09/05/2014
DFS: 4.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
006
Spud Date:
DOL: 5 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 36
SIDEWINDER/221Depth md/tvd (ft): 7,990.02 / 7,898.60
Progress (ft): 392.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
174,008
1,001,466
174,008
1,001,466
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0392.0 / 12.00 = 32.67
15,726.00
Total Man Hours: 323.00 16,236.03
Current Activity: DRILL CURVE @ 7,990' ' ( PTB 7,990' INC: .40.85° AZM: 183.0° TVD: 7,899', 12.8' LEFT, .6' ABOVE VS -327.5') (BURN @ SURVEY 7,956' = 14.91)
24 Hr Summary: POOH FOR CURVE BHA. C/O BHAS. TIH. DRILL CURVE F/ 7,598 TO 7,990'.
FINISH CURVE C&CMUD. POOH FOR LATERAL BHA. C/O BHA. TIH. DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 100 @ 323
Conn Gas (units) @
Form:
BG Gas (units): 135
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
32
RD29427151892
SMITHHUGHES8.758.75
FHi21T606X
392032.7124.7
20 / 3520 / 20 /
1.66
2.23
422.02
234.20567.84
1.38
1.53
289.98
193.57472.06
8,166
7,598
/
7,598
864
3X18
20/20/
12.00
6X14
Grading I O D L B G O R
Bit #
Bit # 3
2
2 1 BT
CT
M 1
X
I
1
BT BHA
1 2 S BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $8,535.90C M Cost($): $35,681.94
Time:
102
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 7,638.02
Density (ppg): 8.60
FV (s/qt): 52
PV (cp): 11
YP (lbf/100ft²): 13
Gels (): 11/14/18
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 36
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
28
0.00
0.0
4.0
70.4 / 29.7
8.00
2.00
1,160.00
601.0
3.70
Mud Additives Used
LIME 36
GELTONE 17
INVERMUL 3
MICA C 10
OIL ABSORBANT 22
BARITE 41 60
ENGINEER 24 HOURS 1
MICA FINE 11
BAROID RIG WASH 1
BAROID 41 6
DRILLTREAT 1
CEDAR FIBER 3
DURATONE HT 2
CALCIUM CHLORIDE POWDER 84
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,553DIESEL 16,363
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
65.00
272.09
0.00
0.00
0.00
0.00
DR
6.00
65.00
272.09
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
3BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
254 7,898.02 7,898.02
1 NMDC FLEX 3.312 6.687 29.55 7,927.57
1 NON MAG DRILL COLLAR 3.312 6.687 30.38 7,957.95
1 UBHO SUB 2.812 6.750 2.59 7,960.54
1 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .50, B-B 4.55, FLOW RANGE 300-600, OPER DIFF 1050.1.750 6.750 28.19 7,988.73
1 FHI21 8.750 8.750 1.00 7,989.73
Total Length: 7,989.73
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
192
175
185
25Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
57
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.10 7,560 488.43-317.747,611 2.90 -481.90 4.26
175.50 7,592 485.43-317.607,643 7.90 -478.90 15.72
175.20 7,623 479.88-317.147,674 12.80 -473.36 15.81
180.20 7,654 471.91-316.867,706 16.10 -465.40 11.02
182.70 7,684 462.22-317.127,738 19.20 -455.70 9.97
183.10 7,713 451.27-317.687,769 22.20 -444.75 9.69
182.20 7,742 438.53-318.267,801 24.80 -431.99 8.20
182.30 7,797 409.13-319.427,863 31.90 -402.58 11.45
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:30 4.50 P DRLPRD 13 TRIP FINISH POOH WITH SIDE BUILD ASSEMBLY.
10:30 13:30 3.00 P DRLPRD 13 TRIP CHANGE OUT BHA. ( BIT, MOTOR, MONEL )
13:30 14:00 0.50 P DRLPRD 13 TRIP TIH TO 1,039'.
14:00 14:30 0.50 P DRLPRD 15 CIRC TEST MWD TOOL & CIRCULATE SLUG OUT OF HOLE.
14:30 15:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG & TOP DRIVE.
15:00 18:00 3.00 P DRLPRD 13 TRIP TIH FROM 1,039' TO 7,598' @ 120FPM. ( BREAKING CIRC EVERY 2,200' )
18:00 06:00 12.00 P DRLPRD 09 DRLCRV DRILL CURVE F/ 7,598' - 7,990'.
Daily Operations Comments
6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .50, B-B 4.55, FLOW RANGE 300-600, OP DIFF 1050 PSI. WORKING FROM DIRECTIONAL PLAN #1 ( EOC
TARGET @ 8,353'MD, INC: 90.58°, AZM: 181.16°, TVD: 8,026', VS: -1.18', DL: 12.0°PER 100' )
9/6/2014 8:07:03AMPrinted: 1
09/06/2014
DFS: 5.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
007
Spud Date:
DOL: 6 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 18
SIDEWINDER/221Depth md/tvd (ft): 8,300.02 / 8,040.31
Progress (ft): 310.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
63,904
1,065,370
63,904
1,065,370
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0310.0 / 11.50 = 26.96
15,726.00
Total Man Hours: 197.00 16,236.03
Current Activity: DRILL CURVE @ 8,300'. ( PTB 8,300' INC: 88.4° AZM: 182.0° TVD: 8,039', 5.6' LEFT, .13' BELOW VS 59.6' BURN =9.0 @ 15' BELOW TARGET LINE).
24 Hr Summary: DRILL CURVE. C&C MUD. POOH DUE TO BUILD RATES. C/O BHA. TIH TO SHOE. REPAIR ST-80. TIH. DRILL CURVE F/ 8,166'- 8,300'.
FINISH CURVE. CBU. POOH FOR LATERAL BHA. C/O BHA'S. TIH. DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 100 @ 323
Conn Gas (units) @
Form:
BG Gas (units): 135
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
43
RD1512RD2942
SMITHSMITH8.758.75
FHi21FHi21
13417626.830.7
25 / 450 / 00 / 200.67
0.90
230.14
172.94309.66
0.67
0.90
230.14
172.94309.66
8,312
8,166
20 / 35
8,166
7,598
3X18
0/00/20
5.006.50
3X18
Grading I O D L B G O R
Bit #
Bit # 4
3
1 1 BT
BT
M 1
1
I
I
BT BHA
2 1 M BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $7,556.17C M Cost($): $43,238.11
Time:
94
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 8,166.02
Density (ppg): 8.60
FV (s/qt): 53
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 12/15/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 34
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.8
70.5 / 29.5
8.00
2.00
1,160.00
623.0
3.70
Mud Additives Used
TRANSPORTATION EACH 1
GELTONE 10
ENGINEER 24 HOURS 1
FUEL SURCHARGE .60 600
DURATONE HT 3
INVERMUL 1
TRANSPORTATION 416
LIME 1
SHRINK WRAP 21
MICA FINE 12
MICA C 12
BAROID 41 40
DRILLTREAT 1
CALCIUM CHLORIDE POWDER 80
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 10,832DIESEL 15,115
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
48.00
200.93
0.00
0.00
0.00
0.00
DR
6.00
48.00
200.93
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
0
4BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
264 8,209.02 8,209.02
1 NMDC FLEX 3.313 6.688 29.55 8,238.57
1 NON MAG DRILL COLLAR 3.313 6.688 30.38 8,268.95
1 UBHO SUB 2.813 6.750 2.59 8,271.54
1 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.38°. SLICK, REVS/GAL .50, B-B 3.8, FLOW RANGE 300-600, OPER DIFF 1050.1.750 6.750 27.59 8,299.13
1 FHI21 8.750 8.750 1.00 8,300.13
Total Length: 8,300.13
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
4,500
2,500
198
175
182
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
7
19
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
183.90 7,849 374.10-321.647,926 36.30 -367.51 8.45
182.50 7,873 355.75-322.667,956 39.30 -349.14 10.40
182.30 7,896 335.55-323.517,987 42.10 -328.93 9.04
182.00 7,919 314.07-324.318,018 45.70 -307.44 11.63
182.20 7,940 291.27-325.158,049 49.10 -284.63 10.98
182.30 7,960 266.39-326.138,081 53.10 -259.74 12.50
183.70 7,978 240.37-327.508,113 56.00 -233.69 9.74
183.70 8,010 186.04-331.018,176 63.70 -179.30 12.22
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 12:30 6.50 P DRLPRD 09 DRLCRV DRILL CURVE F/ 7,990' - 8,166'
12:30 13:00 0.50 P DRLPRD 15 CIRC CIRCULATE AND SLUG
13:00 17:30 4.50 P DRLPRD 13 TRIP POOH DUE TO BUILD RATES.
17:30 19:00 1.50 P DRLPRD 14 PULDSTR C/O BIT AND MOTOR
19:00 19:30 0.50 P DRLPRD 13 TRIP TIH W/ BHA #4 TO CASING SHOE.
19:30 21:00 1.50 P DRLPRD 12 RIGSVC TEST MWD AND RIG SERVICE.
21:00 21:30 0.50 N DRLPRD 47 RROTHR REPAIR ST-80
21:30 01:00 3.50 P DRLPRD 13 TRIP TIH
01:00 06:00 5.00 P DRLPRD 09 DRLCRV DRILL CURVE F/ 8,166' - 8,300'
Daily Operations Comments
6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.38°. SLICK, REVS/GAL .50, B-B 3.8, FLOW RANGE 300-600, OPER DIFF 1050.
9/7/2014 8:13:06AMPrinted: 1
09/07/2014
DFS: 6.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
008
Spud Date:
DOL: 7 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 18
SIDEWINDER/221Depth md/tvd (ft): 8,755.02 / 8,037.72
Progress (ft): 455.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
80,328
1,145,698
80,328
1,145,698
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0455.0 / 5.00 = 91.00
15,726.00
Total Man Hours: 197.00 16,236.03
Current Activity: DRILL LATERAL @ 8,755' .LATERAL LENGTH = 469'. ( PTB 8,755' INC: 90.9° AZM: 181.5° TVD: 8,037', 4.62' LEFT, 15.85' BELOW VS 395' ) LATERAL
STARTS @ 85° AT 8,286'.
24 Hr Summary: FINISH CURVE. CBU. POOH FOR LATERAL BHA. C/O BHA'S. TIH. DRILL LATERAL. 8,312' - 8,755'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 325 @ 323
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
54
7152120RD1512
HUGHESSMITH8.758.75
T606XFHi21
4551291.026.5
6 / 2540 / 600 / 0
0.56
0.38
81.13
102.69218.33
0.79
1.06
228.01
172.14366.01
8,312
35 / 35
8,312
8,166
6X18
40/600/0
5.000.50
3X18
Grading I O D L B G O R
Bit #
Bit # 5
4 BT 1 I1 1 M BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $7,741.06C M Cost($): $50,979.17
Time:
88
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 8,312.02
Density (ppg): 8.60
FV (s/qt): 58
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 11/14/17
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 34
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
4.0
71.3 / 28.7
8.00
2.00
1,160.00
623.0
3.60
Mud Additives Used
LIME 31
DURATONE HT 2
DRILLTREAT 1
ENGINEER 24 HOURS 1
INVERMUL 1
BAROID 41 49
CALCIUM CHLORIDE POWDER 172
GELTONE 23
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 9,400DIESEL 13,851
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
57.00
238.61
0.00
0.00
0.00
0.00
DR
6.00
57.00
238.61
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
400 1,550
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1,8
95
5" DP 4.276 5.000 5,739.01 5,739.01
1 SHOCK SUB 3.250 6.750 11.87 5,750.88
1 AGITATOR 3.250 6.750 12.97 5,763.85
105 5" DP 4.276 5.000 2,457.81 8,221.67
1 NMDC 2.875 6.750 30.71 8,252.38
1 NMDC 3.250 6.813 30.38 8,282.76
1 UBHO 3.250 6.688 2.59 8,285.35
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 8,311.66
1 HUGHES T606X 8.750 1.00 8,312.66
Total Length: 8,312.66
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
0
0
198
178
185
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
1
7
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
183.70 8,022 158.56-332.798,206 69.70 -151.79 20.00
183.70 8,031 129.03-334.708,237 75.80 -122.23 19.68
182.00 8,037 101.65-336.058,265 80.80 -94.83 18.82
180.90 8,040 70.87-336.838,296 86.60 -64.03 19.04
180.30 8,041 38.89-337.178,328 89.40 -32.06 8.95
179.70 8,042 -24.11-337.178,391 89.40 30.93 0.95
182.00 8,042 -119.09-338.588,486 90.70 125.92 2.78
181.50 8,040 -213.03-341.458,580 90.90 219.90 0.57
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P DRLPRD 09 DRLCRV DRILL LATERAL F/ 8,300'-8,312'.
06:30 07:30 1.00 P DRLPRD 15 CIRC CIRCULATE B/U & PUMP 20BBL 1.5LB SLUG.
07:30 13:30 6.00 P DRLPRD 13 TRIP POOH F/ 8,312' FOR LATERAL ASSY. ( USING RIG TONGS )
13:30 15:30 2.00 P DRLPRD 13 TRIP L/D BHA # 4 CURVE ASSY
15:30 17:00 1.50 N DRLPRD 47 RROTHR REPAIR ST-80. REPLACE TRANSMISSION (SECOND TIME 24 HRS).
17:00 19:00 2.00 N DRLPRD 65 WOEP WAIT ON MOTOR.
19:00 20:00 1.00 P DRLPRD 14 PULDSTR M/U BHA # 5
20:00 20:30 0.50 P DRLPRD 13 TRIP TIH W/LATERAL ASSY. TO 1,039'.
20:30 21:00 0.50 P DRLPRD 15 CIRC TEST MWD TOOL
21:00 00:00 3.00 P DRLPRD 13 TRIP TIH F/ 1,039'. T/ 8312'. ( FILLING PIPE EVERY 30 STANDS )
00:00 02:30 2.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,312 - 8,517'. ( LATERAL STARTS @ 85° AT 8,287'.) LOOSING MUD DRILLING AT
REDUCED ROP AND PUMP RATE. 3 MINUTES PER BBLS.
02:30 04:00 1.50 N DRLPRD 15 CIRC CIRCULATE AND PUMP 50 BBLS OF 20 # PER BBL LCM PILL.
04:00 06:00 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,517' - 8,755'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/7/2014 8:17:36AMPrinted: 1
09/07/2014
DFS: 6.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
008
Spud Date:
DOL: 7 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 18
SIDEWINDER/221Depth md/tvd (ft): 8,755.02 / 8,035.62
Progress (ft): 455.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
81,568
1,149,418
81,568
1,149,418
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0455.0 / 5.00 = 91.00
15,726.00
Total Man Hours: 197.00 16,236.03
Current Activity: DRILL LATERAL @ 8,755' .LATERAL LENGTH = 469'. ( PTB 8,755' INC: 90.9° AZM: 181.5° TVD: 8,037', 4.62' LEFT, 15.85' BELOW VS 395' ) LATERAL
STARTS @ 85° AT 8,286'.
24 Hr Summary: FINISH CURVE. CBU. POOH FOR LATERAL BHA. C/O BHA'S. TIH. DRILL LATERAL. 8,312' - 8,755'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 325 @ 323
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
54
7152120RD1512
HUGHESSMITH8.758.75
T606XFHi21
4551291.026.5
6 / 2540 / 600 / 0
0.56
0.38
81.13
102.69218.33
0.79
1.06
228.01
172.14366.01
8,312
35 / 35
8,312
8,166
6X18
40/600/0
5.000.50
3X18
Grading I O D L B G O R
Bit #
Bit # 5
4 BT 1 I1 1 M BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $7,741.06C M Cost($): $50,979.17
Time:
88
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 8,312.02
Density (ppg): 8.60
FV (s/qt): 58
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 11/14/17
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 34
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
4.0
71.3 / 28.7
8.00
2.00
1,160.00
623.0
3.60
Mud Additives Used
LIME 31
DURATONE HT 2
DRILLTREAT 1
ENGINEER 24 HOURS 1
INVERMUL 1
BAROID 41 49
CALCIUM CHLORIDE POWDER 172
GELTONE 23
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 9,400DIESEL 13,851
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
57.00
238.61
0.00
0.00
0.00
0.00
DR
6.00
57.00
238.61
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
400 1,550
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
2,7
89
5" DP 4.276 5.000 8,642.02 8,642.02
1 SHOCK SUB 3.250 6.750 11.87 8,653.89
1 AGITATOR 3.250 6.750 12.97 8,666.86
105 5" DP 4.276 5.000 2,457.81 11,124.67
1 NMDC 2.875 6.750 30.71 11,155.38
1 NMDC 3.250 6.813 30.38 11,185.76
1 UBHO 3.250 6.688 2.59 11,188.35
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 11,214.66
1 HUGHES T606X 8.750 1.00 11,215.66
Total Length: 11,215.66
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
0
0
198
178
185
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
1
7
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
183.70 8,022 158.56-332.798,206 69.70 -151.79 20.00
183.70 8,031 129.03-334.708,237 75.80 -122.23 19.68
182.00 8,037 101.65-336.058,265 80.80 -94.83 18.82
180.90 8,040 70.87-336.838,296 86.60 -64.03 19.04
180.30 8,041 38.89-337.178,328 89.40 -32.06 8.95
179.70 8,042 -24.11-337.178,391 89.40 30.93 0.95
182.00 8,042 -119.09-338.588,486 90.70 125.92 2.78
181.50 8,040 -213.03-341.458,580 90.90 219.90 0.57
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,267'-8,312'.
06:30 07:30 1.00 P DRLPRD 15 CIRC CIRCULATE B/U & PUMP 20BBL 1.5LB SLUG.
07:30 13:30 6.00 P DRLPRD 13 TRIP POOH F/ 8,312' FOR LATERAL ASSY. ( USING RIG TONGS )
13:30 15:30 2.00 P DRLPRD 13 TRIP L/D BHA # 4 CURVE ASSY
15:30 17:00 1.50 N DRLPRD 47 RROTHR REPAIR ST-80. REPLACE TRANSMISSION (SECOND TIME 24 HRS).
17:00 19:00 2.00 N DRLPRD 65 WOEP WAIT ON MOTOR.
19:00 20:00 1.00 P DRLPRD 14 PULDSTR M/U BHA # 5
20:00 20:30 0.50 P DRLPRD 13 TRIP TIH W/LATERAL ASSY. TO 1,039'.
20:30 21:00 0.50 P DRLPRD 15 CIRC TEST MWD TOOL
21:00 00:00 3.00 P DRLPRD 13 TRIP TIH F/ 1,039'. T/ 8312'. ( FILLING PIPE EVERY 30 STANDS )
00:00 02:30 2.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,312 - 8,517'. ( LATERAL STARTS @ 85° AT 8,287'.) LOOSING MUD DRILLING AT
REDUCED ROP AND PUMP RATE. 3 MINUTES PER BBLS.
02:30 04:00 1.50 N DRLPRD 15 CIRC CIRCULATE AND PUMP 50 BBLS OF 20 # PER BBL LCM PILL.
04:00 06:00 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,517' - 8,755'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/8/2014 8:16:46AMPrinted: 1
09/08/2014
DFS: 7.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
009
Spud Date:
DOL: 8 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 31
SIDEWINDER/221Depth md/tvd (ft): 11,215.02 / 7,998.19
Progress (ft): 2,460.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
54,523
1,203,941
54,523
1,203,941
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
02,460.0 / 23.50 = 104.68
15,726.00
Total Man Hours: 353.00 16,236.03
Current Activity: DRILL LATERAL @ 11,215' .LATERAL LENGTH = 2,929'. ( PTB 11,215' INC: 91.5° AZM: 178.70° TVD: 7,998', 15.98' LEFT, 1.15' BELOW VS 2,852' )
24 Hr Summary: DRILL LATERAL. 8,755' - 11,215'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 325 @ 323
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
2,915102.3
15 / 2550 / 60 /
0.66
0.44
90.94
108.09244.73
8,312
/
6X18
50/60
28.50
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $6,935.31C M Cost($): $57,914.48
Time:
93
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 10,422.02
Density (ppg): 8.70
FV (s/qt): 62
PV (cp): 16
YP (lbf/100ft²): 15
Gels (): 11/16/20
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 9.1
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
29
0.00
0.0
3.6
69.2 / 30.8
7.20
2.00
1,160.00
570.0
3.60
Mud Additives Used
MICA FINE 42
LIME 12
CALCIUM CHLORIDE POWDER 140
GELTONE 8
MICA C 42
INVERMUL 1
BARABLOK 3
DURATONE HT 5
CEDAR FIBER 10
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 2,352DIESEL 11,948
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
60.00
251.16
0.00
0.00
0.00
0.00
DR
6.00
60.00
251.16
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
500 3,140
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
326 5" DP 4.276 5.000 10,119.02 10,119.02
1 SHOCK SUB 3.250 6.750 11.87 10,130.89
1 AGITATOR 3.250 6.750 12.97 10,143.86
105 5" DP 4.276 5.000 2,457.81 12,601.68
1 NMDC 2.875 6.750 30.71 12,632.39
1 NMDC 3.250 6.813 30.38 12,662.77
1 UBHO 3.250 6.688 2.59 12,665.36
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 12,691.67
1 HUGHES T606X 8.750 1.00 12,692.67
Total Length: 12,692.67
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
13,500
10,500
210
155
183
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
30
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.90 8,012 -2,008.67-389.0210,378 92.50 2,016.14 2.09
180.90 8,009 -2,102.60-391.3110,472 91.00 2,110.09 1.92
180.10 8,008 -2,197.59-392.1410,567 90.30 2,205.08 1.12
179.50 8,008 -2,292.58-391.8110,662 89.10 2,300.05 1.41
179.50 8,009 -2,387.58-390.9810,757 90.00 2,395.00 0.95
178.60 8,009 -2,482.56-389.4010,852 90.40 2,489.94 1.04
180.00 8,006 -2,576.52-388.2610,946 92.60 2,583.85 2.77
178.70 8,003 -2,671.44-387.1811,041 91.50 2,678.74 1.79
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 14:30 8.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,755' - 9,569'.
14:30 15:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
15:00 06:00 15.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 9,569' - 11,215'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/9/2014 8:18:31AMPrinted: 1
09/08/2014
DFS: 7.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
009
Spud Date:
DOL: 8 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 18
SIDEWINDER/221Depth md/tvd (ft): 11,215.02 / 7,998.24
Progress (ft): 2,460.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
54,523
1,203,941
54,523
1,203,941
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
02,460.0 / 23.50 = 104.68
15,726.00
Total Man Hours: 197.00 16,236.03
Current Activity: DRILL LATERAL @ 11,215' .LATERAL LENGTH = 2,929'. ( PTB 11,215' INC: 91.5° AZM: 178.70° TVD: 7,998', 15.98' LEFT, 1.15' BELOW VS 2,852' )
24 Hr Summary: DRILL LATERAL. 8,755' - 11,215'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 325 @ 323
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
2,915102.3
15 / 2550 / 60 /
0.66
0.44
90.94
108.09244.73
8,312
/
6X18
50/60
28.50
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $6,935.31C M Cost($): $57,914.48
Time:
93
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 10,422.02
Density (ppg): 8.70
FV (s/qt): 62
PV (cp): 16
YP (lbf/100ft²): 15
Gels (): 11/16/20
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 9.1
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
29
0.00
0.0
3.6
69.2 / 30.8
7.20
2.00
1,160.00
570.0
3.60
Mud Additives Used
MICA FINE 42
LIME 12
CALCIUM CHLORIDE POWDER 140
GELTONE 8
MICA C 42
INVERMUL 1
BARABLOK 3
DURATONE HT 5
CEDAR FIBER 10
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 2,352DIESEL 11,948
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
60.00
251.16
0.00
0.00
0.00
0.00
DR
6.00
60.00
251.16
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
500 3,140
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
2,7
89
5" DP 4.276 5.000 8,642.02 8,642.02
1 SHOCK SUB 3.250 6.750 11.87 8,653.89
1 AGITATOR 3.250 6.750 12.97 8,666.86
105 5" DP 4.276 5.000 2,457.81 11,124.67
1 NMDC 2.875 6.750 30.71 11,155.38
1 NMDC 3.250 6.813 30.38 11,185.76
1 UBHO 3.250 6.688 2.59 11,188.35
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 11,214.66
1 HUGHES T606X 8.750 1.00 11,215.66
Total Length: 11,215.66
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
13,500
10,500
210
155
183
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
30
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.90 8,012 -2,008.67-389.0210,378 92.50 2,016.14 2.09
180.90 8,009 -2,102.60-391.3110,472 91.00 2,110.09 1.92
180.10 8,008 -2,197.59-392.1410,567 90.30 2,205.08 1.12
179.50 8,008 -2,292.58-391.8110,662 89.10 2,300.05 1.41
179.50 8,009 -2,387.58-390.9810,757 90.00 2,395.00 0.95
178.60 8,009 -2,482.56-389.4010,852 90.40 2,489.94 1.04
180.00 8,006 -2,576.52-388.2610,946 92.60 2,583.85 2.77
178.70 8,003 -2,671.44-387.1811,041 91.50 2,678.74 1.79
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 14:30 8.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 8,755' - 9,569'.
