STATE OF NEW YORK DEPARTMENT OF TRANSPORTATION
ENGINEERING DIVISION
ALBANY, NEW YORK April 2, 2021
AMENDMENT NO. 3 TO:
CONTRACT NO. D264422
F. A. PROJECT
COUNTY: BRONX
PIN: X110.26 IN THE LETTING OF
MAY 5, 2021 NOTICE TO PROSPECTIVE BIDDERS
1. An amended Project Bid file will be posted at: https://www.dot.ny.gov/bids-and-lettings/construction-contractors/electronic-bid-system/expedite-download-center .
2. The Supplemental Information Available to Bidders for the contract has been updated.
a. Value Engineering Report within Section 13(g) of the CONR9 shall be replaced by thefollowing report D264422_A3_Value Engineering Report and Disposition Forms.pdf
b. A draft PLA agreement to be added to Section 13(j) of the CONR9.c. In addition, Best Value Editable Forms, D264422_A3_Best Value Editable Forms.doc is
attached to be added to Section 13(k) of the CONR9.
d. The Supplemental Information files have been posted at:https://www.dot.ny.gov/portal/page/portal/doing-business/opportunities/const-notices.
3. Change the ESTIMATE QUANTITIES for the following items:
ITEM NO. UNIT QUANTITY 607.41010010 LF 5948 680.92111208 LF 731
The Bidder shall CROSS OUT the ESTIMATE QUANTITIES for the above items now shown in the Contract Proposal and SUBSTITUTE the above quantities for the appropriate item with the bid based on the above quantities.
D264422
1/9
If the Bidder fails to make these changes the Department will do so and adjust the AMOUNT BID and the TOTAL BID accordingly.
Change the quantities for the above items in the ESTIMATE OF QUANTITIES on the Contract Plans.
4. Wherever in the Proposal and Contract Plans the Award Date of “July 5, 2021” is shownshall be changed to “July 6, 2021”.
5. Proposal page deletions/additions/replacements are summarized in the following table:
Old Page # (Replaced or Deleted Only)
New Page #
Description of Changes
8A1 8A2 Best Value Submission Note 64A1 64A2 Revised Conr9
6. Plan sheet deletions/additions/replacements are summarized in the following table:
Old Sheet # (Replaced or Deleted Only)
New Sheet
#
Dwg. # Description of Changes
89A1 89A2 MNR-1 Added Temporary Fencing limits and item 223 223A1 PIP-1 Revised Plan
224A1 224A2 PIP-2 Revised Plan 325 325A1 RW-5 Revised Data in 2 tables 449 449A1 ST1-84 Revised Note 5 of Demolition Procedure
PLEASE BE GOVERNED ACCORDINGLY WHEN SUBMITTING BIDS
D264422
2/9
SPECIAL NOTE BEST VALUE SUBMISSION
Replacement of the Bronx River Parkway Bridge over Metro-North Railroad, PIN X110.26
Substantial Completion Milestone Demobilization;
Contractor’s proposed Project Completion Date.
A possible total of 5 Technical Points for Construction Schedule Narrative, including the Gantt Chart, will be assigned to the Contractor based on the criteria in this section. This encourages proposal submissions with the best understanding of sequencing the work operations and comprehensive schedules.
The Contractor shall provide a Construction Schedule Narrative explaining the sequencing and phasing of work, tasks, logic and any assumptions presented in the schedule. There should be a direct correlation between the Construction Schedule Narrative and the Gantt Chart submitted. In addition, describe factors limiting schedule flexibility or acceleration and potential remedies.
The Gantt Chart shall be limited to no more than 10 pages. The Construction Schedule Narrative shall be limited to no more than 10 pages.
3.2.2 CONSTRUCTION APPROACH – 20 Points
The Contractor shall provide a detailed description of the Construction Approach. A possible to ta l o f 20 Technical Points will be assigned to the Contractor. This description should include written narrative, graphic inserts, charts, and tables as necessary to effectively communicate the approach to the work. The description should address the following items in the same order as shown:
a. Describe the means and methods, including any approvals and construction management,planned to perform the major work elements and discuss how the approach chosen benefitsthe Department and why it is the best solution for constructing the project elements.
b. Describe the coordination needed with other agencies such as NYC MetropolitanTransportation Authority – Metro North Railroad (MNR), New York City Department ofParks & Recreation (NYCDPR), New York City Department of Environmental Protection(DEP), New York City Department of Transportation (NYCDOT), and New York StateDepartment of Environmental Conservation (NYSDEC). Describe the qualifications of theindividual proposed for the Key Personnel position of Railroad Coordinator and why theproposed individual is qualified to provide such services.
c. Using Form RR, list any potential issues and risks that your firm foresees with this project,describe the impact of the risk and the means your firm intends to use to mitigate the risk andminimize impacts to the project. Using Form RR, assign a Level of Impact for each identifiedrisk and a Probability Score. Compute the Risk Score Escalation Number by multiplying theLevel of Impact times the Probability Score.
The Contractor will be scored based on meeting the criteria described above. The Construction Approach shall be limited to no more than 10 pages (including the number of pages necessary for Form RR).
