: $19,366,229
Type:New Facility-RoadCounty:Snohomish County
Sponsor: SOUND TRANSITTitle: Permanent Station at Tukwila
Description:Build permanent station facilities, bus loading area, and new parking facilities (400 new stalls) for a total of 620 stalls at the station upon completion. See also 3557 for Tukwila street access project.Location / Facility:Tukwila Sounder Station
From:Longacres Way @ BNSF RR (Tukwila)
To:
Project ID: 4080
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $43,844,667
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Puyallup Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities,parking management and capacity expansion (up to 600 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Puyallup Sounder Station
From:131 W Main St (Puyallup)
To:
Project ID: 4084
Completion Year:2023
MTP Status: CandidateEstimated Cost: $73,504,295
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Renton HOV Access/N 8th
Description:Construct a direct-access HOV interchange on I-405 at North 8th Street in north Renton. PROJECT IMPLEMENTATION IS DEPENDENT ON WSDOT OBTAINING FUNDING FOR THE I-405 WIDENING PROJECT.Location / Facility:I-405 @ N 8th St
From:I-405@N 8th St.
To:
Project ID: 2372
Completion Year:2011
MTP Status: ApprovedEstimated Cost: $89,773,928
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: S. 200th Park and Ride
Description:630 new stallsLocation / Facility:S. 200th Park and Ride
From:I-5 South
To:
Project ID: 2640
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Sounder Commuter Rail Auburn-Tacoma Track & Signal
Description:Track and signal improvements.Location / Facility:Sounder Commuter Rail
From:Auburn
To:Tacoma
Project ID: 2502
Completion Year:2008
MTP Status: CompletedEstimated Cost: $255,330,708
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: Sounder Lakewood to Dupont Extension
Description:Extension of service to DuPont, upgrade of track & signals between Lakewood and DuPont, and a new station at DuPont HAS ABSORBED 3314Location / Facility:Sounder Commuter Rail
From:Lakewood
To:Dupont
Project ID: 2533
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $161,542,687
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Sounder South service expansion
Description:Expansion of Seattle-Tacoma-Lakewood Sounder service beyond the level provided in Sound Move, and related track and signal improvements along the Seattle/Tacoma Sounder line to support the service expansion. Up to 26 trains (13 round trips) in the south will be provided through agreements with the BNSF. Location / Facility:Sounder Commuter Rail
From:Seattle
To:Lakewood
Project ID: 4087
Completion Year:2023
MTP Status: CandidateEstimated Cost: $229,652,441
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Sounder station in Ballard
Description:Sounder commuter rail. Construct new station (boarding platforms and related access improvements ) along north Sounder line at approximately NW 70th St in Ballard (Seattle).Location / Facility:Sounder Commuter Rail
From:NW 70th Block @ BNSF RR
To:
Project ID: 3311
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $43,199,892
Type:New Facility-RoadCounty:King County
Sponsor: SOUND TRANSITTitle: South Tacoma Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:South Tacoma Station
From:S 56th St & Washington St (Tacoma)
To:
Project ID: 4085
Completion Year:2023
MTP Status: CandidateEstimated Cost: $49,002,863
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Sumner Station improvements
Description:Station/transit center access improvements. Make new improvements or modifications at or adjacent to the station/transit center that improve access for transit users. Potential improvements include pedestrian and bicycle support facilities, parking management and capacity expansion (up to 400 spaces), facilities and systems that enhance operation and access to the station/transit center by bus and other public transport systems, and information and wayfinding systems.Location / Facility:Sumner Sounder Station
From:810 Maple St (Sumner)
To:
Project ID: 4083
Completion Year:2023
MTP Status: CandidateEstimated Cost: $51,581,961
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Surface Parking Expansion at Tacoma Dome Station
Description:Construct a new surface parking lot with up to 300 stalls, for a total of 2,700 stalls upon completion.Location / Facility:Tacoma Dome Station
From:605 Puyallup Ave (Tacoma)
To:
Project ID: 4079
Completion Year:2023
MTP Status: CandidateEstimated Cost: $16,764,137
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Tacoma Link light rail expansion
Description:Light rail. Expansion of existing Tacoma Link system. Places served include: Tacoma General and St. Joseph's medical campuses; mixed-use centers at Stadium High School.Location / Facility:new
From:UWT Station
To:Via Mary Bridge Hospital to MLK Jr. Way and 19th
Project ID: 5459
Completion Year:2023
MTP Status: CandidateEstimated Cost: $177,595,615
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: Tacoma-Lakewood Track & Signal
Description:Track and signal improvements needed to implement the Tacoma-to-Lakewood Commuter Rail project. May include a rail grade-separated overcrossing at Pacific Avenue and S 26th Street in downtown Tacoma listed in project 4110.Location / Facility:Sounder Commuter Rail
From:Tacoma
To:Lakewood
Project ID: 4047
Completion Year:2012
MTP Status: CompletedEstimated Cost: $232,118,825
Type:New Facility-RoadCounty:Pierce County
Sponsor: SOUND TRANSITTitle: University Link light rail extension
Description:Light rail. Extension from downtown Seattle transit tunnel to University of Washington. Stations at Broadway Ave/E John St (Capitol Hill) and Montlake Blvd/NE Pacific St (UW).Location / Facility:Link Light Rail
From:Westlake Station
To:University of Washington Station (stadium)
Project ID: 2493
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $2,249,544,451
Type:New Facility-RoadCounty:King County
Sponsor: SOUTH PRAIRIETitle: Foothills Trail
Description:Shared use bike pathLocation / Facility:Foothills Trail
From:eastern city limits
To:western city limits
Project ID: 2814
Completion Year:2010
MTP Status: CandidateEstimated Cost: $868,387
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Stewart Road (8th Street) Bridge
Description:Replace existing bridge over the White River with a four lane bridge The Stewart Road corridor provides service to West Valley Highway, East Valley Highway and SR-167 from Auburn, Pacific, Bonney Lake, Pierce County and Sumner. Stewart Road sees significant truck traffic from the industrial and manufacturing centers located in north Sumner and south Pacific. The existing bridge structure consists of two 12-foot lanes, with no shoulders, and has been classified as “functionally obsolete”. This project will replace the existing two lane bridge over the White River at Stewart Road. The bridge replacement will accommodate four lanes of traffic, two 12-foot center lanes, two 15-foot outer lanes to accommodate both motorized and bicycle traffic, a 6.5-foot sidewalk on the south side, and a 10.5-foot sidewalk on the north side of the roadway. The overall bridge width, with guardrail, will be approximately 74-feet. The overall bridge length will be approximately 260-feet. Location / Facility:Stewart Road (8th Street) in Sumner WA
From:East bank of the White River
To:West bank of the White River
Project ID: 4460
Completion Year:2018
MTP Status: CandidateEstimated Cost: $12,438,132
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Stuck River Bridge
Description:Widen existing bridge to improve access to Sumner and SR-410 weaveLocation / Facility:Stuck River Bridge
From:Vicinity of Stuck River
To:
Project ID: 499
Completion Year:2016
MTP Status: UnprogrammedEstimated Cost: $15,533,696
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Sumner Trail
Description:Construct multiuse trail on the east side of the Stuck River from the Tacoma Avenue Bridge to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.Location / Facility:Sumner Pacific Trail Extension
From:Tacoma Avenue Bridge
To:24th Street
Project ID: 2684
Completion Year:2014
MTP Status: CandidateEstimated Cost: $6,202,768
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Sumner Trail
Description:Construct multiuse trail on the east side of the Stuck River from the Stuck River Bridge on Stewart Road to 16th Street E in the City of Sumner. This project will include constructed a trail along the western edge of the golf course and constructing a pedestrian bridge over the Stuck River.Houston Road to 24th Street E. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to existing, developer-built trails on the west bank of the Stuck River to the south.Location / Facility:Sumner Pacific Trail
From:The Stuck River Bridge on Stewart Road
To:16th Street E
Project ID: 2913
Completion Year:2012
MTP Status: CompletedEstimated Cost: $5,427,422
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Sumner Trail
Description:Construct multiuse trail on the east side of the Stuck River from the SR 410 overpass on State Street to the Tacoma Avenue Bridge. This trail will provide access to the proposed Interurban and Foothill Trail extensions to the north and to the Foothills and Puyallup Trails to the south.Location / Facility:Sumner Pacific Trail
From:SR 410 Overpass on State Street
To:Tacoma Avenue Bridge Terminus
Project ID: 2914
Completion Year:2014
MTP Status: CandidateEstimated Cost: $4,652,076
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: Traffic Ave/Puyallup Riv Bridge Replacement
Description:Widen Traffic Ave in Sumner and replace bridge across Puyallup River.Location / Facility:Traffic Ave/Puyallup Riv Bridge Replacement
From:Main (Sumner)
To:Puyallup
Project ID: 500
Completion Year:1998
MTP Status: CandidateEstimated Cost: $7,753,460
Type:New Facility-RoadCounty:Pierce County
Sponsor: SUMNERTitle: West bound ramps Highway 410 and 166th Avenue E.
Description:Reconstruct West bound on and off ramps to tie into 64th Street East.Location / Facility:SR 410
From:SR 410 mile post 2.3
To:SR 410 mile post 2.8
Project ID: 4466
Completion Year:2018
MTP Status: CandidateEstimated Cost: $2,221,095
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Brewery District Roadway Improvement
Description:This project will implement the “Complete Streets” concept in the area of south downtown known as the brewery district. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).Location / Facility:Tacoma Brewery District
From:Pacific Avenue to Jefferson Street and from S. 19th Street to S. 25th Street
To:S. 19th St. and S. 21st St. also extend to Tacoma Avenue South
Project ID: 4432
Completion Year:2019
MTP Status: CandidateEstimated Cost: $22,210,951
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Historic Water Ditch Trail
Description:Phase II--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. The trail length is approximately 1.8 miles. Trail amenities include bike racks, signage, trash receptacles, benches, and lighting. An existing small parking lot at South 76th Street and Cedar Street will be bought up to standards and will include trailhead elements. Location / Facility:Tacoma's flume line right-of-way along Clement Ave
From:Washington Street/S. 43rd to S. 47th Street, South 56th to South 60th Street, and South 72nd to South Tacoma Way, Trail to Sounder Rail Station in South Tacoma along S. 58th Street
To:S. 80th at South Tacoma Way
Project ID: 2847
Completion Year:2013
MTP Status: CompletedEstimated Cost: $2,140,063
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Historic Water Ditch Trail
Description:Phase I--construct a Class 1 trail aligned on Tacoma's flume line right-of-way along Clement Ave. Total trail length all phases is approximately 6.5 milesLocation / Facility:0
From:South 47th Street to South 56th Street, South 60th Street to South 72nd Street
To:-
Project ID: 4291
Completion Year:2009
MTP Status: CompletedEstimated Cost: $1,875,933
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Historic Water Ditch Trail Phase III
Description: Phase III --construct an active transportation shared use path adjacent to South Tacoma Way between S. Pine Street and S. M Street. Location / Facility:South Tacoma Way
From:S.Pine St.
To:S. M St.
Project ID: 4292
Completion Year:2018
MTP Status: CandidateEstimated Cost: $3,800,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Historic Water Ditch Trail Phase IV
Description: Phase IV -- construct an active transportation shared use path adjacent to South Tacoma Way from South M Street to South C Street. Location / Facility:South Tacoma Way
From:South M Street
To:South C Street
Project ID: 4293
Completion Year:2015
MTP Status: CandidateEstimated Cost: $2,489,828
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Hylebos Bridge, on E. 11th Street corridor between Taylor Way and Marine View Drive
Description:Bridge ConstructionLocation / Facility:Hylebos Bridge
From:Taylor Way
To:Marine View Drive
Project ID: 4104
Completion Year:2011
MTP Status: CompletedEstimated Cost: $21,079,896
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Lincoln Ave Grade Separation
Description:Grade Separation. This project will construct a three-lane overpass on Lincoln Avenue from Thorne Road to Marc Avenue for a total length of 3,000 feet. The completion of the Lincoln Avenue Overpass will allow for the unimpeded movement of vehicles and trains that move freight and goods in the Port of Tacoma. The overpass will allow rail-switching activity to take place without compromising over the road freight movements between Port Terminals and other businesses in the Puget Sound Region and beyond. The bridge will be a 3-lane structure at the time of implementation in 2009, but will be built to support five lanes; the additional lanes are expected to be added based on capacity needs by 2015. The total cost for all phases of this project (2006 estimate) is $42.5 M.Location / Facility:Lincoln Ave
From:Thorne Ave
To:Marc Ave
Project ID: 3550
Completion Year:2011
MTP Status: CompletedEstimated Cost: $56,882,259
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: MLK Mixed Use Center Complete Streets Improvement Project
Description:This project will implement the “Complete Streets” concept in the area anchored by our two major healthcare facilities. Improvements will include bike lanes, sidewalks, street bulb outs, transit improvements, signalization improvements, channelization, stormwater improvements, utilities and more to transform several arterial streets into a multimodal network that improves efficiency for all modes of transportation. The project will improve connections to the LINK Light Rail transit center and to the Tacoma Dome Station, (Regional Transit Center).Location / Facility:MLK Jr. Way
From:MLK Jr. Way to J St. and from Division St. to S. 25th St.