14:30 15:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
15:00 06:00 15.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 9,569' - 11,215'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/8/2014 8:19:58AMPrinted: 1
09/09/2014
DFS: 8.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
010
Spud Date:
DOL: 9 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 35
SIDEWINDER/221Depth md/tvd (ft): 12,692.03 / 7,965.24
Progress (ft): 1,477.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
119,585
1,331,726
119,585
1,331,726
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,477.0 / 21.50 = 68.70
15,726.00
Total Man Hours: 358.00 16,236.03
Current Activity: DRILL LATERAL @ 12,692' .LATERAL LENGTH = 4,406'. ( PTB 12,692' INC: 90.0° AZM: 182.3° TVD: 7,956', 5.21' LEFT, 15.2' ABOVE VS 4,326' )
24 Hr Summary: DRILL LATERAL. 11,215' - 11,623'. CIR & CLEAN HOLE. DRILL LATERAL 11,623' - 12,692'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 432 @ 432
Form:
BG Gas (units): 522
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
4,39287.8
12 / 3530 / 60 /
1.07
0.72
125.92
126.11338.85
8,312
/
6X18
30/60
50.00
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $13,988.49C M Cost($): $71,902.97
Time:
93
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 11,798.02
Density (ppg): 8.85
FV (s/qt): 60
PV (cp): 17
YP (lbf/100ft²): 16
Gels (): 13/17/21
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 40
ECD (ppg): 9.5
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
4.0
69.2 / 30.8
7.00
2.00
1,160.00
579.0
4.40
Mud Additives Used
OIL ABSORBANT 1
MICA FINE 70
GELTONE 18
LIME 64
MICA C 72
BARABLOK 15
ENGINEER 24 HOURS 1
DURATONE HT 7
INVERMUL 1
EZ MUL 1
CEDAR FIBER 20
BAROID 41 50
CALCIUM CHLORIDE POWDER 252
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,971DIESEL 13,685
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
600 3,725
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
11,882
7,100
225
151
180
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
22
54
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.00 8,016 -3,425.62-383.9611,796 90.60 3,432.69 0.60
182.70 8,012 -3,519.43-387.8111,890 94.40 3,526.56 4.11
182.30 8,005 -3,613.07-391.9011,984 94.30 3,620.26 0.44
181.50 7,999 -3,707.81-395.0412,079 93.30 3,715.04 1.35
183.00 7,992 -3,802.52-398.7612,174 94.30 3,809.82 1.89
183.40 7,985 -3,896.10-403.9912,268 94.50 3,903.48 0.47
183.50 7,978 -3,989.63-409.6312,362 94.60 3,997.11 0.15
182.30 7,971 -4,083.30-414.3812,456 93.00 4,090.85 2.13
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 13:00 7.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 11,215' T/ 11,623'.
13:00 15:30 2.50 N DRLPRD 15 CIRC CIRCULATE AND CLEAN HOLE.
15:30 06:00 14.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 11,623' T/ 12,692'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/10/2014 8:15:41AMPrinted: 1
09/09/2014
DFS: 8.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
010
Spud Date:
DOL: 9 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 35
SIDEWINDER/221Depth md/tvd (ft): 12,692.03 / 7,959.13
Progress (ft): 1,477.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
115,485
1,319,426
115,485
1,319,426
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,477.0 / 21.50 = 68.70
15,726.00
Total Man Hours: 358.00 16,236.03
Current Activity: DRILL LATERAL @ 12,692' .LATERAL LENGTH = 4,406'. ( PTB 12,692' INC: 90.0° AZM: 182.3° TVD: 7,956', 5.21' LEFT, 15.2' ABOVE VS 4,326' )
24 Hr Summary: DRILL LATERAL. 11,215' - 11,623'. CIR & CLEAN HOLE. DRILL LATERAL 11,623' - 12,692'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 432 @ 432
Form:
BG Gas (units): 522
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
4,39287.8
12 / 3530 / 60 /
1.07
0.72
125.92
126.11338.85
8,312
/
6X18
30/60
50.00
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $13,988.49C M Cost($): $71,902.97
Time:
93
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 11,798.02
Density (ppg): 8.85
FV (s/qt): 60
PV (cp): 17
YP (lbf/100ft²): 16
Gels (): 13/17/21
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 40
ECD (ppg): 9.5
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
4.0
69.2 / 30.8
7.00
2.00
1,160.00
579.0
4.40
Mud Additives Used
OIL ABSORBANT 1
MICA FINE 70
GELTONE 18
LIME 64
MICA C 72
BARABLOK 15
ENGINEER 24 HOURS 1
DURATONE HT 7
INVERMUL 1
EZ MUL 1
CEDAR FIBER 20
BAROID 41 50
CALCIUM CHLORIDE POWDER 252
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,971DIESEL 13,685
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
600 3,725
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
326 5" DP 4.276 5.000 10,119.02 10,119.02
1 SHOCK SUB 3.250 6.750 11.87 10,130.89
1 AGITATOR 3.250 6.750 12.97 10,143.86
105 5" DP 4.276 5.000 2,457.81 12,601.68
1 NMDC 2.875 6.750 30.71 12,632.39
1 NMDC 3.250 6.813 30.38 12,662.77
1 UBHO 3.250 6.688 2.59 12,665.36
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 12,691.67
1 HUGHES T606X 8.750 1.00 12,692.67
Total Length: 12,692.67
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
11,882
7,100
225
151
180
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
22
54
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.00 8,016 -3,425.62-383.9611,796 90.60 3,432.69 0.60
182.70 8,012 -3,519.43-387.8111,890 94.40 3,526.56 4.11
182.30 8,005 -3,613.07-391.9011,984 94.30 3,620.26 0.44
181.50 7,999 -3,707.81-395.0412,079 93.30 3,715.04 1.35
183.00 7,992 -3,802.52-398.7612,174 94.30 3,809.82 1.89
183.40 7,985 -3,896.10-403.9912,268 94.50 3,903.48 0.47
183.50 7,978 -3,989.63-409.6312,362 94.60 3,997.11 0.15
182.30 7,971 -4,083.30-414.3812,456 93.00 4,090.85 2.13
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 13:00 7.00 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 11,215' T/ 11,623'.
13:00 15:30 2.50 N DRLPRD 15 CIRC CIRCULATE AND CLEAN HOLE.
15:30 06:00 14.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 11,623' T/ 12,692'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741.
9/9/2014 8:08:47AMPrinted: 1
09/10/2014
DFS: 9.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
011
Spud Date:
DOL: 10 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 37
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress (ft): 969.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
85,114
1,416,840
85,114
1,416,840
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0969.0 / 17.50 = 55.37
15,726.00
Total Man Hours: 325.00 16,236.03
Current Activity: CIRCULATE @ 13,661' .LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' )
24 Hr Summary: DRILL LATERAL 12,692' - 13,661'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
5,36179.4
0 / 2530 / 60 /
1.06
0.71
124.50
126.11335.02
8,312
/
6X18
30/60
67.50
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $9,018.71C M Cost($): $80,921.67
Time:
109
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,388.03
Density (ppg): 8.75
FV (s/qt): 57
PV (cp): 12
YP (lbf/100ft²): 16
Gels (): 11/13/17
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 38
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
3.8
69.6 / 30.4
7.00
2.00
1,160.00
651.0
4.20
Mud Additives Used
DRILLTREAT 2
FUEL SURCHARGE .60 600
ENGINEER 24 HOURS 1
SHRINK WRAP 18
DRUM BANDING 3
GELTONE 2
CALCIUM CHLORIDE POWDER 140
DURATONE HT 8
INVERMUL 2
LIME 12
TRANSPORTATION 551
BARABLOK 8
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 7,911DIESEL 11,405
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
0 3,875
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
13,500
6,400
230
140
175
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
18
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 12,692' - 12,785'.
08:30 09:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
09:00 23:30 14.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 12,785' - 13,651'.
23:30 01:00 1.50 N DRLPRD 15 CIRC CIRCULATE AND CLEAN HOLE
01:00 01:30 0.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 13,651' - 13,661'.
01:30 06:00 4.50 N DRLPRD 15 CIRC CIRCULATE AND ROTATE PIPE ( HOLE PACKING OFF)
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946¿ TVD AT 6500¿ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/11/2014 8:13:29AMPrinted: 1
09/10/2014
DFS: 9.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
011
Spud Date:
DOL: 10 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 37
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress (ft): 969.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
85,114
1,416,840
85,114
1,416,840
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0969.0 / 17.50 = 55.37
15,726.00
Total Man Hours: 325.00 16,236.03
Current Activity: CIRCULATE @ 13,661' .LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' )
24 Hr Summary: DRILL LATERAL 12,692' - 13,661'.
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
5,36179.4
0 / 2530 / 60 /
1.06
0.71
124.50
126.11335.02
8,312
/
6X18
30/60
67.50
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $9,018.71C M Cost($): $80,921.67
Time:
109
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,388.03
Density (ppg): 8.75
FV (s/qt): 57
PV (cp): 12
YP (lbf/100ft²): 16
Gels (): 11/13/17
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 38
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
3.8
69.6 / 30.4
7.00
2.00
1,160.00
651.0
4.20
Mud Additives Used
DRILLTREAT 2
FUEL SURCHARGE .60 600
ENGINEER 24 HOURS 1
SHRINK WRAP 18
DRUM BANDING 3
GELTONE 2
CALCIUM CHLORIDE POWDER 140
DURATONE HT 8
INVERMUL 2
LIME 12
TRANSPORTATION 551
BARABLOK 8
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 7,911DIESEL 11,405
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
DR
6.00
70.00
293.02
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
0 3,875
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
13,500
6,400
230
140
175
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
18
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 12,692' - 12,785'.
08:30 09:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
09:00 23:30 14.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 12,785' - 13,651'.
23:30 01:00 1.50 N DRLPRD 15 CIRC CIRCULATE AND CLEAN HOLE
01:00 01:30 0.50 P DRLPRD 10 DRLLAT DRILL LATERAL F/ 13,651' - 13,661'.
01:30 06:00 4.50 N DRLPRD 15 CIRC CIRCULATE AND ROTATE PIPE ( HOLE PACKING OFF)
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946¿ TVD AT 6500¿ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/10/2014 8:14:55AMPrinted: 1
09/11/2014
DFS: 10.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
012
Spud Date:
DOL: 11 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 32
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
76,805
1,493,645
76,805
1,493,645
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / 0.00 = 0.00
15,726.00
Total Man Hours: 310.00 16,236.03
Current Activity: WORK STUCK PIPE @ 13,549' .LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294'
)
24 Hr Summary: CIRCULATE AND CLEAN HOLE. ATTEMPT TO POOH. WORK STUCK PIPE FROM 13,641' TO 13,549'.
WORK STUCK PIPE. RIG UP WL TRUCK AND RUN FREE POINT LOG. CONDUCT PIPE BACK OFF. POOH W/ DP. P/U FISHING TOOLS AND TIH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
79.4 / / /
0.00
0.00
0.00
0.000.00
8,312
/
6X18
/
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $3,225.18C M Cost($): $84,146.85
Time:
114
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.70
FV (s/qt): 56
PV (cp): 14
YP (lbf/100ft²): 16
Gels (): 13/17/20
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.8
71.8 / 28.2
7.00
2.00
1,160.00
664.0
4.30
Mud Additives Used
ENGINEER 24 HOURS 1
MICA FINE 6
CALCIUM CHLORIDE POWDER 56
LIME 10
DURATONE HT 4
GELTONE 4
BARABLOK 4
MICA C 6
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,553DIESEL 11,406
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
0
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
225
175
182
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 13:00 7.00 N DRLPRD 15 CIRC CIRCULATE AND CLEAN HOLE
13:00 06:00 17.00 N DRLPRD 56 STUCK WORK STUCK PIPE. MAX PULL 350K TOTAL, MAX PRESSURE 750 PSI AND MAX TORQUE 10K .
WORK PIPE FROM 13,641' TO 13,549'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946¿ TVD AT 6500¿ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/11/2014 8:04:07AMPrinted: 1
09/12/2014
DFS: 11.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
013
Spud Date:
DOL: 12 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
54,513
1,548,158
54,513
1,548,158
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 306.00 16,236.03
Current Activity: ATTEMPT TO SCREW INTO FISH . LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS
5,294' )
24 Hr Summary: WORK STUCK PIPE. TORQUE STRING 8 ROUNDS RIGHT. (18,000 FT/#S). PIPE UNSCREWED DOWN HOLE. POOH W/ DP. RECOVERED 6,680,.
P/U FISHING TOOLS AND TIH TO SHOE. SLIP AND CUT . TIH.
JAR ON FISH . R/U AND RUN FREE POINT. BACK OFF PIPE . POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
6X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $85,046.85
Time:
88
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.75
FV (s/qt): 59
PV (cp): 15
YP (lbf/100ft²): 16
Gels (): 13/17/20
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.8
71.8 / 28.2
7.00
2.00
1,160.00
664.0
4.30
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,164DIESEL 10,489
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 15:30 9.50 N DRLPRD 56 STUCK WORK STUCK PIPE
15:30 17:00 1.50 N DRLPRD 56 STUCK TORQUE PIPE 8 ROUNDS. (18,400 FT/ #S) ON THIRD TRY AFTER HOLDING TORQUE FOR 1
MINUTE + / - TORQUE RELEASED AND STRING WT CHANGED FROM 180K TO 149K. PIPE
ROTATED FREE INDICATING A BACK OFF AT APPROX. 6600'.
17:00 20:30 3.50 N DRLPRD 13 TRIP POOH WITH DRILL PIPE. (RECOVERED 70 STANDS AND A DOUBLE). (6,680').
20:30 00:30 4.00 N DRLPRD 53 FISH P/U FISHING TOOLS AND TIH TO CASING SHOE
00:30 02:00 1.50 P DRLPRD 17 CUTSLIP SLIP AND CUT DRLG LINE.
02:00 02:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
02:52 06:00 3.13 N DRLPRD 13 TRIP FINISH TIH.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946’ TVD AT 6500’ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/13/2014 8:12:01AMPrinted: 1
09/12/2014
DFS: 11.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
013
Spud Date:
DOL: 12 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
56,838
1,550,483
56,838
1,550,483
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 306.00 16,236.03
Current Activity: ATTEMPT TO SCREW INTO FISH . LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS
5,294' )
24 Hr Summary: WORK STUCK PIPE. TORQUE STRING 8 ROUNDS RIGHT. (18,000 FT/#S). PIPE UNSCREWED DOWN HOLE. POOH W/ DP. RECOVERED 6,680,.
P/U FISHING TOOLS AND TIH TO SHOE. SLIP AND CUT . TIH.
JAR ON FISH . R/U AND RUN FREE POINT. BACK OFF PIPE . POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
6X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $0.00C M Cost($): $84,146.85
Time:
114
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.70
FV (s/qt): 56
PV (cp): 14
YP (lbf/100ft²): 16
Gels (): 13/17/20
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.8
71.8 / 28.2
7.00
2.00
1,160.00
664.0
4.30
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,164DIESEL 10,489
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 15:30 9.50 N DRLPRD 56 STUCK WORK STUCK PIPE
15:30 17:00 1.50 N DRLPRD 56 STUCK TORQUE PIPE 8 ROUNDS. (18,400 FT/ #S) ON THIRD TRY AFTER HOLDING TORQUE FOR 1
MINUTE + / - TORQUE RELEASED AND STRING WT CHANGED FROM 180K TO 149K. PIPE
ROTATED FREE INDICATING A BACK OFF AT APPROX. 6600'.
17:00 20:30 3.50 N DRLPRD 13 TRIP POOH WITH DRILL PIPE. (RECOVERED 70 STANDS AND A DOUBLE). (6,680').
20:30 00:30 4.00 N DRLPRD 53 FISH P/U FISHING TOOLS AND TIH TO CASING SHOE
00:30 02:00 1.50 P DRLPRD 17 CUTSLIP SLIP AND CUT DRLG LINE.
02:00 02:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
02:52 06:00 3.13 N DRLPRD 13 TRIP FINISH TIH.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946’ TVD AT 6500’ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/12/2014 8:16:11AMPrinted: 1
09/13/2014
DFS: 12.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
014
Spud Date:
DOL: 13 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 35
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
52,588
1,600,746
52,588
1,600,746
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 450.00 16,236.03
Current Activity: BACK REAM OUT OF HOLE W/ FISH @ 11,295'. LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82'
ABOVE VS 5,294' )
24 Hr Summary: JAR ON FISH. RIG REPAIR. BACK REAM OUT OF HOLE W/ FISH.
BACK REAM TO FISHING TOOLS. L/D TOOLS. FINISH POOH. L/D DIRECTIONAL TOOLS. P/U INSERT BIT AND BIT SUB AND TIH FOR CLEANUP
RUN.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
6X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $85,946.85
Time:
114
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.70
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 15
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.0
70.8 / 29.2
7.00
2.00
1,160.00
652.0
3.90
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,164DIESEL 9,560
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 20:00 14.00 N DRLPRD 53 FISH WORK STUCK PIPE 13,549' to 13,511'. (@ 19:30 PRESSURE RELEASED FROM AROUND PACKED
OFF TOOLS AND WE WERE ABLE TO PULL 20' OF PIPE WHILE ROTATING. @ 20:00 14'' LONG
PEICE OF BRAKE BAND BROKE AND FELL OUT OF DRUM. OPERATION WAS SHUT DOWN AND
SLIPS SET TO REPLACE BRAKE BAND).
20:00 20:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
20:30 22:30 2.00 N DRLPRD 44 RRHOIST REPLACE DRILLER OFF SIDE BRAKE BAND.
22:30 06:00 7.50 N DRLPRD 53 FISH BACK REAM OUT OF HOLE W/ FISH F/ 13,511' TO 11,295'.
Daily Operations Comments
HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 2741, ( TARGET POINT 7946’ TVD AT 6500’ V-SECTION,
INCLINATION 90.47°, AZIMUTH 181.16°. )
9/13/2014 8:04:48AMPrinted: 1
09/14/2014
DFS: 13.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
015
Spud Date:
DOL: 14 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
119,391
1,720,137
119,391
1,720,137
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 331.00 16,236.03
Current Activity: POOH @ 1500'. LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' )
24 Hr Summary: BACK REAM TO 8,150'. POOH TO 6,865'. L/D FISHING TOOLS. POOH W/ BHA # 5.
POOH. L/D DIRECTIONAL TOOLS. TIH TO 7500'. CBU X 2. PUMP CEMENT PLUGS. PULL OUT OF PLUGS. CBU X2. POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
5
7152120
HUGHES8.75
T606X
5,36179.4
/ / /
0.00
0.00
0.00
0.000.00
13,661
8,312
/
6X18
/
67.50
Grading I O D L B G O R
Bit #
Bit # 5
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $86,846.85
Time:
114
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.70
FV (s/qt): 64
PV (cp): 13
YP (lbf/100ft²): 15
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.0
70.8 / 29.2
7.00
2.00
1,160.00
652.0
3.90
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,164DIESEL 16,099
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
0
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
0
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 11:30 5.50 N DRLPRD 44 RRHOIST REPLACE SERVICE BRAKE JOY STICK.
11:30 22:30 11.00 N DRLPRD 51 THOLE BACK REAM F/11,295' - 8,153'.
22:30 23:00 0.50 N DRLPRD 53 FISH POOH F/ 8,153' T/ 6800'.
23:00 02:30 3.50 N DRLPRD 53 FISH L/D FISHING TOOLS AND 8 DRILL COLLARS. LOAD OUT FISHING FISHING TOOLS.
02:30 06:00 3.50 N DRLPRD 13 TRIP POOH.
Daily Operations Comments
9/14/2014 8:04:56AMPrinted: 1
09/14/2014
DFS: 13.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
015
Spud Date:
DOL: 14 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
119,391
1,720,137
119,391
1,720,137
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 331.00 13,661.03
Current Activity: POOH @ 1500'. LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' )
24 Hr Summary: BACK REAM TO 8,150'. POOH TO 6,865'. L/D FISHING TOOLS. POOH W/ BHA # 5.
POOH. L/D DIRECTIONAL TOOLS. TIH TO 7500'. CBU X 2. PUMP CEMENT PLUGS. PULL OUT OF PLUGS. CBU X2. POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
4
7152120
HUGHES8.75
T606X
5,36179.4
/ / /
0.00
0.00
0.00
0.000.00
13,661
13,661
/
6X18
/
67.50
Grading I O D L B G O R
Bit #
Bit # 4 1 1 CT G X 1 BT HP
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $86,846.85
Time:
114
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.70
FV (s/qt): 64
PV (cp): 13
YP (lbf/100ft²): 15
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.0
70.8 / 29.2
7.00
2.00
1,160.00
652.0
3.90
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 13,661.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,164DIESEL 16,099
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
4BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
3,5
78
5" DP 4.276 5.000 11,087.38 11,087.38
1 SHOCK SUB 3.250 6.750 11.87 11,099.25
1 AGITATOR 3.250 6.750 12.97 11,112.22
105 5" DP 4.276 5.000 2,457.81 13,570.04
1 NMDC 2.875 6.750 30.71 13,600.75
1 NMDC 3.250 6.813 30.38 13,631.13
1 UBHO 3.250 6.688 2.59 13,633.72
1 HUNTING 1.5° 7/8 5.0 1.5° FBH SLICK PDM MUD MOTOR .29 RPG. BTS 48', BTG 35', BTB 5.82' SN 27412.000 7.000 26.31 13,660.03
1 HUGHES T606X 8.750 1.00 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 11:30 5.50 N DRLPRD 44 RRHOIST REPLACE SERVICE BRAKE JOY STICK.
11:30 22:30 11.00 N DRLPRD 51 THOLE BACK REAM F/11,295' - 8,153'.
22:30 23:00 0.50 N DRLPRD 53 FISH POOH F/ 8,153' T/ 6800'.
23:00 02:30 3.50 N DRLPRD 53 FISH L/D FISHING TOOLS AND 8 DRILL COLLARS. LOAD OUT FISHING FISHING TOOLS.
02:30 06:00 3.50 N DRLPRD 13 TRIP POOH.
Daily Operations Comments
9/15/2014 8:02:29AMPrinted: 1
09/15/2014
DFS: 14.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
016
Spud Date:
DOL: 15 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 28
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
104,095
1,821,932
104,095
1,821,932
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 309.00 864.00
Current Activity: CIRCULATE @ 7300'.
24 Hr Summary: POOH. L/D DIRECTIONAL BHA. P/U CONVENTIONAL ASSEMBLY FOR REAMING. TIH T/ 1,050', REPLACE SAVER SUB, TIH TO 8,210'. DOWN
DRAG 30K. REAM F/ 8,210' TO 8,520'. TIH TO 8,957. REAM 8,957' TIH 9,050 TO 9,147. HOLE PACKING OFF. P/U TO 9,080'. LOST RETURNS.
CIRCULATE. POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
4
7152120
HUGHES8.75
T606X
79.4 / / /
0.00
0.00
0.00
0.000.00
13,661
13,661
/
3X22
/
6X18
Grading I O D L B G O R
Bit #
Bit # 4 1 1 CT G X 1 BT HP
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $87,746.85
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.80
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 16
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
2.6
69.7 / 30.3
7.00
2.00
1,160.00
668.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
MUD DIESEL 9,257DIESEL 15,263
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
8.50 FHI21 3X22 8.500 1.00 1.00
1 BIT SUB 2.500 5.937 2.16 3.16
1 CROSS OVER 2.875 6.500 3.19 6.35
294 13,654.68 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 N DRLPRD 13 TRIP FINISH POOH FROM 1,500' TO SURFACE & L/D DIRECTIONAL TOOLS.
10:00 11:30 1.50 P DRLPRD 13 TRIP M/U CONVENTIONAL ASSEMBLY & TIH T/ 1,050'.
11:30 12:00 0.50 P DRLPRD 15 CIRC FILL PIPE & CIRCULATE SLUG OUT OF HOLE.
12:00 12:30 0.50 P DRLPRD 12 RIGSVC LUBRICATE RIG.
12:30 14:30 2.00 P DRLPRD 13 TRIP CHANGE OUT SAVER SUB.
14:30 17:30 3.00 P DRLPRD 13 TRIP TIH TO 8,210'. TAGGED UP.
17:30 23:00 5.50 P DRLPRD 16 WASHR REAM F/ 8,210' TO 8,520'. TIH TO 8,957. REAM 8,957' TIH 9,050 TO 9,147. PU TO 9,080'
CIRCULATE. HOLE PACKING OFF. BEGAN GETTING EXCESSIVE CUTTINGS TO SURFACE.
23:00 00:00 1.00 N DRLPRD 15 CIRC CIRCULATE AND ROTATE @ 9,080'.
00:00 00:30 0.50 N DRLPRD 52 LSTCIRC LOST RETURNS. LOST 130+- BBLS OBM
00:30 01:00 0.50 N DRLPRD 16 WASHR BACK REAM 9,080' TO 8,611' ROTATING 50 RPM. WELL FLOWED BACK 117 BBLS.
01:00 01:30 0.50 N DRLPRD 43 RRTOP SLIPS STUCK IN ROTARY
01:30 02:00 0.50 N DRLPRD 16 WASHR BACK REAM 8,611' TO 8,422'
02:00 03:00 1.00 N DRLPRD 15 CIRC BACK REAM 8,422' TO 7,950'. ROTATE @ 50 RPM 620 GPM. GETTING EXCESSIVE SHALE RUBBLE
TO SURFACE. ( TOTAL SHALE RECOVERED 135CUFT )
03:00 04:00 1.00 N DRLPRD 13 TRIP POOH 7,950' TO 7,400'.
04:00 06:00 2.00 P DRLPRD 15 CIRC CIRCULATE IN VERTICAL HOLE WHILE ROTATING.
Daily Operations Comments
LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' ) . ( OBM LOST LAST 24HRS=54.0BBLS ) ( TOTAL
SHALE RECOVERED DURING REAMING PROCEDURE 135CUFT )
9/22/2014 8:10:37AMPrinted: 1
09/15/2014
DFS: 14.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
016
Spud Date:
DOL: 15 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 28
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
63,150
1,783,287
63,150
1,783,287
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 309.00 13,661.03
Current Activity: CIRCULATE @ 7300'.
24 Hr Summary: POOH. L/D DIRECTIONAL BHA. P/U CONVENTIONAL ASSEMBLY FOR REAMING. TIH T/ 1,050', REPLACE SAVER SUB, TIH TO 8,210'. DOWN
DRAG 30K. REAM F/ 8,210' TO 8,520'. TIH TO 8,957. REAM 8,957' TIH 9,050 TO 9,147. HOLE PACKING OFF. P/U TO 9,080'. LOST RETURNS.