3.2.3 EXPERIENCE & PAST PERFORMANCE – 15 Points
8A2D264422
3/9
CONR9 (01/02/18)
SUPPLEMENTAL INFORMATION AVAILABLE TO BIDDERSThe information checked in the “Digital” column on this form is available at the Contract Documents tab within the Construction Contracting section of the Business Center on the Department’s web site. The information checked in the “Inspection Only” column on this form is available at the Regional Office having jurisdiction for this project, as identified in the advertisement for bids, for inspection and review prior to the letting date. The bidder’s signature on this proposal certifies that they have made themselves aware of the availability of the information indicated below:
THERE IS NO SUPPLEMENTAL INFORMATION AVAILABLE FOR THIS CONTRACT:
INFORMATION Digital1 Inspection Only1. Unsealed Layered or 3D PDF Files2. CADD Information
a. MicroStation DGNb. InRoads DTM and XML formatc. InRoads ALG and XML format
3. Cross Sections in ADOBE PDF format4. Quantity Work-ups2
5. Record Plans6. Rock Cores (available for inspection only)7. Sign Face Layouts in ADOBE PDF format8. Stormwater Pollution Prevention Plan (SWPPP)9. Subsurface Information1.
a. Subsurface Exploration Logsb. Undisturbed Sample Logsc. Laboratory Test Data from Soil Samples – M.O. GEBd. Tabulated Results of Probinge. Tabulated Depth to Bedrockf. Rock Core Evaluation Logs – (DM-B-33 only)g. Compression Test Data from Rock Samplesh. Rock Outcrop Mapsi. Granular Materials Resource Survey Reportsj. Terrain Reconnaissance Reports
10. Subsurface Information - Other Informationa. Subsurface information from outside sourcesb. Source Information - Granular Material and aggregatesc. Special Subsurface Reports
11. Anticipated Construction Schedule12. Asbestos Information
a. Asbestos Blanket Variancesb. Asbestos Report
13. Special Reports or Other Information:a. Permits: NYCDOT-OCMC Construction Permit,
NYCDPR Construction Permit, SPDES Permitb. Design Approval Documentc. Survey Control Reportd. Wetland Compensation Reporte. Hazardous Waste/Contaminated Materials Screening
Assessmentf. Wetland Delineation Reportg. Value Engineering Report and Disposition Formsh. CCTV Sewer Investigation Report
i. Tree Survey Reportj. Draft PLA Agreementk. Best Value Editable Forms
1 – All digital material is provided in ADOBE (PDF) format, unless noted above.2 – Required for all projects.
64A2D264422
4/9
FE
NC
E 5'
FE
NC
E 5'
FENCE 5'
C
C CC
C
C
CC
C
C
NH 100+00
NH 101+00
NH 102+00
NH 103+00
NH 104+00NH 104+00
109+
00
111+
00
112+
00
113+
00
114+
00
115+
00
GRID
NO
RT
H
10'-0"
MNR 10+00
MNR 11+00
MNR 12+00
MNR 13+00
MNR 14+00
MNR 15+00
MNR 15+54
MNR 15+54
MNR 10+00.0
0
POB
MNR 10+60.6
6
PI
MNR 11+19.2
5PI
MNR 11+85.3
4
PI
MNR 12+45.2
9
PI
MNR 13+10.7
9
PC
MNR 14+28.0
8
PT
MNR 15+54.1
3
POE
10'-0"
10'-5†
"
AND UTILITY RELOCATION PLAN
MNR TEMPORARY ACCESS ROAD
5'-0"
4'-0"
BRONX
RIVE
R PA
RKWAY (SB)
CL OF EXISTING RAIL TRACK
EXISTING GRAVEL PARKING LOT/ACCESS ROADWAY
LOT/ACCESS ROADWAY
EXISTING PARKING
CONNECT TO
EXISTING UTILITY POLE TO REMAIN
EXISTING UTILITY POLE TO REMAIN
EXISTING ABUTMENT
EXISTING ABUTMENT
EXISTING UTILITY POLE TO REMAIN
78
78
79
79 79
78
79
EXISTING TRAFFIC CONTROL CABINETEXISTING UTILITY PULL BOX
EXISTING UTILITY PULL BOX
PRO. TGL MNR
MNR-1
EXISTING SANITARY SEWER TO REMAIN
EXISTING STORM SEWER TO REMAIN
TO BE IDENTIFIED
EXISTING CONCRETE VAULT
(CONFIRM)
EXISTING 18" WATER MAIN TO REMAIN
PROPOSED CONSTRUCTION AREA
OVERHEAD WIRES
RELOCATED
EXISTING ASPHALT DRIVEWAY
THROUGH EXISTING DRIVEWAY DURING CONSTRUCTION
TEMPORARY RAILROAD PERSONNEL ACCESS TO MNR FACILITY
ACCESS DRIVEWAY
EXISTING RAILROAD PERSONNEL
TRANSFORMER
EXISTING ELECTRICAL
TO BE IDENTIFIED
EXISTING MNR COMMS MANHOLE
EXISTING AT GRADE CROSSING
UNDER ITEM 619.2601
THE COST TO BE PAID FOR
DURATION OF CONSTRUCTION,
ACCESS DRIVEWAY FOR THE
MAINTAIN THE TEMPORARY
THE CONTRACTOR SHALL
TO BE RELOCATED
AND TO THE ABUTMENT
MOUNTED TO THE POLE
EXISTING OVERHEAD WIRES
C.
JE
NN
EJ.
LIU
C.
JE
NN
EJ.
LIU
ITEM 607.10010011
PROPOSED DECORATIVE PROTECTIVE SCREENING,
ITEM 607.0516
TEMPORARY FENCE, 16 FT HIGH,
QUANTITY = 154 CY
AFTER COMPLETION OF BRIDGE CONSTRUCTION
BALLAST WILL BE LEFT IN PLACE
DETAILS. 9" THICK BALLAST, ITEM 623.12.
SEE DWG. NOS. MPP-7, MNR-2 AND MNR-3 FOR
TO BE CONSTRUCTED IN STAGE 1A,
TEMPORARY MNR PERSONNEL BALLASTED ACCESS ROAD
10 FT WIDE
ABUTMENT (TYP.)
