DAFTAR TABEL
Tabel II.1 Estimasi Waktu Pekerjaan..................................................................................II-5
Tabel.II.2 Metode Pengerjaan Proyek.................................................................................II-5
Tabel.II.3 Total Float dan Free Float...................................................................................II-6
Tabel.II.4 Kalender Proyek Pembangunan Perpustakaan....................................................II-7
Tabel.III.1 AHS Pekerjaan Pembersihan & Perataan Tanah...............................................III-3
Tabel.III.2 AHS Pas. Bouwplank........................................................................................III-3
Tabel.III.3 AHS Pembuatan Los Kerja...............................................................................III-4
Tabel.III.4 AHS Pembuatan Direksi Keet Dengan Lantai Plester.......................................III-4
Tabel.III.5 AHS Pembuatan Pagar Sementara Dari Seng Gelombang................................III-5
Tabel.III.6 AHS Pembuatan Papan Nama Proyek...............................................................III-5
Tabel.III.7 Rencana Anggaran Biaya Upah dan Bahan Pekerjaan Persiapan.....................III-6
Tabel.III.8 Durasi Pekerjaan Persiapan...............................................................................III-7
Tabel.III.9 RAB Pelaksanaan Tenaga Kerja Pekerjaan Persiapan......................................III-8
Tabel.III.10 RAB Pelaksanaan Bahan Pekerjaan Persiapan................................................III-8
Tabel.III.11 Perhitungan Durasi Tenaga Kerja Pekerjaan Persiapan..................................III-9
Tabel.III.12 Rekapitulasi Tenaga Kerja Pekerjaan Persiapan.............................................III-11
Tabel.III.13 Perhitungan Durasi Bahan Pekerjaan Persiapan..............................................III-11
Tabel.III.14 Rekapitulasi Bahan Pekerjaan Persiapan.........................................................III-13
Tabel.IV.1 AHS Pekerjaan Galian Tanah............................................................................IV-2
v
Tabel.IV.2 Analisis Harga Satuan Pekerjaan Pondasi Batu Kali........................................IV-3
Tabel.IV.3 Analisis Harga Satuan Pekerjaan Pondasi Telapak...........................................IV-4
Tabel.IV.4 Analisis Harga Satuan Pekerjaan Pile Cap........................................................IV-5
Tabel.IV.5 Analisis Harga Satuan Pekerjaan Mini Pile......................................................IV-6
Tabel.IV.6 Rencana Anggaran Biaya Pekerjaan Tanah dan Pondasi..................................IV-7
Tabel.IV.7 Durasi Pekerjaan Tanah dan Pondasi................................................................IV-7
Tabel.IV.8 RAB Pelaksanaan Pekerjaan Tanah dan Pondasi..............................................IV-9
Tabel.IV.9 Perhitungan Durasi Tenaga Kerja Pekerjaan Tanah dan Pondasi.....................IV-12
Tabel.IV.10 Rekapitulasi Baiaya Upah Tenaga Kerja Pekerjaan Tanah dan Pondasi........IV-
14
Tabel.IV.11 Perhitungan Durasi Alat Pekerjaan Tanah dan Pondasi..................................IV-14
Tabel.IV.12 Rekapitulasi Biaya upah Alat Pekerjaan Tanah dan Pondasi..........................IV-14
Tabel.IV.13 Perhitungan Durasi Bahan Pekerjaan Tanah dan Pondasi...............................IV-15
Tabel.IV.14 Rekapitulasi Biaya Bahan Pekerjaan Tanah dan Pondasi...............................IV-17
Tabel.V.1 Analisa Harga Satuan Pekerjaan Beton Tie Beam............................................V-4
Tabel.V.2 AHS Pekerjaan Kolom.......................................................................................V-5
Tabel.V.3 AHS Pekerjaan Balok dan Ring Balok...............................................................V-6
Tabel.V.4 Analisa Harga Satuan Plat Lantai.......................................................................V-7
Tabel.V.5 Analisa Harga Satuan Pekerjaan Tangga............................................................V-8
Tabel.V.6 Rencana anggaran Biaya Pekerjaan Beton.........................................................V-9
Tabel.V.7 Durasi Pekerjaan Beton......................................................................................V-11