CIRCULATE. POOH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
4
7152120
HUGHES8.75
T606X
79.4 / / /
0.00
0.00
0.00
0.000.00
13,661
13,661
/
3X22
/
6X18
Grading I O D L B G O R
Bit #
Bit # 4 1 1 CT G X 1 BT HP
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $87,746.85
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.80
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 16
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
2.6
69.7 / 30.3
7.00
2.00
1,160.00
668.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 13,661.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 9,257DIESEL 15,263
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
8.50 FHI21 3X22 8.500 1.00 1.00
BIT SUB 2.500 5.937 2.16 3.16
CROSS OVER 2.875 6.500 3.19 6.35
13,654.68 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
78
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:00 4.00 N DRLPRD 13 TRIP FINISH POOH FROM 1,500' TO SURFACE & L/D DIRECTIONAL TOOLS.
10:00 11:30 1.50 P DRLPRD 13 TRIP M/U CONVENTIONAL ASSEMBLY & TIH T/ 1,050'.
11:30 12:00 0.50 P DRLPRD 15 CIRC FILL PIPE & CIRCULATE SLUG OUT OF HOLE.
12:00 12:30 0.50 P DRLPRD 12 RIGSVC LUBRICATE RIG.
12:30 14:30 2.00 P DRLPRD 13 TRIP CHANGE OUT SAVER SUB.
14:30 17:30 3.00 P DRLPRD 13 TRIP TIH TO 8,210'. TAGGED UP.
17:30 23:00 5.50 P DRLPRD 16 WASHR REAM F/ 8,210' TO 8,520'. TIH TO 8,957. REAM 8,957' TIH 9,050 TO 9,147. PU TO 9,080'
CIRCULATE. HOLE PACKING OFF. BEGAN GETTING EXCESSIVE CUTTINGS TO SURFACE.
23:00 00:00 1.00 N DRLPRD 15 CIRC CIRCULATE AND ROTATE @ 9,080'.
00:00 00:30 0.50 N DRLPRD 52 LSTCIRC LOST RETURNS. LOST 130+- BBLS OBM
00:30 01:00 0.50 N DRLPRD 16 WASHR BACK REAM 9,080' TO 8,611' ROTATING 50 RPM. WELL FLOWED BACK 117 BBLS.
01:00 01:30 0.50 N DRLPRD 43 RRTOP SLIPS STUCK IN ROTARY
01:30 02:00 0.50 N DRLPRD 16 WASHR BACK REAM 8,611' TO 8,422'
02:00 03:00 1.00 N DRLPRD 15 CIRC BACK REAM 8,422' TO 7,950'. ROTATE @ 50 RPM 620 GPM. GETTING EXCESSIVE SHALE RUBBLE
TO SURFACE. ( TOTAL SHALE RECOVERED 135CUFT )
03:00 04:00 1.00 N DRLPRD 13 TRIP POOH 7,950' TO 7,400'.
04:00 06:00 2.00 P DRLPRD 15 CIRC CIRCULATE IN VERTICAL HOLE WHILE ROTATING.
Daily Operations Comments
LATERAL LENGTH = 5,375'. ( PTB 13,661' INC: 95.0° AZM: 182.2° TVD: 7,953', 11.91' RIGHT, 2.82' ABOVE VS 5,294' ) . ( OBM LOST LAST 24HRS=54.0BBLS ) ( TOTAL
SHALE RECOVERED DURING REAMING PROCEDURE 135CUFT )
9/15/2014 8:14:36AMPrinted: 1
09/16/2014
DFS: 15.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
017
Spud Date:
DOL: 16 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
88,053
1,914,585
88,053
1,914,585
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 348.00 13,661.03
Current Activity: INSPECT TOP DRIVE.
24 Hr Summary: CIR @ 7,300'. WASH & REAM F/ 7,400' T/ 7,765'. CIR. POOH. LD BIT . TIH OPEN ENDED. CIR. PUMP CEMENT PLUG. SET FROM 7,750' TO 6,250'.
PULL 17 STDS. CBU X 2. POOH. INSPECT TOP DRIVE.
INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. P/U CONVENTIONAL BHA. TIH TO 6,150'. CIRCULATE BU. TAG
CEMENT. DRILL 30' IF HARD. TEST CEMENT W/ 100K. DRESS CEMENT TO 6,987'. POOH FOR SIDETRACK BHA. P/U ST BHA AND TIH. TIME
DRILL.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X22
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $88,646.85
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.80
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 16
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
2.6
69.7 / 30.3
7.00
2.00
1,160.00
668.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 13,661.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 3,560DIESEL 14,179
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
8.50 FHI21 3X22 8.500 1.00 1.00
1 BIT SUB 2.500 5.937 2.16 3.16
1 CROSS OVER 2.875 6.500 3.19 6.35
294 13,654.68 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P DRLPRD 15 CIRC CIRCULATE IN VERTICAL HOLE WHILE ROTATING.
06:30 07:00 0.50 P DRLPRD 16 WASHR WASH & REAM F/ 7,400' T/ 7,765'.
07:00 09:00 2.00 P DRLPRD 15 CIRC C&C MUD @ 7,765'.(15' BELOW PLANED BASE OF CMT PLUG)
09:00 13:30 4.50 P DRLPRD 13 TRIP POOH LD REAMING BHA
13:30 18:00 4.50 P DRLPRD 13 TRIP TRIP IN HOLE OPEN ENDED
18:00 19:30 1.50 P DRLPRD 15 CIRC CIRCULATE AND RIG UP COMPASS. PJSM.
19:30 21:00 1.50 P DRLPRD 38 SETCEM SWAP OVER TO COMPASS. TEST LINES TO 5,000 PSI. SET CEMENT PLUG WITH 30 BBL OF
10PPG TUNED SPACE . PUMP 590 SKS AT 16.4 PPG CEMENT. 1.07 YIELD. 10 BBL OF 10.0PPG
TUNED SPACER. DISPLACE WITH 93.5 BBL OBM. FULL CIRCULATION WHILE CEMENTING. RD
COMPASS FROM DP. TOC AT 6,250'.
21:00 22:30 1.50 P DRLPRD 13 TRIP PULL 17 STANDS DRILL PIPE. DROP WIPER BALL.
22:30 23:30 1.00 P DRLPRD 15 CIRC CIRCULATE BU. DROP WIPER BALL. CIRCULATE BU.
23:30 03:30 4.00 P DRLPRD 13 TRIP POOH W/ OPEN ENDED DRILL PIPE
03:30 06:00 2.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
Daily Operations Comments
9/17/2014 8:09:56AMPrinted: 1
09/16/2014
DFS: 15.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
017
Spud Date:
DOL: 16 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 6,690.01 / 6,639.24
Progress (ft): -6,971.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
83,953
1,905,885
83,953
1,905,885
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0-6,971.0 / = 0.00
15,726.00
Total Man Hours: 348.00 864.00
Current Activity: INSPECT TOP DRIVE.
24 Hr Summary: CIR @ 7,300'. WASH & REAM F/ 7,400' T/ 7,765'. CIR. POOH. LD BIT . TIH OPEN ENDED. CIR. PUMP CEMENT PLUG. SET FROM 7,750' TO 6,250'.
PULL 17 STDS. CBU X 2. POOH. INSPECT TOP DRIVE.
INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. P/U CONVENTIONAL BHA. TIH TO 6,150'. CIRCULATE BU. TAG
CEMENT. DRILL 30' IF HARD. TEST CEMENT W/ 100K. DRESS CEMENT TO 6,987'. POOH FOR SIDETRACK BHA. P/U ST BHA AND TIH. TIME
DRILL.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X22
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $900.00C M Cost($): $88,646.85
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.80
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 16
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
2.6
69.7 / 30.3
7.00
2.00
1,160.00
668.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
MUD DIESEL 3,560DIESEL 14,179
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
8.50 FHI21 3X22 8.500 1.00 1.00
1 BIT SUB 2.500 5.937 2.16 3.16
1 CROSS OVER 2.875 6.500 3.19 6.35
294 13,654.68 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P DRLPRD 15 CIRC CIRCULATE IN VERTICAL HOLE WHILE ROTATING.
06:30 07:00 0.50 P DRLPRD 16 WASHR WASH & REAM F/ 7,400' T/ 7,765'.
07:00 09:00 2.00 P DRLPRD 15 CIRC C&C MUD @ 7,765'.(15' BELOW PLANED BASE OF CMT PLUG)
09:00 13:30 4.50 P DRLPRD 13 TRIP POOH LD REAMING BHA
13:30 18:00 4.50 P DRLPRD 13 TRIP TRIP IN HOLE OPEN ENDED
18:00 19:30 1.50 P DRLPRD 15 CIRC CIRCULATE AND RIG UP COMPASS. PJSM.
19:30 21:00 1.50 P DRLPRD 38 SETCEM SWAP OVER TO COMPASS. TEST LINES TO 5,000 PSI. SET CEMENT PLUG WITH 30 BBL OF
10PPG TUNED SPACE . PUMP 590 SKS AT 16.4 PPG CEMENT. 1.07 YIELD. 10 BBL OF 10.0PPG
TUNED SPACER. DISPLACE WITH 93.5 BBL OBM. FULL CIRCULATION WHILE CEMENTING. RD
COMPASS FROM DP. TOC AT 6,250'.
21:00 22:30 1.50 P DRLPRD 13 TRIP PULL 17 STANDS DRILL PIPE. DROP WIPER BALL.
22:30 23:30 1.00 P DRLPRD 15 CIRC CIRCULATE BU. DROP WIPER BALL. CIRCULATE BU.
23:30 03:30 4.00 P DRLPRD 13 TRIP POOH W/ OPEN ENDED DRILL PIPE
03:30 06:00 2.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
Daily Operations Comments
9/22/2014 8:06:06AMPrinted: 1
09/16/2014
DFS: 15.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
017
Spud Date:
DOL: 16 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
88,053
1,871,340
88,053
1,871,340
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 348.00 13,661.03
Current Activity: INSPECT TOP DRIVE.
24 Hr Summary: CIR @ 7,300'. WASH & REAM F/ 7,400' T/ 7,765'. CIR. POOH. LD BIT . TIH OPEN ENDED. CIR. PUMP CEMENT PLUG. SET FROM 7,750' TO 6,250'.
PULL 17 STDS. CBU X 2. POOH. INSPECT TOP DRIVE.
INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. P/U CONVENTIONAL BHA. TIH TO 6,150'. CIRCULATE BU. TAG
CEMENT. DRILL 30' IF HARD. TEST CEMENT W/ 100K. DRESS CEMENT TO 6,987'. POOH FOR SIDETRACK BHA. P/U ST BHA AND TIH. TIME
DRILL.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X22
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $0.00C M Cost($): $87,746.85
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 13,661.03
Density (ppg): 8.80
FV (s/qt): 65
PV (cp): 13
YP (lbf/100ft²): 16
Gels (): 11/13/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
64
28
0.00
0.0
2.6
69.7 / 30.3
7.00
2.00
1,160.00
668.0
4.60
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 13,661.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 3,560DIESEL 14,179
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
5BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
8.50 FHI21 3X22 8.500 1.00 1.00
BIT SUB 2.500 5.937 2.16 3.16
CROSS OVER 2.875 6.500 3.19 6.35
13,654.68 13,661.03
Total Length: 13,661.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 06:30 0.50 P DRLPRD 15 CIRC CIRCULATE IN VERTICAL HOLE WHILE ROTATING.
06:30 07:00 0.50 P DRLPRD 16 WASHR WASH & REAM F/ 7,400' T/ 7,765'.
07:00 09:00 2.00 P DRLPRD 15 CIRC C&C MUD @ 7,765'.(15' BELOW PLANED BASE OF CMT PLUG)
09:00 13:30 4.50 P DRLPRD 13 TRIP POOH LD REAMING BHA
13:30 18:00 4.50 P DRLPRD 13 TRIP TRIP IN HOLE OPEN ENDED
18:00 19:30 1.50 P DRLPRD 15 CIRC CIRCULATE AND RIG UP COMPASS. PJSM.
19:30 21:00 1.50 P DRLPRD 38 SETCEM SWAP OVER TO COMPASS. TEST LINES TO 5,000 PSI. SET CEMENT PLUG WITH 30 BBL OF
10PPG TUNED SPACE . PUMP 590 SKS AT 16.4 PPG CEMENT. 1.07 YIELD. 10 BBL OF 10.0PPG
TUNED SPACER. DISPLACE WITH 93.5 BBL OBM. FULL CIRCULATION WHILE CEMENTING. RD
COMPASS FROM DP. TOC AT 6,250'.
21:00 22:30 1.50 P DRLPRD 13 TRIP PULL 17 STANDS DRILL PIPE. DROP WIPER BALL.
22:30 23:30 1.00 P DRLPRD 15 CIRC CIRCULATE BU. DROP WIPER BALL. CIRCULATE BU.
23:30 03:30 4.00 P DRLPRD 13 TRIP POOH W/ OPEN ENDED DRILL PIPE
03:30 06:00 2.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
Daily Operations Comments
9/16/2014 8:02:52AMPrinted: 1
09/17/2014
DFS: 16.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
018
Spud Date:
DOL: 17 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
96,279
2,006,764
96,279
2,006,764
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 322.00 864.00
Current Activity: CIRCULATE @ 6,600'.
24 Hr Summary: INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. INSTALL NEW BLADDER ON FLOWLINE. P/U CONVENTIONAL BHA.
TIH TO 5,957'.TO TOC @ 6,376'. DRILL CEMENT 6,376' - 6,600'. W/ 5K WOB ROP= 225 TO 85.
CIRCULATE. POOH FOR DIRECTIONAL TOOLS. TIH. TIME DRILL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $9,251.18C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
LIME 26
EZ MUL 1
DURATONE HT 5
CALCIUM CHLORIDE POWDER 168
INVERMUL 2
BARABLOK 3
GELTONE 16
ENGINEER 24 HOURS 1
MICA C 2
BAROID 41 41
DRILLTREAT 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
MUD DIESEL 10,086DIESEL 15,832
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
07:30 10:30 3.00 P DRLPRD 30 TSTWCEQ NIPPLE DOWN FLOWLINE EQUIPMENT & 14" BELL NIPPLE.
10:30 17:00 6.50 P DRLPRD 30 TSTWCEQ R/U TESTING TRUCK AND TEST BOPE 5MIN EACH W/H20 250PSI LOW & 5,000 PSI HIGH, TEST
ANNULAR 250 PSI LOW & 3,600 PSI HIGH, FLOOR VALVES 250PSI LOW & 5,000 HIGH, TOP DRIVE
IBOP & MANUAL KELLY VALVES 250PSI LOW & 5,000 HIGH, MUD PUMPS MANIFOLD 250PSI LOW &
4,000 HIGH, CHOKE MANIFOLD & MUD CROSS 250PSI LOW & 5,000 HIGH.
17:00 21:30 4.50 P DRLPRD 42 OTHER NIPPLE UP 16'' BELL NIPPLE AND FLOWLINE .INSTALL NEW BLADDER ON FLOWLINE.
21:30 22:00 0.50 P DRLPRD 14 PULDSTR PU CONVENTIONAL BHA W/ MILL TOOTH BIT.
22:00 02:30 4.50 P DRLPRD 13 TRIP STRAP IN HOLE TO 5,957'.
02:30 03:00 0.50 N DRLPRD 47 RROTHR PULL MASTER ROTARY BUSHING AND REMOVE DRIP PAN BLOCKING FLOWLINE RESTRICTING
FLOW.
03:00 04:00 1.00 P DRLPRD 16 WASHR WASH 5,957' - 6,376'.
04:00 05:30 1.50 P DRLPRD 42 OTHER DRILL CEMENT 6,376' - 6,600' 5K WOB, ROP= 225 TO 85.
05:30 06:00 0.50 P DRLPRD 15 CIRC CIRCULATE
Daily Operations Comments
9/18/2014 8:18:30AMPrinted: 1
09/17/2014
DFS: 16.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
018
Spud Date:
DOL: 17 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
96,279
2,002,164
96,279
2,002,164
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 322.00 864.00
Current Activity: CIRCULATE @ 6,600'.
24 Hr Summary: INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. INSTALL NEW BLADDER ON FLOWLINE. P/U CONVENTIONAL BHA.
TIH TO 5,957'.TO TOC @ 6,376'. DRILL CEMENT 6,376' - 6,600'. W/ 5K WOB ROP= 225 TO 85.
CIRCULATE. POOH FOR DIRECTIONAL TOOLS. TIH. TIME DRILL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $9,251.18C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
LIME 26
EZ MUL 1
DURATONE HT 5
CALCIUM CHLORIDE POWDER 168
INVERMUL 2
BARABLOK 3
GELTONE 16
ENGINEER 24 HOURS 1
MICA C 2
BAROID 41 41
DRILLTREAT 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
MUD DIESEL 10,086DIESEL 15,832
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
07:30 10:30 3.00 P DRLPRD 30 TSTWCEQ NIPPLE DOWN FLOWLINE EQUIPMENT & 14" BELL NIPPLE.
10:30 17:00 6.50 P DRLPRD 30 TSTWCEQ R/U TESTING TRUCK AND TEST BOPE 5MIN EACH W/H20 250PSI LOW & 5,000 PSI HIGH, TEST
ANNULAR 250 PSI LOW & 3,600 PSI HIGH, FLOOR VALVES 250PSI LOW & 5,000 HIGH, TOP DRIVE
IBOP & MANUAL KELLY VALVES 250PSI LOW & 5,000 HIGH, MUD PUMPS MANIFOLD 250PSI LOW &
4,000 HIGH, CHOKE MANIFOLD & MUD CROSS 250PSI LOW & 5,000 HIGH.
17:00 21:30 4.50 P DRLPRD 42 OTHER NIPPLE UP 16'' BELL NIPPLE AND FLOWLINE .INSTALL NEW BLADDER ON FLOWLINE.
21:30 22:00 0.50 P DRLPRD 14 PULDSTR PU CONVENTIONAL BHA W/ MILL TOOTH BIT.
22:00 02:30 4.50 P DRLPRD 13 TRIP STRAP IN HOLE TO 5,957'.
02:30 03:00 0.50 N DRLPRD 47 RROTHR PULL MASTER ROTARY BUSHING AND REMOVE DRIP PAN BLOCKING FLOWLINE RESTRICTING
FLOW.
03:00 04:00 1.00 P DRLPRD 16 WASHR WASH 5,957' - 6,376'.
04:00 05:30 1.50 P DRLPRD 42 OTHER DRILL CEMENT 6,376' - 6,600' 5K WOB, ROP= 225 TO 85.
05:30 06:00 0.50 P DRLPRD 15 CIRC CIRCULATE
Daily Operations Comments
9/22/2014 8:14:32AMPrinted: 1
09/17/2014
DFS: 16.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / DERDEN, ROY
018
Spud Date:
DOL: 17 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 34
SIDEWINDER/221Depth md/tvd (ft): 13,661.03 / 7,953.21
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
100,379
2,014,964
100,379
2,014,964
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,726.00
Total Man Hours: 322.00 13,661.03
Current Activity: CIRCULATE @ 6,600'.
24 Hr Summary: INSPECT TOP DRIVE, TEST BOPE. NIPPLE UP BELL NIPPLE AND FLOWLINE. INSTALL NEW BLADDER ON FLOWLINE. P/U CONVENTIONAL BHA.
TIH TO 5,957'.TO TOC @ 6,376'. DRILL CEMENT 6,376' - 6,600'. W/ 5K WOB ROP= 225 TO 85.
CIRCULATE. POOH FOR DIRECTIONAL TOOLS. TIH. TIME DRILL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $9,251.18C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
LIME 26
EZ MUL 1
DURATONE HT 5
CALCIUM CHLORIDE POWDER 168
INVERMUL 2
BARABLOK 3
GELTONE 16
ENGINEER 24 HOURS 1
MICA C 2
BAROID 41 41
DRILLTREAT 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 13,661.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 10,086DIESEL 15,832
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 P DRLPRD 42 OTHER INSPECT TOP DRIVE.
07:30 10:30 3.00 P DRLPRD 30 TSTWCEQ NIPPLE DOWN FLOWLINE EQUIPMENT & 14" BELL NIPPLE.
10:30 17:00 6.50 P DRLPRD 30 TSTWCEQ R/U TESTING TRUCK AND TEST BOPE 5MIN EACH W/H20 250PSI LOW & 5,000 PSI HIGH, TEST
ANNULAR 250 PSI LOW & 3,600 PSI HIGH, FLOOR VALVES 250PSI LOW & 5,000 HIGH, TOP DRIVE
IBOP & MANUAL KELLY VALVES 250PSI LOW & 5,000 HIGH, MUD PUMPS MANIFOLD 250PSI LOW &
4,000 HIGH, CHOKE MANIFOLD & MUD CROSS 250PSI LOW & 5,000 HIGH.
17:00 21:30 4.50 P DRLPRD 42 OTHER NIPPLE UP 16'' BELL NIPPLE AND FLOWLINE .INSTALL NEW BLADDER ON FLOWLINE.
21:30 22:00 0.50 P DRLPRD 14 PULDSTR PU CONVENTIONAL BHA W/ MILL TOOTH BIT.
22:00 02:30 4.50 P DRLPRD 13 TRIP STRAP IN HOLE TO 5,957'.
02:30 03:00 0.50 N DRLPRD 47 RROTHR PULL MASTER ROTARY BUSHING AND REMOVE DRIP PAN BLOCKING FLOWLINE RESTRICTING
FLOW.
03:00 04:00 1.00 P DRLPRD 16 WASHR WASH 5,957' - 6,376'.
04:00 05:30 1.50 P DRLPRD 42 OTHER DRILL CEMENT 6,376' - 6,600' 5K WOB, ROP= 225 TO 85.
05:30 06:00 0.50 P DRLPRD 15 CIRC CIRCULATE
Daily Operations Comments
9/17/2014 8:03:28AMPrinted: 1
09/18/2014
DFS: 17.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
019
Spud Date:
DOL: 18 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,690.01 / 6,639.24
Progress (ft): -6,971.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
0
2,006,764
54,142
2,060,906
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0-6,971.0 / = 0.00
15,726.00
Total Man Hours: 306.00 864.00
Current Activity: PU KICK OFF BHA.
24 Hr Summary: DRILLED CMT 6,600'-6,690'. CBU. POOH & LD BHA.
PU KICK OFF BHA. TIH. TIME DRILL OFF PLUG.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $0.00C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
90.00
376.75
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N ABDSUSP 42 OTHER DRILL CEMENT 6,600'-6,690'. 5K WOB, 45 RPM, 370 GPM. 6,600-6,670 ROP=70 TO 100 FPH,
6,670-6,690 ROP=40 TO 70 FPH. FINAL ROP = 62FPH.
08:30 09:30 1.00 N ABDSUSP 15 CIRC SET 50K WOB. NO WASH OFF OBSERVED. CBU.
09:30 15:00 5.50 N ABDSUSP 13 TRIP POOH & LD BHA. ( WELL TOOK CALCULATED FILL AFTER PULLING 30 STANDS )
Daily Operations Comments
9/18/2014 8:03:23AMPrinted: 1
09/18/2014
DFS: 17.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
019
Spud Date:
DOL: 18 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,690.01 / 6,639.24
Progress (ft): -6,971.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
0
2,002,164
54,142
2,056,306
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0-6,971.0 / = 0.00
15,726.00
Total Man Hours: 306.00 864.00
Current Activity: PU KICK OFF BHA.
24 Hr Summary: DRILLED CMT 6,600'-6,690'. CBU. POOH & LD BHA.
PU KICK OFF BHA. TIH. TIME DRILL OFF PLUG.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $0.00C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
90.00
376.75
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N ABDSUSP 42 OTHER DRILL CEMENT 6,600'-6,690'. 5K WOB, 45 RPM, 370 GPM. 6,600-6,670 ROP=70 TO 100 FPH,
6,670-6,690 ROP=40 TO 70 FPH. FINAL ROP = 62FPH.
08:30 09:30 1.00 N ABDSUSP 15 CIRC SET 50K WOB. NO WASH OFF OBSERVED. CBU.
09:30 15:00 5.50 N ABDSUSP 13 TRIP POOH & LD BHA. ( WELL TOOK CALCULATED FILL AFTER PULLING 30 STANDS )
Daily Operations Comments
9/19/2014 8:13:51AMPrinted: 1
09/18/2014
DFS: 17.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
019
Spud Date:
DOL: 18 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/00
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,690.01 / 6,639.24
Progress (ft): -6,971.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
0
2,002,164
58,742
2,060,906
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0-6,971.0 / = 0.00
15,726.00
Total Man Hours: 306.00 864.00
Current Activity: PU KICK OFF BHA.
24 Hr Summary: DRILLED CMT 6,600'-6,690'. CBU. POOH & LD BHA.
PU KICK OFF BHA. TIH. TIME DRILL OFF PLUG.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) 708 @ 708
Form:
BG Gas (units): 798
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
3X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $0.00C M Cost($): $97,898.03
Time:
74
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 6,250.01
Density (ppg): 8.55
FV (s/qt): 55
PV (cp): 9
YP (lbf/100ft²): 12
Gels (): 10/12/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 28
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
2.2
71.1 / 28.9
7.00
2.00
1,160.00
692.0
3.10
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/
INVENTORYItem Inv
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
90.00
376.75
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):403 285
6BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 8 3/4'' FHI21 TRI-CONE 8.750 8.750 1.00 1.00
1 BIT SUB 2.812 6.500 2.11 3.11
6 6 1/2'' DRILL COLLARS 2.380 6.500 179.07 182.18
Total Length: 182.18
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
184.40 7,965 -4,555.58-436.5812,929 90.50 4,563.48 0.87
182.30 7,965 -4,650.41-442.1313,024 89.10 4,658.41 2.66
181.40 7,969 -4,745.30-445.2013,119 86.90 4,753.34 2.50
180.70 7,972 -4,840.20-446.9313,214 88.70 4,848.26 2.03
180.60 7,973 -4,935.19-448.0113,309 90.20 4,943.25 1.58
182.00 7,971 -5,029.13-450.1413,403 92.70 5,037.21 3.05
182.90 7,966 -5,123.91-454.2013,498 93.20 5,132.06 1.08
182.20 7,959 -5,218.57-458.4113,593 95.00 5,226.78 2.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N ABDSUSP 42 OTHER DRILL CEMENT 6,600'-6,690'. 5K WOB, 45 RPM, 370 GPM. 6,600-6,670 ROP=70 TO 100 FPH,
6,670-6,690 ROP=40 TO 70 FPH. FINAL ROP = 62FPH.