To:-
Project ID: 4431
Completion Year:2019
MTP Status: CandidateEstimated Cost: $35,537,521
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Pacific Ave. Safety and Mobility Improvements
Description:Increase SOUNDER passenger rail capacity without degrading existing/future arterial capacity by grade separating the two travel modes.Location / Facility:Pacific Ave
From:S. 17th Street
To:S. 25th Street
Project ID: 4121
Completion Year:2013
MTP Status: CompletedEstimated Cost: $5,548,119
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Pipeline Trail
Description:Multimodal trail on Pipeline ROW from E. 40th to south City limits at S. 72nd St. Location / Facility:Existing Roadways and existing Tacoma Water Pipeline Trail
From:Tacoma Dome Sounder Station
To:South City Limits
Project ID: 2827
Completion Year:2016
MTP Status: CandidateEstimated Cost: $4,143,898
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Prairie Line Trail
Description:Active transportation path in the heart of downtown Tacoma along the historic Prairie Line trail corridor from 400' south of S. 25th, through University of Washington Tacoma campus and down to the Foss Waterway. Location / Facility:Prairie Line Rail ROW
From:South Tacoma Way
To:Thea Foss Waterway
Project ID: 2688
Completion Year:2016
MTP Status: CandidateEstimated Cost: $5,919,854
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Puyallup Bridge F16A & F16B Replacement
Description:Bridge Construction, from 3 to 4 lanes.Location / Facility:Puyallup Ave/Ells Street
From:Portland Ave
To:Milwaukee Way
Project ID: 3648
Completion Year:2015
MTP Status: CandidateEstimated Cost: $47,358,831
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Puyallup River Bridge Rehabilitation (F16C, F16D, F16E).
Description:Bridge Construction. Widen from 1 to 2 lanes WBLocation / Facility:Puyallup Ave/Ells Street
From:Portland Ave
To:Milwaukee Way
Project ID: 4105
Completion Year:2021
MTP Status: UnprogrammedEstimated Cost: $71,038,246
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Schuster Parkway Promenade
Description: Multimodal Trail along Schuster Parkway linking downtown Tacoma with Ruston Way and north end neighborhoods.Location / Facility:Thea Foss Esplanade to Ruston Way
From:McCarver
To:S 4th Street
Project ID: 5514
Completion Year:2020
MTP Status: CandidateEstimated Cost: $10,079,921
Type:New Facility-RoadCounty:Pierce County
Sponsor: TACOMATitle: Train To The Mountain Trail
Description:Shared use path from Tacoma to Mt. RainierLocation / Facility:Tacoma Rail ROW
From:Downtown Tacoma
To:Elbe
Project ID: 5507
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $96,716,177
Type:New Facility-RoadCounty:Pierce County
Sponsor: TUKWILATitle: BNSF Intermodal Railyard Access
Description:Design and construct a new access to BNSF intermodal railyardLocation / Facility:BNSF Intermodal Railyard Access
From:[Not submitted]
To:
Project ID: 1294
Completion Year:2020
MTP Status: CandidateEstimated Cost: $5,295,613
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: E Marginal Way
Description:Design and construct widening to 3 lanes including curbs, gutters, sidewalks, drainage, and pavingLocation / Facility:E Marginal Way
From:Boeing Access Road
To:S 112th St
Project ID: 1299
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $3,031,603
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: Interurban Trail/Green River Trail
Description:Construct a bicycle and pedestrian trail between and Strander and Southcenter Blvds completing the Green River / Interurban trail between Alki and Flaming Geyser trail. Segment is expected to interface with future multimodal center.Location / Facility:Interurban Trail
From:Southcenter Blvd
To:Strander Blvd
Project ID: 3429
Completion Year:2010
MTP Status: CompletedEstimated Cost: $1,053,045
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: SR 99/ Pacific Highway South (Tukwila)
Description:Reconstruct existing roadway which is two (2) through lanes in each direction, a center two-way left turn lane, left and right turn lanes at intersections, and bus pullouts. Other improvements will include curb and gutter, sidewalks, landscaping, drainage, curb ramps, signing, illumination, burying of overhead utilities, traffic signal modifications, and interconnect.Location / Facility:0
From:S 152nd St
To:S 138th St
Project ID: 3431
Completion Year:2012
MTP Status: CompletedEstimated Cost: $11,513,188
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: Tukwila International Blvd
Description:Design and construct widening including paving, curbs, gutters, sidewalks, drainageLocation / Facility:Tukwila International Blvd
From:Boeing Access Road
To:S 116th Way
Project ID: 1300
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $4,652,076
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: Tukwila Station Access with 156th St to 16th Ave S Link
Description:The project will construct approximately 1500 feet of new roadway, curb, gutter and sidewalks, and rail bridges to pass under the BNSF and UP tracks; connecting S 156th St in Tukwila to 16th Ave in Renton. Projects 4051 and 4080 describe the accompanying rail station (for Sound Transit and Amtrak) and Park & Ride facilities. Express bus and light rail may also serve the site.Location / Facility:I-405
From:156th St
To:16th Ave S
Project ID: 3557
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $39,077,437
Type:New Facility-RoadCounty:King County
Sponsor: TUKWILATitle: Tukwila Urban Center Transit Center
Description:Construct Transit Center in the CBDLocation / Facility:Tukwila CBD Bus Transit Center
From:Strander Blvd
To:Tukwila Parkway
Project ID: 1303
Completion Year:2015
MTP Status: CompletedEstimated Cost: $15,506,919
Type:New Facility-RoadCounty:King County
Sponsor: TULALIP TRIBESTitle: I-5 @ 116th Street NE Interchange
Description:This project replaces and upgrades a bottlenecked two signal diamond interchange overcrossing with a higher capacity Single Point Urban Interchange with one signal. Key project elements include adding an additional thru lane in each direction on 116th ST NE, widening of all interchange ramps and turn lanes, HOV bypass lanes on the on ramps, ramp metering, ITS equipment, replacement of the existing 3-lane overpass (116th ST NE) with an 8-lane bridge, bike lanes and sidewalks across I 5, and local road improvements.Location / Facility:I-5 (at 116th ST NE Interchange)
From:I-5 @ 116th Street NE I/C
To:#N/A
Project ID: 5429
Completion Year:2015
MTP Status: CandidateEstimated Cost: $39,140,941
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WOODINVILLETitle: BNRP: Trestle Replacement and Sammamish Bridge Replacement
Description:Trestle Replacement: Widen existing roadway, including bridge sections, trestle removal, re-channelization, additional lanes, non-motorized improvements, signal and operational studies as needed to improve travel time and LOS. SBRP: Widen two-lane road and bridge section to provide additional lanes, curb-gutter, sidewalks and bike lanes for travel and queue storage.Location / Facility:SR 202
From:NE 175th
To:SR 522
Project ID: 2377
Completion Year:2011
MTP Status: CandidateEstimated Cost: $16,315,398
Type:New Facility-RoadCounty:King County
Sponsor: WOODINVILLETitle: SR 202 Corridor Widening Improvement
Description:Widening, bike and ped facilities, ped bridge, landscaping, widened to 3 lanesLocation / Facility:SR 202
From:NE 145th
To:SR 202 (NE 175th)
Project ID: 2383
Completion Year:2010
MTP Status: UnprogrammedEstimated Cost: $8,030,437
Type:New Facility-RoadCounty:King County
Sponsor: WOODINVILLETitle: SR 202 Intersection Corridor Improvement (CCRP)
Description:Rechannelization and reconfiguration of SR 202, including new turn pockets, widening, new traffic signal, and on-ramps, New connection between SR 202 and 175th. New ramp.Location / Facility:SR 202
From:NE 175th
To:NE 182nd
Project ID: 4019
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $49,521,026
Type:New Facility-RoadCounty:King County
Sponsor: WOODINVILLETitle: Woodinville Valley Trail
Description:Shared use bike path (exact location needs to be verified)Location / Facility:Woodinville Valley Trail
From:Tolt Pipeline Trail in vicinity of 145th
To:Tolt Pipeline Trail
Project ID: 2815
Completion Year:2010
MTP Status: CandidateEstimated Cost: $249,661
Type:New Facility-RoadCounty:King County
Sponsor: WOODINVILLETitle: Woodinville-Sno Rd Widening
Description:Widen existing two lanes to provide additional lanes, turn lanes, curb/gutter and bike lanes, street lighting and signal improvements, 2 lanes to 3 lanesLocation / Facility:Woodinville-Snohomish
From:NE 195th St
To:NE 205th St
Project ID: 4017
Completion Year:2015
MTP Status: UnprogrammedEstimated Cost: $4,282,900
Type:New Facility-RoadCounty:King County
Sponsor: WOODINVILLETitle: Woodinville-Sno Rd Widening
Description:Widen existing two lanes to provide an additional continuous left turn lane; also bike lanesLocation / Facility:Woodinville-Snohomish
From:NE 185th St
To:NE 195th St
Project ID: 4018
Completion Year:2012
MTP Status: UnprogrammedEstimated Cost: $4,015,218
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: Bel-Red Regional Connectivity - SR 520 @ 124th I/C
Description:Pending Interchange Justification effort currently underway. Upgrade the interchange to provide additional access to and from the east and construct an auxilary lane each direction between 124th and 148th Ave. NE.Location / Facility:SR 520 @ 124th I/C
From:SR 520 @ 124th I/C
To:
Project ID: 4528
Completion Year:2025
MTP Status: CandidateEstimated Cost: $334,601,525
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: Cedar River Trail / Lake WA Blvd Connector
Description:Add ped / bike facilitiesLocation / Facility:Cedar River Trail / Lake WA Blvd Connector
From:Cedar River Trail
To:Lake Washington Blvd Loop
Project ID: 3541
Completion Year:2030
MTP Status: CandidateEstimated Cost: $6,357,837
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: Cedar-Duwamish Trail Connection
Description:Add ped / bike facilityLocation / Facility:Cedar-Duwamish Trail
From:I-405
To:Interurban Ave S
Project ID: 3542
Completion Year:2030
MTP Status: CandidateEstimated Cost: $3,721,661
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: East D Street Slip Ramps at SR 509
Description:Construct a half diamond interchange at East D Street.Location / Facility:SR-509 and D Street
From:East D Street@SR 509
To:East D Street
Project ID: 4106
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-405 Corridor: Cedar River Trail S Extension
Description:Add ped / bike facilityLocation / Facility:Cedar River Trail S
From:I-405
To:Burnett Ave
Project ID: 3540
Completion Year:2030
MTP Status: CandidateEstimated Cost: $6,692,030
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: Green River Crossing
Description:(b) Rebuilds the Green River crossing.Location / Facility:I-405 @ Green River Crossing
From:I-405 @ Green River Crossing
To:
Project ID: 4304
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,844,435
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-405 / SR 167 Trail Connection
Description:Add trail connectionLocation / Facility:I-405 / SR 167 Trail
From:Lind Ave SE
To:Talbot Rd S
Project ID: 3543
Completion Year:2030
MTP Status: CandidateEstimated Cost: $5,892,629
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-405 interchange at 132nd St. NE
Description:Build half diamond interchange to and from north at the NE 132nd St. Location / Facility:I-405 @ NE 132nd St
From:I-405 @ NE 132nd St
To:
Project ID: 4148
Completion Year:2025
MTP Status: CandidateEstimated Cost: $29,664,360
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-405/I-90 HOV/HOT connections
Description:WB I-90 to NB I-405 Freeway to Freeway HOV/HOT ConnectionLocation / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:
Project ID: 5441
Completion Year:2030
MTP Status: CandidateEstimated Cost: $127,309,545
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-405@I-5 bike/ped facility via or around I-405@I-5 Interchange
Description:Add ped / bike facilityLocation / Facility:I-405
From:I-5
To:
Project ID: 3544
Completion Year:2030
MTP Status: CandidateEstimated Cost: $3,721,661
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 Improvements
Description:(g) Reconstructs NB I-5 through the interchange.Location / Facility:I-5
From:I-5 through I-405 I/C
To:
Project ID: 4363
Completion Year:2030
MTP Status: CandidateEstimated Cost: $70,452,855
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 Interchange
Description:(a) Reconstruct the following I-5/I-405 Interchange ramps: NB I-5 to NB I-405 (c) adds new GP direct connector flyover ramp from SB I-405 to SB I-5 (d) SB I-5 to NB I-405Location / Facility:I-405 @ I-5 I/C
From:I-405 @ I-5 I/C
To:
Project ID: 4360
Completion Year:2030
MTP Status: CandidateEstimated Cost: $140,905,711
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 - Stg. 2 (SR 167 to SR 169: Widening)
Description:SR 167 to SR 169: (a) Widens I-405 from SR 167 to SR 169 by one lane NB and SB resulting in 4 lanes (1 HOV, 2 GP & 1 Aux.) in each direction. Minimizes investments in non-future compatible elements by using some non-standard lanes and shoulders. Location / Facility:I-405
From:SR 167
To:SR 169
Project ID: 4311
Completion Year:2011
MTP Status: CompletedEstimated Cost: $173,042,101
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 - Stg. 2 (Benson Crossing)
Description:(c) Reconstruct the Benson Rd. crossing. Cost included in 4311.Location / Facility:0
From:I-405 @ Benson
To:-
Project ID: 4313
Completion Year:2011
MTP Status: CompletedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (Rainier Ave HOV direct access)
Description:(l) Add HOV direct access ramp in vicinity of Rainier Ave S. Location / Facility:I-405 @ Rainier Ave I/C
From:I-405 @ Rainier Ave I/C
To:
Project ID: 4368
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,844,435
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 167 component)
Description:(n) SR 167 - Add one lane NB and SB from SW 41st to I-405 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP). Location / Facility:SR 167
From:SW 41st St
To:I-405
Project ID: 4369
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 167 I/C and HOV direct access)
Description:SR 167 Interchange: (k) Add GP direct connection ramp from SR 167 NB to I-405 SB. (m) Add NB and SB HOV flyover direct connector ramps connecting I-405 HOV lanes south of SR 167 I/C and SR 167 HOV/HOT lanes. Location / Facility:I-405 @ SR 167 I/C
From:I-405 @ SR 167 I/C
To:
Project ID: 4367
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $530,250,437
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 (SR 181 direct access)
Description:(j) HOV direct access in SR 181 vicinity south of I-405. Location / Facility:I-405 @ SR 181I/C
From:I-405 @ SR 181I/C
To:
Project ID: 4366
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $140,905,711
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 169 Widening Stage 1 (SR 167 component)
Description:(c) On SR 167, extend the SB HOV lane north to I-405 and add a SB auxiliary lane from I-405 to the off-connection at SW 41st St.Location / Facility:0
From:SW 41st St
To:I-405
Project ID: 4302
Completion Year:2010