BRIDGE
MNR
ABUTMENT
SHIELDS ITEM NUMBERS AND DETAILS)
DWG. NOS. RD-4 AND RD-5 FOR PROTECTIVE
AND EQUIPMENT SHEDS, ITEM 608.020102 (SEE
ACCESS TO SIGNAL MAINTAINER'S BUILDING
TEMPORARY RAILROAD PERSONNEL
TO BE RELOCATED BY MNR
EXISTING POLE 2
89A2
BY MNR
EXISTING POLE TO BE RELOCATED 2
EXISTING POLE TO BE RELOCATED BY MNR
2
2
EXISTING POLE TO BE RELOCATED BY MNR2
2
EXISTING POLE TO BE RELOCATED BY MNR 2
2
EXISTING POLE TO BE RELOCATED BY MNR
EXISTING POLE TO BE RELOCATED BY MNR2
2
2
2 AMENDMENT NO. 2 - MARCH 8, 2021
SEE NOTE 1
RELOCATED POLE
RELOCATED POLE, SEE NOTE 1
SEE NOTE 1
RELOCATED POLE
RELOCATED POLE, SEE NOTE 1
SEE NOTE 1
RELOCATED POLE
SEE NOTE 1
RELOCATED POLE
SEE NOTE 1
RELOCATED POLE
SEE NOTE 1
RELOCATED POLE
0 30 60 90 120'30
1" = 60'
0 30 60 90 120'30
1" = 60'
2
SHALL BE DETERMINED BY METRO-NORTH RAILROAD.
1. RELOCATED POLE LOCATIONS ARE APPROXIMATE AND FINAL LOCATIONS
NOTE:
2
619.67020010. SEE NOTE 2 AND DRAWING TLP-21 FOR ADDITIONAL INFORMATION.
MODIFICATION OF THE EXISTING ABUTMENT. COST TO BE INCLUDED IN ITEM
TEMPORARY RELOCATED AS REQUIRED TO ALLOW CONSTRUCITON OF THE RETAINING WALL AND
LIGHT'S OVERHEAD SERVICE WIRES (MNR TRACK INTERLOCKING LIGHTING SYSTEM) TO BE
THE EXISTING FLOOD LIGHTS MOUNTED TO THE EXISTING BEGIN ABUTMENT INCLUDING THE
2
BRONX
RIVE
R PA
RKWAY (NB)
PAID FOR UNDER ITEM 670.91100010.
A NEW POLE SHALL BE USED AND
PAID FOR UNDER ITEM 670.90030009.
THE POLE RELOCATION WORK IS TO BE
AND CLEAR THE NEW RETAINING WALL.
THE OVERHEAD INTERLOCKING LIGHTING WIRES
POLE IS AS REQUIRED TO SUPPORT
WALL. THE LOCATION OF THE UTILITY
ALLOW CONSTRUCTION OF THE RETAINING
RELOCATED BY THE CONTRACTOR TO
EXISTING UTILITY POLE TO BE
THE INTERLOCK LIGHTING WORK SHALL BE PAID FOR UNDER ITEM 619.67020010.
INSTALLED BACK ONTO THE EXISTING ABUTMENT WALL. THE COST OF THE RELOCATION OF
THE ABUTMENT MODIFICATION WORK IS COMPLETE THE INTERLOCK LIGHTING SHALL BE
SHIELDING AND/OR UTILITY POLES AS NEEDED TO LIGHT THE TRACK INTERLOCKING. AFTER
ABUTMENT. THE INTERLOCKING LIGHTING CAN BE TEMPORARY RELOCATED TO THE TEMPORARY
AND ACCEPTED BY MNR FOR BOTH THE TEMPORARY RELOCATION AND THEIR RETURN TO THE
TO LOCATE/ POSITION THE LIGHTING UNTIL THE TRACK INTERLOCKING IS ADEQUATELY LIT
AND RETAINING WALL WORK AND WILL REQUIRE THE CONTRACTOR TO COORDINATE WITH MNR
LIGHTING SYSTEM) IS NECESSARY TO CARRY OUT THE EXISTING ABUTMENT MODIFICATION
RELOCATION OF THE FLOOD LIGHTS AND ITS OVERHEAD SERVICE WIRES (INTERLOCK
LIGHTING OF THE TRACK INTERLOCKING BY METRO-NORTH RAILROAD (MNR). THE TEMPORARY
2. THE EXISTING FLOOD LIGHTS MOUNTED TO THE BEGIN ABUTMENT ARE UTILIZED FOR THE
AMENDMENT NO. 3 - MARCH 31, 20213
3
THIS SHEET SUPERSEDES SHEET 89A1
3
3
ITEM 607.41010010
BARRIER FENCE
TEMPORARY PLASTIC
3
E: 1022587.118
N: 266411.164
E: 1022598.811
N: 266377.457
E: 1022608.560
N: 266400.419
N: 266619.648, E: 1022692.972
E: 1022659.015
N: 266525.9383
E: 1023012.496
N: 266948.789
3
E: 1022606.118
N: 266243.769
ATTACH END OF FENCE TO VERTICAL SHIELD
ITEM 607.41010010
TEMPORARY PLASTIC BARRIER FENCE
TO VERTICAL SHIELD
ATTACH END OF FENCE
ITEM 607.41010010
BARRIER FENCE
TEMPORARY PLASTIC
CLEARING AND GRUBBING.
BALLAST FOR THE ACCESS DRIVEWAY SHALL BE PAID FOR UNDER ITEM NO. 201.06 -
3. ALL NECESSARY CLEANING AND GRUBBING PRIOR TO EXCAVATION AND INSTALLATION OF
NOTES CONTINUED:
2
x11026_c
ph_
mnr access_
A2.d
gn
01-
AP
R-2021 12:5
1
jbager
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION: 11
X110.26
BRONX
1-07504-9
D264422METRO-NORTH RAILROAD
REPLACEMENT OF THE BRONX RIVER PARKWAY BRIDGE OVER
ON:
AFFIX SEAL: HARDESTY & HANOVER, LLC
D.