08:30 09:30 1.00 N ABDSUSP 15 CIRC SET 50K WOB. NO WASH OFF OBSERVED. CBU.
09:30 15:00 5.50 N ABDSUSP 13 TRIP POOH & LD BHA. ( WELL TOOK CALCULATED FILL AFTER PULLING 30 STANDS )
Daily Operations Comments
9/22/2014 8:34:09AMPrinted: 1
09/18/2014
DFS: 18.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
020
Spud Date:
DOL: 19 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,700.01 / 6,649.24
Progress (ft): 6,700.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
54,142
2,060,906
54,142
2,060,906
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
06,700.0 / 7.50 = 893.34
15,614.00
Total Man Hours: 306.00 15,614.03
Current Activity: TIME DRILLING OFF PLUG @ 6,700' PTB-6,700 INC-0.5 AZM-129.3 TVD-6,649B( FORMATION 25%@ 6,698' )
24 Hr Summary: PU KICK OFF BHA. TIH. TIME DRILL OFF PLUG 6,690-6,700'.
TIME DRILL OFF PLUG.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 44 @
Conn Gas (units) @
Form:
BG Gas (units): 4
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
7
12188394
HALLIBURTONM322
8.75
MMD55C
101.3
2 / 50 / 0 / 0.25
0.16
42.53
73.92125.52
6,690
/
5X18, 2X16
0/0
7.50
Grading I O D L B G O R
Bit #
Bit # 7
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $6,554.16C M Cost($): $104,452.19
Time:
94
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 6,690.01
Density (ppg): 8.70
FV (s/qt): 55
PV (cp): 15
YP (lbf/100ft²): 13
Gels (): 12/15/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 37
ECD (ppg): 8.7
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
65
28
0.00
0.0
1.2
69.7 / 30.3
4.40
2.00
1,160.00
546.0
3.90
Mud Additives Used
BAROID RIG WASH 2
BARITE 41 0
LIME 6
CEDAR FIBER 5
FUEL SURCHARGE .60 300
GELTONE 3
BARABLOK 6
BAROID 41 34
DURATONE HT 3
ENGINEER 24 HOURS 1
TRANSPORTATION 288
INVERMUL 1
SHRINK WRAP 11
CALCIUM CHLORIDE POWDER 28
more...
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 7,756DIESEL 14,965
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
90.00
376.75
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):245 178
376 930
7BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 SECURITY MMD55C 8.750 1.00 1.00
1 RYAN 2.38° 4/5 7.0 PDM. BTB=6.07', BTS=50', BTG=37', RPG=.486.750 28.45 29.45
1 UBHO 2.875 6.625 2.82 32.27
1 MWD 3.250 6.875 28.90 61.17
1 NM FLEX DC 2.750 6.500 30.66 91.83
5" DP 4.276 5.000 6,608.18 6,700.01
Total Length: 6,700.01
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
0
0
175
169
172
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
8
9
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
129.30 6,616 490.79-318.116,667 0.50 -483.68 0.00
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
15:00 17:00 2.00 N DRLPRD 13 TRIP MU KICK OFF BHA.
17:00 17:30 0.50 N DRLPRD 13 TRIP TIH TO 941'
17:30 18:00 0.50 N DRLPRD 15 CIRC BREAK CIRCULATION AND TEST MWD
18:00 18:30 0.50 N DRLPRD 12 RIGSVC RIG SERVICE
18:30 22:00 3.50 N DRLPRD 13 TRIP TIH TO 6690' , BREAKING CIRCULATION EVERY 20 STANDS (20K- 40K DRAG 2,830'- 3,010' )
22:00 22:30 0.50 N DRLPRD 15 CIRC BREAK CIRCULATION, SYNC MWD, ORIENT TOOLFACE.
22:30 06:00 7.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 2.0 FPH 6,690'-6,700'. WOB 1-3 K, DIFF 25-80 PSI, GPM 375. ( FORMATION
25%@ 6,698' )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444'
9/18/2014 8:11:16AMPrinted: 1
09/19/2014
DFS: 19.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
021
Spud Date:
DOL: 20 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,995.01 / 6,942.15
Progress (ft): 295.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
93,140
2,154,046
93,140
2,154,046
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0295.0 / 18.50 = 15.95
15,614.00
Total Man Hours: 306.00 15,614.03
Current Activity: LD KICK OFF BHA. ( PTB @ 6,995' 5° INC, 170° AZM, 27' ABOVE, 8' LEFT, DLN 10.5, BRN 10.4, 31' FROM ORIGINAL WELLBORE )
24 Hr Summary: TIME DRILL OFF PLUG 6,700'-6,747'. DIRECTIONAL DRILL TANGENT 6,747'-6,975. DRILLED CURVE 6,975'-6,995'. CBU. POOH FOR CURVE BHA.
FINISH POOH. LD KICK OFF BHA.P/U CURVE BHA, TIH, DRILL CURVE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 44 @
Conn Gas (units) @
Form:
BG Gas (units): 175
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
7
12188394
HALLIBURTONM322
8.75
MMD55C
30511.7
3 / 2015 / 15 /
0.35
0.21
52.51
82.13154.97
6,995
6,690
/
5X18, 2X16
15/15
26.00
Grading I O D L B G O R
Bit #
Bit # 7 2 2 CT G X I BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,077.13C M Cost($): $116,529.32
Time:
100
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 6,831.01
Density (ppg): 8.70
FV (s/qt): 51
PV (cp): 13
YP (lbf/100ft²): 11
Gels (): 11/14/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 41
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
25
0.00
0.0
2.2
72.7 / 27.3
4.80
2.00
1,160.00
566.0
4.50
Mud Additives Used
INVERMUL 3
CEDAR FIBER 3
MICA FINE 6
SHRINK WRAP 13
CALCIUM CHLORIDE POWDER 224
LIME 128
OIL ABSORBANT 8
TRANSPORTATION 392
EZ MUL 1
ENGINEER 24 HOURS 1
FUEL SURCHARGE .60 300
GELTONE 19
MICA C 6
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 9,680DIESEL 14,811
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
100.00
418.61
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):245 178
420 1,150
8BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 FHI21 8.750 8.750 1.00 1.00
1 RYAN 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .48, B-B 5.1, BTG-36. MAX DIFF 1125, GPM 300-6006.750 25.17 26.17
FLOAT SUB 2.750 6.687 1.90 28.07
1 UBHO SUB 2.875 6.625 2.82 30.89
1 NON MAG DRILL COLLAR 3.250 6.875 28.90 59.79
1 NON MAG FLEX DRILL COLLAR 2.812 6.312 29.87 89.66
227 4.276 5.000 7,696.36 7,786.02
Total Length: 7,786.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
4,000
1,000
185
175
180
20Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
19
28
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
129.30 6,616 490.79-318.116,667 0.50 -483.68 0.00
152.60 6,646 490.34-317.826,697 1.60 -483.23 3.86
159.80 6,676 488.71-317.166,727 5.10 -481.62 11.73
171.00 6,708 485.18-316.326,759 8.00 -478.10 9.86
168.10 6,739 480.91-315.546,790 8.10 -473.85 1.35
164.10 6,801 472.93-313.586,853 6.90 -465.92 2.08
158.70 6,865 465.70-311.156,917 6.80 -458.74 1.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 2 FPH 6,700-6,705'. WOB 1-3 K, DIFF 25-40 PSI, GPM 375. ( FORMATION
65%@ 6,704' )
08:00 11:30 3.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 3 FPH 6,705'-6,713'. WOB 3-5 K, DIFF 30-50 PSI, GPM 375. ( FORMATION
90%@ 6,710' )
11:30 13:30 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 4 FPH 6,713'-6,721'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
99%@ 6,718' )
13:30 16:00 2.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 6 FPH 6,721'-6,739'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
100%@ 6,729' )
16:00 17:30 1.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 8 FPH 6,739'-6,747'. WOB 6-7 K, DIFF 40-80 PSI, GPM 375. ( FORMATION
100%@ 6,739'. FIRST SURVEY SEEING 7' OF SLIDE @ 6,697' BUILT 1.1°. MY 16.5°. INDICATING
SIDETRACK SLIGHTLY AFTER PLUG KOP @ 6,690'. 17.5 HRS TOTAL TO KICK OFF PLUG.
AVERAGE MOTOR YEILD=13.1° )
17:30 23:00 5.50 N DRLPRD 08 DRLDIR DIRECTIONAL DRILL TANGENT 6,747'-6,975'. ( BEGAN ROTATION 6,747' )
23:00 00:30 1.50 N DRLPRD 09 DRLCRV DRILLED CURVE 6,975'-6,995'. UNABLE TO CONTROL TOOLFACE.
00:30 01:00 0.50 N DRLPRD 15 CIRC CBU, ORIENT TOOL FACE TO HS, & PUMP SLUG.
01:00 06:00 5.00 N DRLPRD 13 TRIP POOH FOR CURVE BHA. ( WELL TOOK CALCULATED FILL AFTER 30 STANDS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/23/2014 8:19:25AMPrinted: 1
09/19/2014
DFS: 19.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
021
Spud Date:
DOL: 20 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,995.01 / 6,942.15
Progress (ft): 295.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
93,140
2,154,046
93,140
2,154,046
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0295.0 / 18.50 = 15.95
15,614.00
Total Man Hours: 306.00 15,614.03
Current Activity: LD KICK OFF BHA. ( PTB @ 6,995' 5° INC, 170° AZM, 27' ABOVE, 8' LEFT, DLN 10.5, BRN 10.4, 31' FROM ORIGINAL WELLBORE )
24 Hr Summary: TIME DRILL OFF PLUG 6,700'-6,747'. DIRECTIONAL DRILL TANGENT 6,747'-6,975. DRILLED CURVE 6,975'-6,995'. CBU. POOH FOR CURVE BHA.
FINISH POOH. LD KICK OFF BHA.P/U CURVE BHA, TIH, DRILL CURVE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 44 @
Conn Gas (units) @
Form:
BG Gas (units): 175
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
7
12188394
HALLIBURTONM322
8.75
MMD55C
30511.7
3 / 2015 / 15 /
0.35
0.21
52.51
82.13154.97
6,995
6,690
/
5X18, 2X16
15/15
26.00
Grading I O D L B G O R
Bit #
Bit # 7 2 2 CT G X I BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,077.13C M Cost($): $116,529.32
Time:
100
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 6,831.01
Density (ppg): 8.70
FV (s/qt): 51
PV (cp): 13
YP (lbf/100ft²): 11
Gels (): 11/14/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 41
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
25
0.00
0.0
2.2
72.7 / 27.3
4.80
2.00
1,160.00
566.0
4.50
Mud Additives Used
INVERMUL 3
CEDAR FIBER 3
MICA FINE 6
SHRINK WRAP 13
CALCIUM CHLORIDE POWDER 224
LIME 128
OIL ABSORBANT 8
TRANSPORTATION 392
EZ MUL 1
ENGINEER 24 HOURS 1
FUEL SURCHARGE .60 300
GELTONE 19
MICA C 6
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 9,680DIESEL 14,811
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
100.00
418.61
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):245 178
420 1,150
8BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 FHI21 8.750 8.750 1.00 1.00
1 RYAN 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .48, B-B 5.1, BTG-36. MAX DIFF 1125, GPM 300-6006.750 25.17 26.17
FLOAT SUB 2.750 6.687 1.90 28.07
1 UBHO SUB 2.875 6.625 2.82 30.89
1 NON MAG DRILL COLLAR 3.250 6.875 28.90 59.79
1 NON MAG FLEX DRILL COLLAR 2.812 6.312 29.87 89.66
227 4.276 5.000 7,696.36 7,786.02
Total Length: 7,786.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
4,000
1,000
185
175
180
20Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
19
28
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
129.30 6,616 490.79-318.116,667 0.50 -483.68 0.00
152.60 6,646 490.34-317.826,697 1.60 -483.23 3.86
159.80 6,676 488.71-317.166,727 5.10 -481.62 11.73
171.00 6,708 485.18-316.326,759 8.00 -478.10 9.86
168.10 6,739 480.91-315.546,790 8.10 -473.85 1.35
164.10 6,801 472.93-313.586,853 6.90 -465.92 2.08
158.70 6,865 465.70-311.156,917 6.80 -458.74 1.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 2 FPH 6,700-6,705'. WOB 1-3 K, DIFF 25-40 PSI, GPM 375. ( FORMATION
65%@ 6,704' )
08:00 11:30 3.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 3 FPH 6,705'-6,713'. WOB 3-5 K, DIFF 30-50 PSI, GPM 375. ( FORMATION
90%@ 6,710' )
11:30 13:30 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 4 FPH 6,713'-6,721'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
99%@ 6,718' )
13:30 16:00 2.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 6 FPH 6,721'-6,739'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
100%@ 6,729' )
16:00 17:30 1.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 8 FPH 6,739'-6,747'. WOB 6-7 K, DIFF 40-80 PSI, GPM 375. ( FORMATION
100%@ 6,739'. FIRST SURVEY SEEING 7' OF SLIDE @ 6,697' BUILT 1.1°. MY 16.5°. INDICATING
SIDETRACK SLIGHTLY AFTER PLUG KOP @ 6,690'. 17.5 HRS TOTAL TO KICK OFF PLUG.
AVERAGE MOTOR YEILD=13.1° )
17:30 23:00 5.50 N DRLPRD 08 DRLDIR DIRECTIONAL DRILL TANGENT 6,747'-6,975'. ( BEGAN ROTATION 6,747' )
23:00 00:30 1.50 N DRLPRD 09 DRLCRV DRILLED CURVE 6,975'-6,995'. UNABLE TO CONTROL TOOLFACE.
00:30 01:00 0.50 N DRLPRD 15 CIRC CBU, ORIENT TOOL FACE TO HS, & PUMP SLUG.
01:00 06:00 5.00 N DRLPRD 13 TRIP POOH FOR CURVE BHA. ( WELL TOOK CALCULATED FILL AFTER 30 STANDS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/22/2014 8:16:41AMPrinted: 1
09/19/2014
DFS: 19.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
021
Spud Date:
DOL: 20 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 6,995.01 / 6,942.12
Progress (ft): 295.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
81,780
2,138,086
81,780
2,138,086
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0295.0 / 18.50 = 15.95
15,614.00
Total Man Hours: 306.00 15,614.03
Current Activity: LD KICK OFF BHA. ( PTB @ 6,995' 5° INC, 170° AZM, 27' ABOVE, 8' LEFT, DLN 10.5, BRN 10.4, 31' FROM ORIGINAL WELLBORE )
24 Hr Summary: TIME DRILL OFF PLUG 6,700'-6,747'. DIRECTIONAL DRILL TANGENT 6,747'-6,975. DRILLED CURVE 6,975'-6,995'. CBU. POOH FOR CURVE BHA.
FINISH POOH. LD KICK OFF BHA.P/U CURVE BHA, TIH, DRILL CURVE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 44 @
Conn Gas (units) @
Form:
BG Gas (units): 175
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
7
12188394
HALLIBURTONM322
8.75
MMD55C
30511.7
3 / 2015 / 15 /
0.35
0.21
52.51
82.13154.97
6,995
6,690
/
5X18, 2X16
15/15
26.00
Grading I O D L B G O R
Bit #
Bit # 7
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,077.13C M Cost($): $116,529.32
Time:
100
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 6,831.01
Density (ppg): 8.70
FV (s/qt): 51
PV (cp): 13
YP (lbf/100ft²): 11
Gels (): 11/14/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 41
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
25
0.00
0.0
2.2
72.7 / 27.3
4.80
2.00
1,160.00
566.0
4.50
Mud Additives Used
INVERMUL 3
CEDAR FIBER 3
MICA FINE 6
SHRINK WRAP 13
CALCIUM CHLORIDE POWDER 224
LIME 128
OIL ABSORBANT 8
TRANSPORTATION 392
EZ MUL 1
ENGINEER 24 HOURS 1
FUEL SURCHARGE .60 300
GELTONE 19
MICA C 6
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 9,520DIESEL 14,743
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
100.00
418.61
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):245 178
420 1,150
7BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 SECURITY MMD55C 8.750 1.00 1.00
1 RYAN 2.38° 4/5 7.0 PDM. BTB=6.07', BTS=50', BTG=37', RPG=.486.750 28.45 29.45
1 UBHO 2.875 6.625 2.82 32.27
1 MWD 3.250 6.875 28.90 61.17
1 NM FLEX DC 2.750 6.500 30.66 91.83
5" DP 4.276 5.000 6,903.18 6,995.01
Total Length: 6,995.01
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
4,000
1,000
185
175
180
20Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
19
28
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
129.30 6,616 490.79-318.116,667 0.50 -483.68 0.00
152.60 6,646 490.34-317.826,697 1.60 -483.23 3.86
159.80 6,676 488.71-317.166,727 5.10 -481.62 11.73
171.00 6,708 485.18-316.326,759 8.00 -478.10 9.86
168.10 6,739 480.91-315.546,790 8.10 -473.85 1.35
164.10 6,801 472.93-313.586,853 6.90 -465.92 2.08
158.70 6,865 465.70-311.156,917 6.80 -458.74 1.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 2 FPH 6,700-6,705'. WOB 1-3 K, DIFF 25-40 PSI, GPM 375. ( FORMATION
65%@ 6,704' )
08:00 11:30 3.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 3 FPH 6,705'-6,713'. WOB 3-5 K, DIFF 30-50 PSI, GPM 375. ( FORMATION
90%@ 6,710' )
11:30 13:30 2.00 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 4 FPH 6,713'-6,721'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
99%@ 6,718' )
13:30 16:00 2.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 6 FPH 6,721'-6,739'. WOB 4-6 K, DIFF 30-70 PSI, GPM 375. ( FORMATION
100%@ 6,729' )
16:00 17:30 1.50 N DRLPRD 08 DRLDIR TIME DRILL OFF PLUG 8 FPH 6,739'-6,747'. WOB 6-7 K, DIFF 40-80 PSI, GPM 375. ( FORMATION
100%@ 6,739'. FIRST SURVEY SEEING 7' OF SLIDE @ 6,697' BUILT 1.1°. MY 16.5°. INDICATING
SIDETRACK SLIGHTLY AFTER PLUG KOP @ 6,690'. 17.5 HRS TOTAL TO KICK OFF PLUG.
AVERAGE MOTOR YEILD=13.1° )
17:30 23:00 5.50 N DRLPRD 08 DRLDIR DIRECTIONAL DRILL TANGENT 6,747'-6,975'. ( BEGAN ROTATION 6,747' )
23:00 00:30 1.50 N DRLPRD 09 DRLCRV DRILLED CURVE 6,975'-6,995'. UNABLE TO CONTROL TOOLFACE.
00:30 01:00 0.50 N DRLPRD 15 CIRC CBU, ORIENT TOOL FACE TO HS, & PUMP SLUG.
01:00 06:00 5.00 N DRLPRD 13 TRIP POOH FOR CURVE BHA. ( WELL TOOK CALCULATED FILL AFTER 30 STANDS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/19/2014 8:09:39AMPrinted: 1
09/20/2014
DFS: 20.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
022
Spud Date:
DOL: 21 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 7,533.02 / 7,374.20
Progress (ft): 538.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
98,238
2,252,284
98,238
2,252,284
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0538.0 / 14.50 = 37.10
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILLING CURVE @ 7533'. PTB-7,533 ' INC-61.0 AZM-182.0 TVD-7,372' LEFT-3' ABOVE-12' M/Y-11.0 BRN-10.1 DLN-10.1
24 Hr Summary: P/U CURVE BHA, TIH, DRILL CURVE 6,995'-7,533'
LAND CURVE. TOOH, P/U LATERAL BHA, TIH, BEGIN DRILLING LATERAL24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 1,560 @
Conn Gas (units) @
Form:
BG Gas (units): 96
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
8
RD2945
SMITH8.75
FHi21
53837.1
15 / 4520 / 20 /
0.76
1.01
249.72
180.15336.00
7,786
6,995
/
3X18
20/20
14.50
5X18, 2X16
Grading I O D L B G O R
Bit #
Bit # 8 1 1 BT M 1 I BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $4,024.84C M Cost($): $120,554.16
Time:
93
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 7,155.01
Density (ppg): 8.60
FV (s/qt): 56
PV (cp): 13
YP (lbf/100ft²): 12
Gels (): 10/13/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 34
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
1.3
71.0 / 29.0
4.80
2.00
1,160.00
501.0
3.23
Mud Additives Used
ENGINEER 24 HOURS 1
BAROID 41 40
CALCIUM CHLORIDE POWDER 56
LIME 22
BAROID RIG WASH 1
INVERMUL 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 8,967DIESEL 15,263
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
50.00
209.30
0.00
0.00
0.00
0.00
DR
6.00
50.00
209.30
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):280 205
430 1,650
8BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 FHI21 8.750 8.750 1.00 1.00
1 RYAN 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .48, B-B 5.1, BTG-36. MAX DIFF 1125, GPM 300-6006.750 25.17 26.17
FLOAT SUB 2.750 6.687 1.90 28.07
1 UBHO SUB 2.875 6.625 2.82 30.89
1 NON MAG DRILL COLLAR 3.250 6.875 28.90 59.79
1 NON MAG FLEX DRILL COLLAR 2.812 6.312 29.87 89.66
227 4.276 5.000 7,696.36 7,786.02
Total Length: 7,786.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
3,300
1,000
180
160
170
25Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
15
15
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.80 7,137 396.74-310.177,200 28.30 -389.82 13.29
181.10 7,164 381.43-310.557,231 30.90 -374.51 8.46
181.70 7,191 364.29-310.987,263 33.90 -357.37 9.43
181.90 7,216 346.35-311.547,294 36.90 -339.41 9.68
182.10 7,241 326.53-312.247,326 39.70 -319.58 8.76
183.30 7,265 305.35-313.247,358 43.30 -298.39 11.52
184.40 7,287 283.52-314.727,389 46.50 -276.53 10.62
183.90 7,309 259.86-316.437,421 49.20 -252.84 8.52
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N DRLPRD 13 TRIP P/U CURVE BHA & TIH TO 1,052'.
08:30 09:00 0.50 N DRLPRD 15 CIRC TEST MWD.
09:00 09:30 0.50 N DRLPRD 12 RIGSVC SERVICE RIG.
09:30 13:30 4.00 N DRLPRD 13 TRIP TIH TO 6,704'. ( ORIENT TOOLFACE TO 180M BEFORE GOING INTO SIDETRACK @ 6,990', BREAK
CIRCULATION EVERY 25 STANDS )
13:30 15:30 2.00 N DRLPRD 13 TRIP WORK THROUGH RESISTANCE 6,704'-6,709', WASHED W/180MTF 6,719'-6,747'. TIH TO 6,995'.
15:30 06:00 14.50 N DRLPRD 09 DRLCRV DRILLED CURVE 6,995'-7,533'
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/21/2014 8:07:04AMPrinted: 1
09/20/2014
DFS: 20.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
022
Spud Date:
DOL: 21 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 7,533.02 / 7,374.20
Progress (ft): 538.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
98,238
2,252,284
98,238
2,252,284
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0538.0 / 14.50 = 37.10
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILLING CURVE @ 7533'. PTB-7,533 ' INC-61.0 AZM-182.0 TVD-7,372' LEFT-3' ABOVE-12' M/Y-11.0 BRN-10.1 DLN-10.1
24 Hr Summary: P/U CURVE BHA, TIH, DRILL CURVE 6,995'-7,533'
LAND CURVE. TOOH, P/U LATERAL BHA, TIH, BEGIN DRILLING LATERAL24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 1,560 @
Conn Gas (units) @
Form:
BG Gas (units): 96
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
8
RD2945
SMITH8.75
FHi21
53837.1
15 / 4520 / 20 /
0.76
1.01
249.72
180.15336.00
7,786
6,995
/
3X18
20/20
14.50
5X18, 2X16
Grading I O D L B G O R
Bit #
Bit # 8 1 1 BT M 1 I BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $4,024.84C M Cost($): $120,554.16
Time:
93
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 7,155.01
Density (ppg): 8.60
FV (s/qt): 56
PV (cp): 13
YP (lbf/100ft²): 12
Gels (): 10/13/15
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 34
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
1.3
71.0 / 29.0
4.80
2.00
1,160.00
501.0
3.23
Mud Additives Used
ENGINEER 24 HOURS 1
BAROID 41 40
CALCIUM CHLORIDE POWDER 56
LIME 22
BAROID RIG WASH 1
INVERMUL 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 8,967DIESEL 15,263
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
50.00
209.30
0.00
0.00
0.00
0.00
DR
6.00
50.00
209.30
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):280 205
430 1,650
8BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 FHI21 8.750 8.750 1.00 1.00
1 RYAN 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .48, B-B 5.1, BTG-36. MAX DIFF 1125, GPM 300-6006.750 25.17 26.17
FLOAT SUB 2.750 6.687 1.90 28.07
1 UBHO SUB 2.875 6.625 2.82 30.89
1 NON MAG DRILL COLLAR 3.250 6.875 28.90 59.79
1 NON MAG FLEX DRILL COLLAR 2.812 6.312 29.87 89.66
227 4.276 5.000 7,696.36 7,786.02
Total Length: 7,786.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
3,300
1,000
180
160
170
25Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
15
15
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.80 7,137 396.74-310.177,200 28.30 -389.82 13.29
181.10 7,164 381.43-310.557,231 30.90 -374.51 8.46
181.70 7,191 364.29-310.987,263 33.90 -357.37 9.43
181.90 7,216 346.35-311.547,294 36.90 -339.41 9.68
182.10 7,241 326.53-312.247,326 39.70 -319.58 8.76
183.30 7,265 305.35-313.247,358 43.30 -298.39 11.52
184.40 7,287 283.52-314.727,389 46.50 -276.53 10.62
183.90 7,309 259.86-316.437,421 49.20 -252.84 8.52
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N DRLPRD 13 TRIP P/U CURVE BHA & TIH TO 1,052'.