MTP Status: CompletedEstimated Cost: $5,847,067
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5 to SR 181 Widening
Description:(h) Add one lane NB and SB resulting in 5 lanes (1 HOV & 4 GP) between I-5 and SR 181Location / Facility:I-405
From:I-5
To:SR 181
Project ID: 4364
Completion Year:2030
MTP Status: CandidateEstimated Cost: $140,905,711
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-5/ I-405 HOV direct connector ramps
Description:(f) adds HOV direct connector ramps between I-405 and I-5 in all directions. Location / Facility:I-405 @ I-5 I/C
From:I-405 @ I-5 I/C
To:
Project ID: 4362
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $705,764,568
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-90 I/C and braided ramps
Description:(a) Add NB I-405 to EB I-90 and (b) EB I-90 to SB I-405 braided ramps between Coal Ck Pkwy. and I-90. Location / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:I-90
Project ID: 4330
Completion Year:2030
MTP Status: CandidateEstimated Cost: $229,898,791
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-90 to NE 6th Street (widening)
Description:Add one lane NB and SB between I-90 and NE 6th Street resulting in 6 lanes NB and SB.Location / Facility:I-405
From:I-90
To:SR 520
Project ID: 4336
Completion Year:2030
MTP Status: ROW Conditionally ApEstimated Cost: $43,260,525
Type:Major Widening-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (114th Ave NE ramps)
Description:(d) Modify ramps to accommodate lane addition and reconstruct and close a portion of 114th Ave NE. Costs included in 4382.Location / Facility:I-405 @ 114th Ave NE
From:I-405 @ 114th Ave NE
To:
Project ID: 4339
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (Main St. Bridge component)
Description:(b) Reconstruct the Main Street bridge. Cost included in 4336.Location / Facility:I-405 @ Main St bridge
From:I-405 @ Main St bridge
To:
Project ID: 4337
Completion Year:2030
MTP Status: ROW Conditionally ApEstimated Cost: $70,452,855
Type:Bridge ReplaceCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: I-90 to SR 520 (SE 8th braided ramps)
Description:(c) Construct NB and SB braided crossings for the on and off ramps on the north legs of the SE 8th St Interchange. Location / Facility:I-405 @ SE 8th St I/C
From:I-405 @ SE 8th St I/C
To:
Project ID: 4338
Completion Year:2030
MTP Status: CandidateEstimated Cost: $239,786,911
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 10th I/C
Description:(b) Includes the EB SR 520 off-ramp to NE 10th.Location / Facility:SR 520 @ NE 10th I/C
From:SR 520 @ NE 10th I/C
To:
Project ID: 4345
Completion Year:2030
MTP Status: CandidateEstimated Cost: $70,452,855
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 10th ramp
Description:(c) Includes constructing the NE 10th to EB SR 520 ramp. Location / Facility:SR 520 @ NE 10th I/C
From:SR 520 @ NE 10th I/C
To:
Project ID: 4341
Completion Year:2012
MTP Status: CompletedEstimated Cost: $936,210
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 12th improvements
Description:(e) Requires replacement of the NE 12th structure and ramp and collector distributor revisions on EB SR 520. Location / Facility:I-405 @ NE 12th structure/ SR 520
From:I-405 @ NE 12th structure/ SR 520
To:
Project ID: 4343
Completion Year:2012
MTP Status: CompletedEstimated Cost: $936,210
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 2nd St
Description:(e) NE 2nd St.: Construct half-diamond interchange with ramps to and from the south. Costs included in 4382.Location / Facility:I-405 @ NE 2nd St I/C
From:I-405 @ NE 2nd St I/C
To:
Project ID: 4380
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 4th to SR 520 and NE 8th to SR 520 -NB Braided Ramps
Description:(a) Construct NB to SR 520 EB braided ramp to separate NB I-405 to EB SR 520 off-ramp from NE 8th to NB I-405 on-ramp and (b) Separating I-405 to EB SR 520 traffic from SR 520 EB off-ramp to 124th Ave NE traffic. (d) Adds one NB auxiliary lane from NE 4th to SR 520. (f) Convert WB SR 520 to SB I-405 ramp to auxiliary lane.Location / Facility:I-405 @ SR 520 I/C
From:I-405 @ SR 520 I/C
To:#N/A
Project ID: 4340
Completion Year:2012
MTP Status: CompletedEstimated Cost: $274,295,023
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 6th Street to SR 520 (widening):
Description:Add one lane NB and SB between NE 6th Street and SR 520 resulting in 6 lanes NB and SB.Location / Facility:I-405
From:NE 6th St
To:SR 520
Project ID: 4479
Completion Year:2020
MTP Status: CandidateEstimated Cost: $18,540,225
Type:Major Widening-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 85th - NE 124th
Description:(h) NE 85th to NE 116th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer. (i) NE 116th to NE 124th: Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction including Managed Lanes buffer.Location / Facility:I-405
From:NE 85th
To:NE 124th
Project ID: 4351
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $38,316,465
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 8th St
Description:(f) NE 8th St.: Revise NE 8th Interchange configuration. Costs included in 4382.Location / Facility:I-405 @ NE 8th St I/C
From:I-405 @ NE 8th St I/C
To:
Project ID: 4381
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: NE 8th to SR 520 - SB Braided Ramps
Description:(a) Construct SB braided ramp to separate SB I-405 to NE 8th and EB SR 520 to NE 10th traffic from EB SR 520 to SB I-405 traffic.Location / Facility:I-405 @ SR 520 I/C
From:I-405 @ SR 520 I/C
To:
Project ID: 4344
Completion Year:2030
MTP Status: CandidateEstimated Cost: $70,452,855
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Direct HOV Ramps
Description:SR 167 Interchange: Construct NB and SB HOV flyover ramps directly connecting SR 167 HOV/HOT lanes with I-405 HOV lanes north of the SR 167 Interchange. (a) Provides SB I-405 HOV/HOT to SB SR 167 HOV/HOT and (b) NB SR 167 HOV/HOT to NB I-405 HOV/HOT.Location / Facility:I-405
From:SR 167
To:SR 167
Project ID: 4133
Completion Year:2018
MTP Status: ApprovedEstimated Cost: $396,203,923
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange
Description:(a) Add one GP lane NB and SB through the SR 167 Interchange resulting in 1 HOV and 3 GP lanes in each direction.Location / Facility:I-405 @ SR 167 I/C
From:I-405 @ SR 167 I/C
To:
Project ID: 4306
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,844,435
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange
Description:(d) Construct GP ramp connecting I-405 SB to SR 167 SB.Location / Facility:I-405 @ SR 167 I/C
From:I-405 @ SR 167 I/C
To:
Project ID: 4309
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $106,297,290
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (Lind half-diamond component)
Description:(b) Construct half-diamond interchange at Lind Ave.Location / Facility:I-405 @ Lind Ave
From:I-405 @ Lind Ave
To:
Project ID: 4307
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $70,452,855
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (Lind to Talbot frontage roads)
Description:(c) Construct NB and SB frontage roads connecting half-diamond interchanges at Lind and Talbot (SR 515).Location / Facility:Frontage roads parallel to I-405
From:Lind
To:Talbot (SR 515)
Project ID: 4308
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $17,304,210
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 Interchange (SR 167 component)
Description:(e) Add one NB lane on SR 167 between S 180th (SW 43rd) and I-405 resulting in 4 lanes (1 HOV and 3 GP).Location / Facility:SR 167
From:S 180th (SW 43rd)
To:I-405
Project ID: 4310
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $61,800,750
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening
Description:(a) Rebuilds I-405 to Master Plan resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. HOV buffer. Location / Facility:I-405
From:SR 167
To:SR 169
Project ID: 4314
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $194,040,760
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening
Description: (b) Rebuilds the SR 169 Interchange.Location / Facility:I-405 @ SR 169 I/C
From:I-405 @ SR 169 I/C
To:
Project ID: 4315
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $87,757,065
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening (BNRR and Cedar Bridge crossings)
Description:(d) Reconstructs the bridge over the Cedar R and realigns and reconstructs the BNRR over the Cedar River.Location / Facility:I-405 @ Cedar River crossing
From:I-405 @ Cedar River crossing
To:
Project ID: 4317
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $123,601,500
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 167 to SR 169 Widening (Renton Hill access component)
Description:(c) Reconstructs access to Renton Hill. Location / Facility:unknown
From:unknown
To:
Project ID: 4316
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,844,435
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 Direct Connection Ramp
Description:(a) Construct NB SR 169 to NB I-405 direct connection ramp. Location / Facility:I-405 @ SR 169 I/C
From:I-405 @ SR 169 I/C
To:
Project ID: 4373
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $35,844,435
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90
Description:(b) Modify or rebuild N 3rd St. I/C (to accommodate future direct ramp to SR 169); Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ N 3rd St
From:I-405 @ N 3rd St
To:
Project ID: 4320
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $247,203,001
Type:Major Interchange-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (112th St I/C component)
Description:(f) Modify or rebuild 112th St I/C (to accommodate future flyer stop and park & ride expansion). Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ 112th St I/C
From:I-405 @ 112th St I/C
To:
Project ID: 4324
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $144,613,756
Type:Major Interchange-HOVCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy component NB lane)
Description:Add 1 NB GP/Aux lane between 112th and I-90Location / Facility:I-405
From:112th St
To:I-90
Project ID: 4478
Completion Year:2025
MTP Status: CandidateEstimated Cost: $71,688,870
Type:Major Widening-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Coal Creek Pkwy Component)
Description:(g) Modify or rebuild Coal Ck Pkwy I/C; add SB lane and rebuild the existing roadway half way to the 112th St interchanges in the south and all the way to I-90 in the north. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ Coal Creek Pkwy
From:I-405 @ Coal Creek Pkwy
To:
Project ID: 4325
Completion Year:2025
MTP Status: ROW Conditionally ApEstimated Cost: $71,688,870
Type:Major Interchange-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (Lk Wa bike path realignment)
Description:(l) Realignment and reconstruction of Lk. Washington bike path.Location / Facility:Lk. Washington bike path
From:SR 169
To:I-90
Project ID: 4329
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $15,506,919
Type:Regional Trail (Sep.)County:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (NE 30th I/C component)
Description:(d) Modify or rebuild NE 30th I/C. Cost includes part of the 4318 widening through this segment. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ NE 30th St
From:I-405 @ NE 30th St
To:
Project ID: 4322
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $144,613,756
Type:Major Interchange-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (NE 44th I/C component)
Description:(e) Modify or rebuild NE 44th I/C (to accommodate future HOV Direct Access); Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ NE 44th I/C
From:I-405 @ NE 44th I/C
To:
Project ID: 4323
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $247,203,001
Type:Major Interchange-HOVCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (SR 169 Direct Connection Ramp)
Description:(i) Construct SB I-405 to SB SR 169 direct connection ramp. Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ SR 169 I/C
From:I-405 @ SR 169 I/C
To:
Project ID: 4326
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $95,173,155
Type:Major Interchange-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (SR 900 I/C component)
Description:(c) Modify or rebuild SR 900 I/C; Cost includes part of the 4318 widening through this segment.Location / Facility:I-405 @ SR 900 I/C
From:I-405 @ SR 900 I/C
To:
Project ID: 4321
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $206,414,506
Type:Major Interchange-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 169 to I-90 (widening)
Description:(a) Add lanes NB and SB and rebuild the existing roadway from SR 169 to I-90, including the 4 ft. HOV buffer, resulting in 6 lanes (1 HOV & 4 GP & 1 Aux or 2 HOV & 3 GP & 1 Aux) in both directions. Costs of this widening are split between the various interchange projects (4320, 4321, 4322, 4323, 4324, 4325 and 4326).Location / Facility:I-405
From:SR 169
To:I-90
Project ID: 4318
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $0
Type:Major Widening-GPCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 181 I/C
Description:(c) Rebuilds the SR 181 Interchange.Location / Facility:I-405 @ SR 181
From:I-405 @ SR 181
To:
Project ID: 4305
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $140,905,711
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 181 to SR 167
Description:(i) 6 lanes (1 HOV, 4 GP & 1 Aux.) between SR 181 and SR 167 in each direction. Location / Facility:I-405
From:SR 181
To:SR 167
Project ID: 4365
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $283,047,436
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 181 to SR 167 Widening
Description:(a) Rebuilds I-405 adding one auxiliary lane NB and SB from SR 181 to the SR 167 I/C resulting in 5 lanes (1 HOV, 3 GP & 1 Aux.) in each direction in this section. I-5 to SR 181 remains at 4 lanes (1 HOV & 3 GP) each direction. Includes the 4 ft. HOV buffer from SR 181 to SR 167. Location / Facility:I-405
From:SR 181
To:SR 167
Project ID: 4303
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $106,297,290
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 515/Talbot half diamond
Description:(b) Constructs the SR 515 (Talbot Rd.) half diamond interchange which is a first phase of the redevelopment of the SR 167 Interchange. Provides SR 515 to NB I-405 and SB I-405 to SR 515 movements. Cost included in 4311.Location / Facility:0
From:I-405 @ SR 515/Talbot Rd
To:-
Project ID: 4312
Completion Year:2011
MTP Status: CompletedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 518 Interchange
Description:(b) Reconstruct of the following Interchange ramps: EB SR 518 to NB I-5, (e) EB SR 518 to SB I-5 Location / Facility:I-405 @ SR 518 I/C
From:I-405 @ SR 518 I/C
To:
Project ID: 4361
Completion Year:2030
MTP Status: CandidateEstimated Cost: $140,905,711
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 Interchange
Description:Rebuild the interchange to include direct HOV connectors in the SE quadrant. This requires shifting the NB I-405 and EB SR 520 mainline lanes to accommodate this rebuild.Location / Facility:I-405 @ SR 520 I/C
From:I-405 @ SR 520 I/C
To:
Project ID: 4383
Completion Year:2040
MTP Status: CandidateEstimated Cost: $355,314,016
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 Interchange (HOV direct connection ramps)