WA
NJ.
BA
GE
RJ.
BA
GE
R
SS
S
S
E
S
S
S
S
STA
TEOFNEWYOR
K
LI C
EN
SE
PROFESSIONAL
EN
GIN
EE
R
D
JN
CE
X ELSIOR
U LIU
NO.09 16
64
3
5/9
E E
#X002633
#X002784
E
W
E
E
#X002783
E
E
E
BENCHES
S
S
SS
S
SS
W
W
S
SW
B 103+00
B 104+00
100+00
101+00
102+00 103+00
104+00
GRID
NO
RT
H
BRONX RIV
ER
FLOW
E 233R
D ST
NYS RTE 907H BRONX RIVER PARKWAY (NB)
NYS RTE 907H BRONX RIVER PARKWAY (SB)
RAMP B
E 233R
D ST
x11026_c
ph_IT
S_gn
p_01.d
gn_
A1
25-
MA
R-2021 14:4
5
adonayre
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION: 11
X110.26
BRONX
1-07504-9
D264422METRO-NORTH RAILROAD
REPLACEMENT OF THE BRONX RIVER PARKWAY BRIDGE OVER
ON:
AFFIX SEAL: HARDESTY & HANOVER, LLC
D.
WA
NJ.
BA
GE
RJ.
BA
GE
R
MAT
CH LI
NE - S
HEET pip-02
0 20 40 60 80'20
1" = 40'
CONC. MEDIAN BARRIER
ITEM DESCRIPTION UNIT QUANTITY
680.99120011 FT 8540
670.2306 2" CONDUIT, COATED PLASTIC STEELGALVANIZED FT 1380
670.2307 2.5" CONDUIT, COATED PLASTIC STEELGALVANIZED FT 650
670.2310 4" CONDUIT, COATED PLASTIC STEELGALVANIZED FT 1810
683.17003011 POLE CAMERA30' EACH 1
683.10110008 TYPE BARREL ASSEMBLY CAMERA IPHD EACH 1
680.97105011 CABINET A TYPE EQUIPMENT CONTROL MOUNTEDPOLE EACH 2
680.53000211 36"X24"X8" BOX PULL MOUNT STRUCTURE 4X NEMAS.S. EACH
683.96050308 EACH 2
ITEM DESCRIPTION UNIT QUANTITY
670.40 BOXES JUNCTION IRONCAST EACH 3
680.510501 EACH 9
680.92111208 FIBERS CABLE-12 OPTICFIBER FT
680.96037211 FIBERS 72 MODE SINGLE CABLE OPTICFIBER FT 4920
680.98124811 FIBER 12 - PANEL TERMINATION OPTICFIBER FT 6
EACH
683.09230208 TYPE-II SWITCH ETHERNET HARDENEDFIELD EACH
680.53010010 CONDUIT EXISTINGCLEAN FT 300
206.05 EXCAVATION PITTEST EACH
1851
for more information
see electrical sheets
EACH 3680.51960011
4
1
1
4
680.510501PAY ITEM
TYPE E
683.96050308
680.51960011PAY ITEM
SPLICE ENCLOSURE
TYPE F1 MANHOLE WITH
680.510501PAY ITEM
TYPE F2 PULL BOX
FIBER OPTIC SPLICE ENCLOSURE & SPLICE TRAY
TELEPHONE DEMARCATION CABINET TYPE 2 PIN ONLY
680.510501PAY ITEM
TYPE E
FURNISH AND INSTALL CONCRETE FIBER OPTIC PULLBOX (TYPE F1)
683.06020011
FIBER OPTIC INNERDUCT, 1 CHANNEL
PULLBOX-RECTANGULAR, 26"X18", REINFORCED CONCRETE (TYPE F2, E)
INCLUDED)
CONDUIT EXCAVATION AND BACKFILL - (RESTORING TOP SURFACES NOT 206.03010010 LF
680.96460011 EA 1
731
LF670.7002 SINGLE CONDUCTOR CABLE, NUMBER 2 GAGE 4640
670.7501 LF 1550GROUND WIRE NUMBER 6 AWG
FIBER OPTIC CABLE SPLICE
608.01010125 WORK PAD 1EACH
(TYP)
206.03010010
PAY ITEM
FIBER TRENCH
ITS POWER AND
(TYP)
670.2306PAY ITEM
NEW 2" ITS POWER CONDUIT
680.96037211
680.99120011
670.2310PAY ITEM
DUCT, 2 INNER DUCT SPARE) (TYP)
72 FIBER CABLE (ONE CABLE PER INNER
ITS 4" C WITH 4-1" INNER DUCT WITH (2) -
4. QTY SHOWN ONLY APPLY TO ITS.
ONLY.
PAY ITEM FOR TRENCHING IN STREET LIGHTING
206.03010010, PAYMENT SHALL BE MADE UNDER THE
TRENCH IS SATISFIED AS FOUND IN PAY ITEM
ELECTRICAL CONDUITS.IF THE DEFINTION OF SAME
THE SAME TRENCH WITH STREET LIGHTING
3. ITS CONDUIT (ELECTRICAL AND FIBER) CAN BE IN
TRENCH, THERE SHALL BE NO SEPERATE PAYMENT.
2. INSTALL FIBER AND POWER CONDUIT IN THE SAME
1. SEE ITS GENERAL NOTES FOR MORE REQUIREMENTS.
NOTES:
FT 280206.03120011 CONDUIT INSTALLED ON ABOVE GRADE STRUCTURESea683.03100011 1CAMERA SUPPORT, POLE MOUNT (NEW)
CONC. CURB
GUIDE RAILING (TYP)
this sheet supersedes sheet 223.
3 amendment no. 3 - march 31, 2021
3
PIP-1
223A1
A.