08:30 09:00 0.50 N DRLPRD 15 CIRC TEST MWD.
09:00 09:30 0.50 N DRLPRD 12 RIGSVC SERVICE RIG.
09:30 13:30 4.00 N DRLPRD 13 TRIP TIH TO 6,704'. ( ORIENT TOOLFACE TO 180M BEFORE GOING INTO SIDETRACK @ 6,990', BREAK
CIRCULATION EVERY 25 STANDS )
13:30 15:30 2.00 N DRLPRD 13 TRIP WORK THROUGH RESISTANCE 6,704'-6,709', WASHED W/180MTF 6,719'-6,747'. TIH TO 6,995'.
15:30 06:00 14.50 N DRLPRD 09 DRLCRV DRILLED CURVE 6,995'-7,533'
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/23/2014 8:12:24AMPrinted: 1
09/21/2014
DFS: 21.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
023
Spud Date:
DOL: 22 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 7,786.02 / 7,442.28
Progress (ft): 253.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
80,085
2,332,369
80,085
2,332,369
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0253.0 / 8.50 = 29.76
15,614.00
Total Man Hours: 306.00 15,614.03
Current Activity: TROUBLESHOOTING IBOP. ETA ON ELECTRICIAN 8:00 AM. ( PTB-7,786' INC-87.8 AZM-182.5 ABOVE-2' LEFT-3.5' M/Y-14.6 )
24 Hr Summary: LANDED CURVE. TOOH, L/D CURVE BHA, P/U LATERAL BHA, TIH-5,790', DOWNTIME TROUBLESHOOTING IBOP.
REPAIR IBOP. TIH. DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 1,560 @
Conn Gas (units) @
Form:
BG Gas (units): 148
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
98
20862RD2945
ULTERRASMITH8.758.75
U519SFHi21
2530.034.4 / / 20 / 20
0.00
0.00
0.00
0.000.00
0.64
0.86
224.50
169.34302.07
7,786
15 / 45
7,786
6,995
7X18
/20/20
8.50
3X18
Grading I O D L B G O R
Bit #
Bit # 9
8 BT 1 I1 1 M BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $9,677.05C M Cost($): $130,231.21
Time:
101
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 7,786.02
Density (ppg): 8.75
FV (s/qt): 54
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 11/14/16
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
1.3
71.7 / 28.3
5.60
2.00
1,160.00
535.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
DRILLTREAT 1
GELTONE 19
LIME 12
EZ MUL 1
INVERMUL 2
BAROID 41 77
CALCIUM CHLORIDE POWDER 200
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 6,335DIESEL 14,179
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
94.00
393.49
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):280 205
395 1,650
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
219 DRILL PIPE 4.250 5.000 7,017.94 7,017.94
1 SHOCK SUB 2.250 6.500 11.84 7,029.78
1 AGITATOR 2.250 6.750 12.97 7,042.75
78 26 STANDS DP 4.250 5.000 2,457.81 9,500.57
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 9,530.46
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 9,559.36
1 UBHO SUB 2.875 6.625 2.82 9,562.18
1 FLOAT SUB 2.750 6.680 1.90 9,564.08
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 9,588.99
1 U519S 8.750 8.750 1.00 9,589.99
Total Length: 9,589.99
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
4,500
1,000
180
160
170
25Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
9
23
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.00 7,366 183.99-319.837,516 58.20 -176.91 10.94
181.80 7,381 157.10-320.727,547 62.30 -150.01 13.24
180.60 7,394 129.18-321.307,578 66.30 -122.08 13.37
180.50 7,406 99.55-321.587,610 69.30 -92.46 9.38
181.00 7,417 69.34-321.987,642 72.30 -62.24 9.49
181.50 7,426 39.55-322.637,673 75.70 -32.45 11.08
182.20 7,433 8.35-323.647,705 79.00 -1.23 10.53
182.50 7,438 -23.19-324.937,737 82.20 30.33 10.04
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 14:00 8.00 N DRLPRD 09 DRLCRV DRILLED CURVE 7,533'-7,764'.
14:00 14:30 0.50 N DRLPRD 10 DRLLAT DRILLED LATERAL 7,764'-7,786'.
14:30 15:30 1.00 N DRLPRD 15 CIRC CBU, FLOW CHECK, WELL STATIC. PUMPED SLUG.
15:30 17:00 1.50 N DRLPRD 13 TRIP POOH 7,786'-5,900' ( PIPE PULLING WET).
17:00 17:30 0.50 N DRLPRD 15 CIRC PUMPED SLUG.
17:30 21:00 3.50 N DRLPRD 13 TRIP POOH, L/D CURVE BHA. ( PIPE PULLING WET).
21:00 23:00 2.00 N DRLPRD 13 TRIP P/U LATERAL BHA. TIH TO SHOE.
23:00 01:00 2.00 N DRLPRD 17 CUTSLIP SLIP & CUT DRILL LINE. LEVEL DERRICK
01:00 01:30 0.50 N DRLPRD 13 TRIP TIH TO 1,030'. TEST MWD.
01:30 02:00 0.50 N DRLPRD 12 RIGSVC SERVICE RIG.
02:00 05:00 3.00 N DRLPRD 13 TRIP TIH TO 5,790'
05:00 06:00 1.00 N DRLPRD 43 RRTOP UNABLE TO FUNCTION TOP DRIVE IBOP. CIRCULATE WHILE TROUBLESHOOTING SAME.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'.
9/22/2014 8:35:11AMPrinted: 1
09/22/2014
DFS: 22.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
024
Spud Date:
DOL: 23 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 9,475.02 / 7,428.30
Progress (ft): 1,689.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
80,461
2,412,830
80,461
2,412,830
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,689.0 / 20.50 = 82.39
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILLING LATERAL @ 9,475' ( PTB-9,475' INC-89.0 AZM-180.7 ABOVE-1' RIGHT-5' ) TOTAL LATERAL-1711'
24 Hr Summary: TIH WITH LATERAL BHA. DRILL LATERAL 7,786'-9,475'
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 432 @
Conn Gas (units) 436 @ 538
Form:
BG Gas (units): 302
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
1,68982.4
10 / 4050 / 50 /
0.41
0.23
53.50
83.38167.96
7,786
/
7X18
50/50
20.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $6,517.71C M Cost($): $136,748.92
Time:
96
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 8,722.02
Density (ppg): 8.60
FV (s/qt): 55
PV (cp): 14
YP (lbf/100ft²): 15
Gels (): 12/16/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 32
ECD (ppg): 93.0
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.9
71.5 / 28.5
5.60
2.00
1,160.00
515.0
3.20
Mud Additives Used
ENGINEER 24 HOURS 1
MICA FINE 51
MICA C 51
GELTONE 9
BARABLOK 1
BAROID RIG WASH 1
CEDAR FIBER 22
INVERMUL 1
LIME 38
DURATONE HT 1
CALCIUM CHLORIDE POWDER 80
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 5,061DIESEL 16,099
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
60.00
807.00
0.00
0.00
DR
6.00
54.00
226.05
60.00
835.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):297 216
450 2,450
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
219 DRILL PIPE 4.250 5.000 7,017.94 7,017.94
1 SHOCK SUB 2.250 6.500 11.84 7,029.78
1 AGITATOR 2.250 6.750 12.97 7,042.75
78 26 STANDS DP 4.250 5.000 2,457.81 9,500.57
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 9,530.46
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 9,559.36
1 UBHO SUB 2.875 6.625 2.82 9,562.18
1 FLOAT SUB 2.750 6.680 1.90 9,564.08
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 9,588.99
1 U519S 8.750 8.750 1.00 9,589.99
Total Length: 9,589.99
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
9,500
3,000
191
150
173
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
21
21
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.80 7,426 -961.03-356.498,676 88.40 968.64 3.43
182.90 7,427 -1,055.90-361.218,771 89.50 1,063.58 1.16
180.70 7,428 -1,149.84-364.168,865 90.40 1,157.57 2.53
179.40 7,426 -1,244.83-364.258,960 91.40 1,252.54 1.73
180.60 7,425 -1,337.82-364.259,053 89.50 1,345.51 2.42
181.60 7,424 -1,431.79-366.059,147 91.60 1,439.49 2.47
181.80 7,424 -1,526.74-368.879,242 88.80 1,534.48 2.95
180.70 7,426 -1,619.70-370.909,335 89.00 1,627.46 1.20
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N DRLPRD 13 TRIP TIH TO 6,640', ORIENT TOOLFACE TO 180M & TIH TO 7,786'.
08:30 10:00 1.50 N DRLPRD 10 DRLLAT DRILL LATERAL 7,786'-7,905'. WELL TAKING 65 BPH.
10:00 10:30 0.50 N DRLPRD 15 CIRC PUMP 20 BBLS 20PPB LCM PILL & CIRCULATE TO ESTABLISH FULL RETURNS.
10:30 15:30 5.00 N DRLPRD 10 DRLLAT DRILL LATERAL 7,905'-8,246'.
15:30 16:00 0.50 N DRLPRD 12 RIGSVC RIG SERVICE
16:00 06:00 14.00 N DRLPRD 10 DRLLAT DRILL LATERAL 8,246'-9,475'. ( LOST 120 BBLS OBM LAST 24 HRS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 120 BBLS MUD, TOTAL LOST 120 BBLS )
9/22/2014 8:08:26AMPrinted: 1
09/22/2014
DFS: 22.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
024
Spud Date:
DOL: 23 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 9,475.02 / 7,424.65
Progress (ft): 1,689.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
80,461
2,412,830
80,461
2,412,830
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,689.0 / 20.50 = 82.39
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILLING LATERAL @ 9,475' ( PTB-9,475' INC-89.0 AZM-180.7 ABOVE-1' RIGHT-5' ) TOTAL LATERAL-1711'
24 Hr Summary: TIH WITH LATERAL BHA. DRILL LATERAL 7,786'-9,475'
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 432 @
Conn Gas (units) 436 @ 538
Form:
BG Gas (units): 302
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
1,68971.9
10 / 4050 / 50 /
0.40
0.23
53.00
83.00166.41
7,786
/
7X18
50/50
23.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $6,517.71C M Cost($): $136,748.92
Time:
96
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 8,722.02
Density (ppg): 8.60
FV (s/qt): 55
PV (cp): 14
YP (lbf/100ft²): 15
Gels (): 12/16/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 32
ECD (ppg): 93.0
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.9
71.5 / 28.5
5.60
2.00
1,160.00
515.0
3.20
Mud Additives Used
ENGINEER 24 HOURS 1
MICA FINE 51
MICA C 51
GELTONE 9
BARABLOK 1
BAROID RIG WASH 1
CEDAR FIBER 22
INVERMUL 1
LIME 38
DURATONE HT 1
CALCIUM CHLORIDE POWDER 80
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 5,061DIESEL 16,099
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
60.00
807.00
0.00
0.00
DR
6.00
54.00
226.05
60.00
835.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):297 216
450 2,450
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
287 DRILL PIPE 4.250 5.000 8,987.98 8,987.98
1 SHOCK SUB 2.250 6.500 11.84 8,999.82
1 AGITATOR 2.250 6.750 12.97 9,012.79
78 26 STANDS DP 4.250 5.000 2,457.81 11,470.60
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 11,500.49
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 11,529.39
1 UBHO SUB 2.875 6.625 2.82 11,532.21
1 FLOAT SUB 2.750 6.680 1.90 11,534.11
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 11,559.02
1 U519S 8.750 8.750 1.00 11,560.02
Total Length: 11,560.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
9,000
3,500
191
150
165
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
21
21
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.80 7,426 -961.03-356.498,676 88.40 968.64 3.43
182.90 7,427 -1,055.90-361.218,771 89.50 1,063.58 1.16
180.70 7,428 -1,149.84-364.168,865 90.40 1,157.57 2.53
179.40 7,426 -1,244.83-364.258,960 91.40 1,252.54 1.73
180.60 7,425 -1,337.82-364.259,053 89.50 1,345.51 2.42
181.60 7,424 -1,431.79-366.059,147 91.60 1,439.49 2.47
181.80 7,424 -1,526.74-368.879,242 88.80 1,534.48 2.95
180.70 7,426 -1,619.70-370.909,335 89.00 1,627.46 1.20
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 N DRLPRD 13 TRIP TIH TO 6,640', ORIENT TOOLFACE TO 180M & TIH TO 7,786'.
08:30 10:00 1.50 N DRLPRD 10 DRLLAT DRILL LATERAL 7,786'-7,905'. WELL TAKING 65 BPH.
10:00 10:30 0.50 N DRLPRD 15 CIRC PUMP 20 BBLS 20PPB LCM PILL & CIRCULATE TO ESTABLISH FULL RETURNS.
10:30 15:30 5.00 N DRLPRD 10 DRLLAT DRILL LATERAL 7,905'-8,246'.
15:30 16:00 0.50 N DRLPRD 12 RIGSVC RIG SERVICE
16:00 06:00 14.00 N DRLPRD 10 DRLLAT DRILL LATERAL 8,246'-9,475'. ( LOST 120 BBLS OBM LAST 24 HRS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 120 BBLS MUD, TOTAL LOST 120 BBLS )
9/23/2014 8:08:43AMPrinted: 1
09/23/2014
DFS: 23.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
025
Spud Date:
DOL: 24 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 33
SIDEWINDER/221Depth md/tvd (ft): 11,560.02 / 7,405.52
Progress (ft): 2,085.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
89,952
2,502,782
89,952
2,502,782
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
02,085.0 / 23.50 = 88.72
15,614.00
Total Man Hours: 322.00 15,614.03
Current Activity: DRILL LATERAL @ 11560,' ( PTB-11,560' INC-89.0 AZM-182.2 ABOVE-3' LEFT-8' ) TOTAL LATERAL-3,796.'
24 Hr Summary: DRILL LATERAL 9,475-11,560'. ( LAST 24 HRS LOST 40 BBLS MUD, TOTAL LOST 160 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 383
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
3,77480.3
10 / 5550 / 50 /
0.48
0.28
59.61
88.02187.14
7,786
/
7X18
50/50
47.00
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $13,288.57C M Cost($): $150,037.49
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 10,907.02
Density (ppg): 8.65
FV (s/qt): 52
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 12/16/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 33
ECD (ppg): 9.1
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.5
71.0 / 29.0
5.20
2.00
1,160.00
501.0
3.30
Mud Additives Used
MICA C 118
MICA FINE 118
TRANSPORTATION 797
CALCIUM CHLORIDE POWDER 140
SHRINK WRAP 30
DURATONE HT 5
OIL ABSORBANT 4
FUEL SURCHARGE .60 600
INVERMUL 2
CEDAR FIBER 45
GELTONE 7
BARABLOK 5
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,276DIESEL 12,657
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
57.00
238.61
60.00
844.00
0.00
0.00
DR
6.00
57.00
238.61
60.00
810.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):320 235
475 2,750
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
330 DRILL PIPE 4.250 5.000 10,428.02 10,428.02
1 SHOCK SUB 2.250 6.500 11.84 10,439.86
1 AGITATOR 2.250 6.750 12.97 10,452.83
78 26 STANDS DP 4.250 5.000 2,457.81 12,910.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 12,940.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 12,969.44
1 UBHO SUB 2.875 6.625 2.82 12,972.26
1 FLOAT SUB 2.750 6.680 1.90 12,974.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 12,999.07
1 U519S 8.750 8.750 1.00 13,000.07
Total Length: 13,000.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
11,000
4,000
205
145
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
45
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
180.30 7,414 -3,042.25-384.6810,758 91.00 3,049.97 1.79
180.00 7,411 -3,136.20-384.9210,852 92.50 3,143.91 1.63
180.80 7,408 -3,230.14-385.5810,946 91.60 3,237.84 1.28
181.00 7,408 -3,326.11-387.0911,042 88.10 3,333.82 3.65
181.90 7,409 -3,420.07-389.4711,136 91.60 3,427.80 3.84
182.00 7,408 -3,514.00-392.6611,230 89.30 3,521.79 2.45
182.20 7,407 -3,608.92-396.1411,325 92.00 3,616.76 2.85
182.20 7,406 -3,703.84-399.7911,420 89.00 3,711.74 3.16
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 N DRLPRD 10 DRLLAT DRILL LATERAL 9,475'-9,667'
07:30 08:00 0.50 N DRLPRD 10 DRLLAT RIG SERVICE.
08:00 06:00 22.00 N DRLPRD 10 DRLLAT DRILL LATERAL 9,667'-11,560'.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 40 BBLS MUD, TOTAL LOST 160 BBLS )
9/24/2014 8:21:41AMPrinted: 1
09/23/2014
DFS: 23.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
025
Spud Date:
DOL: 24 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 19
SIDEWINDER/221Depth md/tvd (ft): 11,560.02 / 7,408.37
Progress (ft): 2,085.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
89,952
2,502,782
89,952
2,502,782
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
02,085.0 / 23.50 = 88.72
15,614.00
Total Man Hours: 322.00 15,614.03
Current Activity: DRILL LATERAL @ 11560,' ( PTB-11,560' INC-89.0 AZM-182.2 ABOVE-3' LEFT-8' ) TOTAL LATERAL-3,796.'
24 Hr Summary: DRILL LATERAL 9,475-11,560'. ( LAST 24 HRS LOST 40 BBLS MUD, TOTAL LOST 160 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 383
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
3,77480.3
10 / 5550 / 50 /
0.48
0.28
59.61
88.02187.14
7,786
/
7X18
50/50
47.00
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $13,288.57C M Cost($): $150,037.49
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 10,907.02
Density (ppg): 8.65
FV (s/qt): 52
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 12/16/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 33
ECD (ppg): 9.1
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.5
71.0 / 29.0
5.20
2.00
1,160.00
501.0
3.30
Mud Additives Used
MICA C 118
MICA FINE 118
TRANSPORTATION 797
CALCIUM CHLORIDE POWDER 140
SHRINK WRAP 30
DURATONE HT 5
OIL ABSORBANT 4
FUEL SURCHARGE .60 600
INVERMUL 2
CEDAR FIBER 45
GELTONE 7
BARABLOK 5
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,276DIESEL 12,657
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
57.00
238.61
60.00
844.00
0.00
0.00
DR
6.00
57.00
238.61
60.00
810.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):320 235
475 2,750
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
287 DRILL PIPE 4.250 5.000 8,987.98 8,987.98
1 SHOCK SUB 2.250 6.500 11.84 8,999.82
1 AGITATOR 2.250 6.750 12.97 9,012.79
78 26 STANDS DP 4.250 5.000 2,457.81 11,470.60
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 11,500.49
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 11,529.39
1 UBHO SUB 2.875 6.625 2.82 11,532.21
1 FLOAT SUB 2.750 6.680 1.90 11,534.11
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 11,559.02
1 U519S 8.750 8.750 1.00 11,560.02
Total Length: 11,560.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
11,000
4,000
205
145
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
45
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
180.30 7,414 -3,042.25-384.6810,758 91.00 3,049.97 1.79
180.00 7,411 -3,136.20-384.9210,852 92.50 3,143.91 1.63
180.80 7,408 -3,230.14-385.5810,946 91.60 3,237.84 1.28
181.00 7,408 -3,326.11-387.0911,042 88.10 3,333.82 3.65
181.90 7,409 -3,420.07-389.4711,136 91.60 3,427.80 3.84
182.00 7,408 -3,514.00-392.6611,230 89.30 3,521.79 2.45
182.20 7,407 -3,608.92-396.1411,325 92.00 3,616.76 2.85
182.20 7,406 -3,703.84-399.7911,420 89.00 3,711.74 3.16
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 N DRLPRD 10 DRLLAT DRILL LATERAL 9,475'-9,667'
07:30 08:00 0.50 N DRLPRD 10 DRLLAT RIG SERVICE.
08:00 06:00 22.00 N DRLPRD 10 DRLLAT DRILL LATERAL 9,667'-11,560'.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 40 BBLS MUD, TOTAL LOST 160 BBLS )
9/23/2014 8:27:58AMPrinted: 1
09/24/2014
DFS: 24.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
026
Spud Date:
DOL: 25 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 32
SIDEWINDER/221Depth md/tvd (ft): 13,000.03 / 7,393.98
Progress (ft): 1,440.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
79,243
2,582,025
79,243
2,582,025
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,440.0 / 22.50 = 64.00
15,614.00
Total Man Hours: 316.00 15,614.03
Current Activity: DRILL LATERAL @ 13,000,' ( PTB-13,000' INC-90.0 AZM-184.1 BELOW-1' LEFT-7' ) TOTAL LATERAL-5,236'.
24 Hr Summary: DRILL LATERAL 11,560'-13,000'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 333
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
5,21475.0
10 / 7550 / 50 /
0.41
0.24
54.12
83.38169.91
7,786
/
7X18
50/50
69.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,655.27C M Cost($): $162,692.76
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 12,588.03
Density (ppg): 8.70
FV (s/qt): 55
PV (cp): 15
YP (lbf/100ft²): 15
Gels (): 13/18/22
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
4.7
71.0 / 29.0
5.20
2.00
1,160.00
499.0
3.90
Mud Additives Used
EZ MUL 1
CALCIUM CHLORIDE POWDER 168
BARABLOK 5
LIME 107
CEDAR FIBER 64
INVERMUL 2
GELTONE 7
DURATONE HT 5
MICA FINE 109
ENGINEER 24 HOURS 1
MICA C 134
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,432DIESEL 10,304
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
60.00
900.00
0.00
0.00
DR
6.00
54.00
226.05
60.00
920.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):320 235
450 2,600
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
374 DRILL PIPE 4.250 5.000 11,827.02 11,827.02
1 SHOCK SUB 2.250 6.500 11.84 11,838.86
1 AGITATOR 2.250 6.750 12.97 11,851.83
78 26 STANDS DP 4.250 5.000 2,457.81 14,309.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 14,339.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 14,368.44
1 UBHO SUB 2.875 6.625 2.82 14,371.26
1 FLOAT SUB 2.750 6.680 1.90 14,373.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 14,398.07
1 U519S 8.750 8.750 1.00 14,399.07
Total Length: 14,399.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
6,500
210
135
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
23
69
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
178.10 7,411 -4,458.02-421.1212,175 89.00 4,466.20 1.62
179.40 7,411 -4,550.99-419.0912,268 91.00 4,559.11 2.56
178.80 7,409 -4,645.96-417.6012,363 91.50 4,654.01 0.82
178.80 7,408 -4,739.92-415.6312,457 90.40 4,747.91 1.17
181.80 7,406 -4,832.90-416.1212,550 91.20 4,840.88 3.34
180.90 7,403 -4,927.81-418.3512,645 92.80 4,935.82 1.93
182.20 7,399 -5,021.69-420.8912,739 91.90 5,029.74 1.68
184.10 7,398 -5,116.53-426.1112,834 90.00 5,124.66 2.83
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 11,560'-11,783'.
09:30 10:00 0.50 N DRLSURF 52 LSTCIRC WELL TAKING 35 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
10:00 13:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 11,783'-12,031'
13:30 14:00 0.50 N DRLPRD 12 RIGSVC RIG SERVICE
14:00 00:00 10.00 N DRLPRD 10 DRLLAT DRILL LATERAL 12,031'-12,596'
00:00 00:30 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 30 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
00:30 06:00 5.50 N DRLPRD 10 DRLLAT DRILL LATERAL 12,596-13,000'.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
9/25/2014 8:09:59AMPrinted: 1
09/24/2014
DFS: 24.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
026
Spud Date:
DOL: 25 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 32
SIDEWINDER/221Depth md/tvd (ft): 13,000.03 / 7,393.98
Progress (ft): 1,440.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
79,243
2,553,025
79,243
2,553,025
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,440.0 / 22.50 = 64.00
15,614.00
Total Man Hours: 316.00 15,593.03
Current Activity: DRILL LATERAL @ 13,000,' ( PTB-13,000' INC-90.0 AZM-184.1 BELOW-1' LEFT-7' ) TOTAL LATERAL-5,236'.
24 Hr Summary: DRILL LATERAL 11,560'-13,000'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 333
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
5,21475.0
10 / 7550 / 50 /
0.41
0.24
54.12
83.38169.91
15,593
7,786
/
7X18
50/50
69.50
Grading I O D L B G O R
Bit #
Bit # 9 1 1 CT M 1 I CT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,655.27C M Cost($): $162,686.76
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 12,588.03
Density (ppg): 8.70
FV (s/qt): 55
PV (cp): 15
YP (lbf/100ft²): 15
Gels (): 13/18/22
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
4.7
71.0 / 29.0
5.20
2.00
1,160.00
499.0
3.90
Mud Additives Used
EZ MUL 1
CALCIUM CHLORIDE POWDER 168
BARABLOK 5
LIME 107
CEDAR FIBER 64
INVERMUL 2
GELTONE 7
DURATONE HT 5
MICA FINE 109
ENGINEER 24 HOURS 1
MICA C 134
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,432DIESEL 10,304
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
60.00
900.00
0.00
0.00
DR
6.00
54.00
226.05
60.00
920.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):320 235
450 2,600
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 U519S 8.750 8.750 1.00 1.00
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 25.91
1 FLOAT SUB 2.750 6.680 1.90 27.81
1 UBHO SUB 2.875 6.625 2.82 30.63
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 59.53
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 89.42
78 26 STANDS DP 4.250 5.000 2,457.81 2,547.24
1 AGITATOR 2.250 6.750 12.97 2,560.21
1 SHOCK SUB 2.250 6.500 11.84 2,572.05
412 DRILL PIPE 4.250 5.000 13,020.99 15,593.03
Total Length: 15,593.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
6,500
210
135
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
23
69
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
178.10 7,411 -4,458.02-421.1212,175 89.00 4,466.20 1.62
179.40 7,411 -4,550.99-419.0912,268 91.00 4,559.11 2.56
178.80 7,409 -4,645.96-417.6012,363 91.50 4,654.01 0.82
178.80 7,408 -4,739.92-415.6312,457 90.40 4,747.91 1.17
181.80 7,406 -4,832.90-416.1212,550 91.20 4,840.88 3.34
180.90 7,403 -4,927.81-418.3512,645 92.80 4,935.82 1.93
182.20 7,399 -5,021.69-420.8912,739 91.90 5,029.74 1.68
184.10 7,398 -5,116.53-426.1112,834 90.00 5,124.66 2.83
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:30 3.50 N DRLPRD 71 OTHERTR DRILL LATERAL 11,560'-11,783'.