Description:(g) Rebuild the interchange to include direct HOV connectors in the NW and SW quadrants. Location / Facility:I-405 @ SR 520 I/C
From:I-405 @ SR 520 I/C
To:
Project ID: 4382
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $1,320,865,755
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening
Description:(a) Add one lane SB from SR 520 to NE 85th St resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.Location / Facility:I-405
From:SR 520
To:NE 85th
Project ID: 4352
Completion Year:2015
MTP Status: ROW Conditionally ApEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NB NE 195th to SR 527)
Description:(e) Add one NB lane from between NE 195th St. and SR 527 resulting in 4 lanes (1 HOV & 3 GP) in this section and includes Managed Lanes buffer. Location / Facility:0
From:NE 195th St
To:SR 527
Project ID: 4356
Completion Year:2010
MTP Status: CompletedEstimated Cost: $43,962,153
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NB NE 70th to NE 85th)
Description:(b) Add one lane NB between NE 70th and NE 85th Streets resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in this section. Cost included in 4354.Location / Facility:I-405
From:NE 85th
To:NE 70th
Project ID: 4353
Completion Year:2015
MTP Status: ROW Conditionally ApEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NE 124th to SR 522)
Description:(c) Add one lane NB and SB from NE 124th St. to SR 522 resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes Managed Lanes buffer. Managed Lanes: Should the decisions be made to implement Managed Lanes they could be incorporated Location / Facility:I-405
From:NE 124th St
To:SR 522
Project ID: 4354
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $391,816,756
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to I-5 Widening (NE 132nd structures)
Description:(d) Rebuild the structures over NE 132nd St. Cost included in 4354.Location / Facility:I-405 @ NE 132nd St
From:I-405 @ NE 132nd St
To:
Project ID: 4355
Completion Year:2025
MTP Status: ApprovedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522
Description:(e) SR 522: Add SB climbing auxiliary lane through NE 160th Interchange to SR 522. Location / Facility:I-405
From:NE 160th I/C
To:SR 522
Project ID: 4390
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $16,068,195
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (aux lanes)
Description:(a) Add NB and SB auxiliary lanes from SR 520 to NE 70th including Managed Lanes buffer. Location / Facility:I-405
From:SR 520
To:NE 70th
Project ID: 4346
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $30,900,375
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (Central Kirkland Transit Station)
Description:(h) Transit/HOV: Central Kirkland Transit Station. Location / Facility:Central Kirkland Transit Station
From:Central Kirkland Transit Station
To:
Project ID: 4393
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $40,965,693
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NB Aux lane NE 160th to NE 195th)
Description:(g) Add NB auxiliary lane extending from NE 160th to NE 195th. Location / Facility:I-405
From:NE 160th
To:NE 195th
Project ID: 4392
Completion Year:2020
MTP Status: CandidateEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 124th I/C)
Description:(c) Reconfigure and rebuild the NE 124th St. Interchange. Location / Facility:I-405 @ NE 124th St I/C
From:I-405 @ NE 124th St I/C
To:
Project ID: 4388
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $306,494,997
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 160th I/C)
Description:(d) Rebuild the NE 160th St. Interchange. Location / Facility:I-405 @ NE 160th St I/C
From:I-405 @ NE 160th St I/C
To:
Project ID: 4389
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $60,564,735
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 70th I/C)
Description:(c) Reconfigure and rebuild the NE 70th and NE 85th Interchanges including HOV bypasses. Rebuilding of NE 70th requires abandonment of the Houghton Park & Ride.Location / Facility:I-405 @ NE 70th I/C and NE 85th I/C
From:I-405 @ NE 70th I/C and NE 85th I/C
To:
Project ID: 4348
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $247,203,001
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (NE 85th I/C connections and direct access)
Description:(d) Construct HOV direct access at NE 85th (g) Improve NE 85th connection to I-405 from Kirkland Way to 148th Ave NE including transit and HOV queue bypass and upgrade arterial. Location / Facility:NE 85th IC and I-405 @ NE 85th I/C
From:Kirkland Way
To:148th
Project ID: 4349
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (SR 522 I/C and HOV direct access)
Description:(f) SR 522 Interchange Rebuild: Reconfigure and rebuild the SR 522 Interchange. The existing SR 522 WB to I-405 SB ramp will remain. Include HOV direct connection in center. Location / Facility:I-405 @ SR 522 I/C
From:I-405 @ SR 522 I/C
To:
Project ID: 4391
Completion Year:2020
MTP Status: CandidateEstimated Cost: $577,219,007
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 520 to SR 522 (Widening - SR 520 to NE 124th St)
Description:(b) Add one lane NB and SB resulting in 6 lanes (1 HOV, 4 GP & 1 Aux. or 2 HOV, 3 GP & 1 Aux.) in each direction.Location / Facility:I-405
From:SR 520
To:NE 124th St
Project ID: 4387
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $152,578,295
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (240th St. SE direct access ramp)
Description:(d) Construct direct access ramp to 240th St. SE. Location / Facility:I-405 @ 240th St SR I/C
From:I-405 @ 240th St SR I/C
To:
Project ID: 4399
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $123,601,500
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (Canyon Park Transit Station)
Description:(j) Canyon Park Transit Station, Location / Facility:Canyon Park Transit Station
From:Canyon Park Transit Station
To:
Project ID: 4403
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $40,965,693
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (Direct Access to Canyon Park P&R)
Description:(e) Construct direct access to the Canyon Park - Park & Ride. Location / Facility:I-405 @ Canyon Park - Park & Ride
From:I-405 @ Canyon Park - Park & Ride
To:
Project ID: 4400
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $56,856,690
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (DT Woodinville Transit Center)
Description:(l) Downtown Woodinville Transit Center, Location / Facility:Downtown Woodinville Transit Center
From:Downtown Woodinville Transit Center
To:
Project ID: 4405
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $40,965,693
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (I-5 north/ I-405 I/C and HOV direct access ramps)
Description:(g) Construct HOV direct connection ramps connecting I-405 managed lanes with I-5 HOV lanes north and south of the I-5 Interchange. (h) Reconfigure the NB I-405 to NB I-5 from 1 lane to a 2 lane on connection. (i) Addresses I-5 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion. Location / Facility:I-405 @ I-5 I/C
From:I-405 @ I-5 I/C
To:
Project ID: 4402
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $317,655,856
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (NE 195th I/C)
Description:(c) Rebuild the NE 195th St. Interchange. Location / Facility:I-405 @ NE 195th St I/C
From:I-405 @ NE 195th St I/C
To:
Project ID: 4398
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $56,856,690
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (SR 522 I/C braided ramps)
Description:(b) Remove ramp weaves north of the SR 522 Interchange by constructing NB and SB braided ramps. Location / Facility:I-405 @ SR 522 I/C
From:I-405 @ SR 522 I/C
To:
Project ID: 4397
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $112,477,365
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (SR 527 I/C)
Description:(f) Reconfigure the SR 527 Interchange.Location / Facility:I-405 @ SR 527 I/C
From:I-405 @ SR 527 I/C
To:
Project ID: 4401
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $161,917,966
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (UW Bothell Transit Station)
Description:(k) UW Bothell Transit Station, Location / Facility:UW Bothell Transit Station
From:UW Bothell Transit Station
To:
Project ID: 4404
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $40,965,693
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: SR 522 to I-5 (widening between NE 195th St to SR 527)
Description:(a) Add 2 lanes NB and SB, except 1 lane NB between NE 195th St. and SR 527 where NB lane previously built, resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP) in each direction. Includes the 4 ft. managed lane buffer. Location / Facility:I-405
From:NE 195th
To:SR 527
Project ID: 4396
Completion Year:2030
MTP Status: CandidateEstimated Cost: $236,897,879
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-405 Corridor: SR 900 to NE 30th
Description:(k) Construct NB auxiliary lane between SR 900 and NE 30th. Cost included in 4321Location / Facility:I-405
From:SR 900
To:NE 30th
Project ID: 4328
Completion Year:2020
MTP Status: CandidateEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405 Corridor: Sunset Blvd undercrossing
Description:(j) Realign and reconstruct undercrossing at Sunset Blvd. Cost included in 4320.Location / Facility:I-405 @ Sunset Blvd undercrossing
From:I-405 @ Sunset Blvd undercrossing
To:
Project ID: 4327
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $0
Type:Bridge RehabCounty:King County
Sponsor: WSDOTTitle: I-405/I-90 Interchange (HOV direct connector ramps)
Description: (a) Construct HOV direct connector ramps between I-405 and I-90 in all four quadrants of the interchange. Location / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:
Project ID: 4376
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $1,002,408,169
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405/I-90 Interchange (I--90 approach)
Description:I-90 Interchange: (d) Address I-90 connecting capacity to I-405 as necessary by adding one lane approaching ramp to I-405 to avoid congestion. Cost included in 4376. Location / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:
Project ID: 4379
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405/I-90 Interchange (new NB bridge)
Description:I-90 Interchange: (c) Construct a new 5 lane NB bridge over I-90 including 4 ft. HOV buffer replacing the existing two bridges. Cost included in 4376. Location / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:
Project ID: 4378
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-405/I-90 Interchange (SB bridge widening)
Description:I-90 Interchange: (b) Widen SB bridge by 2 lanes including 4 ft. HOV buffer resulting in 5 lanes (1 HOV & 4 GP or 2 HOV & 3 GP). Cost included in 4376. Location / Facility:I-405 @ I-90 I/C
From:I-405 @ I-90 I/C
To:
Project ID: 4377
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $0
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ SR 512 Interchange (Tier 1)
Description: Tier 1 -Constructs short term improvements to address congestion at the SR 512 interchange; including auxiliary lanes between NB I-5 Bridgeport Way and EB SR 512, NB I-5 between SR 512 and 84th.Location / Facility:I-5
From:SR 512 I/C
To:E Steele St.
Project ID: 4190
Completion Year:2020
MTP Status: CandidateEstimated Cost: $65,118,392
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5 @ SR 512 Interchange (Tier 2)
Description:"Tier 2 - In addition to the short term improvements described in Tier 1, Tier 2 rebuilds the interchange to provide free movements for all directions. Flyover ramps will be provided for the movements from I-5 NB to SR 512 EB, SR 512 EB to I-5 NB and I-5 NB to SR 512 WB. A loop ramp will be provided for the movement from SR 512 WB to I-5 SB."Location / Facility:I-5
From:I-5/SR 512 I/C
To:
Project ID: 4425
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $620,389,552
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5 @ 100th and Everett Mall: South Everett Interchange Improvements
Description:Construct a new crossing under I-5 at 100th St and provide NB and SB HOV access south of SR 526/SR527/South Broadway interchange. This entails a new on-ramp from NB ever mall way to SB I-5 Undercrossing at 100th St. SE which terminates at E side of freeway. This involves an arterial under I-5 then surface on W side of I-5. Those arterial improvements extend on that side up to 7th. NB Everett mall way to SB I-5 (on collector distributor on W side of I-5) starts from 526 to SB I-5 - on ramp traffic will connect.Location / Facility:I-5; 100th Street SE
From:SR 527/South Broadway I/C
To:SB I-5; 7th Avenue SE
Project ID: 4006
Completion Year:2030
MTP Status: CandidateEstimated Cost: $55,541,548
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 @ 196th St (SR 524) Interchange Northbound Braided Ramp Project
Description:This project adds a braided ramp NB at the I-5/ 196th St I/CLocation / Facility:I-5 @ 196th St
From:I-5 @ 196th St
To:
Project ID: 4278
Completion Year:2030
MTP Status: CandidateEstimated Cost: $74,160,900
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 @ 196th St (SR 524) Interchange Southbound Braided Ramp Project
Description:This project will construct a braided ramp configuration where the SR 525 to southbound I-5 ramp and the I-405 to southbound I-5 ramp will be grade separated over the southbound I-5 to 196th St. ramp. It is expected this concept will improve the I-5 mainline operations, eliminate the weave and address a high accident location.Location / Facility:0
From:I-5 @ 196th St
To:-
Project ID: 1625
Completion Year:2012
MTP Status: CompletedEstimated Cost: $39,864,210
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 @ 272nd Street Interchange
Description:Reconstruct the S. 272nd Street I/C. Current concept is for a SPUI, This project includes a flyer stop.Location / Facility:I-5 @ 272nd Street Interchange
From:I-5 @ 272nd Street Interchange
To:
Project ID: 4091
Completion Year:2030
MTP Status: CandidateEstimated Cost: $100,661,773
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ 88th St. N Interchange
Description:Reconstruct interchange to a SPUI configurationLocation / Facility:I-5 @ 88th Street NE I/C
From:I-5 @ 88th Street NE I/C
To:-
Project ID: 1945
Completion Year:2020
MTP Status: CandidateEstimated Cost: $63,000,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 @ Airport/Industrial Way
Description:HOV direct access connection to South Industrial Way/E3 bus way.Location / Facility:I-5
From:0.5 miles south of West Seattle Freeway
To:Metro's E3 Busway
Project ID: 1595
Completion Year:2025
MTP Status: CandidateEstimated Cost: $95,516,451
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ Lake City Way
Description:Extend right lane that drops to Lake City Way up to the N 85th St. exit and braid the N 70th on ramp into the mainline.Location / Facility:I-5
From:Lake City Way I/C
To:
Project ID: 4198
Completion Year:2025
MTP Status: CandidateEstimated Cost: $72,433,309
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ Mercer and SR 520 I/C's
Description:Reconstruct the Mercer Street and SR 520 Interchanges to eliminate the left side exit ramps. Location / Facility:I-5
From:E Denny Way
To:NE 45th St.