Tabel.V.8 RAB Pelaksanaan Tenaga Kerja Pekerjaan Beton.............................................V-12
vi
Tabel.V.9 RAB Pelaksanaan Bahan Pekerjaan Beton.........................................................V-14
Tabel.V.10 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Beton.................................V-16
Tabel.V.11 Rekapitulasi Upah Tenaga Kerja Pekerjaan Beton...........................................V-34
Tabel.V.12 Kebutuhan Bahan Pekerjaan Beton..................................................................V-35
Tabel.V.13 Rekapitulasi Biaya Bahan Pekerjaan Beton.....................................................V-53
Tabel.VI.1 AHS Pekerjaan Dinding Pasangan Bata Merah...............................................VI-3
Tabel.VI.2 AHS Pekerjaan Plesteran Dinding...................................................................VI-3
Tabel.VI.3 Analisa Harga Satuan Pekerjaan Dinding Partisi.............................................VI-4
Tabel.VI.4 Analisa Harga Satuan Pasangan Dinding Batu Tempel Hitam........................VI-4
Tabel.VI.5 Durasi Pekerjaan Dinding.................................................................................VI-5
Tabel.VI.6 Rencana Anggaran Biaya Pekerjaan Dinding...................................................VI-6
Tabel.VI.7 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Dinding........VI-6
Tabel.VI.8 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Dinding...................VI-7
Tabel.VI.9 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Dinding..............................VI-8
Tabel.VI.10 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Dinding...........................VI-9
Tabel.VI.11 Kebutuhan Bahan Pekerjaan Dinding.............................................................VI-10
Tabel.VI.12 Rekapitulasi Biaya Bahan Pekerjaan Dinding.................................................VI-13
Tabel.VII.1 Analisa Harga Satuan Pekerjaan Kusen...........................................................VII-4
Tabel.VII.2 Durasi Pekerjaan Kusen...................................................................................VII-9
Tabel.VII.3 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan KusenVII-
10
Tabel.VII.4 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Kusen.....................VII-11
vii
Tabel.VII.5 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Kusen...............................VII-12
Tabel.VII.6 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Kusen...............................VII-17
Tabel.VII.7 Kebutuhan Bahan Pekerjaan Kusen.................................................................VII-18
Tabel.VII.8 Rekapitulasi Biaya Bahan Pekerjaan Kusen....................................................VII-23
Tabel.VIII.1 AHS Pekerjaan Langit – Langit Gypsum.......................................................VIII-2
Tabel.VIII.2 AHS Pekerjaan Rangka Langit-langit............................................................VIII-2
Tabel.VIII.3 Analisa Harga Satuan Pekerjaan List Langit Langit.......................................VIII-3
Tabel.VIII.4 Durasi Pekerjaan Plafond...............................................................................VIII-4
Tabel.VIII.5 Rencana Anggaran Biaya Pekerjaan Plafond.................................................VIII-5
Tabel.VIII.6 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Plafond
.............................................................................................................................................VIII-6
Tabel.VIII.7 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Plafond.................VIII-6
Tabel.VIII.8 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Plafond............................VIII-7
Tabel.VIII.9 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Plafond...........................VIII-8
Tabel.VIII.10 Kebutuhan Bahan Pekerjaan Plafond...........................................................VIII-8
Tabel.VIII.11 Rekapitulasi Biaya Bahan Pekerjaan Plafond...............................................VIII-10
Tabel.IX.1 AHS Pekerjaan Kuda-kuda Atap Baja Ringan 1...............................................IX-2
Tabel.IX.2 AHS Pekerjaan Nok Genteng Metal Sheet........................................................IX-2
Tabel.IX.3 AHS Pekerjaan List plank 3x20 cm..................................................................IX-3