09:30 10:00 0.50 N DRLSURF 52 LSTCIRC WELL TAKING 35 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
10:00 13:30 3.50 N DRLPRD 71 OTHERTR DRILL LATERAL 11,783'-12,031'
13:30 14:00 0.50 P DRLPRD 12 RIGSVC RIG SERVICE
14:00 00:00 10.00 N DRLPRD 71 OTHERTR DRILL LATERAL 12,031'-12,596'
00:00 00:30 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 30 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
00:30 06:00 5.50 N DRLPRD 71 OTHERTR DRILL LATERAL 12,596-13,000'.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
10/1/2014 8:27:12AMPrinted: 1
09/24/2014
DFS: 24.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
026
Spud Date:
DOL: 25 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 32
SIDEWINDER/221Depth md/tvd (ft): 13,000.03 / 7,397.60
Progress (ft): 1,440.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
79,243
2,582,025
79,243
2,582,025
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,440.0 / 22.50 = 64.00
15,614.00
Total Man Hours: 316.00 15,614.03
Current Activity: DRILL LATERAL @ 13,000,' ( PTB-13,000' INC-90.0 AZM-184.1 BELOW-1' LEFT-7' ) TOTAL LATERAL-5,236'.
24 Hr Summary: DRILL LATERAL 11,560'-13,000'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 333
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
5,21475.0
10 / 7550 / 50 /
0.41
0.24
54.12
83.38169.91
7,786
/
7X18
50/50
69.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $12,655.27C M Cost($): $162,692.76
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 12,588.03
Density (ppg): 8.70
FV (s/qt): 55
PV (cp): 15
YP (lbf/100ft²): 15
Gels (): 13/18/22
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 36
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
4.7
71.0 / 29.0
5.20
2.00
1,160.00
499.0
3.90
Mud Additives Used
EZ MUL 1
CALCIUM CHLORIDE POWDER 168
BARABLOK 5
LIME 107
CEDAR FIBER 64
INVERMUL 2
GELTONE 7
DURATONE HT 5
MICA FINE 109
ENGINEER 24 HOURS 1
MICA C 134
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,432DIESEL 10,304
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
60.00
900.00
0.00
0.00
DR
6.00
54.00
226.05
60.00
920.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):320 235
450 2,600
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
330 DRILL PIPE 4.250 5.000 10,428.02 10,428.02
1 SHOCK SUB 2.250 6.500 11.84 10,439.86
1 AGITATOR 2.250 6.750 12.97 10,452.83
78 26 STANDS DP 4.250 5.000 2,457.81 12,910.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 12,940.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 12,969.44
1 UBHO SUB 2.875 6.625 2.82 12,972.26
1 FLOAT SUB 2.750 6.680 1.90 12,974.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 12,999.07
1 U519S 8.750 8.750 1.00 13,000.07
Total Length: 13,000.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
6,500
210
135
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
23
69
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.40 7,411 -4,550.99-419.0912,268 91.00 4,559.11 2.56
178.80 7,409 -4,645.96-417.6012,363 91.50 4,654.01 0.82
178.80 7,408 -4,739.92-415.6312,457 90.40 4,747.91 1.17
181.80 7,406 -4,832.90-416.1212,550 91.20 4,840.88 3.34
180.90 7,403 -4,927.81-418.3512,645 92.80 4,935.82 1.93
182.20 7,399 -5,021.69-420.8912,739 91.90 5,029.74 1.68
184.10 7,398 -5,116.53-426.1112,834 90.00 5,124.66 2.83
184.10 7,398 -5,282.11-437.9813,000 90.00 5,290.46 0.00
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 09:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 11,560'-11,783'.
09:30 10:00 0.50 N DRLSURF 52 LSTCIRC WELL TAKING 35 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
10:00 13:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 11,783'-12,031'
13:30 14:00 0.50 N DRLPRD 12 RIGSVC RIG SERVICE
14:00 00:00 10.00 N DRLPRD 10 DRLLAT DRILL LATERAL 12,031'-12,596'
00:00 00:30 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 30 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS.
00:30 06:00 5.50 N DRLPRD 10 DRLLAT DRILL LATERAL 12,596-13,000'.
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 85 BBLS MUD, TOTAL LOST 245 BBLS )
9/24/2014 8:30:29AMPrinted: 1
09/25/2014
DFS: 25.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
027
Spud Date:
DOL: 26 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 37
SIDEWINDER/221Depth md/tvd (ft): 14,399.03 / 7,378.07
Progress (ft): 1,399.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
103,846
2,685,871
103,846
2,685,871
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,399.0 / 21.00 = 66.62
15,614.00
Total Man Hours: 324.00 15,614.03
Current Activity: DRILL LATERAL @ 14,399', ( PTB-14,399' INC-88.8 AZM-180.3 ABOVE-1.0' RIGHT-1.0' ) TOTAL LATERAL-6,635'.
24 Hr Summary: DRILL LATERAL 13,000'-14,399' . ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 336
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
6,61373.1
10 / 7550 / 50 /
0.48
0.28
60.09
87.61188.64
7,786
/
7X18
50/50
90.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $7,528.40C M Cost($): $170,221.16
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 14,015.03
Density (ppg): 8.75
FV (s/qt): 51
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 12/16/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 43
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.5
72.0 / 28.0
5.80
1.00
1,160.00
492.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
GELTONE 14
DURATONE HT 5
MICA FINE 92
CEDAR FIBER 44
EZ MUL 1
BARABLOK 5
MICA C 102
LIME 55
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,121DIESEL 8,065
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):311 226
470 2,780
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
408 DRILL PIPE 4.250 5.000 12,866.03 12,866.03
1 SHOCK SUB 2.250 6.500 11.84 12,877.87
1 AGITATOR 2.250 6.750 12.97 12,890.84
78 26 STANDS DP 4.250 5.000 2,457.81 15,348.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 15,378.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 15,407.44
1 UBHO SUB 2.875 6.625 2.82 15,410.26
1 FLOAT SUB 2.750 6.680 1.90 15,412.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 15,437.07
1 U519S 8.750 8.750 1.00 15,438.07
Total Length: 15,438.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
7,000
220
132
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
21
93
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.00 7,389 -5,875.37-461.7913,594 91.10 5,884.10 1.96
179.10 7,389 -5,969.35-460.2313,688 89.30 5,978.03 1.92
181.60 7,389 -6,065.34-460.8213,784 90.60 6,074.00 2.94
182.10 7,386 -6,160.24-463.8813,879 92.70 6,168.95 2.27
182.90 7,383 -6,255.09-468.0313,974 91.40 6,263.87 1.61
181.50 7,382 -6,349.01-471.6314,068 90.10 6,357.84 2.03
180.70 7,380 -6,443.98-473.4614,163 91.40 6,452.83 1.61
180.30 7,380 -6,538.97-474.2914,258 88.80 6,547.82 2.77
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 10 DRLLAT DRILL LATERAL 13,000'-13,163'.
08:00 10:00 2.00 N DRLSURF 15 CIRC PERFORM CLEAN UP CYCLE. 490 GPM. 70 RPM. RECIPROCATE 96'. OFF BOTTOM TORQUE
DECREASED 7,500FT LBS TO 5,900 FTLBS. PUMPED TWO 20PPB LCM PILLS, LOST 25 BBLS OBM
ON CLEAN UP CYCLE.
10:00 13:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 13,163'-13,446'.
13:30 14:00 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 68 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS. LOST 30 BBLS OBM.
14:00 14:30 0.50 N DRLPRD 12 RIGSVC CIRCULATE WHILE SERVICING RIG.
14:30 17:00 2.50 N DRLPRD 10 DRLLAT DRILL LATERAL 13,446'-13,661.'
17:00 06:00 13.00 P DRLPRD 10 DRLLAT DRILL LATERAL 13,661'-14,399'. ( LAST 24 HRS LOST 65 BBLS OBM ).
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
9/26/2014 8:26:40AMPrinted: 1
09/25/2014
DFS: 25.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
027
Spud Date:
DOL: 26 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 37
SIDEWINDER/221Depth md/tvd (ft): 14,399.03 / 7,378.07
Progress (ft): 1,399.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
103,846
2,656,871
103,846
2,656,871
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,399.0 / 21.00 = 66.62
15,614.00
Total Man Hours: 324.00 15,593.03
Current Activity: DRILL LATERAL @ 14,399', ( PTB-14,399' INC-88.8 AZM-180.3 ABOVE-1.0' RIGHT-1.0' ) TOTAL LATERAL-6,635'.
24 Hr Summary: DRILL LATERAL 13,000'-14,399' . ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 336
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
6,61373.1
10 / 7550 / 50 /
0.48
0.28
60.09
87.61188.64
15,593
7,786
/
7X18
50/50
90.50
Grading I O D L B G O R
Bit #
Bit # 9 1 1 CT M 1 I CT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $7,528.40C M Cost($): $170,215.16
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 14,015.03
Density (ppg): 8.75
FV (s/qt): 51
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 12/16/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 43
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.5
72.0 / 28.0
5.80
1.00
1,160.00
492.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
GELTONE 14
DURATONE HT 5
MICA FINE 92
CEDAR FIBER 44
EZ MUL 1
BARABLOK 5
MICA C 102
LIME 55
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,121DIESEL 8,065
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):311 226
470 2,780
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 U519S 8.750 8.750 1.00 1.00
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 25.91
1 FLOAT SUB 2.750 6.680 1.90 27.81
1 UBHO SUB 2.875 6.625 2.82 30.63
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 59.53
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 89.42
78 26 STANDS DP 4.250 5.000 2,457.81 2,547.24
1 AGITATOR 2.250 6.750 12.97 2,560.21
1 SHOCK SUB 2.250 6.500 11.84 2,572.05
412 DRILL PIPE 4.250 5.000 13,020.99 15,593.03
Total Length: 15,593.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
7,000
220
132
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
21
93
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.00 7,389 -5,875.37-461.7913,594 91.10 5,884.10 1.96
179.10 7,389 -5,969.35-460.2313,688 89.30 5,978.03 1.92
181.60 7,389 -6,065.34-460.8213,784 90.60 6,074.00 2.94
182.10 7,386 -6,160.24-463.8813,879 92.70 6,168.95 2.27
182.90 7,383 -6,255.09-468.0313,974 91.40 6,263.87 1.61
181.50 7,382 -6,349.01-471.6314,068 90.10 6,357.84 2.03
180.70 7,380 -6,443.98-473.4614,163 91.40 6,452.83 1.61
180.30 7,380 -6,538.97-474.2914,258 88.80 6,547.82 2.77
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 71 OTHERTR DRILL LATERAL 13,000'-13,163'.
08:00 10:00 2.00 N DRLSURF 52 LSTCIRC PERFORM CLEAN UP CYCLE. 490 GPM. 70 RPM. RECIPROCATE 96'. OFF BOTTOM TORQUE
DECREASED 7,500FT LBS TO 5,900 FTLBS. PUMPED TWO 20PPB LCM PILLS, LOST 25 BBLS OBM
ON CLEAN UP CYCLE.
10:00 13:30 3.50 N DRLPRD 71 OTHERTR DRILL LATERAL 13,163'-13,446'.
13:30 14:00 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 68 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS. LOST 30 BBLS OBM.
14:00 14:30 0.50 N DRLPRD 71 OTHERTR CIRCULATE WHILE SERVICING RIG.
14:30 17:00 2.50 N DRLPRD 71 OTHERTR DRILL LATERAL 13,446'-13,661.'
17:00 06:00 13.00 P DRLPRD 10 DRLLAT DRILL LATERAL 13,661'-14,399'. ( LAST 24 HRS LOST 65 BBLS OBM ).
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
10/1/2014 8:01:59AMPrinted: 1
09/25/2014
DFS: 25.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
027
Spud Date:
DOL: 26 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 37
SIDEWINDER/221Depth md/tvd (ft): 14,399.03 / 7,383.15
Progress (ft): 1,399.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
103,846
2,685,871
103,846
2,685,871
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,399.0 / 21.00 = 66.62
15,614.00
Total Man Hours: 324.00 15,614.03
Current Activity: DRILL LATERAL @ 14,399', ( PTB-14,399' INC-88.8 AZM-180.3 ABOVE-1.0' RIGHT-1.0' ) TOTAL LATERAL-6,635'.
24 Hr Summary: DRILL LATERAL 13,000'-14,399' . ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 336
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
6,61373.1
10 / 7550 / 50 /
0.48
0.28
60.09
87.61188.64
7,786
/
7X18
50/50
90.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $7,528.40C M Cost($): $170,221.16
Time:
111
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 14,015.03
Density (ppg): 8.75
FV (s/qt): 51
PV (cp): 14
YP (lbf/100ft²): 13
Gels (): 12/16/18
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 43
ECD (ppg): 9.3
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.5
72.0 / 28.0
5.80
1.00
1,160.00
492.0
4.60
Mud Additives Used
ENGINEER 24 HOURS 1
GELTONE 14
DURATONE HT 5
MICA FINE 92
CEDAR FIBER 44
EZ MUL 1
BARABLOK 5
MICA C 102
LIME 55
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 4,121DIESEL 8,065
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
DR
6.00
56.00
234.42
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):311 226
470 2,780
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
374 DRILL PIPE 4.250 5.000 11,827.02 11,827.02
1 SHOCK SUB 2.250 6.500 11.84 11,838.86
1 AGITATOR 2.250 6.750 12.97 11,851.83
78 26 STANDS DP 4.250 5.000 2,457.81 14,309.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 14,339.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 14,368.44
1 UBHO SUB 2.875 6.625 2.82 14,371.26
1 FLOAT SUB 2.750 6.680 1.90 14,373.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 14,398.07
1 U519S 8.750 8.750 1.00 14,399.07
Total Length: 14,399.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
7,000
220
132
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
21
93
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.00 7,389 -5,875.37-461.7913,594 91.10 5,884.10 1.96
179.10 7,389 -5,969.35-460.2313,688 89.30 5,978.03 1.92
181.60 7,389 -6,065.34-460.8213,784 90.60 6,074.00 2.94
182.10 7,386 -6,160.24-463.8813,879 92.70 6,168.95 2.27
182.90 7,383 -6,255.09-468.0313,974 91.40 6,263.87 1.61
181.50 7,382 -6,349.01-471.6314,068 90.10 6,357.84 2.03
180.70 7,380 -6,443.98-473.4614,163 91.40 6,452.83 1.61
180.30 7,380 -6,538.97-474.2914,258 88.80 6,547.82 2.77
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 N DRLPRD 10 DRLLAT DRILL LATERAL 13,000'-13,163'.
08:00 10:00 2.00 N DRLSURF 15 CIRC PERFORM CLEAN UP CYCLE. 490 GPM. 70 RPM. RECIPROCATE 96'. OFF BOTTOM TORQUE
DECREASED 7,500FT LBS TO 5,900 FTLBS. PUMPED TWO 20PPB LCM PILLS, LOST 25 BBLS OBM
ON CLEAN UP CYCLE.
10:00 13:30 3.50 N DRLPRD 10 DRLLAT DRILL LATERAL 13,163'-13,446'.
13:30 14:00 0.50 N DRLPRD 52 LSTCIRC WELL TAKING 68 BPH. PUMP 40 BBL 20 PPB LCM PILL & CIRCULATE TO ESTABLISH FULL
RETURNS. LOST 30 BBLS OBM.
14:00 14:30 0.50 N DRLPRD 12 RIGSVC CIRCULATE WHILE SERVICING RIG.
14:30 17:00 2.50 N DRLPRD 10 DRLLAT DRILL LATERAL 13,446'-13,661.'
17:00 06:00 13.00 P DRLPRD 10 DRLLAT DRILL LATERAL 13,661'-14,399'. ( LAST 24 HRS LOST 65 BBLS )
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 65 BBLS MUD, TOTAL LOST 310 BBLS )
9/25/2014 8:22:44AMPrinted: 1
09/26/2014
DFS: 26.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
028
Spud Date:
DOL: 27 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 15,438.03 / 7,369.98
Progress (ft): 1,039.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
89,230
2,775,101
89,230
2,775,101
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,039.0 / 19.00 = 54.68
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILL LATERAL @ 15,438', ( PTB-15,438' INC-89.3 AZM- 183.1 ABOVE-5' RIGHT-9' ) TOTAL LATERAL-7,674'.
24 Hr Summary: DRILL LATERAL 14,399'-15,438' . ( LAST 24 HRS LOST 146 BBLS OBM, TOTAL LOST 456 BBLS OBM ).
DRILL LATERAL TO TD. CIRCULATE HOLE CLEAN. TOOH L/D DRILL PIPE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
7,65269.9
15 / 8550 / 50 /
0.46
0.26
58.33
86.32183.13
15,593
7,786
/
7X18
50/50
109.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $15,161.77C M Cost($): $185,382.93
Time:
116
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,100.03
Density (ppg): 8.75
FV (s/qt): 52
PV (cp): 15
YP (lbf/100ft²): 13
Gels (): 13/16/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.9
72.0 / 28.0
5.80
1.00
1,160.00
535.0
4.60
Mud Additives Used
CALCIUM CHLORIDE POWDER 224
ENGINEER 24 HOURS 1
LIME 38
INVERMUL 3
MICA FINE 173
SHRINK WRAP 8
MICA C 175
GELTONE 16
TRANSPORTATION 208
CEDAR FIBER 63
OIL ABSORBANT 2
FUEL SURCHARGE .60 300
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 5,061DIESEL 6,037
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
56.00
234.42
60.00
545.00
0.00
0.00
DR
6.00
56.00
234.42
60.00
565.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
468 3,050
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 U519S 8.750 8.750 1.00 1.00
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 25.91
1 FLOAT SUB 2.750 6.680 1.90 27.81
1 UBHO SUB 2.875 6.625 2.82 30.63
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 59.53
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 89.42
78 26 STANDS DP 4.250 5.000 2,457.81 2,547.24
1 AGITATOR 2.250 6.750 12.97 2,560.21
1 SHOCK SUB 2.250 6.500 11.84 2,572.05
412 DRILL PIPE 4.250 5.000 13,020.99 15,593.03
Total Length: 15,593.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
8,000
220
125
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
19
116
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.50 7,378 -6,918.87-476.4114,638 90.90 6,927.67 0.99
179.40 7,378 -7,012.86-475.5114,732 89.30 7,021.62 1.71
182.00 7,378 -7,106.84-476.6514,826 91.10 7,115.61 3.36
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL 14,399-14,491'.
08:00 11:00 3.00 N DRLPRD 52 LSTCIRC LOOSING 82 BPH. PUMP 20PPB LCM SWEEPS, LOWER PUMP RATE TO 390 GPM, ESTABLISH FULL
CIRCULATION. STAGE PUMP UP TO 500 GPM & CIRCULATE HOLE CLEAN.
11:00 15:00 4.00 P DRLPRD 10 DRLLAT DRILL LATERAL 14,491'-14,777'.
15:00 15:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
15:30 23:00 7.50 P DRLPRD 10 DRLLAT DRILL LATERAL 14,777'-15,160'
23:00 23:30 0.50 N DRLPRD 57 DIRFAIL RECYCLE PUMPS DUE TO MWD TOOL
23:30 01:30 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL 15,160'-15,299'.
01:30 02:30 1.00 N DRLPRD 52 LSTCIRC LOOSING 80 BPH. PUMP 20PPB LCM SWEEPS, LOWER PUMP RATE TO 410 GPM, ESTABLISH FULL
CIRCULATION. STAGE PUMP UP TO 468 GPM & CIRCULATE HOLE CLEAN.
02:30 06:00 3.50 P DRLPRD 10 DRLLAT DRILL LATERAL 15,299'-15,438'. ( LAST 24 HRS LOST 146 BBLS OBM ).
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 146 BBLS OBM, TOTAL LOST 456 BBLS OBM )
9/27/2014 8:15:55AMPrinted: 1
09/26/2014
DFS: 26.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
028
Spud Date:
DOL: 27 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 15,438.03 / 7,365.89
Progress (ft): 1,039.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
89,230
2,775,101
89,230
2,775,101
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,039.0 / 19.00 = 54.68
15,614.00
Total Man Hours: 310.00 15,614.03
Current Activity: DRILL LATERAL @ 15,438', ( PTB-15,438' INC-89.3 AZM- 183.1 ABOVE-5' RIGHT-9' ) TOTAL LATERAL-7,674'.
24 Hr Summary: DRILL LATERAL 14,399'-15,438' . ( LAST 24 HRS LOST 146 BBLS OBM, TOTAL LOST 456 BBLS OBM ).
DRILL LATERAL TO TD. CIRCULATE HOLE CLEAN. TOOH L/D DRILL PIPE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
7,65269.9
15 / 8550 / 50 /
0.46
0.26
58.33
86.32183.13
7,786
/
7X18
50/50
109.50
Grading I O D L B G O R
Bit #
Bit # 9
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $15,161.77C M Cost($): $185,382.93
Time:
116
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,100.03
Density (ppg): 8.75
FV (s/qt): 52
PV (cp): 15
YP (lbf/100ft²): 13
Gels (): 13/16/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 42
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.9
72.0 / 28.0
5.80
1.00
1,160.00
535.0
4.60
Mud Additives Used
CALCIUM CHLORIDE POWDER 224
ENGINEER 24 HOURS 1
LIME 38
INVERMUL 3
MICA FINE 173
SHRINK WRAP 8
MICA C 175
GELTONE 16
TRANSPORTATION 208
CEDAR FIBER 63
OIL ABSORBANT 2
FUEL SURCHARGE .60 300
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,614.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 5,061DIESEL 6,037
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
56.00
234.42
60.00
545.00
0.00
0.00
DR
6.00
56.00
234.42
60.00
565.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
468 3,050
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
408 DRILL PIPE 4.250 5.000 12,866.03 12,866.03
1 SHOCK SUB 2.250 6.500 11.84 12,877.87
1 AGITATOR 2.250 6.750 12.97 12,890.84
78 26 STANDS DP 4.250 5.000 2,457.81 15,348.65
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 15,378.54
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 15,407.44
1 UBHO SUB 2.875 6.625 2.82 15,410.26
1 FLOAT SUB 2.750 6.680 1.90 15,412.16
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 15,437.07
1 U519S 8.750 8.750 1.00 15,438.07
Total Length: 15,438.07
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
8,000
220
125
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
19
116
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
179.50 7,378 -6,918.87-476.4114,638 90.90 6,927.67 0.99
179.40 7,378 -7,012.86-475.5114,732 89.30 7,021.62 1.71
182.00 7,378 -7,106.84-476.6514,826 91.10 7,115.61 3.36
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL 14,399-14,491'.
08:00 11:00 3.00 N DRLPRD 52 LSTCIRC LOOSING 82 BPH. PUMP 20PPB LCM SWEEPS, LOWER PUMP RATE TO 390 GPM, ESTABLISH FULL
CIRCULATION. STAGE PUMP UP TO 500 GPM & CIRCULATE HOLE CLEAN.
11:00 15:00 4.00 P DRLPRD 10 DRLLAT DRILL LATERAL 14,491'-14,777'.
15:00 15:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
15:30 23:00 7.50 P DRLPRD 10 DRLLAT DRILL LATERAL 14,777'-15,160'
23:00 23:30 0.50 N DRLPRD 57 DIRFAIL RECYCLE PUMPS DUE TO MWD TOOL
23:30 01:30 2.00 P DRLPRD 10 DRLLAT DRILL LATERAL 15,160'-15,299'.
01:30 02:30 1.00 N DRLPRD 52 LSTCIRC LOOSING 80 BPH. PUMP 20PPB LCM SWEEPS, LOWER PUMP RATE TO 410 GPM, ESTABLISH FULL
CIRCULATION. STAGE PUMP UP TO 468 GPM & CIRCULATE HOLE CLEAN.
02:30 06:00 3.50 P DRLPRD 10 DRLLAT DRILL LATERAL 15,299'-15,438'. ( LAST 24 HRS LOST 146 BBLS OBM ).
Daily Operations Comments
WORKING OFF DIRECTIONAL PLAN # 2 ST1, LANDING TARGET TVD 7,444' PLANNED AZIMUTH 181.26. SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL
STARTS 7,764'. ( LAST 24 HRS LOST 146 BBLS OBM, TOTAL LOST 456 BBLS OBM )
9/26/2014 8:22:49AMPrinted: 1
09/27/2014
DFS: 27.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
029
Spud Date:
DOL: 28 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 30
SIDEWINDER/221Depth md/tvd (ft): 15,593.03 / 7,366.44
Progress (ft): 155.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
82,327
2,857,428
82,327
2,857,428
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0155.0 / 1.50 = 103.33
15,614.00
Total Man Hours: 308.00 15,593.03
Current Activity: POOH LD DP @ 1,500' (PTB @ 15,593', INC:92°, AZM:183.1°, TVD:7,366', VS:7,881', ABOVE: 6.9', RIGHT: 13.8', TOTAL LATERAL 7,829'. SOUTH
7,872'.)
24 Hr Summary: DRILL LATERAL TO TD @ 15,593'. CIRCULATE HOLE CLEAN. R/U L/D TRUCK, TOOH L/D DRILL PIPE TO EOC. CBU. POOH LD DP.
TOOH L/D DRILL PIPE AND BHA# 3. R/U CSG CREW. RUN 5 1/2'' PRODUCTION CSG TO 15,593'. R/U COMPASS CEMENTING HEAD AND LINES.