Project ID: 4200
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $876,059,886
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ Port of Tacoma Interchange Improvement
Description:Reconstruct the Port of Tacoma Road interchange (study underway to determine final configuration)Location / Facility:I-5
From:Port of Tacoma Road
To:Port of Tacoma Road
Project ID: 4529
Completion Year:2025
MTP Status: CandidateEstimated Cost: $35,444,286
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5 @ SR 18/SR 161 (Triangle) - phase 1
Description:Phase 1 - The interchange will be modified to eliminate the current weave ramps on I-5 both southbound and northbound, and on SR 18 westbound and eastbound. The project will rebuild the I-5 / SR-18 interchange by replacing the northwest and southeast cloverleaf ramps with a westbound SR 18 to southbound I -5 "flyover" ramp and an eastbound SR 18 to northbound I-5 flyover" ramp. It will also build a new direct connection from westbound SR 18 to SR 161 in the vicinity of S 359th ST, realign the eastbound SR 18 to Southbound I-5 at-grade access ramp and associated elements.Location / Facility:I-5 @ SR 18/SR 161 I/C
From:I-5 @ SR 18/SR 161 I/C
To:
Project ID: 2567
Completion Year:2012
MTP Status: CompletedEstimated Cost: $129,052,813
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ SR 18/SR 161 (Triangle) - phase 2
Description:Phase 2 - This project completes the reconstruction of the I-5/SR 18/SR 161 interchange by constructing a southbound Collector-Distributor lane from SB I-5 to the intersection of 359TH ST and 356TH St along SR 161, Weyerhauser Way to westbound SR 18 flyover ramp, replace the SR 161 Bridge that crosses over I-5, and making other interchange modifications.Location / Facility:I-5 @ SR 18/SR 161 I/C
From:I-5 @ SR 18/SR 161 I/C
To:
Project ID: 5535
Completion Year:2020
MTP Status: ROW Conditionally ApEstimated Cost: $125,566,166
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 @ SR 526 I/C
Description:Construct on ramp to southbound I-5. Either at SR 526 I/C or SR 99/ Everett Mall Way. Exact location TBDLocation / Facility:I-5
From:SR 526 I/C
To:SR 526 I/C
Project ID: 5430
Completion Year:2015
MTP Status: UnprogrammedEstimated Cost: $4,000,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 @ SR 96 / 128th St SW
Description:Reconstruct interchange. Current concept is for a SPUILocation / Facility:I-5
From:SR 96/128th St. SW I/C
To:
Project ID: 1706
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $119,478,912
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: I-405 to US 2
Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5
From:I-405 (Tukwila)
To:US 2
Project ID: 5427
Completion Year:2020
MTP Status: CandidateEstimated Cost: $312,000,000
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: Pierce/ King County Line to S. 260th
Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5
From:Pierce/King County Line
To:S. 260th St
Project ID: 5425
Completion Year:2020
MTP Status: CandidateEstimated Cost: $31,000,000
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: S. 260th to I-405
Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5
From:S. 260th St
To:I-405
Project ID: 5426
Completion Year:2020
MTP Status: CandidateEstimated Cost: $192,000,000
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5 HOV to HOT lane Conversion: SR 16 to Pierce/ King County Line
Description:Convert HOV lanes to HOT lanes. Assume existing HOV conversion and shoulder for dual HOT lanes. Cost does not include shoulder prep.Location / Facility:I-5
From:SR 16
To:Pierce/King County Line
Project ID: 5424
Completion Year:2015
MTP Status: CandidateEstimated Cost: $28,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5 Steilacoom/DuPont I/C to Thorne Lane
Description:Construct additional SB and NB lanesLocation / Facility:I-5 Steilacoom/DuPont I/C to Thorne Lane I/C
From:Sreilacoom/DuPont I/C
To:Thorne Lane I/C
Project ID: 4194
Completion Year:2024
MTP Status: CandidateEstimated Cost: $48,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/JBLM Berkeley Drive I/C
Description: This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.Location / Facility:I-5
From:Berkeley Drive I/C
To:Berkeley Drive I/C
Project ID: 4421
Completion Year:2018
MTP Status: CandidateEstimated Cost: $71,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/JBLM Corridor Planning and NEPA documentation
Description:Complete interchange justification reports and begin NEPA documentation for DuPont Steilacoom Road, 41st Division St. Berkley St., and Thorne Lane interchanges reconstruction and corridor widening.Location / Facility:I-5
From:JBLM Vicinity
To:JBLM Vicinity
Project ID: 4430
Completion Year:2015
MTP Status: CandidateEstimated Cost: $6,598,689
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/JBLM DuPont-Steilacoom-New Interchange
Description:This project would replace the interchange with one that would have more capacity to move more traffic and allow additional lanes to be added to I-5.Location / Facility:I-5
From:Dupont-Steilacoom I/C
To:Dupont-Steilacoom I/C
Project ID: 4419
Completion Year:2018
MTP Status: CandidateEstimated Cost: $149,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/JBLM Thorne Lane Interchange
Description:This project would replace the interchange with a more modern design that could accommodate the levels of traffic anticipated in the future as well as provide additional width to add new lanes on I-5.Location / Facility:I-5
From:Thorne Lane I/C
To:Thorne Lane I/C
Project ID: 4422
Completion Year:2018
MTP Status: CandidateEstimated Cost: $77,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/JBLM, 41st Division Dr. I/C
Description:This project builds a new bridge that allows one ramp to pass over the other allowing traffic to flow smoother. This results in a reduction of congestion and an improvement of safety on I-5.Location / Facility:I-5
From:41st Division Dr. I/C
To:41st Division Dr. I/C
Project ID: 4420
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $24,195,193
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/Mounts Road to Center Drive Auxiliary Lane Extension
Description:This project will extend the NB auxiliary lane south for approximately 1.5 miles between the Mounts Rd and Center Dr. Interchanges. This auxiliary lane will be an interim configuration until the full corridor improvements are completed.Location / Facility:I-5
From:Mounts Rd Interchange
To:Center Dr Interchange
Project ID: 4477
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $8,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5/Thorne Lane to Gravelly Lake Drive - Auxiliary Lanes
Description:Construct SB and NB auxiliary lanesLocation / Facility:I-5
From:Thorne Lane
To:Gravelly Lake Drive
Project ID: 4424
Completion Year:2025
MTP Status: UnprogrammedEstimated Cost: $26,821,526
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5: 220th St. SW to 44th Ave W
Description:Construct a northbound auxiliary lane.Location / Facility:I-5
From:220th St SW
To:44th Ave W
Project ID: 1624
Completion Year:2025
MTP Status: CandidateEstimated Cost: $8,755,675
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5: Mounts-Old Nisqually Road to 41st Division Drive, JBLM
Description:Add one lane each direction (GP or HOV/HOT) - Mounts-Old Nisqually Road to 41st Division DriveLocation / Facility:I-5
From:Mounts-Old Nisqually Road
To:41st Division Drive, JBLM
Project ID: 1803
Completion Year:2023
MTP Status: CandidateEstimated Cost: $181,500,809
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5: NB Express Lanes Northgate Vic - Merge Revision
Description:Separate the northbound HOV and GP merge from the express lanes to the mainline by moving the GP merge south to the 92nd Street vicinity. Location / Facility:I-5 Express lanes
From:I-5 @ Northgate Way
To:I-5 @ 92nd St. vicinity
Project ID: 5336
Completion Year:2020
MTP Status: CandidateEstimated Cost: $24,381,780
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5: Port of Tacoma Rd Interchange to Pierce/King County Line
Description:Core HOV lanes, interchange improvements, ITS, enhanced transit.Location / Facility:I-5
From:Port of Tacoma Rd Interchange
To:Pierce/King County Line
Project ID: 5343
Completion Year:2012
MTP Status: CompletedEstimated Cost: $433,831,572
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5: S. 96th to SR 16 - Widening (HOV/HOT)
Description:Extends HOV lanes south in both directions between the SR 512 interchange and the SR 16 interchange. Reconstructs the 72nd Street and 84th Street interchanges to accommodate the widening and improve traffic movements on and off the interstate, replace the S 48th St. Bridge.Location / Facility:I-5
From:SR 512
To:SR 16
Project ID: 4189
Completion Year:2025
MTP Status: ApprovedEstimated Cost: $351,930,073
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5: Seneca to Mercer St - Additional lane
Description:The project will provide an additional NB lane to relieve congestion in the Downtown Seattle area of I 5. Requires narrowing traveled lanes to 11 feet and widening a structureLocation / Facility:I-5
From:Seneca
To:Mercer
Project ID: 5508
Completion Year:2020
MTP Status: CandidateEstimated Cost: $12,190,890
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5: SR 104 to NE 175th
Description:Construct a southbound auxiliary lane on I-5 from SR 104 down to NE 175th Street.Location / Facility:I-5
From:SR 104 I/C
To:NE 175th St.
Project ID: 4199
Completion Year:2025
MTP Status: CandidateEstimated Cost: $19,103,290
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-5: SR 16 to Port of Tacoma Rd Interchange
Description:Core HOV lanes, interchange improvements, ITS, enhanced transit. Actual restriping and opening of HOV lanes south of the Port of Tacoma Interchange is likely to occur during or after POT Bridge replacement work (2017) since existing POT Interchange does not have enough existing span width to accommodate HOV lane widening underneath bridge.Location / Facility:I-5
From:SR 16
To:Port of Tacoma Rd Interchange
Project ID: 1644
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $948,449,717
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5: SR 2 to SR 528
Description:Construct HOV/HOT Lanes in each direction and reconstruct the SR 528 I/CLocation / Facility:I-5
From:SR 2
To:SR 528
Project ID: 1708
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $660,151,709
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5: SR 528 to SR 531
Description:Add one lane in each direction (from 3-4 lanes)Location / Facility:I-5
From:SR 528
To:SR 531
Project ID: 4204
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $143,542,273
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: I-5: Thorne Lane to SR 512.
Description:Add HOV/HOT Lanes in both directions.Location / Facility:I-5
From:Thorne Lane I/C
To:Gravelly Lake Dr.
Project ID: 1720
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $164,585,142
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-5:Thorne Lane to Gravelly Lake Dr.-Frontage Road
Description:This project improves traffic flow on I-5 by completing a missing local connection. Location / Facility:I-5
From:Thorne Lane
To:Gravelly Lake Dr.
