4
Dada Olushola Joseph House No 35 Kajola Street, Igbesa, Ogun state, Nigeria +234: (0) 8030799356, 8025475282 [email protected] PROFILE I’m a result oriented polyvalent professional with a passion to improve work processes and exceed delivery expectations. I have acquired over 15 years top quality work experience across production & manufacturing, team building and leadership, production auditing and supervision to administration and data management, plant facility maintenance, efficiency & productivity management, root cause analysis, pre-commissioning and commissioning. I am very skilled at handling task outside the scope of my experience. CAREER HIGHLIGHTS Member of 5 man team that went to Germany for training on hard bouillon and high speed line in culinary plant; Also a Member of Nestle Productivity Team 2006 Reduced losses minor stoppage on the line using ECRS to eliminate source of contamination (SOC) which led to 8% increase in Asset intensity Created an OPL to avert losses due to wrong fixing of component on high speed machines and commissioned 2 high speed machine in a new Nestlé factory DMAIC WB project on elimination of unplanned stoppages on Theegarten sealing unit. (475,000 NGN on one line and 19.9mio after replicating whole 42 lines pa) DMAIC WB project on reduction of wrapping deviation on Theegarten line (125,056 savings on a line and 5.6mio on all 42 lines) Worked to restore the pressing and wrapping machine to basic condition (-increase plant AI by 3%, achieved and surpassed the planned packing target by 28% Team lead in migration from SAP split to SAP HANA which improve quality of input and integrity of data for ease of reconciliation Introduced SOCO machine system; reduced packaging material waste, cleaning time on pressing and wrapping line by reducing spaghetti movement using SMED Training team, increased competence by 90%, recorded zero accident, no time loss due to accident and reduced absent frequency from 1.5% to 0.5% in 2015 Key team member that started the high speed machine in pressing and wrapping in 2003; and achieved performance improvement reports as Line manager Restored high speed machine brought to Nestlé Agbara from youpogon, cotedvoire & championed CDM in the plant (consequence driven maintenance) as Line manager Participated in smooth transition from legacy system FMS1 to SAP system as Nestlé globe project, in end to end process, market integration testing and team training Creatively passed phase Zero, step 1,2 and 3 on pilot line and expanded to additional 9 lines in 2015, eliminated SOC and HTRP and transited from SAP split to SAP HANA Key member of a 5 man team that went to Germany for training on pressing and wrapping machine in 2009 and also a member of 6 man team that start up the new pressing and wrapping plant.

Dada Olushola Joseph - CV

Embed Size (px)

Citation preview

Page 1: Dada Olushola Joseph - CV

Dada Olushola Joseph House No 35 Kajola Street, Igbesa, Ogun state, Nigeria

+234: (0) 8030799356, 8025475282

[email protected]

PROFILE I’m a result oriented polyvalent professional with a passion to improve work processes and exceed delivery expectations. I have acquired over 15 years top quality work experience across production & manufacturing, team building and leadership, production auditing and supervision to administration and data management, plant facility maintenance, efficiency & productivity management, root cause analysis, pre-commissioning and commissioning. I am very skilled at handling task outside the scope of my experience. CAREER HIGHLIGHTS

Member of 5 – man team that went to Germany for training on hard bouillon and high speed line in culinary plant; Also a Member of Nestle Productivity Team 2006

Reduced losses minor stoppage on the line using ECRS to eliminate source of contamination (SOC) which led to 8% increase in Asset intensity

Created an OPL to avert losses due to wrong fixing of component on high speed machines and commissioned 2 high speed machine in a new Nestlé factory

DMAIC WB project on elimination of unplanned stoppages on Theegarten sealing unit. (475,000 NGN on one line and 19.9mio after replicating whole 42 lines pa)

DMAIC WB project on reduction of wrapping deviation on Theegarten line (125,056 savings on a line and 5.6mio on all 42 lines)

Worked to restore the pressing and wrapping machine to basic condition (-increase plant AI by 3%, achieved and surpassed the planned packing target by 28%

Team lead in migration from SAP split to SAP HANA which improve quality of input and integrity of data for ease of reconciliation

Introduced SOCO machine system; reduced packaging material waste, cleaning time on pressing and wrapping line by reducing spaghetti movement using SMED

Training team, increased competence by 90%, recorded zero accident, no time loss due to accident and reduced absent frequency from 1.5% to 0.5% in 2015

Key team member that started the high speed machine in pressing and wrapping in 2003; and achieved performance improvement reports as Line manager

Restored high speed machine brought to Nestlé Agbara from youpogon, cotedvoire & championed CDM in the plant (consequence driven maintenance) as Line manager

Participated in smooth transition from legacy system FMS1 to SAP system as Nestlé globe project, in end to end process, market integration testing and team training

Creatively passed phase Zero, step 1,2 and 3 on pilot line and expanded to additional 9 lines in 2015, eliminated SOC and HTRP and transited from SAP split to SAP HANA

Key member of a 5 man team that went to Germany for training on pressing and wrapping machine in 2009 and also a member of 6 – man team that start up the new pressing and wrapping plant.