CEMENT CSG.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
9
20862
ULTERRA8.75
U519S
7,80770.3
15 / 8550 / 50 /
0.45
0.26
57.00
86.32178.94
15,593
7,786
/
7X18
50/50
111.00
Grading I O D L B G O R
Bit #
Bit # 9 1 1 CT M 1 I CT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $14,718.88C M Cost($): $200,101.81
Time:
112
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,593.03
Density (ppg): 8.75
FV (s/qt): 51
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 13/17/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 43
ECD (ppg): 8.8
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
26
0.00
0.0
3.6
71.7 / 28.3
5.80
1.00
1,160.00
527.0
4.60
Mud Additives Used
INVERMUL 1
FUEL SURCHARGE .60 300
GELTONE 12
SHRINK WRAP 7
MICA FINE 153
TRANSPORTATION EACH 1
BAROID 41 89
LIME 42
MICA C 169
ENGINEER 24 HOURS 1
CALCIUM CHLORIDE POWDER 252
CEDAR FIBER 55
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 868DIESEL 4,276
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
112.00
468.84
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
468 3,050
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 U519S 8.750 8.750 1.00 1.00
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 25.91
1 FLOAT SUB 2.750 6.680 1.90 27.81
1 UBHO SUB 2.875 6.625 2.82 30.63
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 59.53
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 89.42
78 26 STANDS DP 4.250 5.000 2,457.81 2,547.24
1 AGITATOR 2.250 6.750 12.97 2,560.21
1 SHOCK SUB 2.250 6.500 11.84 2,572.05
412 DRILL PIPE 4.250 5.000 13,020.99 15,593.03
Total Length: 15,593.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
14,000
8,000
220
125
170
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
2
125
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
183.10 7,370 -7,671.96-505.2215,392 89.30 7,681.21 2.94
182.90 7,370 -7,766.82-510.2015,487 90.90 7,776.16 1.70
183.10 7,368 -7,826.72-513.3315,547 92.00 7,836.12 1.86
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:30 1.50 P DRLPRD 10 DRLLAT DRILL LATERAL 15,438'-15,593' .PTB @ 15,593', INC:92°, AZM:183.1°, TVD:7,366', VS:7,881', ABOVE:
6.9', RIGHT: 13.8', TOTAL LATERAL 7,829'. SOUTH 7,872'.)
07:30 13:30 6.00 P DRLPRD 15 CIRC PUMP 40 BBLS 20 PPB LCM PILL. SLOWLY STAGE PUMPS UP TO 530 GPM & CIRCULATE HOLE
CLEAN WHILE ROTATING 60 RPM & RECIPROCATING PIPE 96'.
13:30 14:00 0.50 P DRLPRD 13 TRIP PULL 5 STANDS.
14:00 14:30 0.50 P DRLPRD 15 CIRC PUMP SLUG.
14:30 20:00 5.50 P DRLPRD 13 TRIP POOH LD DP TO 8,000'.
20:00 22:30 2.50 P DRLPRD 15 CIRC SLOWLY STAGE PUMPS UP TO 540 GPM & CIRCULATE HOLE CLEAN WHILE ROTATING 60 RPM &
RECIPROCATING PIPE 96'. PUMP SLUG.
22:30 06:00 7.50 P DRLPRD 13 TRIP POOH LD DP. ( RUN IN 5 STANDS DP OUT OF DERRICK. ) ( 24 HOUR OBM LOSS = 65 BBLS. )
Daily Operations Comments
SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL STARTS 7,764'. ( LAST 24 HRS LOST 65 BBLS OBM, TOTAL LOST 521 BBLS OBM ) NOTIFIED JESSICA W/
TRRC 9/26/14 18:00. NOTIFIED JEFF WHITE W/ UNIVERSITY LANDS 9/25/14 16:51
9/28/2014 8:16:36AMPrinted: 1
09/28/2014
DFS: 28.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEWEBBER, HUDSON / DERDEN, ROY
030
Spud Date:
DOL: 29 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 52
SIDEWINDER/221Depth md/tvd (ft): 15,593.03 / 7,366.44
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
375,143
3,232,571
375,143
3,232,571
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,614.00
Total Man Hours: 478.00 15,593.03
Current Activity: CEMENTING 5.5'' PRODUCTION CASING
24 Hr Summary: TOOH L/D DRILL PIPE AND BHA. R/U CSG CREW. RUN 5 1/2'' PRODUCTION CSG TO 15,593'. R/U COMPASS CEMENTING HEAD AND LINES.
CEMENT CSG.
FINISH CEMENTING. FLUSH BOP. N/D BOP. SET CASING SLIPS. N/D SPACER SPOOL. CUT CASING. REMOVE SPACER SPOOL. INSTALL
B-SECTION. INSTALL TA CAP. RELEASE RIG AND RIG DOWN
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
7X18
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $1,505.00C M Cost($): $201,606.81
Time:
914
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,593.03
Density (ppg): 8.70
FV (s/qt): 62
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 13/17/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.6
71.9 / 28.1
5.80
1.00
1,160.00
509.0
3.90
Mud Additives Used
BAROID RIG WASH 1
ENGINEER 24 HOURS 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 61DIESEL 3,446
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
9BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 U519S 8.750 8.750 1.00 1.00
1 7'' 7/8 LOBE, 5.0 STAGE, 1.5°. SLICK, REVS/GAL 0.31, B-B 5.12, FLOW RANGE 300-600, MAX DIFF 1000.7.000 24.91 25.91
1 FLOAT SUB 2.750 6.680 1.90 27.81
1 UBHO SUB 2.875 6.625 2.82 30.63
1 NON MAG DRILL COLLAR 3.250 6.870 28.90 59.53
1 NON MAG DRILL COLLAR 2.750 6.430 29.89 89.42
78 26 STANDS DP 4.250 5.000 2,457.81 2,547.24
1 AGITATOR 2.250 6.750 12.97 2,560.21
1 SHOCK SUB 2.250 6.500 11.84 2,572.05
412 DRILL PIPE 4.250 5.000 13,020.99 15,593.03
Total Length: 15,593.03
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
183.10 7,370 -7,671.96-505.2215,392 89.30 7,681.21 2.94
182.90 7,370 -7,766.82-510.2015,487 90.90 7,776.16 1.70
183.10 7,368 -7,826.72-513.3315,547 92.00 7,836.12 1.86
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:00 2.00 P DRLPRD 13 TRIP POOH LD DP AND BHA.
08:00 08:30 0.50 P DRLPRD 14 PULDSTR LD TWO STANDS 6 1/2" DC FROM DERRICK.
08:30 09:30 1.00 P CASPRD1 24 RUNCAS PJSM. INSTALL CASING BAILS. RU CASING CREW & TORQUE TURN.
09:30 20:30 11.00 P CASPRD1 24 RUNCAS RUN 5 1/2'' 17# HCP-110 LTC CASING TO 13,051'.
20:30 21:30 1.00 N CASPRD1 47 RROTHR REMOVE BACKLASH FROM DRAWWORKS DRUM.
21:30 00:00 2.50 P CASPRD1 24 RUNCAS RUN TOTAL OF 387 JOINTS 5 1/2'' 17# HCP-110 LTC CASING TO 15,593'. LANDING COLLAR @
15,546'. ORIO @ 15,505'. MID LATERAL MARKER @ 11,679'. BOC MARKER @ 7,771'. NCS
FLOATATION COLLAR @ 7,563'. TOC MARKER @ 6,957'. RAN 65 CENTRALIZERS EVERY 3RD
JOINT TO KOP.
00:00 03:00 3.00 P CASPRD1 15 CIRC RU COMPASS CMT HEAD. RUPTURE DISK W/ 1380 PSI. CIRCULATE OUT AIR @ 7 BPM W/ 517
PSI. HOLD PJSM WITH CREW.
03:00 06:00 3.00 P CASPRD1 25 PRIMCEM TEST LINES TO 5K. CEMENT HEAD VALVE LEAKED C/O CEMENT HEAD. PUMPED 40 BBLS 9.5 PPG
TUNED SPACER. PUMPING 11.5 PPG LEAD CEMENT
Daily Operations Comments
SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL STARTS 7,764'. ( LAST 24 HOURS 0 BBLS OBM LOST. TOTAL LOSS 521 BBLS OBM )
9/29/2014 8:03:16AMPrinted: 1
09/29/2014
DFS: 29.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEMOTLEY, DEREK / DANNY MANGUM
031
Spud Date:
DOL: 30 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 15,593.03 / 7,366.44
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
185,833
3,389,404
185,833
3,389,404
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,614.00
Total Man Hours: 306.00 15,593.03
Current Activity: RIGGING DOWN & CLEANING RIG. RIG RELEASED 17:00 HRS 9-28-14.
24 Hr Summary: FINISH CEMENTING. FLUSH BOP. N/D BOP. SET CASING SLIPS. N/D SPACER SPOOL. CUT CASING. REMOVE SPACER SPOOL. INSTALL
B-SECTION. INSTALL TA CAP. RELEASE RIG AND RIG DOWN
RIG DOWN, WASH RIG, PREP TO MOVE TO UNIVERSITY EAST 43 23 GH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $0.00C M Cost($): $201,606.81
Time:
914
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,593.03
Density (ppg): 8.70
FV (s/qt): 62
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 13/17/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.6
71.9 / 28.1
5.80
1.00
1,160.00
509.0
3.90
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 0DIESEL 1,346
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
183.10 7,370 -7,671.96-505.2215,392 89.30 7,681.21 2.94
182.90 7,370 -7,766.82-510.2015,487 90.90 7,776.16 1.70
183.10 7,368 -7,826.72-513.3315,547 92.00 7,836.12 1.86
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P CASPRD1 25 PRIMCEM PUMPED 409 BBLS (815 SKS W/ 2.82 YLD) 11.5 PPG LEAD CMT, 390 BBLS ( 1555 SKS W/ 1.41 YLD )
14.4 PPG TAIL CEMENT. DISPLACED W/ 361 BBLS 2% CLAY WEB. BUMPED PLUG 500 PSI OVER
09/28/14 @ 0930 HRS. HELD 5 MIN. RELEASED PRESSURE. BLED BACK 2.5 BBLS. FLOATS HELD.
LOST RETURNS 120 BBLS INTO DISPLACEMENT. ETOC @ 3,820'.
08:30 09:30 1.00 P CASPRD1 42 OTHER FLUSH OUT BOP & RD COMPASS.
09:30 17:00 7.50 P CASPRD1 29 NDBOPE ND FLOW LINE & BOP. SET 13 5/8" X 5 1/2" C-22 CSG SLIPS IN 13 5/8" 5M X 13 3/8" WELL HEAD
W/100 K. SET BOP BACK DOWN. ND 3' SPACER SPOOL. ROUGH CUT & LD EXCESS CSG. ND
BELL NIPPLE. REMOVE & LAY OUT 3' SPACER SPOOL. FINAL CUT CASING. INSTALL B SECTION.
SET 5 1/2" C21 SLIPS ( NO WEIGHT SET ON B SECTION SLIPS ), INSTALL SEAL ASSEMBLY & TA
CAP. RIG RELEASED @ 17:00 ON 9/28/2014.
17:00 06:00 13.00 P RDMO 02 RDMO RIG DOWN & CLEAN MUD TANKS.
Daily Operations Comments
SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL STARTS 7,764'. ( LAST 24 HOURS 240 BBLS OBM LOST. TOTAL OBM LOST ON SIDE TRACK IS 760 BBLS )
9/30/2014 8:13:23AMPrinted: 1
09/29/2014
DFS: 29.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / WESTON WHITEMOTLEY, DEREK / DANNY MANGUM
031
Spud Date:
DOL: 30 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/17/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/01
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 29
SIDEWINDER/221Depth md/tvd (ft): 15,593.03 / 7,366.44
Progress:ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
177,333
3,409,904
177,333
3,409,904
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0 / = 0.00
15,614.00
Total Man Hours: 306.00 15,593.03
Current Activity: RIGGING DOWN & CLEANING RIG. RIG RELEASED 17:00 HRS 9-28-14.
24 Hr Summary: FINISH CEMENTING. FLUSH BOP. N/D BOP. SET CASING SLIPS. N/D SPACER SPOOL. CUT CASING. REMOVE SPACER SPOOL. INSTALL
B-SECTION. INSTALL TA CAP. RELEASE RIG AND RIG DOWN
RIG DOWN, WASH RIG, PREP TO MOVE TO UNIVERSITY EAST 43 23 GH.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 0 @
Conn Gas (units) 0 @ 0
Form:
BG Gas (units): 325
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $0.00C M Cost($): $201,606.81
Time:
914
5:00
Location:SUCTION TANK
Pit Temp (°F):
Depth (ft): 15,593.03
Density (ppg): 8.70
FV (s/qt): 62
PV (cp): 14
YP (lbf/100ft²): 14
Gels (): 13/17/19
WL (cc/30min):
HTHP (°F): 250
Cake:
Solids (lbm/bbl): 39
ECD (ppg): 9.4
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
67
26
0.00
0.0
3.6
71.9 / 28.1
5.80
1.00
1,160.00
509.0
3.90
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 5.50 15,593.03 7,374.01
INVENTORYItem Inv
MUD DIESEL 0DIESEL 1,346
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
0.00
0.00
0.00
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):317 230
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
181.40 7,377 -7,200.80-479.4414,920 89.60 7,209.60 1.72
182.20 7,376 -7,294.73-482.3915,014 92.30 7,303.57 3.00
183.80 7,373 -7,388.56-487.3115,108 90.90 7,397.49 2.26
183.60 7,372 -7,482.36-493.3815,202 89.80 7,491.40 1.19
183.80 7,371 -7,577.14-499.5115,297 92.00 7,586.29 2.33
183.10 7,370 -7,671.96-505.2215,392 89.30 7,681.21 2.94
182.90 7,370 -7,766.82-510.2015,487 90.90 7,776.16 1.70
183.10 7,368 -7,826.72-513.3315,547 92.00 7,836.12 1.86
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 08:30 2.50 P CASPRD1 25 PRIMCEM PUMPED 409 BBLS (815 SKS W/ 2.82 YLD) 11.5 PPG LEAD CMT, 390 BBLS ( 1555 SKS W/ 1.41 YLD )
14.4 PPG TAIL CEMENT. DISPLACED W/ 361 BBLS 2% CLAY WEB. BUMPED PLUG 500 PSI OVER
09/28/14 @ 0930 HRS. HELD 5 MIN. RELEASED PRESSURE. BLED BACK 2.5 BBLS. FLOATS HELD.
LOST RETURNS 120 BBLS INTO DISPLACEMENT. ETOC @ 3,820'.
08:30 09:30 1.00 P CASPRD1 42 OTHER FLUSH OUT BOP & RD COMPASS.
09:30 17:00 7.50 P CASPRD1 29 NDBOPE ND FLOW LINE & BOP. SET 13 5/8" X 5 1/2" C-22 CSG SLIPS IN 13 5/8" 5M X 13 3/8" WELL HEAD
W/100 K. SET BOP BACK DOWN. ND 3' SPACER SPOOL. ROUGH CUT & LD EXCESS CSG. ND
BELL NIPPLE. REMOVE & LAY OUT 3' SPACER SPOOL. FINAL CUT CASING. INSTALL B SECTION.
SET 5 1/2" C21 SLIPS ( NO WEIGHT SET ON B SECTION SLIPS ), INSTALL SEAL ASSEMBLY & TA
CAP. RIG RELEASED @ 17:00 ON 9/28/2014.
17:00 06:00 13.00 P RDMO 02 RDMO RIG DOWN & CLEAN MUD TANKS.
Daily Operations Comments
SIDETRACK WINDOW 6,690'. CURVE KOP 6,975'. LATERAL STARTS 7,764'. ( LAST 24 HOURS 240 BBLS OBM LOST. TOTAL OBM LOST ON SIDE TRACK IS 760 BBLS )
9/29/2014 8:06:50AMPrinted: 1
09/01/2014
DFS: 0.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
002
Spud Date:
DOL: 1 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 0
SIDEWINDER/221Depth md/tvd (ft): 864.00 / 864.00
Progress (ft): 0.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
172,732
586,827
172,732
586,827
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
00.0 / = 0.00
15,726.00
Total Man Hours: 0.00 16,236.03
Current Activity: TESTING BOPE.
24 Hr Summary: WALK RIG FROM 8-29 CH. CENTER AND LEVEL SUB. NU BOPE. TEST BOPE. ( RIG ON OPERATING RATE AT 23:30 HRS 8-31-14.)
FINISH TEST BOPE. FINISH NU. C/O SAVER SUB. PU DRILL OUT BHA ( 12 1/4'' BIT). TIH. DRILL FE AND CEMENT. POOH . C/O BHA. TIH. DRILL
SIDE BUILD.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: 0 (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: VENTURE MUD ONE LP
D M Cost($): $0.00C M Cost($): $0.00
Time:
0
18:13
Location: PIT
Pit Temp (°F):
Depth (ft): 860.50
Density (ppg): 10.00
FV (s/qt): 28
PV (cp): 1
YP (lbf/100ft²): 1
Gels (): 1/1/0
WL (cc/30min):
HTHP (°F): 0
Cake (32nd"):
Solids (lbm/bbl): 0
ECD (ppg): 10.0
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
0
85
0.00
0.0
0.0
0.0 / 0.0
0.00
0.00
1,160.00
5.22
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 90.58
INVENTORYItem Inv
MUD DIESEL 10,594DIESEL 13,005
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
36.15 125 0.100.07125 0.11 -0.10 0.09
38.83 225 0.200.15225 0.04 -0.20 0.07
354.63 325 0.330.16325 0.12 -0.34 0.10
4.97 425 0.550.16425 0.13 -0.55 0.02
339.23 525 0.820.11525 0.19 -0.82 0.09
351.02 625 1.150.03625 0.20 -1.15 0.04
314.24 725 1.39-0.08725 0.12 -1.39 0.13
318.09 823 1.55-0.23823 0.14 -1.55 0.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
20:30 22:30 2.00 P MIRU 01 MIRU WALK RIG OVER WELL.
22:30 23:30 1.00 P MIRU 01 MIRU CENTER AND LEVEL SUBSTRUCTURE. ( RIG ON OPERATING RATE AT 23:30 HRS 8-31-14.)
23:30 01:00 1.50 P CASSURF 28 NUBOPE SET SPACER SPOOL AND BOP. NIPPLE UP SAME.
01:00 02:00 1.00 P CASSURF 17 CUTSLIP SLIP AND CUT 126' DRILLING LINE.
02:00 06:00 4.00 P CASSURF 19 TEST RIG UP TESTING TRUCK AND TEST BOPE 250PSI LOW, 5,000 PSI HIGH, 5MIN EACH W/H20. TEST
ANNULAR 250 PSI LOW, 3,500 PSI HIGH 5 MIN EACH.
Daily Operations Comments
9/1/2014 8:01:37AMPrinted: 1
09/01/2014
DFS: 0.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
002
Spud Date:
DOL: 1 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 26
SIDEWINDER/221Depth md/tvd (ft): 864.00 / 864.00
Progress (ft): 0.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
172,732
586,827
172,732
586,827
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
00.0 / = 0.00
15,726.00
Total Man Hours: 308.00 16,236.03
Current Activity: TESTING BOPE.
24 Hr Summary: WALK RIG FROM 8-29 CH. CENTER AND LEVEL SUB. NU BOPE. TEST BOPE. ( RIG ON OPERATING RATE AT 23:30 HRS 8-31-14.)
FINISH TEST BOPE. FINISH NU. C/O SAVER SUB. PU DRILL OUT BHA ( 12 1/4'' BIT). TIH. DRILL FE AND CEMENT. POOH . C/O BHA. TIH. DRILL
SIDE BUILD.
24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: 0 (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: VENTURE MUD ONE LP
D M Cost($): $0.00C M Cost($): $0.00
Time:
0
18:13
Location: PIT
Pit Temp (°F):
Depth (ft): 860.50
Density (ppg): 10.00
FV (s/qt): 28
PV (cp): 1
YP (lbf/100ft²): 1
Gels (): 1/1/0
WL (cc/30min):
HTHP (°F): 0
Cake (32nd"):
Solids (lbm/bbl): 0
ECD (ppg): 10.0
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
0
85
0.00
0.0
0.0
0.0 / 0.0
0.00
0.00
1,160.00
5.22
Mud Additives Used
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 10,594DIESEL 13,005
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
36.15 125 0.100.07125 0.11 -0.10 0.09
38.83 225 0.200.15225 0.04 -0.20 0.07
354.63 325 0.330.16325 0.12 -0.34 0.10
4.97 425 0.550.16425 0.13 -0.55 0.02
339.23 525 0.820.11525 0.19 -0.82 0.09
351.02 625 1.150.03625 0.20 -1.15 0.04
314.24 725 1.39-0.08725 0.12 -1.39 0.13
318.09 823 1.55-0.23823 0.14 -1.55 0.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
20:30 22:30 2.00 P MIRU 01 MIRU WALK RIG OVER WELL.
22:30 23:30 1.00 P MIRU 01 MIRU CENTER AND LEVEL SUBSTRUCTURE. ( RIG ON OPERATING RATE AT 23:30 HRS 8-31-14.)
23:30 01:00 1.50 P CASSURF 28 NUBOPE SET SPACER SPOOL AND BOP. NIPPLE UP SAME.
01:00 02:00 1.00 P CASSURF 17 CUTSLIP SLIP AND CUT 126' DRILLING LINE.
02:00 06:00 4.00 P CASSURF 19 TEST RIG UP TESTING TRUCK AND TEST BOPE 250PSI LOW, 5,000 PSI HIGH, 5MIN EACH W/H20. TEST
ANNULAR 250 PSI LOW, 3,500 PSI HIGH 5 MIN EACH.
Daily Operations Comments
9/2/2014 8:00:56AMPrinted: 1
09/02/2014
DFS: 1.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
003
Spud Date:
DOL: 2 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 26
SIDEWINDER/221Depth md/tvd (ft): 2,834.01 / 2,808.23
Progress (ft): 1,970.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
83,245
670,072
83,245
670,072
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,970.0 / 9.50 = 207.37
15,726.00
Total Man Hours: 318.00 16,236.03
Current Activity: DIRECTIONAL DRILL SIDE BUILD @ 2,834'.( PTB 2,834'' INC: 9.7° AZM: 324.4° TVD:2808', 1.2' LEFT, 28.1 'AHEAD VS -248.25')
24 Hr Summary: TEST BOPE & CASING. NU BELL NIPPLE. FLOW LINE, CENTER BOP. P/U 12 1/4" BIT & BHA. TIH. DRILL CMT & FE. LEVEL DERRICK. POOH. P/U
SIDE BUILD BHA. TIH. DRILL SIDE BUILD 864'- 2,834'.
DRILL SIDE BUILD.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
2
7151892
HUGHES8.75
T606X
1,970207.4
15 / 2540 / 40 /
1.87
2.07
353.75
214.42575.87
864
/
6X14
40/40
9.50
6X18
Grading I O D L B G O R
Bit #
Bit # 2
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $9,831.34C M Cost($): $9,831.34
Time:
98
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 1,045.00
Density (ppg): 8.60
FV (s/qt): 53
PV (cp): 12
YP (lbf/100ft²): 11
Gels (): 10/13/15
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 33
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.5
71.0 / 29.0
8.00
2.00
1,160.00
539.0
3.60
Mud Additives Used
FUEL SURCHARGE .60 300
CALCIUM CHLORIDE POWDER 84
SHRINK WRAP 13
ENGINEER 24 HOURS 1
TRANSPORTATION 331
GELTONE 8
DRILLTREAT 7
EZ MUL 1
MUD RENTAL 2,049
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,494DIESEL 11,588
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
72.00
301.40
0.00
0.00
0.00
0.00
DR
6.00
72.00
301.40
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
600 2,200
2BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 BIT 8-3/4" T606X W/ 6-14'S 8.750 1.00 1.00
1 6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'.1.750 6.750 26.30 27.30
1 UBHO SUB 2.812 6.625 3.20 30.50
1 NON MAG DRILL COLLAR. MWD 3.312 6.875 30.38 60.88
1 NON MAG DRILL COLLAR 2.875 6.437 30.65 91.53
1 X- OVER SUB 3.250 6.500 1.65 93.18
3 STEEL DRILL COLLARS 2.812 6.437 90.28 183.46
1 X- OVER 2.812 6.500 2.23 185.69
5" DRILL PIPE 4.276 5.000 2,648.32 2,834.01
Total Length: 2,834.01
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
8,500
2,500
92
85
87
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
10
10
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
322.00 2,013 143.09-90.062,027 9.60 -141.24 0.66
315.50 2,106 154.81-100.312,122 9.30 -152.74 1.17
327.40 2,199 167.03-109.992,216 9.90 -164.77 2.20
329.40 2,293 180.52-118.302,311 9.30 -178.09 0.72
321.70 2,386 193.67-127.372,406 10.10 -191.05 1.60
321.20 2,480 206.57-137.652,501 9.90 -203.74 0.23
319.60 2,573 218.83-147.792,595 9.60 -215.80 0.43
324.40 2,666 231.37-157.592,690 9.70 -228.14 0.85
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P CASSURF 19 TEST TEST BOPE 250PSI LOW, 5,000 PSI HIGH, 5MIN EACH W/H20. TEST ANNULAR 250 PSI LOW, 3,500
PSI HIGH 5 MIN EACH.
07:00 08:00 1.00 P CASSURF 31 TESTCAS TEST CASING TO 500 PSI FOR 30 MIN.
08:00 11:00 3.00 P CASSURF 28 NUBOPE NU BELL NIPPLE & FLOW LINE. CENTER BOP STACK WITH TURNBUCKLES. HOOK UP FILL UP &
TRIP TANKS LINE. SET CAT WALK. INSTALL MOUSE HOLE. CLEAR RIG FLOOR.
11:00 12:00 1.00 P CASSURF 42 OTHER CHANGE OUT TOP DRIVE SAVER SUB.
12:00 14:00 2.00 P CASSURF 13 TRIP PU BHA #1 & TIH.
14:00 15:30 1.50 P CASSURF 32 DRLFLOAT DRILL CMT & FE 846'-864'.
15:30 16:00 0.50 P CASSURF 42 OTHER LEVEL DERRICK.