Project ID: 4423
Completion Year:2018
MTP Status: CandidateEstimated Cost: $30,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: I-90
Description:On West Lake Sammamish Parkway, convert single lane roundabout to a dual lane roundaboutLocation / Facility:I-90
From:West Lake Sammamish Parkway
To:West Lake Sammamish Parkway
Project ID: 5437
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $2,472,030
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90
Description:Construct a westbound auxiliary lane between West Lake Sammamish Parkway and Sunset Way.Location / Facility:I-90
From:West Lake Sammamish Parkway
To:Sunset Way
Project ID: 5438
Completion Year:2020
MTP Status: CandidateEstimated Cost: $54,005,642
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90
Description:Reconstruct the Front Street I/CLocation / Facility:I-90
From:Front St. I/C
To:Front St. I/C
Project ID: 5439
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $111,241,350
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90 @ SR 18
Description:Construct freeway to freeway interchange at SR 18, widen to four lanes in each direction, maintain truck lanes, and reconstruct interchange ramps.Location / Facility:I-90 @ SR 18
From:I-90 @ SR 18
To:
Project ID: 4223
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $268,199,578
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90 @ SR 18
Description:Construct a westbound I-90 to WB SR 18 flyover ramp and widen SR 18 to four lanes between Deep Creek to I-90.Location / Facility:I-90 @ SR 18
From:I-90 @ SR 18
To:
Project ID: 4414
Completion Year:2020
MTP Status: CandidateEstimated Cost: $219,436,019
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90 Highpoint to Preston Trail
Description:Shared use bike pathLocation / Facility:Highpoint Trail
From:Terminus of existing Highpoint Trail near Issaquah eastern city limits
To:Western terminus of existing Preston-Snoqualmie Trail
Project ID: 2882
Completion Year:2012
MTP Status: CompletedEstimated Cost: $5,751,889
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90 HOV to HOT
Description:Convert HOV lanes to HOT lanesLocation / Facility:I-90
From:I-5
To:SR 900
Project ID: 5435
Completion Year:2020
MTP Status: CandidateEstimated Cost: $42,000,000
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: I-90: Eastgate to W. Lake Sammamish Pkwy (Lakemont) - Added Aux. Lane
Description:Construct an eastbound auxiliary lane or Hard Should Running between Eastgate and West Lake Sammamish Parkway (Lakemont).Location / Facility:I-90
From:Eastgate
To:West Lake Sammamish Parkway (Lakemont)
Project ID: 5436
Completion Year:2020
MTP Status: CandidateEstimated Cost: $61,800,750
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: Interurban Ave Capacity Expansion
Description:Expand capacity on North-South arterialsLocation / Facility:SR 181
From:144th St
To:Southcenter Blvd
Project ID: 3528
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $22,795,172
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: NE Park Drive Ped/Bike
Description:Add sidewalk / paved shoulder crossing I-405 from SR 900 / Sunset Blvd to Lake Washington BlvdLocation / Facility:NE Park Drive
From:SR 900 / Sunset Blvd
To:Lake Washington Blvd
Project ID: 3536
Completion Year:2030
MTP Status: CandidateEstimated Cost: $6,667,975
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 104
Description:Add one lane each direction on SR 104 from 178th to SR 522 with intersection channelization improvements at 178th, 175th and SR 522.Location / Facility:SR 104
From:SR 522
To:178th
Project ID: 1682
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $10,721,726
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 104
Description:NFS - New connection from existing SR 104 alignment to proposed multimodal terminal location.Location / Facility:SR 104
From:Pine St. I/S
To:Proposed ferry terminal
Project ID: 1711
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $13,545,963
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 16
Description:Approved in 24, 2003. Core HOV lanes, new interchange, TSM/TDM, ITS, enhanced transit. Cost unknown for expanding North Gig Harbor Park and Ride lot (Kimball), therefore not in estimate. SR 16/36th St to Olympic Dr NW - Add HOV Lanes is programmed for completion in 2010.Location / Facility:0
From:Tacoma Narrows Bridge (36th St E)
To:Olympic Drive
Project ID: 1650
Completion Year:2010
MTP Status: CompletedEstimated Cost: $12,171,381
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 16
Description:Construct Core HOV lanes, interchange improvements, frontage road, Intelligent Transportation Systems. This project has several Conditions approved by EB on September 29th, 2000: a) No additional freeway capacity expansion NW of SR-16/Wollochet Drive NW/Pioneer Way interchange until a complete grade-separated exchange is developed on SR-16 in the vicinity of the intersection with SE Burley-Olalla Road. This condition does not preclude development of interim measures to address safety and access controls at SE Burley/Olalla Road. b) Future HOV capacity expansion entire SR 16 corridor from I-5 to SR3 should include full implementation of surveillance control and driver information (SC&DI) system improvements to include conventional electronic flow monitoring and on-ramp metering for preferential HOV access.Location / Facility:SR 16
From:Olympic Drive
To:SR 302 Vicinity
Project ID: 1651
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $151,064,172
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 16
Description:Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost not included for Park and Ride Lots at Armory and Landfill.Location / Facility:SR 16
From:SR 160 (Sedgwick Rd) Vicinity
To:SR 166
Project ID: 1727
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $94,142,508
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 16
Description:Widen from 4 lanes to 6 lanes creating HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transitLocation / Facility:SR 16
From:SR 302 Vicinity
To:Pierce/Kitsap County Line
Project ID: 1811
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $78,294,437
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 16
Description:Widen from 4 lanes to 6 lanes creating HOV lanes, I/C improvements, TDM, ITS, enhanced transit. Cost unknown for expansion of Park and Ride Lot at Mullenix, therefore not in estimateLocation / Facility:SR 16
From:Pierce/Kitsap County Line
To:SR 160 (Sedgwick Rd) Vicinity
Project ID: 1833
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $108,191,777
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 16
Description:Approved in April 24, 2003. Core HOV lanes, interchange improvements, TSM/TDM, ITS, enhanced transit. Location / Facility:SR 16
From:I-5
To:Tacoma Narrows Bridge
Project ID: 4099
Completion Year:2014
MTP Status: CompletedEstimated Cost: $168,138,427
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 16
Description:Construct EB and WB auxiliary lanesLocation / Facility:SR 16
From:Burnham Drive I/C
To:SR 302 Bridges
Project ID: 4213
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $7,193,933
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 16 @ Wollochet Interchange
Description:The current interchange in Gig Harbor is more than 40 years old and has marginal onramps that make it difficult for vehicles entering the freeway to merge into traffic creating potential conflicts. This project will add a new onramp and modernize the rest of the interchange to improve capacity, relieve congestion and reduce the potential for collisions.Location / Facility:SR 16
From:SR 16
To:Gig Harbor I/C
Project ID: 4426
Completion Year:2020
MTP Status: CandidateEstimated Cost: $9,143,167
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 161
Description:SR 161/24th St E to Jovita - Add Lanes is programmed for completion in 2011, but majority of work likely to be done by 2010.Location / Facility:SR 161
From:24th St. E
To:Jovita Blvd.
Project ID: 1658
Completion Year:2014
MTP Status: CompletedEstimated Cost: $42,024,510
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 161
Description:SR 161/36th to Vicinity 24th St E -Widen to 5 lanes (creating 5 lane roadway with center two-way left turn).Location / Facility:SR 161
From:36th St. E
To:24th St. E
Project ID: 5344
Completion Year:2022
MTP Status: ApprovedEstimated Cost: $38,316,465
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 162: SR 410 - 96th St E
Description:Widen to 4 lanes with restricted median. Make operational improvements at the SR 410/SR 167 Interchange.Location / Facility:SR 162
From:SR 410
To:96th St. E
Project ID: 497
Completion Year:2030
MTP Status: CandidateEstimated Cost: $131,609,190
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 167
Description:Construct auxiliary lanes between interchanges.Location / Facility:SR 167
From:S 277th St.
To:SR 516
Project ID: 4229
Completion Year:2025
MTP Status: CandidateEstimated Cost: $165,879,260
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 167
Description:Add 1 GP lane each direction from 15th St. NW to S. 180th St.Location / Facility:SR 167
From:15th St. NW
To:S 180th (SW 43rd)
Project ID: 5325
Completion Year:2030
MTP Status: UnprogrammedEstimated Cost: $1,588,279,281
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 167 Corridor Completion Phase 1
Description:Phase I includes one lane in each direction from the existing SR167 terminus at the Meridian interchange in Puyallup to I-5. There will be two lanes in each direction from the I-5/SR 167 Extension to the SR 167 / 54th Avenue interchange in Fife, where two lanes would drop and a single lane in each direction would continue to a connection at SR 509 in Tacoma. The SR 167 Extension – Phase I includes full interchanges at Meridian Avenue and Valley Avenue in Puyallup as well as a freeway-to-freeway interchange connections with I-5. A partial interchange (NB on/SB off) would be included at 54th Avenue in Fife. All necessary right-of-way for the SR 167 extension full-build would be purchased.Location / Facility:SR 167
From:SR 509
To:I-5
Project ID: 1659
Completion Year:2015
MTP Status: ROW Conditionally ApEstimated Cost: $850,598,385
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 167 Corridor Completion Phases 2 and 3.
Description:Phase 2 will widen the SR 167 to 2 general purpose lanes in each direction from SR 509 (Port of Tacoma) to the Meridian Interchange (SR 161) in Puyallup. Phase 3 will add HOV lanes each direction between I-5 and the Meridian Interchange.Location / Facility:SR 167
From:SR 509
To:Puyallup/ Sumner vicinity (SR 161)
Project ID: 1722
Completion Year:2040
MTP Status: CandidateEstimated Cost: $425,299,192
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 167 HOV lane completion
Description:Extend HOV/HOT Lanes from current termini to SR 410 in Sumner.Location / Facility:SR 167
From:SR 410 (Sumner)
To:15th St. SW/ NW
Project ID: 1652
Completion Year:2017
MTP Status: ApprovedEstimated Cost: $395,643,958
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 169
Description:Construct a southbound truck climbing lane.Location / Facility:SR 169
From:SE 383rd St.
To:Green River
Project ID: 4231
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $13,718,874
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 169
Description:Replace the existing northbound truck climbing shoulder with a truck climbing lane and extend it to the north.Location / Facility:SR 169
From:Green River
To:Crest of Hill (ARMP 6.32)
Project ID: 4232
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $24,720,300
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 169
Description:Construct a southbound truck climbing lane.Location / Facility:SR 169
From:Near Cedar River (ARM 16.02 to 17.02
To:
Project ID: 4233
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $12,360,150
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 169 Widening SR 516 to 231st
Description:Widen to 4 lanes with turn lanes where warranted.Location / Facility:SR 169
From:SR 516
To:SE 231st St.
Project ID: 3644
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $149,615,914
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 169 Widening: I-405 to 152nd Ave. SE
Description:Widen SR 169 from 4 to 6 lanes between I-405 and 152nd Ave. SELocation / Facility:SR 169
From:I-405
To:152nd Ave. SE
Project ID: 5327
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $113,713,380
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 18
Description:Add an Auxiliary lane each direction on SR 18 from C Street to SR 164.Location / Facility:SR 18
From:C Street
To:SR 164 I/C
Project ID: 4214
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $43,173,239
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 18
Description:Widen to four lanes, interchange improvementsLocation / Facility:SR 18
From:Issaquah-Hobart Road
To:Tigergate
Project ID: 4216
Completion Year:2040
MTP Status: ApprovedEstimated Cost: $89,957,076
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 18
Description:Widen to four lanes, interchange improvements. The first phase (Tier 2 investment) is to make improvements to the existing truck climbing lane in the 'raging river' vicinity.Location / Facility:SR 18
From:Tigergate
To:I-90
Project ID: 4217
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $107,534,251
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 204
Description:Relocate Frontier Village access out of intersection with SR 9 and look at removing signal at 91st. Add storage for traffic from eastbound SR 204 to northbound SR 9.Location / Facility:SR 204
From:US 2
To:SR 9
Project ID: 1712
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $6,485,371
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 3 @ SR 16 Interchange (Gorst)
Description:Eliminate lane drop on SR 16 to northbound SR 3 by extending the lane north of the railroad bridge and extending the northbound SR 3 on-ramp.Location / Facility:SR 3
From:SR 3/ SR 16 Vicinity (Gorst)
To:SR 3/ SR 16 Vicinity (Gorst)
Project ID: 4185
Completion Year:2017
MTP Status: CandidateEstimated Cost: $22,704,034
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3 @ SR 304 I/C - Interchange Reconstruction
Description:Reconstruct Interchange.Location / Facility:SR 3
From:SR 3/SR 304 Interchange Vicinity
To:SR 3/SR 304 Interchange Vicinity
Project ID: 4183
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $59,328,720
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3 @ SR 304 I/C - Ramp Modification
Description:Extend SB SR 3 two-lanes though SR 304 Interchanges and adjust SR 304 SB ramp to merge instead of add lane.Location / Facility:SR 3
From:SR 3/SR 304 Interchange Vicinity
To:SR 3/SR 304 Interchange Vicinity
Project ID: 4182
Completion Year:2017
MTP Status: CandidateEstimated Cost: $12,407,791
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3: Kinman-Big Valley Rd to SR 104
Description:Add northbound (NB) truck/climbing holding laneLocation / Facility:SR 3
From:Kinman/Big Valley Road
To:SR 104
Project ID: 1832
Completion Year:2030
MTP Status: CandidateEstimated Cost: $33,695,747
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3: Pioneer Way to Kinman-Big Valley Rd
Description:Southbound truck/climbing lane between Pioneer Way and Kinman-Big Valley Road.Location / Facility:SR 3
From:Pioneer Way
To:Kinman-Big Valley Road
Project ID: 4181
Completion Year:2016
MTP Status: UnprogrammedEstimated Cost: $16,453,143
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3: SR 16 to SR 304 - HOV Widening
Description:Widen from four to six-lane divided facility (creating one HOV lane in each direction) between the SR 3/SR 16 Interchange and the SR 3/SR 304 Interchange.Location / Facility:SR 3
From:SR 16
To:SR 304
Project ID: 4184
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $317,359,025
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3: SR 304 to Loxie Eagens Blvd - HOV Widening
Description:Widen to 6 lanes (creating one HOV lane in each direction) from SR 304 to Loxie Eagans Boulevard; and maintain the northbound auxiliary lane.Location / Facility:SR 3
From:SR 3/SR 304 Interchange Vicinity
To:Loxie Eagens Blvd.
Project ID: 1828
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $18,395,865
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 3: SR 305 to SR 104
Description:Widen to a 4-lane, median divided facility Location / Facility:SR 3
From:SR 305
To:SR 104
Project ID: 4180
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $70,114,203
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 302
Description:Construct a new corridor from the vicinity of 144th Street NW to a new interchange on SR 16 in the vicinity of SE Pine Road.Location / Facility:SR 302
From:144th Street
To:SR 16
Project ID: 5440
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $325,260,949
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 302 Capacity Improvements--Elgin-Clifton Road to SR 16
Description:Widen SR 302 to 4 lanes from Elgin-Clifton Road to 144th St NW to tie in with planned new alignment from 144th St NW to SR 16.Location / Facility:SR 302
From:Elgin Clifton Rd.
