+ RL 902.330
+ RL 903.080+ RL 900.520+ RL 900.160
+ RL 899.630
+ RL 900.950
+ RL 906.440
+ RL 906.920
+ RL 907.120
+ RL 900.710
+ RL 905.170
+ RL 904.340
EXISTING INTERNAL PLANT
EXISTINGRETAINING WALL
PHARMACY BUILDING
EXISTING BREAKOUTREFURBISH TO CREATE MODEL ROOM/ INFORMAL LEARNING
EXISTING CLINICSIMULATION SUITE(AV UPGRADE)
CLINIC
DIRTY UTILITY
STORE
SIMULATION CLINIC
PATIENTENSUITE
CLINIC
EQUIPMENT STORE
FOYER STAIR
ENTRANCE
STAIR MALEWC LIFT
TUTORIAL ROOM 2
SIMULATIONCLINICS
CLINIC LABORATORY SUPPORT
AMENITIES
AMENITIES
NOTE B
NOTE D
NOTE A
NOTE A
NOTE D
NOTE A
NOTE ANOTE A
NOTE C
NOTE D
NOTE E
NOTE E
NOTE A
NOTE ANOTE ANOTE A
NOTE ANOTE A
NOTE F
NOTE CNOTE CNOTE C
NOTE A
NOTE A
SECTION 1SECTION 1
SECT
ION
2SE
CTIO
N 2
2182
0 EL
C D
A10
Floo
r Pla
n vw
x.vw
x
29/3/19
©
brewster hjorth architects
Demolition Plan - Level 1
Revision -
Health Sciences Active Based Learning CSU Orange Campus
29/3/19
1:100 @ B1 + 1:200 @ A3
DA13
NOTE A
EXISTING FACADE TO BE DEMOLISHED
EXISTING INTERNAL PARTITION DEMOLISHED ALONG WITH ASSOCIATED DOORS
NOTE B
LEGEND - DEMOLITION PLAN :
EXISTING WASH HANDBASIN DEMOLISHEDNOTE C
EXISTING JOINERY DEMOLISHEDNOTE D
EXISTING EQUIPMENT REMOVEDNOTE E
EXISTING DOOR REMOVEDNOTE F
DEMOLITION - LEVEL 1
+ RL 902.330
+ RL 903.080+ RL 900.520+ RL 900.160
+ RL 899.630
+ RL 900.950
+ RL 906.440
+ RL 906.920
+ RL 907.120
+ RL 900.710
+ RL 905.170
+ RL 904.340
EXISTING INTERNAL PLANT
EXISTINGRETAINING WALL
PHARMACY BUILDING
COMMSAREA
MECAREA
GROUP WORKROOM 5
GROUP WORKROOM 6
SEMINARROOM
TEACHINGLABORATORY 2
GROUPWORKROOM 2
GROUPWORKROOM 3
GROUPWORKROOM 1
STAIR
LIFT
LABORATORY ACCESS
AMENITIESACCESS
LABORATORY STORE
STAIR
NOTE A
NOTE A
NOTE A
NOTE A
NOTE A
NOTE A
NOTE B
NOTE B
NOTE B
NOTE A NOTE A
NOTE A
GROUPWORKROOM 4
STUDENTINTERACTION ZONE
NOTE A
NOTE A
SECTION 1SECTION 1
SECT
ION
2SE
CTIO
N 2
NOTE A
EXISTING FACADE TO BE DEMOLISHED
EXISTING INTERNAL PARTITION DEMOLISHED ALONG WITH ASSOCIATED DOORS
NOTE B
LEGEND - DEMOLITION PLAN :
EXISTING WASH HANDBASIN DEMOLISHEDNOTE C
EXISTING JOINERY DEMOLISHEDNOTE D
EXISTING EQUIPMENT REMOVEDNOTE E
EXISTING DOOR REMOVEDNOTE F
2182
0 EL
C D
A10
Floo
r Pla
n vw
x.vw
x
29/3/19
©
brewster hjorth architects
Demolition Plan - Level 2
Revision -
Health Sciences Active Based Learning CSU Orange Campus
29/3/19
1:100 @ B1 + 1:200 @ A3
DA15
DEMOLITION - LEVEL 2
DA13-Demolition Plan - Level 1Viewport-8