Tabel.IX.4 Durasi Pekerjaan Atap.......................................................................................IX-4
Tabel.IX.5 Rencana Anggaran Biaya Pekerjaan Atap.........................................................IX-5
Tabel.IX.6 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Atap.............IX-5
viii
Tabel IX.7 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Atap.........................IX-6
Tabel IX.8 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Atap...................................IX-6
Tabel IX.9 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Atap...................................IX-9
Tabel IX.10 Kebutuhan Bahan Pekerjaan Atap...................................................................IX-9
Tabel IX.11 Rekapitulasi Biaya Bahan Pekerjaan Atap......................................................IX-12
Tabel.X.1 AHS Pekerjaan Lantai........................................................................................X-3
Tabel.X.2 Rencana Anggaran Biaya Pekerjaan Lantai.......................................................X-4
Tabel.X.3 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Lantai............X-4
Tabel.X.4 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Lantai.......................X-4
Tabel.X.5 Durasi Pekerjaan Lantai......................................................................................X-6
Tabel.X.6 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Lantai..................................X-7
Tabel.X.7 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Lantai..................................X-9
Tabel.X.8 Kebutuhan Bahan Pekerjaan Lantai....................................................................X-9
Tabel.X.9 Rekapitulasi Biaya Bahan Pekerjaan Lantai.......................................................X-11
Tabel.XI.1 AHS Pekerjaan Instalasi Listrik........................................................................XI-3
Tabel.XI.2 Durasi Pekerjaan Instalasi Listrik......................................................................XI-6
Tabel.XI.3 Rencana anggaran Biaya Pekerjaan Instalasi Listrik........................................XI-6
Tabel.XI.4 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Instalasi
Listrik................................................................................................................XI-7
Tabel.XI.5 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Instalasi Listrik.......XI-8
Tabel.XI.6 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Instalasi Listrik..................XI-9
Tabel.XI.7 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Instalasi Listrik..................XI-11
ix
Tabel.XI.8 Kebutuhan Bahan Pekerjaan Instalasi Listrik...................................................XI-12
Tabel.XI.9 Rekapitulasi Biaya Bahan Pekerjaan Instalasi Listrik.......................................XI-15
Tabel.XII.1 AHS Pekerjaan Pompa Air..............................................................................XII-4
Tabel.XII.2 AHS Reservoir Air...........................................................................................XII-4
Tabel.XII.3 AHS Pemasangan Pipa Air Bersih...................................................................XII-5
Tabel.XII.4 AHS Pemasangan Pipa Air Kotor....................................................................XII-6
Tabel.XII.5 Analisa Harga Satuan Tangki air.....................................................................XII-7
Tabel.XII.6 Analisa Harga Kloset Duduk...........................................................................XII-7
Tabel.XII.7 Analisa Harga Wastafel...................................................................................XII-7
Tabel.XII.8 Analisa Harga Urinoir......................................................................................XII-8
Tabel.XII.9 Analisa Harga Bak Cuci Piring........................................................................XII-8
Tabel.XII.10 Analisa Harga Floor Drain.............................................................................XII-8
Tabel.XII.11 Analisa Harga Krain Air................................................................................XII-9
Tabel.XII.12 AHS Pekerjaan Septictank.............................................................................XII-9