To:SR 16
Project ID: 3618
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $25,591,485
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 303
Description:Construct Business Access and Transit Lanes.Location / Facility:SR 303
From:11th Street (Bremerton)
To:Fairgrounds Road
Project ID: 4095
Completion Year:2018
MTP Status: UnprogrammedEstimated Cost: $200,867,894
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 305: Bainbridge Ferry Terminal to Suquamish Way - Mobility
Description:Intersection improvements with transit queue jump lanes.Location / Facility:SR 305
From:Bainbridge Ferry Terminal
To:Suquamish Way
Project ID: 4237
Completion Year:2016
MTP Status: CandidateEstimated Cost: $7,246,359
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOTTitle: SR 410: 214th Ave E - 234th add lanes
Description:Widen from 2 lanes to 4 lanes, realign 234th Ave E to create a "split intersection" and add a signal --per Route Development Plan/Design. SR 410/214th Ave E to 234th - Add Lanes is programmed for completion in 2011, but it appears majority of CN will be done by 2010Location / Facility:SR 410
From:214th Ave E Vicinity
To:234th Ave E Vicinity
Project ID: 1661
Completion Year:2011
MTP Status: CompletedEstimated Cost: $33,943,096
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 509 Extension (with I-5), Phase 1
Description:SR 509 Connection and I-5 Freight Mobility Project Phase 1 includes one lane in each direction between S 188th Street and S 24th/26th Ave, and two lanes in each direction between S 24th/26th Ave and I-5 with both GP &HOV/express toll lane connections to I-5, a full diamond interchange at SR509/S 188th Street, a half diamond interchange at SR 509/S 24th Ave to provide access to the airport via S 24/26th Ave and an improved air cargo road from S 188th Street to the airport, and a direct access to I-5 from the Kent Valley via S 228th Street and reconstruction of the SR 516 interchange. On I-5, Phase 1 also includes adding SB auxiliary lane from the extension to S 272nd St and NB auxilary lane from the SR 516 Interchange to the extension, converting the existing I-5 HOV lanes to ETL and the upgrading inside shoulders as ETL during peak periods from the SR 509 Connection to Federal Way.Location / Facility:SR 509
From:I-5
To:Existing SR 509
Project ID: 1613
Completion Year:2019
MTP Status: ROW Conditionally ApEstimated Cost: $740,020,595
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 509 Extension (with I-5), Phase 2
Description:SR 509 Connection and I-5 Freight Mobility Project Phase 2 includes widening the extension to two lanes each direction between S 188th Street and S 24th/26th Ave, construct partial interchange at 200th St. to link with the Airport South Access Road. Location / Facility:SR 509
From:I-5
To:Existing SR 509
Project ID: 4429
Completion Year:2040
MTP Status: CandidateEstimated Cost: $148,854,717
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 512
Description:Construct eastbound and westbound auxiliary lanes from Meridian to Pioneer with two lane off-ramps at each Interchange.Location / Facility:SR 512
From:Meridian/ SR 161
To:Pioneer
Project ID: 4243
Completion Year:2025
MTP Status: CandidateEstimated Cost: $38,137,343
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 512
Description:Covert shoulders for use as additional lane during peak periods in the peak direction of travelLocation / Facility:SR 512
From:I-5
To:Meridian Street
Project ID: 5442
Completion Year:2030
MTP Status: CandidateEstimated Cost: $67,812,355
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 512/94th Ave WB Ramps to SR 161 - Widening
Description:Widen the westbound off ramp to SR 161 to two lanes, widen the eastbound on ramp from SR 161 to two lanes, widen the SR 512/SR 161 under-crossing from two to six lanes and extend the westbound climbing lane through interchange to tie in with the westbound on-ramp from 94th Ave. SE to SR 512.Location / Facility:SR 512 @ Meridian/ SR 161 I/C
From:SR 512 @ Meridian/ SR 161 I/C
To:SR 512/SR 161 I/C
Project ID: 1821
Completion Year:2025
MTP Status: CandidateEstimated Cost: $15,595,486
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 512/Canyon Rd Interchange EB & WB - Mobility
Description:Construct a two lane eastbound and westbound off-ramps to Canyon Road.Location / Facility:SR 512 @ Canyon Road I/C
From:SR 512 @ Canyon Road I/C
To:SR 512Canyon Road I/C
Project ID: 4242
Completion Year:2015
MTP Status: CandidateEstimated Cost: $9,038,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 512/SR 7 Interchange - Mobility
Description:Construct a two lane eastbound off-ramp to SR 7.Location / Facility:SR 512 @ SR 7
From:SR 512 @ SR 7
To:SR 512/SR 7 I/C
Project ID: 4241
Completion Year:2015
MTP Status: CandidateEstimated Cost: $8,000,000
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 518
Description:Add a second eastbound lane from the I-5 southbound drop lane to the I-5 northbound add lane at the Tukwila I/C.Location / Facility:SR 518 @ I-5 Interchange
From:SR 518 @ I-5 Interchange
To:SR 518/I-5 Interchange
Project ID: 4245
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $90,229,095
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 518
Description:Relocate the I-5 northbound ramp to the right side and combine I-5 northbound, I-5 southbound and the 51st Ave. S ramps at the Tukwila I/C. Location / Facility:SR 518 @ I-5 Interchange
From:SR 518 @ I-5 Interchange
To:SR 518/I-5 Interchange
Project ID: 4246
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $79,769,032
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 518
Description:Construct a new interchange at SR 99Location / Facility:SR 518 @ SR 99
From:SR 518 @ SR 99
To:I-5
Project ID: 5390
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $111,404,504
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 518 at Des Moines Memorial Drive Interchange Phase I - Eastbound Off Ramp
Description:The project is located within the city limits of Burien and incorporates an area within Section 20 Township 23N and Range 4E. The project will construct a new eastbound off-ramp from SR 518 to Des Moines Memorial Drive including a new ramp bridge over 8th Avenue South. The new off-ramp will be located primarily within the existing WSDOT right-of-way. This project will also include storm drain conveyance, stormwater treatment, retaining walls, illumination, and sidewalks on both sides of 8th Avenue South from S 148th Street to south of the new bridge over 8th Avenue South. Stormwater detention will be accomplished off-site utilizing an equivalent area swap approved by the Department of Ecology.Location / Facility:SR 518
From:SR 509
To:Des Moines Memorial Drive
Project ID: 4416
Completion Year:2020
MTP Status: ApprovedEstimated Cost: $14,057,986
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 518 at Des Moines Memorial Drive Interchange Phase II - Westbound Ramps
Description:Reconstruct the existing half diamond interchange at Des Moines Memorial Drive. Phase 2 includes adding a westbound off- ramp from SR 518 to northbound SR 509 that diverges from SR 518 prior to the Des Moines Memorial Drive Interchange and an on-ramp from Des Moines Memorial Drive to westbound SR 518.Location / Facility:SR 518
From:SR 509
To:Des Moines Memorial Drive
Project ID: 4476
Completion Year:2020
MTP Status: CandidateEstimated Cost: $67,316,204
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 519 Intermodal Access Project - Phase 2: South Atlantic Corridor
Description:I-90 Off-Ramp to South Atlantic Street. A new two-lane elevated ramp connection would be built from westbound I 90 to terminate at a signalized T-intersection at South Atlantic Street. The new South Atlantic Street connection would serve westbound freeway traffic from I 90 and I-5. The new ramp would be entirely elevated, passing over Fourth Avenue South and Third Avenue South and connecting to the South Atlantic Street overpass southeast of Safeco Field. Exiting northbound I-5 traffic would be routed to South Atlantic Street, while exiting southbound I-5 traffic would have the option of taking either the new off-ramp to South Atlantic Street or the existing I-90 off-ramp to Fourth Avenue South. South Royal Brougham Way Railroad Overpass. The South Royal Brougham Way at-grade railroad crossing would be closed and a new two-lane elevated structure would be constructed, connecting Occidental Avenue South to Third Avenue South. The new overpass would transport vehicular, pedestrian, and bicycle traffic over the BNSF Railway tracks and provide a new connection from South Royal Brougham Way into the second level of Qwest Field Event Center parking garage. The new ramp would accommodate local two-way traffic.Location / Facility:0
From:I-90
To:Seattle Waterfront
Project ID: 1866
Completion Year:2010
MTP Status: CompletedEstimated Cost: $92,923,924
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520
Description:Widen SR 520 to 8 lanes including HOV Lanes and auxiliary lanes. Construct a new SR 520/SR 202 interchange.Location / Facility:0
From:W Lake Sammamish Parkway
To:SR 202
Project ID: 4101
Completion Year:2010
MTP Status: CompletedEstimated Cost: $96,210,542
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520
Description:Construct new six lane connection between I-5 and Montlake Blvd. This includes reconstruction of the Portage Bay Bridge. Construct a westbound to southbound freeway-to-freeway Core HOV Connection at the I-5/SR520 interchange.Location / Facility:SR 520
From:I-5
To:Foster Island Vicinity
Project ID: 4250
Completion Year:2022
MTP Status: ROW Conditionally ApEstimated Cost: $1,249,673,569
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520 @ 148th Ave NE I/C Vicinity - I/C Improvments
Description:Provide 2nd eastbound grade separated off ramp access to the east of 148th Ave NE. Improve interchange ped and bike facilities along 148th Ave NE.Location / Facility:SR 520
From:148th Ave NE
To:
Project ID: 4418
Completion Year:2020
MTP Status: CandidateEstimated Cost: $62,173,539
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520 Eastbound Auxiluary Lane: NE 148th Ave to NE 40th St.
Description:Construct a auxilary lane eastbound between NE 148th Ave to NE 40th St.Location / Facility:SR 520
From:NE 148th Ave.
To:NE 40th St.
Project ID: 4462
Completion Year:2022
MTP Status: CandidateEstimated Cost: $14,207,649
Type:New Facility-RoadCounty:
Sponsor: WSDOTTitle: SR 520 HOV to HOT
Description:Convert HOV lanes to HOT lanesLocation / Facility:SR 520
From:I-405
To:SR 202
Project ID: 5443
Completion Year:2020
MTP Status: CandidateEstimated Cost: $20,000,000
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520 Trail
Description:Shared use bike path pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail
From:Montlake
To:east to Seattle city limits at water's edge
Project ID: 2906
Completion Year:2017
MTP Status: CandidateEstimated Cost: $976,936
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520 Trail
Description:Shared use bike path Pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail
From:Medina western city limits
To:Medina eastern city limits
Project ID: 2907
Completion Year:2015
MTP Status: CompletedEstimated Cost: $713,318
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520 Trail over 520 Bridge
Description:Shared use bike path Pending outcome of Trans-Lake Corridor studyLocation / Facility:SR 520 Trail over 520 Bridge
From:Eastern Seattle city limits
To:Western Medina city limits
Project ID: 2910
Completion Year:2016
MTP Status: ROW Conditionally ApEstimated Cost: $2,496,614
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520: Eastside Transit and HOV
Description:Add HOV lanes eastbound between Evergreen Point Road and 108th Ave. Move existing HOV lanes and upgrade to full standard lanes to the inside and add a direct HOV access at 108th Avenue. Cost for this project includes the HOV restriping between I-405 (108th Ave) and SR 202 (MTP 4284).Location / Facility:SR 520
From:Evergreen Point Road
To:108th Ave
Project ID: 4252
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $590,276,795
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 520: I-5 to Medina - Evergreen Point Floating Bridge and Landings
Description:The Floating Bridge and Landings Project is one of four projects in the SR 520 Bridge Replacement and HOV Program. The proposed project would replace the SR 520 floating bridge and landings, including the connections to the existing structure east of Foster Island, and to the existing roadway in Medina. The new bridges will meet current design standards for windstorms and earthquakes. The road will have six lanes including two HOV lanes, bicycle/pedestrian facilities, and the ability to accommodate future light rail.Location / Facility:SR 520
From:West end of floating bridge
To:Evergreen Point Road
Project ID: 4251
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $1,136,779,255
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 522 (Nickel)
Description:This project will widen SR 522 from the existing two lanes to four lanes with median separation from the Cathcart Road vicinity (Snohomish River Bridge) to US 2. The proposed action evaluated in this EA includes a new bridge across the Snohomish River, a wildlife crossing near milepost 22, improvements to the 164th St. SE (W Main St) interchange, and a new ramp connection and improvements to the US 2 interchange.Location / Facility:SR 522
From:Snohomish River Bridge
To:US 2
Project ID: 4159
Completion Year:2015
MTP Status: ApprovedEstimated Cost: $150,000,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 522 @ 195th
Description:Construct second half of the existing half-diamond interchange making a full diamond interchange.Location / Facility:SR 522
From:NE 195th Street
To:NE 195th Street
Project ID: 2380
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $46,182,070
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 522 @ Paradise Lake Road Interchange
Description:Construct a new grade separated diamond interchange.Location / Facility:SR 522
From:Paradise Lake Road
To:Paradise Lake Road
Project ID: 4257
Completion Year:2020
MTP Status: CandidateEstimated Cost: $106,060,742
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 522 UW Bothell Campus South Access
Description:Construct a new interchange on SR 522 providing direct access to/from the UW-Bothell/Cascadia Community College joint campus in Bothell. Provide a new signalized intersection approx. one half mile west of the I-405 interchange where a new public street will be constructed from the campus to meet the existing "T" intersection of Woodinville Drive and Brackett's landing. A new bridge over this intersection will allow traffic exiting I-405 to merge onto WB SR 522 unimpeded by turns at the new intersection. The SB I-405 off-ramp to WB SR 522 will be widened to give motorists the option of entering the campus or using the new overpass to SB SR 522.Location / Facility:0
From:UW Bothell/Cascadia Community College
To:one half mile west of I-405
Project ID: 3621
Completion Year:2007
MTP Status: CompletedEstimated Cost: $39,454,870
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 522: Paradise Lk Rd to Snohomish River - Widening
Description:Add two lanes converting a two lane highway to a four lane divided highway. Complete construction of the Fales/Echo Lake Interchange.Location / Facility:SR 522
From: Paradise Lake Rd.
To:Snohomish River
Project ID: 1698
Completion Year:2020
MTP Status: CandidateEstimated Cost: $69,488,073
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 524
Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524
From:24th Ave.
To:SR 527
Project ID: 1714
Completion Year:2025
MTP Status: ApprovedEstimated Cost: $111,000,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 524
Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524
From:SR 527
To:35th/39th Street
Project ID: 4259
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $95,512,919
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 524
Description:Widen to five lanes adding two general purpose lanes and a two-way-left-turn-lane.Location / Facility:SR 524
From:35th/39th Street
To:SR 522
Project ID: 4260
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $72,771,748
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 525
Description:NFS - Connect to proposed ferry terminal location. Costs are develop a new three-lane roadway on new alignment that would access the relocated Mukilteo Ferry Terminal down an environmentally sensitive drainage known as Japanese GulchLocation / Facility:SR 525
From:SR 526
To:Proposed Mukilteo Multimodal Terminal.
Project ID: 1715
Completion Year:2027
MTP Status: UnprogrammedEstimated Cost: $207,617,394
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 527 Ped/Bike I-405 Overcrossing
Description:Add ped / bike facility crossing I-405 from 220th St SE to 228th St SELocation / Facility:SR 527
From:220th St SE
To:228th St SE
Project ID: 3539
Completion Year:2030
MTP Status: CandidateEstimated Cost: $5,272,353
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 529 - Ebey Slough Bridge 529/25 Replacement
Description:This project will replace the existing Ebey Slough Bridge, 529/25, with a new fixed span structure and remove the existing bridge structure. The bridge will be widened from two to four lanes to match the four-lane roadway sections immediately before and after the bridge.Location / Facility:SR 529
From:MP 6.21
To:MP 6.35
Project ID: 5543
Completion Year:2010
MTP Status: CompletedEstimated Cost: $53,686,904
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 531
Description:Four-lane widening with intersection improvementsLocation / Facility:SR 531
From:43rd Ave.