DO
NA
YR
ET.
KO
ST
ADIN
OV
A.
DO
NA
YR
ET.
KO
ST
ADIN
OV
ITS PLAN 13/25/2021
6/9
BRONX RIVER P
ARKWAY (SB)
BRONX RIVER P
ARKWAY (NB)
BRONX RIVER P
ARKWAY (SB)
BRONX RIVER P
ARKWAY (NB)
E
#4301
3 STORY METAL SIDING & BLOCK
PARKING LOT(BRONX RIVER VOLKSWAGON)
CONCRETE BUILDING
B 105+00
B 106+00
B 107+00
B 108+00
105+00
106+00107+00
108+00
109+00
SHL
R
7'-
0"
GRID
NO
RT
H
FLOW
NY907H BRONX RIVER PARKWAY (NB)
NY907H BRONX RIVER PARKWAY (SB)
RAMP B
BULL
ARD
AVE
BRONX BLVD
BRONX RIVER
PT
x11026_c
ph_IT
S_gn
p_02.d
gn_
A2
25-
MA
R-2021 14:4
6
adonayre
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION: 11
X110.26
BRONX
1-07504-9
D264422METRO-NORTH RAILROAD
REPLACEMENT OF THE BRONX RIVER PARKWAY BRIDGE OVER
ON:
AFFIX SEAL: HARDESTY & HANOVER, LLC
D.
WA
NJ.
BA
GE
RJ.
BA
GE
R
MAT
CH LI
NE - S
HEET piP-03
MAT
CH LI
NE - S
HEET piP-01
0 20 40 60 80'20
1" = 40'
EXISTING ITS JB
SIGN STRUCTURE
information
sheets for more
see lighting
information
sheets for more
see lighting
EXISTING ITS JB
680.510501PAY ITEM
TYPE E
680.510501PAY ITEM
TYPE F2 PULL BOX
680.510501PAY ITEM
TYPE E
(TYP)
206.03010010
670.2306PAY ITEM
NEW 2" ITS POWER CONDUIT
206.03010010
680.96037211
680.99120011
670.2310PAY ITEM
INNER DUCT, 2 INNER DUCT SPARE) (TYP)
(2) - 72 FIBER CABLE (ONE CABLE PER
ITS 4" C WITH 4-1" INNER DUCT WITH
STRUCTURE
MOUNTED ON SIGN
CCTV CAMERA pole
PAY ITEM 680.53000211
BOX ON SIGN STRUCTURE
ITS POWER CONDUIT PULLPAY ITEM 680.53000211
BOX ON SIGN STRUCTURE
ITS FIBER CONDUIT PULL
PAY ITEM 680.53000211
BOX ON SIGN STRUCTURE
ITS POWER CONDUIT PULL
PAY ITEM 680.53000211
BOX ON SIGN STRUCTURE
ITS FIBER CONDUIT PULL
670.7501
670.7002
PAY ITEMS:
CCTV (TYP)
GND POWER CONDUCTORS FOR
NEW (3)#2awg, (1)#6AWG
670.7501
670.7002
PAY ITEMS:
CCTV (TYP)
GND POWER CONDUCTORS FOR
NEW (3)#2awg, (1)#6AWG670.7501
670.7002
PAY ITEMS:
CONDUCTORS END AT CCTV CABINET)
CONDUCTORS FOR CCTV (NEW
NEW (3)#2awg, (1)#6AWG GND POWER
680.96460011
680.51960011PAY ITEM
FIBER OPTIC SPLICE
TYPE F1 MANHOLE WITH
CABLE LEFT IN THE CONDUIT
REMOVE ANY ELECTRICAL
680.53010010PAY ITEM
PULL BOX (120ft)
TO EXISTING METER CABINET
CLEAN EXISTING 4" CONDUIT
THE CONDUIT
REMOVE ANY CABLE LEFT IN
680.53010010PAY ITEM
CABINET (120FT)
TO EXISTING VERIZON
CLEAN EXISTING 4" CONDUIT
min 4'x4'x4"
work pad pay item: 608.01010125
(TYP)
206.03010010
PAY ITEM
FIBER TRENCH
ITS POWER AND
680.96037211
680.99120011
670.2310PAY ITEM
INNER DUCT, 2 INNER DUCT SPARE) (TYP)
(2) - 72 FIBER CABLE (ONE CABLE PER
ITS 4" C WITH 4-1" INNER DUCT WITH
(TYP)
206.03010010
PAY ITEM
FIBER TRENCH
ITS POWER AND
(TYP)
670.2306
PAY ITEM
NEW 2" ITS FIBER CONDUIT
(TYP)
670.2306PAY ITEM
NEW 2" ITS POWER CONDUIT
(TYP)
670.2306
PAY ITEM
NEW 2" ITS FIBER CONDUIT
(TYP)
670.2306PAY ITEM
NEW 2" ITS POWER CONDUIT
(TYP)
670.2306PAY ITEM
NEW 2" ITS POWER CONDUIT
(TYP)
670.2306
PAY ITEM
NEW 2" ITS FIBER CONDUIT
206.03120011
PAY ITEM 670.2306
ON SIGN STRUCTURE
ROUTED ACROSS ROADWAY
ITS POWER CONDUIT
206.03120011
680.92111208
670.2306
PAY ITEM
STRUCTURE
ACROSS ROADWAY ON SIGN
ITS FIBER CONDUIT ROUTED
683.03100011 -CAMERA SUPPORT, POLE MOUNT (NEW)
Telephone Demarcation Cabinet Type-2 PIN only-683.06020011
Pole Mounted Control Equipment Type A Cabinet-680.97105011
30 FT CAMERA POLE-683.17003011
Fiber Optic Cable-12 Fibers- 680.92111208
Fiber Optic Termination Panel - 12 Fiber-680.98124811
Field Hardened Ethernet Switch Type-II-683.09230208
IP Camera Assembly Barrel TypeHD-683.10110008
Pay items:
CONC. MEDIAN
SEE NOTE 4
2
2
2 amendment no. 2 - march 8, 2021
3 amendment no. 3 - march 31, 2021
this sheet supersedes sheet 224A1.