Tabel.XII.13 Rencana Anggaran Pekerjaan Sanitasi...........................................................XII-10
Tabel.XII.14 Durasi Pekerjaan Sanitasi..............................................................................XII-12
Tabel.XII.15 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Sanitasi
.............................................................................................................................................XII-13
Tabel.XII.16 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Sanitasi................XII-14
Tabel.XII.17 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Sanitasi...........................XII-15
Tabel.XII.18 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Sanitasi...........................XII-21
Tabel.XII.19 Kebutuhan Bahan Pekerjaan Sanitasi............................................................XII-22
x
Tabel.XII.20 Rekapitulasi Biaya Bahan Pekerjaan Sanitasi................................................XII-28
Tabel.XIII.1 AHS Pekerjaan Pengecatan Dinding Baru.....................................................XIII-2
Tabel.XIII.2 Analisa Harga Satuan Pengecatan Bidang Kayu............................................XIII-2
Tabel.XIII.3 Analisa Harga Satuan Pengecatan Dinding Partisi dan Plafond.....................XIII-3
Tabel.XIII.4 Analisa Harga Satuan Pengecatan Bidang Alumunium.................................XIII-3
Tabel.XIII.5 Durasi Pekerjaan Pengecatan..........................................................................XIII-4
Tabel.XIII.6 Rencana Anggaran Biaya Pekerjaan Pengecatan...........................................XIII-5
Tabel.XIII.7 Rencana Anggaran Biaya Pelaksanaan Tenaga Kerja Pekerjaan Pengecatan
.............................................................................................................................................XIII-5
Tabel.XIII.8 Rencana Anggaran Biaya Pelaksanaan Bahan Pekerjaan Pengecatan...........XIII-6
Tabel.XIII.9 Durasi dan Produktivitas Tenaga Kerja Pekerjaan Pengecatan......................XIII-7
Tabel.XIII.10 Rekapitulasi Biaya Upah Tenaga Kerja Pekerjaan Pengecatan....................XIII-8
Tabel.XIII.11 Kebutuhan Bahan Pekerjaan Pengecatan......................................................XIII-9
Tabel.XIII.12 Rekapitulasi Biaya Bahan Pekerjaan Pengecatan.........................................XIII-12
Tabel.XIV.1 Barchart 1 – Rencana Barchart Tenaga Kerja Dimulai Early Start (ES)
dengan Durasi Normal....................................................................................XIV-3
Tabel.XIV.2 Barchart 2 – Rencana Barchart Tenaga Kerja Diakhiri Lastest Finish (LF) -
Durasi Normal................................................................................................XIV-5
Tabel.XIV.3 Barchart 3 – Rencana Barchart Tenaga Kerja Dimulai ES Dengan Durasi
Normal + Free Float.......................................................................................XIV-7
Tabel.XIV.4 Barchart 4 – Rencana Barchart Tenaga Kerja Dimulai ES Dengan T.K
Tidak Tersebar Merata...................................................................................XIV-9
Tabel.XIV.5 Banana Curve Berdasarkan Rencana Anggaran Biaya Rencana....................XIV-11
Tabel.XV.1 Analisa Tenaga Kerja Pekerjaan Persiapan Per Minggu.................................XV-1
xi
Tabel.XV.2 Analisa Tenaga kerja Pekerjaan.......................................................................XV-6
Tabel.XV.3 Analisa Tenaga Kerja Pekerjaan Beton Per Minggu.......................................XV-9
Tabel.XV.4 Analisa Tenaga Kerja Pekerjaan Dinding Per Minggu....................................XV-41
Tabel.XV.5 Analisa Tenaga Kerja Pekerjaan Kusen Per Minggu.......................................XV-45
Tabel.XV.6 Analisa Tenaga Kerja Pekerjaan Plafond Per Minggu....................................XV-55
Tabel.XV.7 Analisa Tenaga Kerja Pekerjaan Atap Per Minggu.........................................XV-57
Tabel.XV.8 Analisa Tenaga Kerja Pekerjaan Lantai Per Minggu.......................................XV-61
Tabel.XV.9 Analisa Tenaga Kerja Pekerjaan Instalasi Listrik Per Minggu........................XV-65
Tabel.XV.10 Analisa Tenaga Kerja Pekerjaan Sanitasi Per Minggu..................................XV-67