16:00 17:30 1.50 P CASSURF 13 TRIP POOH & LD BHA.
17:30 20:30 3.00 P CASSURF 13 TRIP P/U SIDE BUILD BHA. TIH TO 864'.
20:30 06:00 9.50 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 864'- 2,834'. (SPUD WELL @ 20:30 ON 9/01/2014)
Daily Operations Comments
6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'. (SPUD WELL @ 20:30 ON 9/01/2014)
9/2/2014 8:00:44AMPrinted: 1
09/02/2014
DFS: 1.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
003
Spud Date:
DOL: 2 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 26
SIDEWINDER/221Depth md/tvd (ft): 2,834.01 / 2,808.23
Progress (ft): 1,970.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
83,245
670,072
83,245
670,072
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,970.0 / 9.00 = 218.89
15,726.00
Total Man Hours: 318.00 16,236.03
Current Activity: DIRECTIONAL DRILL SIDE BUILD @ 2,834'.( PTB 2,834'' INC: 9.7° AZM: 324.4° TVD:2808', 1.2' LEFT, 28.1 'AHEAD VS -248.25')
24 Hr Summary: TEST BOPE & CASING. NU BELL NIPPLE. FLOW LINE, CENTER BOP. P/U 12 1/4" BIT & BHA. TIH. DRILL CMT & FE. LEVEL DERRICK. POOH. P/U
SIDE BUILD BHA. TIH. DRILL SIDE BUILD 864'- 2,834'.
DRILL SIDE BUILD.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
2
7151892
HUGHES8.75
T606X
1,970218.9
15 / 2540 / 40 /
1.87
2.07
353.75
214.42575.87
864
/
6X14
40/40
9.00
6X18
Grading I O D L B G O R
Bit #
Bit # 2
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $9,831.34C M Cost($): $9,831.34
Time:
98
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 1,045.00
Density (ppg): 8.60
FV (s/qt): 53
PV (cp): 12
YP (lbf/100ft²): 11
Gels (): 10/13/15
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 33
ECD (ppg): 8.6
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.5
71.0 / 29.0
8.00
2.00
1,160.00
539.0
3.60
Mud Additives Used
FUEL SURCHARGE .60 300
CALCIUM CHLORIDE POWDER 84
SHRINK WRAP 13
ENGINEER 24 HOURS 1
TRANSPORTATION 331
GELTONE 8
DRILLTREAT 7
EZ MUL 1
MUD RENTAL 2,049
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,494DIESEL 11,588
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
72.00
301.40
0.00
0.00
0.00
0.00
DR
6.00
72.00
301.40
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
600 2,200
2BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 BIT 8-3/4" T606X W/ 6-14'S 8.750 1.00 1.00
1 6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'.1.750 6.750 26.30 27.30
1 UBHO SUB 2.812 6.625 3.20 30.50
1 NON MAG DRILL COLLAR. MWD 3.312 6.875 30.38 60.88
1 NON MAG DRILL COLLAR 2.875 6.437 30.65 91.53
1 X- OVER SUB 3.250 6.500 1.65 93.18
3 STEEL DRILL COLLARS 2.812 6.437 90.28 183.46
1 X- OVER 2.812 6.500 2.23 185.69
5" DRILL PIPE 4.276 5.000 6,109.32 6,295.01
Total Length: 6,295.01
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
8,500
2,500
92
85
87
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
9
9
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
322.00 2,013 143.09-90.062,027 9.60 -141.24 0.66
315.50 2,106 154.81-100.312,122 9.30 -152.74 1.17
327.40 2,199 167.03-109.992,216 9.90 -164.77 2.20
329.40 2,293 180.52-118.302,311 9.30 -178.09 0.72
321.70 2,386 193.67-127.372,406 10.10 -191.05 1.60
321.20 2,480 206.57-137.652,501 9.90 -203.74 0.23
319.60 2,573 218.83-147.792,595 9.60 -215.80 0.43
324.40 2,666 231.37-157.592,690 9.70 -228.14 0.85
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 07:00 1.00 P CASSURF 19 TEST TEST BOPE 250PSI LOW, 5,000 PSI HIGH, 5MIN EACH W/H20. TEST ANNULAR 250 PSI LOW, 3,500
PSI HIGH 5 MIN EACH.
07:00 08:00 1.00 P CASSURF 31 TESTCAS TEST CASING TO 500 PSI FOR 30 MIN.
08:00 11:00 3.00 P CASSURF 28 NUBOPE NU BELL NIPPLE & FLOW LINE. CENTER BOP STACK WITH TURNBUCKLES. HOOK UP FILL UP &
TRIP TANKS LINE. SET CAT WALK. INSTALL MOUSE HOLE. CLEAR RIG FLOOR.
11:00 12:00 1.00 P CASSURF 42 OTHER CHANGE OUT TOP DRIVE SAVER SUB.
12:00 14:00 2.00 P CASSURF 13 TRIP PU BHA #1 & TIH.
14:00 15:30 1.50 P CASSURF 32 DRLFLOAT DRILL CMT & FE 846'-864'.
15:30 16:00 0.50 P CASSURF 42 OTHER LEVEL DERRICK.
16:00 17:30 1.50 P CASSURF 13 TRIP POOH & LD BHA.
17:30 20:30 3.00 P CASSURF 13 TRIP P/U SIDE BUILD BHA. TIH TO 864'.
20:30 21:30 1.00 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 864'- 1,114'. (SPUD WELL @ 20:30 ON 9/01/2014)
21:30 22:00 0.50 P DRLPRD 12 RIGSVC RIG SERVICE.
22:00 06:00 8.00 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 1,114'-2,834'.
Daily Operations Comments
6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'. (SPUD WELL @ 20:30 ON 9/01/2014)
9/3/2014 8:13:08AMPrinted: 1
09/03/2014
DFS: 2.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
JOE WILKERSON / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
004
Spud Date:
DOL: 3 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 31
SIDEWINDER/221Depth md/tvd (ft): 6,295.01 / 6,244.25
Progress (ft): 3,461.01ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
80,792
750,864
80,792
750,864
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
03,461.0 / 23.50 = 147.28
15,726.00
Total Man Hours: 329.00 16,236.03
Current Activity: DIRECTIONAL DRILL SIDE BUILD @ 6,295'.( PTB 6,295'' INC: .40° AZM: 101.4° TVD:6244', 10.4' LEFT, 3.0 'AHEAD VS -486.45')
24 Hr Summary: DIRECTIONAL DRILL SIDE BUILD 2,834'- 6,295'.
DRILL SIDE BUILD. C&CMUD. POOH FOR CURVE BHA.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
2
7151892
HUGHES8.75
T606X
5,431167.1
15 / 2540 / 70 /
0.79
0.88
200.14
160.81325.81
864
/
6X14
40/70
32.50
Grading I O D L B G O R
Bit #
Bit # 2
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: WESLEY VAUGHN
D M Cost($): $9,253.49C M Cost($): $19,084.83
Time:
104
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 5,025.01
Density (ppg): 8.65
FV (s/qt): 52
PV (cp): 15
YP (lbf/100ft²): 13
Gels (): 11/14/16
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 36
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
27
0.00
0.0
3.1
71.0 / 29.0
7.60
2.00
1,160.00
523.0
4.00
Mud Additives Used
MICA FINE 35
INVERMUL 2
LIME 62
EZ MUL 1
ENGINEER 24 HOURS 1
BARABLOK 5
GELTONE 11
MICA C 27
CALCIUM CHLORIDE POWDER 84
OIL ABSORBANT 14
DURATONE HT 9
BAROID RIG WASH 1
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,335DIESEL 9,560
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
54.00
226.05
0.00
0.00
0.00
0.00
DR
6.00
54.00
226.05
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
454 1,900
2BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 BIT 8-3/4" T606X W/ 6-14'S 8.750 1.00 1.00
1 6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'.1.750 6.750 26.30 27.30
1 UBHO SUB 2.812 6.625 3.20 30.50
1 NON MAG DRILL COLLAR. MWD 3.312 6.875 30.38 60.88
1 NON MAG DRILL COLLAR 2.875 6.437 30.65 91.53
1 X- OVER SUB 3.250 6.500 1.65 93.18
3 STEEL DRILL COLLARS 2.812 6.437 90.28 183.46
1 X- OVER 2.812 6.500 2.23 185.69
5" DRILL PIPE 4.276 5.000 6,109.32 6,295.01
Total Length: 6,295.01
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
5,200
2,500
165
150
160
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
33
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
76.00 5,384 492.96-327.405,435 0.50 -486.23 0.64
74.10 5,479 493.22-326.445,530 0.70 -486.51 0.21
80.00 5,574 493.48-325.315,625 0.70 -486.79 0.08
87.50 5,668 493.60-324.255,719 0.60 -486.93 0.14
95.90 5,762 493.58-323.355,813 0.50 -486.93 0.14
108.10 5,858 493.43-322.625,909 0.40 -486.80 0.14
104.90 5,953 493.24-321.986,004 0.40 -486.62 0.02
101.40 6,048 493.09-321.346,099 0.40 -486.49 0.03
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 20:00 14.00 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 2,834'- 5,102'.
20:00 20:30 0.50 P DRLPRD 12 RIGSVC SERVICE RIG
20:30 06:00 9.50 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 5,102'- 6295'.
Daily Operations Comments
6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'. (SPUD WELL @ 20:30 ON 9/01/2014)
9/3/2014 8:13:48AMPrinted: 1
09/04/2014
DFS: 3.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
005
Spud Date:
DOL: 4 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 21
SIDEWINDER/221Depth md/tvd (ft): 7,598.02 / 7,547.22
Progress (ft): 1,303.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
76,594
827,458
76,594
827,458
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,303.0 / 21.50 = 60.60
15,726.00
Total Man Hours: 208.00 16,236.03
Current Activity: POOH FOR CURVE BHA. ( PTB 7,598' INC: .30° AZM: 182.0° TVD:7,547', 14' LEFT, .3' BEHIND VS -483.5')
24 Hr Summary: DIRECTIONAL DRILL SIDE BUILD 6,297'- 7,598'. C&CMUD. SPOT 40 BBLS OF 20#/ BBL LCM PILL AND PUMP SLUG. POOH FOR CURVE BHA.
POOH FOR CURVE BHA. C/O BHAS. TIH. DRILL CURVE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
2
7151892
HUGHES8.75
T606X
6,734124.7
15 / 2540 / 70 /
0.79
0.88
200.14
160.81325.81
7,598
864
/
6X14
40/70
54.00
Grading I O D L B G O R
Bit #
Bit # 2 1 2 CT S X 1 BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $8,061.21C M Cost($): $27,146.04
Time:
105
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 7,090.01
Density (ppg): 8.60
FV (s/qt): 52
PV (cp): 14
YP (lbf/100ft²): 10
Gels (): 11/13/17
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 36
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
65
28
0.00
0.0
3.4
69.9 / 30.1
8.00
2.00
1,160.00
551.0
3.60
Mud Additives Used
LIME 69
INVERMUL 1
BARABLOK 6
CALCIUM CHLORIDE POWDER 140
GELTONE 6
DURATONE HT 1
ENGINEER 24 HOURS 1
BAROID 41 10
MICA C 68
MICA FINE 62
BARITE 41 20
BARO SEAL CLASSIC 5
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,653DIESEL 7,878
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
55.00
0.00
30.00
354.00
60.00
614.00
DR
6.00
55.00
230.23
30.00
352.00
60.00
646.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
400 2,000
2BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 BIT 8-3/4" T606X W/ 6-14'S 8.750 1.00 1.00
1 6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'.1.750 6.750 26.30 27.30
1 UBHO SUB 2.812 6.625 3.20 30.50
1 NON MAG DRILL COLLAR. MWD 3.312 6.875 30.38 60.88
1 NON MAG DRILL COLLAR 2.875 6.437 30.65 91.53
1 X- OVER SUB 3.250 6.500 1.65 93.18
3 STEEL DRILL COLLARS 2.812 6.437 90.28 183.46
1 X- OVER 2.812 6.500 2.23 185.69
5" DRILL PIPE 4.276 5.000 7,412.32 7,598.02
Total Length: 7,598.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
6,800
2,500
192
175
185
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
22
57
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
326.40 6,898 489.84-316.866,949 0.40 -483.33 0.84
337.30 6,994 490.35-317.147,045 0.30 -483.83 0.12
333.90 7,087 490.72-317.317,138 0.20 -484.20 0.11
265.30 7,183 490.87-317.467,234 0.10 -484.34 0.20
197.80 7,277 490.78-317.577,328 0.10 -484.25 0.12
205.50 7,372 490.63-317.637,423 0.10 -484.10 0.01
182.00 7,467 490.30-317.687,518 0.30 -483.77 0.22
180.90 7,499 490.14-317.687,550 0.30 -483.61 0.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 18:00 12.00 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 6,295'-6,997'.
18:00 18:30 0.50 P DRLPRD 12 RIGSVC RIG SERVICE.
18:30 04:00 9.50 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 6,997'-7,598.
04:00 05:00 1.00 P DRLPRD 15 CIRC C&CMUD. SPOT 40 BBLS OF 20# PER BBL LCM PILL. PUMP SLUG
05:00 06:00 1.00 P DRLPRD 13 TRIP POOH FOR CURVE BHA.
Daily Operations Comments
6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'. (SPUD WELL @ 20:30 ON 9/01/2014), WORKING FROM DIRECTIONAL PLAN #1 ( EOC TARGET @
8,353'MD, INC: 90.58°, AZM: 181.16°, TVD: 8,026', VS: -1.18', DL: 12.0°PER 100' )
9/5/2014 8:01:36AMPrinted: 1
09/04/2014
DFS: 3.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
005
Spud Date:
DOL: 4 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 21
SIDEWINDER/221Depth md/tvd (ft): 7,598.02 / 7,547.23
Progress (ft): 1,303.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
77,786
828,651
77,786
828,651
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
01,303.0 / 23.50 = 55.45
15,726.00
Total Man Hours: 208.00 16,236.03
Current Activity: POOH FOR CURVE BHA. ( PTB 7,598' INC: .30° AZM: 182.0° TVD:7,547', 14' LEFT, .3' BEHIND VS -483.5')
24 Hr Summary: DIRECTIONAL DRILL SIDE BUILD 6,297'- 7,598'. C&CMUD. SPOT 40 BBLS OF 20#/ BBL LCM PILL AND PUMP SLUG. POOH FOR CURVE BHA.
POOH FOR CURVE BHA. C/O BHAS. TIH. DRILL CURVE.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): @
Conn Gas (units) @
Form:
BG Gas (units):
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
/ / /
/
6X14
Grading I O D L B G O R
Bit #
Bit #
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $8,061.21C M Cost($): $27,146.04
Time:
105
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 7,090.01
Density (ppg): 8.60
FV (s/qt): 52
PV (cp): 14
YP (lbf/100ft²): 10
Gels (): 11/13/17
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 36
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
65
28
0.00
0.0
3.4
69.9 / 30.1
8.00
2.00
1,160.00
551.0
3.60
Mud Additives Used
LIME 69
INVERMUL 1
BARABLOK 6
CALCIUM CHLORIDE POWDER 140
GELTONE 6
DURATONE HT 1
ENGINEER 24 HOURS 1
BAROID 41 10
MICA C 68
MICA FINE 62
BARITE 41 20
BARO SEAL CLASSIC 5
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 6,653DIESEL 7,878
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
55.00
0.00
30.00
354.00
60.00
614.00
DR
6.00
55.00
230.23
30.00
352.00
60.00
646.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
400 2,000
2BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
1 BIT 8-3/4" T606X W/ 6-14'S 8.750 1.00 1.00
1 6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'.1.750 6.750 26.30 27.30
1 UBHO SUB 2.812 6.625 3.20 30.50
1 NON MAG DRILL COLLAR. MWD 3.312 6.875 30.38 60.88
1 NON MAG DRILL COLLAR 2.875 6.437 30.65 91.53
1 X- OVER SUB 3.250 6.500 1.65 93.18
3 STEEL DRILL COLLARS 2.812 6.437 90.28 183.46
1 X- OVER 2.812 6.500 2.23 185.69
5" DRILL PIPE 4.276 5.000 7,412.32 7,598.02
Total Length: 7,598.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
6,800
2,500
192
175
185
Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
24
56
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
326.40 6,898 489.84-316.866,949 0.40 -483.33 0.84
337.30 6,994 490.35-317.147,045 0.30 -483.83 0.12
333.90 7,087 490.72-317.317,138 0.20 -484.20 0.11
265.30 7,183 490.87-317.467,234 0.10 -484.34 0.20
197.80 7,277 490.78-317.577,328 0.10 -484.25 0.12
205.50 7,372 490.63-317.637,423 0.10 -484.10 0.01
182.00 7,467 490.30-317.687,518 0.30 -483.77 0.22
180.90 7,499 490.14-317.687,550 0.30 -483.61 0.02
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 18:00 12.00 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 6,295'-6,997'.
18:00 18:30 0.50 P DRLPRD 12 RIGSVC RIG SERVICE.
18:30 04:00 9.50 P DRLPRD 08 DRLDIR DIRECTIONAL DRILL SIDE BUILD 6,997'-7,598.
04:00 05:00 1.00 P DRLPRD 15 CIRC C&CMUD. SPOT 40 BBLS OF 20# PER BBL LCM PILL. PUMP SLUG
05:00 06:00 1.00 P DRLPRD 13 TRIP POOH FOR CURVE BHA.
Daily Operations Comments
6-3/4'' 7/8, 5.0,SLICK, BTB 3.67' .29 RPG,BTG 35', BTS 48'. (SPUD WELL @ 20:30 ON 9/01/2014), WORKING FROM DIRECTIONAL PLAN #1 ( EOC TARGET @
8,353'MD, INC: 90.58°, AZM: 181.16°, TVD: 8,026', VS: -1.18', DL: 12.0°PER 100' )
9/4/2014 8:02:25AMPrinted: 1
09/05/2014
DFS: 4.00
Well Name/Wellbore No.:
Country:State/OCSGField/Permit#:
BRANDON GREEN / DAVID WALDRUMWEBBER, HUDSON / MANGUM, DANNY
006
Spud Date:
DOL: 5 AFE Days: 11Last BOP T.:Safety & Environmental Incident: No
09/01/2014
Release Date:
Report Number:
Report Date:Daily Drilling
Report Onshore TEXASWOLFCAMP CENTRAL
Supervisors:Engineer/Manager:
09/01/2014USA
UNIVERSITY CENTRAL 0829BH/OH
Rig:
Rig Phone: 713-997-1295
RKB (ft): 2,830.01Ground Level (ft): 2,805.0
POB: 36
SIDEWINDER/221Depth md/tvd (ft): 7,990.02 / 7,904.70
Progress (ft): 392.00ROP:
Proposed TD (ft):Next Csg Point (ft): 7,454,366
Drlg Comp Total
AFE #:
Day Cost($):
AFE($):
Cum Cost($)
156,725
984,183
156,725
984,183
0
0
2,581,966 4,167,400
162800/51765
Fac
705,000
0
0392.0 / 12.00 = 32.67
15,726.00
Total Man Hours: 323.00 16,236.03
Current Activity: DRILL CURVE @ 7,990' ' ( PTB 7,990' INC: .40.85° AZM: 183.0° TVD: 7,899', 12.8' LEFT, .6' ABOVE VS -327.5') (BURN @ SURVEY 7,956' = 14.91)
24 Hr Summary: POOH FOR CURVE BHA. C/O BHAS. TIH. DRILL CURVE F/ 7,598 TO 7,990'.
FINISH CURVE C&CMUD. POOH FOR LATERAL BHA. C/O BHA. TIH. DRILL LATERAL.24 Hr Forecast:
MUD LOGGINGTrip Gas (units): 100 @ 323
Conn Gas (units) @
Form:
BG Gas (units): 135
Pore Pressure: (%)
Surf to Surf:
Lag Strokes:
Lag Time: (min)
BIT RECORD
Bit#
S/NSize (in)
MfgIADC Type
Model #
Jets
Depth In (ft)
Depth Out (ft)
Bit RotationsOn Btm Hrs Cum
Footage Cum (ft)
ROP CumWOB mn/mx (kip)
RPM rot/bitBit HP
HSIPSI Drop (psi)
Jet Vel (ft/s)
Imp Force
32
RD29427151892
SMITHHUGHES8.758.75
FHi21T606X
392032.7124.7
20 / 3520 / 20 /
1.66
2.23
422.02
234.20567.84
1.38
1.53
289.98
193.57472.06
7,598
/
7,598
864
3X18
20/20/
12.00
6X14
Grading I O D L B G O R
Bit #
Bit # 3
2 CT X 11 2 S BT BHA
MUD MATERIALSMUD PROPERTIES
Fluids Co.: HALLIBURTONFluids Eng: ROBERT H SPARKS
D M Cost($): $8,535.90C M Cost($): $35,681.94
Time:
102
5:00
Location: PIT
Pit Temp (°F):
Depth (ft): 7,638.02
Density (ppg): 8.60
FV (s/qt): 52
PV (cp): 11
YP (lbf/100ft²): 13
Gels (): 11/14/18
WL (cc/30min):
HTHP (°F): 250
Cake (32nd"):
Solids (lbm/bbl): 36
ECD (ppg): 8.9
Oil Cnt (%):
H2O Cnt (%):
Sand Cnt (%):
MBT (lbm/bbl): 0.0
pH: 10.0
Pm (cc): 0.1
Pf (cc):/Mf (cc): 0.1 / 0.4
Chloride (ppm): 179,000
Calcium (ppm):
LCM (lbm/bbl):
ES (mV):
LGS (%):
Ex Lime (ppb):
OWR:
66
28
0.00
0.0
4.0
70.4 / 29.7
8.00
2.00
1,160.00
601.0
3.70
Mud Additives Used
LIME 36
GELTONE 17
INVERMUL 3
MICA C 10
OIL ABSORBANT 22
BARITE 41 60
ENGINEER 24 HOURS 1
MICA FINE 11
BAROID RIG WASH 1
BAROID 41 6
DRILLTREAT 1
CEDAR FIBER 3
DURATONE HT 2
CALCIUM CHLORIDE POWDER 84
CASINGSize(in) MD(ft)/TVD(ft) FIT/LOT(ppg)
/ 20.00 65.00 65.00
/ 13.38 864.00 864.00
/ 5.50 16,236.03 7,946.02
INVENTORYItem Inv
MUD DIESEL 11,553DIESEL 16,363
SOLIDS CONTROLDeck 1 ScreensSkr Deck 2 Screens
1 140///
2 140///
MUD PUMPS#1 #2 #3
Pump
Type:
Liner ID:
SPM:
GPM:
SPR:
1 SPM:
Pressure:
2 SPM:
Pressure:
DR
6.00
65.00
272.09
0.00
0.00
0.00
0.00
DR
6.00
65.00
272.09
0.00
0.00
0.00
0.00
T GPM (gpm): SPP (psi):
AV (DC): AV (DP):358 268
3BHA #ID (in) Len (ft)Item DescriptionQty OD (in) Cum (ft)
254 7,898.31 7,898.31
1 NMDC FLEX 3.312 6.687 29.55 7,927.86
1 NON MAG DRILL COLLAR 3.312 6.687 30.38 7,958.24
1 UBHO SUB 2.812 6.750 2.59 7,960.83
1 6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .50, B-B 4.55, FLOW RANGE 300-600, OPER DIFF 1050.1.750 6.750 28.19 7,989.02
1 FHI21 8.750 8.750 1.00 7,990.02
Total Length: 7,990.02
STRING LOADS
On Btm Torque:
Off Btm Torque:
Str. Wt. Up:
Str. Wt. Down:
Str. Wt. Rot.:
192
175
185
25Max Over Pull:
BHA PROPERTIES
BHA Hrs:
Jar Hrs:
Cum String Hours:
Weight B Jars (kip):
57
SURVEYSMD (ft) Inclination(°) Azimuth (°) TVD (ft) V Section (ft) +E/-W (ft) Dog Leg (°/100ft)+N/-S (ft)
182.10 7,560 488.43-317.747,611 2.90 -481.90 4.26
175.50 7,592 485.43-317.607,643 7.90 -478.90 15.72
175.20 7,623 479.88-317.147,674 12.80 -473.36 15.81
180.20 7,654 471.91-316.867,706 16.10 -465.40 11.02
182.70 7,684 462.22-317.127,738 19.20 -455.70 9.97
183.10 7,713 451.27-317.687,769 22.20 -444.75 9.69
182.20 7,742 438.53-318.267,801 24.80 -431.99 8.20
182.30 7,797 409.13-319.427,863 31.90 -402.58 11.45
OPERATION DETAILSDESCRIPTIONPHASEHRSTOFROM CODEOP CODE ACTIVITY
06:00 10:30 4.50 P DRLPRD 13 TRIP FINISH POOH WITH SIDE BUILD ASSEMBLY.
10:30 13:30 3.00 P DRLPRD 13 TRIP CHANGE OUT BHA. ( BIT, MOTOR, MONEL )
13:30 14:00 0.50 P DRLPRD 13 TRIP TIH TO 1,039'.
14:00 14:30 0.50 P DRLPRD 15 CIRC TEST MWD TOOL & CIRCULATE SLUG OUT OF HOLE.
14:30 15:00 0.50 P DRLPRD 12 RIGSVC SERVICE RIG & TOP DRIVE.
15:00 18:00 3.00 P DRLPRD 13 TRIP TIH FROM 1,039' TO 7,598' @ 120FPM. ( BREAKING CIRC EVERY 2,200' )
18:00 06:00 12.00 P DRLPRD 09 DRLCRV DRILL CURVE F/ 7,598' - 7,990'
Daily Operations Comments
6 3/4'' 4/5 LOBE, 7.0 STAGE, 2.12°. SLICK, REVS/GAL .50, B-B 4.55, FLOW RANGE 300-600, OP DIFF 1050 PSI. WORKING FROM DIRECTIONAL PLAN #1 ( EOC
TARGET @ 8,353'MD, INC: 90.58°, AZM: 181.16°, TVD: 8,026', VS: -1.18', DL: 12.0°PER 100' )