3
680.92111208 (TYP)
Fibers PAY ITEM
Fiber Optic Cable-12
3
680.92111208 (TYP)
Fibers PAY ITEM
Fiber Optic Cable-12 3
680.92111208 (TYP)
Fibers PAY ITEM
Fiber Optic Cable-12
3
2
SEE NOTE 5
3
UTILITY CABINETS ACROSS BRONX BLVD.
CABLES IN THE RESPECTIVE CONDUITS AND TO THE RESPECTIVE
EXISTING CABLES AND RUN NEW POWER CONDUCTORS AND FIBER
5. CONTRACTOR SHALL CLEAN EXISTING 4" CONDUITS, REMOVE
IN PLACE.
4. EXISTING CONDUIT, PULL BOXES AND CONDUCTORS TO BE ABANDONED
TRENCHING IN STREET LIGHTING ONLY.
206.03010010, PAYMENT SHALL BE MADE UNDER THE PAY ITEM FOR
DEFINTION OF SAME TRENCH IS SATISFIED AS FOUND IN PAY ITEM
TRENCH WITH STREET LIGHTING ELECTRICAL CONDUITS.IF THE
3. ITS CONDUIT (ELECTRICAL AND FIBER) CAN BE IN THE SAME
SHALL BE NO SEPERATE PAYMENT.
2. INSTALL FIBER AND POWER CONDUIT IN THE SAME TRENCH, THERE
1. SEE ITS GENERAL NOTES FOR MORE REQUIREMENTS.
NOTES:
3
PIP-2
224A2
A.
DO
NA
YR
ET.
KO
ST
ADIN
OV
A.
DO
NA
YR
ET.
KO
ST
ADIN
OV
ITS PLAN 2
3/25/2021
7/9
x11026_c
pb_ge
o_
wal_
h ge
om.d
gn
25-
MA
R-2021 12:0
3
djudge
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION: 11
X110.26
BRONX
1-07504-9
D264422METRO-NORTH RAILROAD
REPLACEMENT OF THE BRONX RIVER PARKWAY BRIDGE OVER
D.
WA
Nj. bager
j. bager
ON:
AFFIX SEAL: INFRATECH ENGINEERING
SOUTHEAST
SOUTHEAST SECONDARY
NORTHEAST
NORTHEAST SECONDARY
NORTHWEST
EAST ARCH BRIDGE
WEST ARCH BRIDGE
NOTES:
RW-5
TABLES
HORIZONTAL GEOMETRY
RETAINING WALLS
L.
JO
HN
D.
PE
TE
RS
ON
D.
JU
DG
ED.
PE
TE
RS
ON
1/18/2021 FOR ELEVATIONS AND PILE SCHEDULE
SEE DWGS. RW-15, RW-22 AND RW-26
THIS SHEET SUPERSEDES SHEET 325
AMENDMENT N0. 3 - MARCH 22, 20213
3
325A1
3
8/9
SUGGESTED DEMOLITION PROCEDURE:
SUGGESTED ERECTION PROCEDURE:
GENERAL DEMOLITION NOTES: GENERAL ERECTION NOTES:
ST1-84ERECTION SEQUENCE NOTESSUGGESTED DEMOLITION AND
M.
MO
RE
NO
J.
BA
GE
RM.
MO
RE
NO
J.
BA
GE
R
ABUTMENT.
POUR CONCRETE FOR DECK SLAB AND UPPER PORTION OF INTEGRAL 9.
ABUTMENT (SEE DRAWINGS ST1-49 FOR DETAILS)
SET REINFORCEMENT FOR DECK SLAB AND UPPER POUR OF INTEGRAL 8.
INSTALL STAY IN PLACE FORMWORK.7.
DURING TRACK OUTAGE INSTALL SHIELDING.6.
ABUTMENT. SECURE THE SUPPORT SEAT.
DURING TRACK OUTAGES ERECT GIRDERS ONTO THE LOWER PORTION OF 5.
POSITION THE CRANES FOR ERECTION OF NEW GIRDERS, SEE NOTE 9.4.
NEXT STAGE. MOVE GIRDER TO LIFTING POINT.
ON EXTERIOR FACE OF GIRDER FOR CONNECTION WITH GIRDERS FOR
DIAPHRAGMS BETWEEN GIRDERS TO BE ERECTED. INSTALL DIAPHRAGMS
PERFORM PREPARATORY WORK - SPLICE GIRDER SEGMENTS, INSTALL 3.
CONSTRUCTION PLANS.
WITHIN THE STAGE LIMITS AS SPECIFIED ON THE ABUTMENT
AFTER CONSTRUCTION OF LOWER PORTION (CAP) OF INTEGRAL ABUTMENT 2.
OPERATIONS.
FOR EACH STAGE PERFORM WZTC AS REQUIRED TO CARRY WORK 1.
TO THE EIC APPROVAL.
THE SCHEDULE, UNIT COST AND PAY LIMITS ARE MAINTAINED SUBJECT
SYSTEM/HEIGHT OF EXCAVATION MAY BE MODIFIED TO PROVIDE SAFETY.