Tabel.XV.11 Analisa Tenaga Kerja Pekerjaan Pengecatan Per Minggu.............................XV-71
Tabel.XVI.1 Daftar Upah Pekerja.......................................................................................XVI-1
Tabel.XVI.2 Analisa Kebutuhan Tenaga Kerja Minggu 1..................................................XVI-2
Tabel.XVI.3 Kebutuhan Tenaga Kerja Minggu 2...............................................................XVI-3
Tabel.XVI.4 Analisa Kebutuhan Tenaga Kerja Minggu 3..................................................XVI-4
Tabel.XVI.5 Analisa Kebutuhan Tenaga Kerja Minggu 4..................................................XVI-5
Tabel.XVI.6 Analisa Kebutuhan Tenaga Kerja Minggu 5..................................................XVI-6
Tabel.XVI.7 Analisa Kebutuhan Tenaga Kerja Minggu 6..................................................XVI-7
Tabel.XVI.8 Analisa Kebutuhan Tenaga Kerja Minggu 7..................................................XVI-8
Tabel.XVI.9 Analisa Kebutuhan Tenaga Kerja Minggu 8..................................................XVI-9
Tabel.XVI.10 Analisa Kebutuhan Tenaga Kerja Minggu 9................................................XVI-10
Tabel.XVI.11 Analisa Kebutuhan Tenaga Kerja Minggu 10..............................................XVI-11
xii
Tabel.XVI.12 Analisa Kebutuhan Tenaga Kerja Minggu 11..............................................XVI-12
Tabel.XVI.13 Analisa Kebutuhan Tenaga Kerja Minggu 12..............................................XVI-13
Tabel.XVI.14 Analisa Kebutuhan Tenaga Kerja Minggu 13..............................................XVI-15
Tabel.XVI.15 Analisa Kebutuhan Tenaga Kerja Minggu 14..............................................XVI-16
Tabel.XVI.16 Analisa Kebutuhan Tenaga Kerja Minggu 15..............................................XVI-17
Tabel.XVI.17 Analisa Kebutuhan Tenaga Kerja Minggu 16..............................................XVI-18
Tabel.XVI.18 Analisa Kebutuhan Tenaga Kerja Minggu 17..............................................XVI-19
Tabel.XVI.19 Analisa Kebutuhan Tenaga Kerja Minggu 18..............................................XVI-21
Tabel.XVI.20 Analisa Kebutuhan Tenaga Kerja Minggu 19..............................................XVI-22
Tabel.XVI.21 Analisa Kebutuhan Tenaga Kerja Minggu 20..............................................XVI-23
Tabel.XVI.22 Analisa Kebutuhan Tenaga Kerja Minggu 21..............................................XVI-24
Tabel.XVI.23 Analisa Kebutuhan Tenaga Kerja Minggu 22..............................................XVI-25
Tabel.XVI.24 Analisa Kebutuhan Tenaga Kerja Minggu 23..............................................XVI-26
Tabel.XVI.25 Analisa Kebutuhan Tenaga Kerja Minggu 24..............................................XVI-27
Tabel.XVI.26 Total Biaya Analisa Tiap Minggu ...............................................................XVI-28
Tabel.XVI.27 Rencana Anggaran Biaya Tenaga Kerja Rencana........................................XVI-28
Tabel.XVI.28 Total Biaya upah T.K (Tenaga Kerja (X) – 10%)........................................XVI-29
Tabel.XVII.1 Analisa Kebutuhan Alat Per Minggu............................................................XVII-2
Tabel.XVII.2 Biaya Kebutuhan Alat Per Minggu...............................................................XVII-4
Tabel.XVII.3 Analisa Kebutuhan Bahan Minggu ke-1.......................................................XVII-5
Tabel.XVII.4 Analisa Kebutuhan Bahan Minggu Ke-2......................................................XVII-11
xiii
Tabel.XVII.5 Analisa Kebutuhan Bahan Minggu ke-3.......................................................XVII-17
Tabel.XVII.6 Analisa Kebutuhan Bahan Minggu ke-4.......................................................XVII-23
Tabel.XVII.7 Analisa Kebutuhan Bahan Minggu ke-5.......................................................XVII-29
Tabel.XVII.8 Analisa Kebutuhan Bahan Minggu ke-6.......................................................XVII-35
Tabel.XVII.9 Analisa Kebutuhan Bahan Minggu Ke-7......................................................XVII-43
Tabel.XVII.10 Analisa Kebutuhan Bahan Minggu ke-8.....................................................XVII-51
Tabel.XVII.11 Analisa Kebutuhan Bahan Minggu Ke-9....................................................XVII-59