To:SR 9
Project ID: 1639
Completion Year:2030
MTP Status: CandidateEstimated Cost: $52,958,220
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 704 - Cross Base Highway, I-5 to Spanaway Loop Rd
Description:Construct new four-lane, limited access facility between Fort Lewis and McCord Air Base. Includes reconstructed interchange at I-5. Includes Gravelly Thorne Connector: Construct one mile single lane SB roadway connecting Gravelly Lake Drive to Thorne Lane west of the Sound Transit/Burlington Northern Railroad tracks. Also includes bike/ ped separated path.Location / Facility:SR 704 - new alignment located approx. along the common boundary of Ft. Lewis and McChord AFB
From:I-5
To:SR 7
Project ID: 112
Completion Year:2035
MTP Status: UnprogrammedEstimated Cost: $503,240,693
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 9
Description:Widen to four/ five lanes.Location / Facility:SR 9
From:176th St SE
To:SR 96
Project ID: 4206
Completion Year:2020
MTP Status: CandidateEstimated Cost: $74,364,429
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9
Description:Widen to 4 lanes and intersection improvements at Marsh RoadLocation / Facility:SR 9
From:Marsh Rd
To:Snohomish River Bridge
Project ID: 4207
Completion Year:2030
MTP Status: CandidateEstimated Cost: $12,051,057
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9
Description:Widen to 4/5 lanes from US-2 to Lake Stevens RoadLocation / Facility:SR 9
From:US 2
To:Market Place
Project ID: 4208
Completion Year:2035
MTP Status: CandidateEstimated Cost: $82,666,490
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9
Description:Add third NB and third SB through lanesLocation / Facility:SR 9
From:Market Place
To:Lundeen Parkway
Project ID: 4209
Completion Year:2025
MTP Status: CandidateEstimated Cost: $16,000,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9
Description:Widen to 4 lanes and intersection improvementsLocation / Facility:SR 9
From:Snohomish River Bridge
To:US 2
Project ID: 5432
Completion Year:2030
MTP Status: CandidateEstimated Cost: $63,799,716
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9
Description:Intersection improvements at Division Street and 84th StreetLocation / Facility:SR 9
From:SR 92
To:SR 530
Project ID: 5434
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $6,427,278
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9 / US2 Interchange
Description:Reconstruct the SR 9/US 2 I/CLocation / Facility:SR 9 @ US 2
From:SR 9 @ US 2
To:
Project ID: 5433
Completion Year:2030
MTP Status: CandidateEstimated Cost: $24,811,000
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9 @ SR 204 Intersection Improvement
Description:Widen SR 9 for both northbound and southbound to provide one additional through lane at the SR 9/SR 204 intersection. A grade separated option is also being evaluated.Location / Facility:SR 9
From:SR 9 / SR 204 Intersection
To:SR 9 / SR 204 Intersection
Project ID: 4413
Completion Year:2020
MTP Status: CandidateEstimated Cost: $54,842,362
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9 Widening: 212th St. SE to 176th St. SE
Description:Widen SR 9 to 4/5 lanesLocation / Facility:SR 9
From:212th St SE
To:176th St SE
Project ID: 1627
Completion Year:2015
MTP Status: CompletedEstimated Cost: $81,069,418
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9 Widening: SR 522 to 212th St SE
Description:Widen SR 9 to 4/5 lanesLocation / Facility:SR 9
From:SR 522
To:212th
Project ID: 4428
Completion Year:2011
MTP Status: CompletedEstimated Cost: $0
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9: Snohomish River Bridge
Description:Replace bridge with new 4-lane bridge across river. Also, new 4-lane overflow bridge south of Snohomish River with ramp and interchange improvements.Location / Facility:SR 9
From:Snohomish River Bridge
To:Snohomish River Bridge
Project ID: 5431
Completion Year:2030
MTP Status: CandidateEstimated Cost: $108,459,516
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9: Lundeen Pkwy to SR 92
Description:This project adds new northbound and southbound SR-9 through lanes, improves or adds the left and right turn lanes on northbound and southbound SR-9 as needed, adds a left turn lane and extends the right turn lane on SR 92, and upgrades illumination and signal systems at Lundeen Parkway, Soper Hill Rd and SR 92 intersections. The project will treat and detain new impervious stormwater runoff. Location / Facility:SR 9
From:Lundeen Parkway
To:SR 92
Project ID: 4267
Completion Year:2013
MTP Status: CompletedEstimated Cost: $48,155,868
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 9: SR 96 to Marsh Road
Description:This project will widen SR 9 to two lanes in each direction and add left and right turn lanes at SR 96 and Marsh Rd. Other improvements include upgrading the existing lighting and traffic signals and modifying the drainage system at each intersection. Location / Facility:0
From:SR 96
To:Marsh Road
Project ID: 4265
Completion Year:2011
MTP Status: CompletedEstimated Cost: $42,437,544
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 900
Description:Widen to 4 lanes w/ TWLTL. Location / Facility:0
From:Issaquah WCL
To:I-90
Project ID: 1617
Completion Year:2010
MTP Status: CompletedEstimated Cost: $51,154,226
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 99
Description:Add a southbound thru lane on Hwy 99 from 54th to NB On Ramp to I-5. Improve intersection of HWY 99 and 54th Avenue.Location / Facility:SR 99
From:I-5
To:Pacific Highway East/54th Ave
Project ID: 1812
Completion Year:2017
MTP Status: UnprogrammedEstimated Cost: $5,582,031
Type:New Facility-RoadCounty:Pierce County
Sponsor: WSDOTTitle: SR 99/ Evergreen Way: 148tth St SW to Airport Rd
Description:Construct BAT lanes on Evergreen Way / Highway 99 from 148th Street SW to airport Road.Location / Facility:Evergreen Way Transit HOV Treatments
From:148th Street SW
To:Airport Road
Project ID: 4415
Completion Year:2020
MTP Status: CandidateEstimated Cost: $36,572,670
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 99/Viaduct Surface Restoration & Construction Transit Center
Description:Restoration and improvements of Surface Street Alaskan Way following the demolition of the Alaskan Way Viaduct Structure. The project includes an allowance for construction mitigation to replace the loss of parking stalls from under the existing structure.Location / Facility:SR 99
From:S King Street
To:Roy Street
Project ID: 4282
Completion Year:2018
MTP Status: ROW Conditionally ApEstimated Cost: $253,254,054
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 99: 244TH ST. SW to 240th St. SW - BAT Lanes
Description:Add one lane each direction to connect with Business Access and Transit (BAT) lanes that cities have built or are planning to build on each side of the HWY 99 and SR 104 Interchange.Location / Facility:0
From:244th Ave SW
To:240th St. SW
Project ID: 1630
Completion Year:2010
MTP Status: CompletedEstimated Cost: $78,021,696
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: SR 99: S Holgate St to S King St - Viaduct Replacement
Description:Remove and replace the seismically vulnerable viaduct by adding new SR 99 on and off ramps, constructing a new undercrossing at S. Atlantic St, constructing new bicycle/pedestrian paths, signing, illumination, utilities, and drainage.Location / Facility:SR 99
From:S Holgate St.
To:S King St
Project ID: 4280
Completion Year:2013
MTP Status: CompletedEstimated Cost: $445,326,900
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: SR 99: S. King Street to Roy Street – Central Waterfront Viaduct Replacement
Description:The proposed bored tunnel would be constructed under downtown Seattle between the vicinity of S. King Street and Roy Street to replace the seismically vulnerable Alaskan Way Viaduct along the central waterfront. The proposed bored tunnel would move SR 99 to a below-ground alignment under downtown Seattle and would bypass the existing Battery Street Tunnel. The project includes removal of the existing viaduct structure and decommissioning of Battery Street Tunnel.Location / Facility:SR 99
From:S King St
To:Roy St
Project ID: 4281
Completion Year:2016
MTP Status: ApprovedEstimated Cost: $2,546,661,831
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: Tukwila Urban Access Improvement Project
Description:The project will widen Southcenter Parkway to the east from south of Strander Boulevard to the 1-5 northbound off-ramp to provide added storage length for the back-to-back dual left turn lanes between Strander Boulevard and Klickitat Drive. The southbound lanes of Southcenter Parkway will be re-profiled to provide a grade separation at the Klickitat Drive intersection. A new bridge structure maintains the connection between the existing surface grades of Klickitat Drive and northbound and southbound Southcenter Parkway. A new signal on Southcenter Parkway south of Strander Boulevard provides for access management to adjacent businesses and collision reduction. Traffic signal interconnections, pedestrian facilities on the east side of Southcenter parkway will be included.Location / Facility:Southcenter Pkwy
From:Tukwila Pkwy
To:Strander Blvd
Project ID: 3527
Completion Year:2012
MTP Status: ApprovedEstimated Cost: $29,873,559
Type:New Facility-RoadCounty:King County
Sponsor: WSDOTTitle: US 2 "Trestle" ATM
Description:Restripe the east bound carriageway to allow hard shoulder running (3 lanes) during the PM peak and install other companion ATM devices.Location / Facility:0
From:I-5
To:SR 204
Project ID: 5323
Completion Year:2010
MTP Status: CompletedEstimated Cost: $356,807
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Bickford to Monroe
Description:Widen to four lanes. The alignment may be on the existing highway or it may be on R/W purchased for a bypass in the 1960s. The final decision should be resolved in an EIS.Location / Facility:US 2
From:Bickford Ave.
To:City of Monroe (SR 522)
Project ID: 4176
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $420,245,102
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Monroe Bypass - phase 1
Description:Construct a two lane SR 522 extension to the north and terminate at Chain Lake Road that connects to the local street system.Location / Facility:SR 522 Extension
From:North of the SR 522 I/C
To: North of the SR 522 I/C
Project ID: 5444
Completion Year:2020
MTP Status: CandidateEstimated Cost: $45,106,293
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Monroe Bypass phases 2 & 3
Description:Construct a four- lane, limited access bypass around Monroe on new alignment to the north of the city. This project could be constructed in two stages. Location / Facility:US 2 (on new alignment)
From:(west of) SR 522
To:Monroe east City limits
Project ID: 1620
Completion Year:2020
MTP Status: UnprogrammedEstimated Cost: $177,986,161
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Monroe to City of Sultan
Description:Widen the corridor to four lanes.Location / Facility:US 2
From:Monroe east city limits
To:Sultan west city limits
Project ID: 4177
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $304,772,248
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: SR 204 to Bickford
Description:Widen to 4 lanes. Location / Facility:US 2
From:SR 204
To:Bickford Ave.
Project ID: 4175
Completion Year:2040
MTP Status: CandidateEstimated Cost: $82,813,005
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Sultan to Goldbar
Description:In between Sultan and Gold Bar would be a four lane section (two lanes in each direction) separated by a four foot median with rumble strips to improve safety.Location / Facility:US 2
From:City of Sultan east city limits
To:Goldbar West City Limits
Project ID: 1704
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $93,937,140
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Trestle Widening - Stage 1
Description:Build a new westbound US-2 structure over Ebey Slough for the future configuration of 2 general purpose lanes and 1 HOV lane. Realign the westbound SR 204 to westbound US-2 on-ramp utilizing the new westbound structure, improving the weaving conditions for the interchange.Location / Facility:US 2
From:I-5
To:SR 204
Project ID: 4412
Completion Year:2020
MTP Status: CandidateEstimated Cost: $195,054,239
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: Trestle Widening - Stage 2
Description:Widen the trestle to 3 lanes each direction (with HOV lane) with standard lane and shoulder widths and improve the US 2/I-5 interchange. Location / Facility:US 2
From:I-5
To:SR 204
Project ID: 5324
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $731,453,396
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: within Baring
Description:Widen to four lanes (safety related widening)Location / Facility:US 2
From:Enter Baring
To:Leave Baring
Project ID: 5420
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $53,148,645
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: within Goldbar
Description:Within the city of Goldbar, this will be a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.Location / Facility:US 2
From:Gold Bar WCL
To:Gold Bar ECL
Project ID: 5419
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $56,856,690
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 2: within Sultan
Description:The long term vision through Sultan is a four-lane section (two lanes in each direction with bike lanes, sidewalks and a center median). The existing signalized intersections would be replaced with roundabouts.Location / Facility:US 2
From:City of Sultan west city limits
To:City of Sultan east city limits
Project ID: 4178
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $173,440,397
Type:New Facility-RoadCounty:Snohomish County
Sponsor: WSDOTTitle: US 3
Description:Widen from Imperial Way to SR 16 to four lanesLocation / Facility:SR 3
From:Imperial Way
To:Gorst (SR 16)
Project ID: 5422
Completion Year:2040
MTP Status: UnprogrammedEstimated Cost: $134,725,636
Type:New Facility-RoadCounty:Kitsap County
Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY)Title: Colman Dock
Description:WSF facility improvementsLocation / Facility:Alaskan Way S
From:Marion St
To:
Project ID: 5135
Completion Year:2040
MTP Status: CandidateEstimated Cost: $301,141,372
Type:New Facility-RoadCounty:King County
Sponsor: WSDOT MARINE DIV. (PSRC REGION ONLY)Title: Mukilteo Terminal Relocation/Expansion
Description:Terminal relocation/expansionLocation / Facility:Mukilteo Terminal
From:Loveland
To:Cornelia St.
Project ID: 2486
Completion Year:2019
MTP Status: CandidateEstimated Cost: $129,000,000
Type:New Facility-RoadCounty:Snohomish County