LOCATIONS, THE CONTRACTOR IS MADE AWARE THAT THE PROTECTION
AND CLOSENESS TO ACTIVE TRAFFIC DEEMS IT NECESSARY. AT THESE
PART OF THE DESIGN, ESPECIALLY AT LOCATIONS WHERE THE HEIGHT
IN BETWEEN STAGES ARE DESIGNED ASSUMING WALES AND BRACING AS
PARTICULAR SITUATION. SOLIDER PILE AND LAGGING PROTECTION WALLS
THE CONTRACTOR SHALL PROVIDE EQUIPMENT SUITABLE FOR THAT
MICROPILE MATERIAL AND INSTALLATION EQUIPMENT IS VERY LIMITED.
FOR STAGES 2 AND 4, THE AVAILABLE SPACE TO PROVIDE THE 6.
WEEKEND NIGHTS.
GIRDER ERECTION REQUIRES FULL TRACK OUTAGE AVAILABLE ON 5.
AND DRAWINGS FOR EACH GIRDER.
DEVELOPMENT OF THE ERECTION PLANS INCLUDING THE CALCULATIONS
ALL CONSTRUCTION ENGINEERING NECESSARY INCLUDING THE
RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PERFORMING
SUGGESTED ERECTION PLAN SHOWN IS CONCEPTUAL AND DOES NOT 4.
SPECIFICATIONS AND THE CONTRACT PLANS AND PROPOSAL.
THE REQUIREMENTS OF THE NYSDOT AND METRO-NORTH RAILROAD
DEMOLITION AND STEEL ERECTION PLANS SHALL BE IN ACCORDANCE TO 3.
LIFTING OPERATIONS.
GIRDER DURING LIFTING AND DETAILED SEQUENCE OF WORK AND
WITH NECESSARY CALCULATIONS SHOWING ADEQUACY OF THE NEW
ERECTION PLAN SHALL INCLUDE PREPARATORY WORK BEING PERFORMED 2.
RIGGING.
GIRDER SEATS AND INSTALLING LIFTING POINTS AND ATTACHMENTS OF
TOGETHER, INSTALLATION OF THE DIAPHRAGMS AND SETTING THE
OF GIRDER TO PICK LOCATION, SPLICING THE GIRDER SEGMENTS
PREPARATORY WORK MAY CONSIST OF BUT NOT TO THE TRANSPORTING
EFFICIENT ERECTION OF THE STRUCTURE DURING TRACK OUTAGES.
PERFORM ALL PREPARATORY WORK IN ADVANCE IN ORDER TO ALLOW
ARE REQUIRED FOR LIFTING OPERATIONS THE CONTRACTOR SHALL
DUE TO THE RESTRICTIVE TIME PROVIDED FOR TRACK OUTAGES THAT 1.
LIFTING POINTS AND ATTACHMENTS OF RIGGING.
WITH TEMPORARY BOLTS OF STEEL CONNECTIONS AND INSTALLING
PRE-CUTTING OF STEEL AND/OR RIVET REMOVAL AND REPLACEMENT
PREPARATORY WORK SHALL CONSIST OF SAW CUTTING DECK,
EFFICIENT REMOVAL OF THE STRUCTURE DURING TRACK OUTAGES.
PERFORM ALL PREPARATORY WORK IN ADVANCE IN ORDER TO ALLOW
ARE REQUIRED FOR LIFITING OPERATIONS THE CONTRACTOR SHALL
DUE TO THE RESTRICTIVE TIME PROVIDED FOR TRACK OUTAGES THAT 11.
TO BE MOVED AWAY AFTER COMPLETION OF EACH OPERATION.
CONSTRUCTION STAGES. ON EACH OF THESE CASES, THE CRANES ARE
NEEDED FOR ERECTION OF THE NEW BRIDGE WITH IS BEING BUILT IN
STAGES 2 AND 4. THE LARGE CRANES OR OTHER METHODS ARE ALSO
CRANES OR OTHER METHODS, THESE ARE TO BE BROUGHT IN FOR
DEMOLITION AND MAINTENANCE OF TRAFFIC, WOULD REQUIRE LARGE
PLACING OF THE STRONGBACK GIRDERS THAT WILL ALLOW FOR STAGED 10.
OUTAGE.
LIGHTING OPERATION WILL BE ALLOWED OVER THE TRACKS WITHOUT AN
DEMOLITION AND CONSTRUCTION OF THE NEW BRIDGE, NO CRANE
SAFETY SHIELDING, WHICH IS TO BE IN PLACE AT ALL TIMES DURING
ACTIVE AS PER MNR SCHEDULE AND WITH THE USE OF PROTECTIVE
PERMIT STIPULATIONS. MNR TRACKS BELOW THE BRIDGE, WILL BE
THAT LANE CLOSURES NEEDED ARE WITHIN THE LIMITS OF THE OCMC
SMALL ENOUGH THAT THEY CAN BE PICKED UP AND CARTED AWAY, SO
PIECES OF THE BRIDGE (DECK, STRINGERS AND FLOORBEAMS) ARE
EQUIPMENT ARE USED TO DEMOLISH THE BRIDGE IN SUCH A WAY THAT
DEMOLITION SHALL BE SET IN SUCH A WAY THAT SMALL CRANES OR 9.
TO MNR NOTES ON THE PLANS (DWG. GN-3) AND SPECIFICATIONS.
OPERATING DURING ACTIVE TRACK, FOR THIS OPERATION WE REFER YOU
AND AVAILABLE TRACK OUTAGES. MNR WILL NOT ALLOW ANY LIFTING
WITH MNR WHO WILL BE PROVIDING THE REQUIRED FLAGGING, SAFETY
DEMOLITION OF THE EXISTING BRIDGE WILL BE MADE IN COORDINATION 8.
OF THE EXISTING BRIDGE.
DURING CONSTRUCTION OF THE INTEGRAL ABUTMENT AND DEMOLITION
STAGES 2 AND 4 DUE TO THE 10 FT. WIDE LANES BEING PROVIDED
THEIR EQUIPMENT IN ALL STAGES. THIS IS VERY CRITICAL DURING
THE CONTRACTOR IS MADE AWARE OF THE TIGHT AVAILABLE SPACE FOR 7.