Tabel.XVII.12 Analisa Kebutuhan Bahan Minggu ke-10...................................................XVII-69
Tabel.XVII.13 Analisa Kebutuhan Bahan Minggu ke-11...................................................XVII-75
Tabel.XVII.14 Analisa Kebutuhan Bahan Minggu ke-12...................................................XVII-81
Tabel.XVII.15 Analisa Kebutuhan Bahan Minggu ke-13...................................................XVII-92
Tabel.XVII.16 Analisa Kebutuhan Bahan Minggu ke-14...................................................XVII-99
Tabel.XVII.17 Analisa Kebutuhan Bahan Minggu ke-15...................................................XVII-107
Tabel.XVII.18 Analisa Kebutuhan Bahan Minggu ke-16...................................................XVII-113
Tabel.XVII.19 Analisa Kebutuhan Bahan Minggu ke-17...................................................XVII-119
Tabel.XVII.20 Analisa Kebutuhan Bahan Minggu Ke-18..................................................XVII-127
Tabel.XVII.21 Analisa Kebutuhan Bahan Minggu Ke-19..................................................XVII-133
Tabel.XVII.22 Analisa Kebutuhan Bahan Minggu ke-20...................................................XVII-139
Tabel.XVII.23 Analisa Kebutuhan Bahan Minggu ke-21...................................................XVII-144
Tabel.XVII.24 Analisa Kebutuhan Bahan Minggu ke-22...................................................XVII-149
Tabel.XVII.25 Analisa Kebutuhan Bahan Minggu Ke-23..................................................XVII-153
Tabel.XVII.26 Analisa Kebutuhan Bahan Minggu ke-24...................................................XVII-157
Tabel.XVII.27 Biaya Kebutuhan Bahan Per Minggu..........................................................XVII-161
Tabel.XVII.28 Total Rencana Anggaran Biaya Bahan Rencana........................................XVII-162
Tabel.XVII.29 Bobot Biaya Tiap Minggu...........................................................................XVII-163
Tabel.XVII.30 Banana Curve Analisa................................................................................XVII-164
xiv
DAFTAR GAMBAR
Gambar.I.1 Diagram pengelolaan proyek............................................................................I-3
Gambar.I.2 Langkah Perhitungan........................................................................................I-4
Gambar.II.1 Analisa Diagram CPM Induk..........................................................................II-6
Gambar.II.4 Papan Nama Proyek........................................................................................II-12
Gambar III.1 CPM Anak Pekerjaan Persiapan....................................................................III-7
Gambar IV.1 CPM Anak Pekerjaan Tanah dan Pondasi.....................................................IV-8
Gambar V.1 CPM Anak Pekerjaan Beton...........................................................................V-10
Gambar VI.1 CPM Anak Pekerjaan Dinding......................................................................VI-5
Gambar.VII.1 CPM Anak Pekerjaan Kusen Pintu dan Jendela...........................................VII-8
Gambar.VIII.1 CPM Anak Pekerjaan Plafond....................................................................VIII-4
Gambar.IX.1 CPM Anak Pekerjaan Atap...........................................................................IX-4
Gambar.X.1 CPM Anak Pekerjaan Lantai..........................................................................X-6
Gambar.XI.1 CPM Anak Pekerjaan Instalasi Listrik..........................................................XI-5
Gambar.XII.1 CPM Anak Pekerjaan Sanitasi.....................................................................XII-11
Gambar.XIII.1 CPM Anak Pekerjaan Pengecatan..............................................................XIII-4
Gambar.XIV.1 Prosedur Pengalokasian Tenaga Kerja.......................................................XIV-2
xv
DAFTAR GRAFIK
Grafik.XIV.1 Tenaga Kerja Dimulai Early Start (ES) dengan Durasi Normal...................XIV-3
Grafik.XIV.2 Tenaga Kerja Diakhiri Lastest Finish (LF) - Durasi Normal........................XIV-6
Grafik.XIV.3 Tenaga Kerja Dimulai ES Dengan Durasi Normal + Free Float..................XIV-8
Grafik.XIV.4 Tenaga Kerja Dimulai ES Dengan T.K Tidak Tersebar Merata...................XIV-10
xvi