Page 2: Dada Olushola Joseph - CV

WORK EXPERIENCE NESTLE NIGERIA PLC, Agbara, Lagos Line Manager – Responsibilities 2010 – Date Food Safety Regulatory Compliance

Manage safety assurance of food, quality control, records and regulatory compliance Ensure strict compliance to first priority level of the plant and maintain food safety

Production Machine Management Manage labour efficiency, overtime, line performance, productivity & service control Reduce materials waste, losses (variances), manage documentation & work records Maintain high level of NGMP & 5s’ within plant, HSE management and activity report Review plant efficiency, performance improvement, capacity maximization & report

Team Coordination & Organization Supervise team collaboration, good social climate and team spirit among personnel Prepare & manage staff leave plan, process documentation and supervise handover Supervise safety training management, general safety control for plant & personnel Develop team training plan, manage performance and recommend training for team

General Administration Lead, implement continuous service improvement and achieve global best practice Business organization, technical advisory support, deadline and target actualization Manage Globe foundation Index, general guidelines and procedure implementation Prepare activity reports of any corrective action/occurrence and events in the plant

Team Leader – Responsibilities 2006 – 2010

Supervise tasks, schedule, coordinate and plan maintenance of production Machines Manage repair breakdown machines & process requests for needed plant materials Raise work orders, notification for maintenance work & document production data Ensure a zero breakdown of production process and reduced incidence of downtime

Production Technician – Responsibilities 2005 – 2006

Execute plant maintenance activities, capacity maximization & standard compliance Manage reduction in material waste, ensure service uptime and improved efficiency Drive work plan implementation, quality service delivery & provide activity report

Production Operative – Responsibilities Aug. 2003 – 2005

Drive team inclusiveness, service delivery, manage high speed lines & achieve target Collaborate with team, develop training methods, improve and supervise efficiency

BLESSED ENGINEERING CO, Sango Workshop Industrial Attachment – Responsibilities 2000 – 2001

Manage practical knowledge of fitting, tools identification & maintain all equipments Handle major machining task, operate Lathes, Milling, Grinding and Drilling machine

Page 3: Dada Olushola Joseph - CV

ACADEMIC HISTORY University of Education Winneba, Ghana 2014

B. Sc. – Information Technology Government Technical College, Igbesa Ogun State 2006

Advance National Business and Technical Certificates Government Technical College, Igbesa Ogun State 1997 – 2000

National Business and technical certificates Federal Labour Trade Test 1, 2 & 3 National craft certificate

LG Primary School Elero, Igbesa Ogun State 1985 – 1991

FSLC – First School Leaving Cert PROFESSIONAL PROJECTS – SAP SUPER USER (Nestle Globe IS/IT Project

Member of BCP co-ordinate and disaster recovery team Delivering lectures and presentations for end users across the stream System Application Product training organised by Nestle Switzerland. Nov. 2007 Ensuring smooth transition from legacy into SAP systems – Nestle Globe project Achieving flawless training/implementation of the nestle Globe IS/IT SAP project. Participating in end to end process, market integration testing (MIT 1&2), scenario

testing, and day in life (DIL) activities WORKSHOPS, CONFERENCES & SEMINARS ATTENDED

Capability building training by MACTAY Oct., 2015 AM/PM intermediate training by Nestle Nigeria Plc in collaboration with Nestle

CWAR Sept., 2015 Certificate of Recognition (TPM Phase Zero) Oct., 2014 Total Performance Management Training (TPM) by Nestle CWAR and the RIST team.

Youpogon, Cote Divoire Sept., 2013 Behavior Based Safety’ by ETSA, France. June 2012 Nestle Supervisor’s Excellence Training: Communication and Presentation Skills,

Leadership Skills, Team Building, Delegation Skills, Problem Solving & Decision Making, Resource Management, Developing People Skills Matrix, Coaching, Champion Network” by Ernst & Young, Ghana. April 2012

Personal Effectiveness program by LEAP AFRICA July, 2011 Six sigma (DMAIC) white belt training by Nestle IP team Feb., 2011 Leadership & Effective Supervisory Skills’ by Skills Development Limited. May 2010 BCW3 Packaging machine training by Dresden Germany June 2009 Operation, maintenance and calibration of tableting system. IMA Kilian, GMBH solid

dose division, Germany. May, 2009 Effective Communication Skills’ by Management Consultancy Services Nov 2005 Performance Improvement champion by Nestle Nigeria PLC May 2005

Page 4: Dada Olushola Joseph - CV

PROFESSIONAL MEMBERSHIPS Member; Autonomous Maintenance Pillar SOC and HTRP champion

COMPETENCIES & SKILLS

A team working spirit and good networking skills Capable of coping with new challenges and duties Target driven, creative with good organizational skills Goal oriented, ready and willing to accept responsibilities Creating and adding value while seeking professional excellence Capable of prioritizing responsibilities and ensuring that deadline is met.

TECHNICAL EXPERTISE

Stock reconciliation, inventory management and report preparation Oral & written communication, analytical, self-motivated and goal driven Project administration, presentation skills, Microsoft office suites and SAP Well organized & highly efficient working in a multi-tasking dynamic environment

LEISURE INTEREST

Reading, troubleshooting working equipments & traveling.

REFERENCES Mr. Ladipo Moyomade Engr. Nosiru Tesilimi TPM Manager Plant Engineer Nestle Nigeria Plc Nestle Nigeria Plc Agbara, Ogun State Agbara, Ogun State [email protected] [email protected] GENDER DATE OF BIRTH MARITAL STATUS STATE OF ORIGIN Male 8th of April, 1981 Married Ogun State