WEEKEND NIGHTS.
REMOVAL REQUIRES ALL TRACKS OUT OF SERVICE AVAILABLE ON
FROM THE CENTER OF THE SPAN TOWARDS EACH ABUTMENT. GIRDER
PERFORMED 1/2 OF THE SPAN AT A TIME. THE REMOVAL WILL PROCEED
THE CONCRETE DECK, FLOORBEAM AND STRINGERS MAY HAVE TO BE
DUE TO THE LIMITED AVAILABLE ALL TRACK OUTAGES THE REMOVAL OF 6.
THE DEMOLITION PLANS OF THE BRIDGE FOR EACH STAGE.
PERFORMANCE OF THE CALCULATIONS AND DRAWING DEVELOPMENT OF
ALL CONSTRUCTION ENGINEERING NECESSARY INCLUDING THE
RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PERFORMING
SUGGESTED DEMOLITION PLAN SHOWN IS CONCEPTUAL AND DOES NOT 5.
SPECIFICATIONS AND THE CONTRACT PLANS AND PROPOSAL.
THE REQUIREMENTS OF THE NYSDOT AND METRO-NORTH RAILROAD
DEMOLITION AND STEEL ERECTION PLANS SHALL BE IN ACCORDANCE TO 4.
DETAILED SEQUENCE OF WORK AND LIFTING OPERATIONS.
THE STRUCTURE WITH PRE-CUTS OR CONNECTION MODIFICATIONS AND
PERFORMED WITH NECESSARY CALCULATIONS SHOWING ADEQUACY OF
DEMOLITION PLAN SHALL INCLUDE PREPARATORY WORK BEING 3.
AND INSTALLING LIFTING POINTS AND ATTACHMENTS OF RIGGING.
AND REPLACEMENT WITH TEMPORARY BOLTS OF STEEL CONNECTIONS
CUTTING OF DECK, PRE-CUTTING OF STEEL AND/OR RIVET REMOVAL
PREPARATORY WORK SHALL CONSIST OF BUT NOT LIMIT TO THE SAW
EFFICIENT REMOVAL OF THE STRUCTURE DURING TRACK OUTAGES.
PERFORM ALL PREPARATORY WORK IN ADVANCE IN ORDER TO ALLOW
ARE REQUIRED FOR LIFTING OPERATIONS THE CONTRACTOR SHALL
DUE TO THE RESTRICTIVE TIME PROVIDED FOR TRACK OUTAGES THAT 2.
EXISTING CONCRETE DECK IS NON COMPOSITE.1.
FOR STAGE 3 AND 5 REMOVE TEMPORARY STRONGBACK.7.
PERFORM STEP 3 FOR EACH COMPONENT UNTIL ALL IS REMOVED.6.
DEMOLITION PLAN.
STRINGERS, FLOORBEAMS AND GIRDERS IN ACCORDANCE TO THE
DURING TRACK OUTAGES REMOVE THE CONCRETE DECK SEGMENTS, 5.
LIFT.
POSITION THE CRANE/EQUIPMENT THAT WILL BE UTILIZED FOR THE 4.
MODIFICATIONS AS REQUIRED.
PERFORM PREPARATORY WORK; SAW CUT DECK AND STEEL REMOVAL 3.
FOR STAGE 2 AND 4 INSTALL STRONGBACK.2.
OPERATIONS.
FOR EACH STAGE PERFORM WZTC AS REQUIRED TO CARRY WORK 1.
3
3
tHIS SHEET SUPERSEDES SHEET 449
449
AMENDMENT NO. 3 - MARCH 25, 2021
x11026_gir
_de
m_ere
_n
otes_449_
A1
25-
MA
R-2021 09:5
1
jbager
BRIDGES CULVERTSPIN
JO
B
MA
NA
GE
RD
ESIG
N
SU
PE
RVIS
OR
COUNTY:
PR
OJ
EC
T
MA
NA
GE
RD
ESIG
ND
RA
FTIN
GC
HE
CK
CH
EC
K
DESCRIPTION OF ALTERATIONS:
AS-BUILT REVISIONS ALL DIMENSIONS IN ft UNLESS OTHERWISE NOTED
FIL
E
NA
ME
=
US
ER
=
DA
TE/
TI
ME
=
ON:
ALTERED BY:
SHALL STAMP THE DOCUMENT AND INCLUDE THE NOTATION "ALTERED BY" FOLLOWED BY THEIR SIGNATURE, THE DATE OF SUCH ALTERATION, AND A SPECIFIC DESCRIPTION OF THE ALTERATION.
TO ALTER AN ITEM IN ANY WAY. IF AN ITEM BEARING THE STAMP OF A LICENSED PROFESSIONAL IS ALTERED, THE ALTERING ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR
IT IS A VIOLATION OF LAW FOR ANY PERSON, UNLESS THEY ARE ACTING UNDER THE DIRECTION OF A LICENSED PROFESSIONAL ENGINEER, ARCHITECT, LANDSCAPE ARCHITECT, OR LAND SURVEYOR,
CONTRACT NUMBER
DRAWING NO.
SHEET NO. REGION: 11
X110.26
BRONX
1-07504-9
D264422METRO-NORTH RAILROAD
REPLACEMENT OF THE BRONX RIVER PARKWAY BRIDGE OVER
ON:
AFFIX SEAL: HARDESTY & HANOVER, LLC
D.
WA
NJ.
BA
GE
RJ.
BA
GE
R
STATE
OFNEWYORK
LI C
EN
SE
PROFESSIONAL
EN
GIN
EE
R
D
F
N
CE
X ELSIOR
U SIE
NO.08 12
31
UCH
H
: 1/20/2021
9/9