8/13/2019 Daily Program Dec-2011
1/21
S.l.
No.Description Work Program of 1st Dec. 2011 Achievement of 30th Nov Nov.2011
Drainage pipe installation Drainage pipe installation in progress
Sub-base materials laying Sub-base materials laying in progress
Water Supply pipe Installation work Water Supply pipe Instal lation work in progress
Layout of HT Cable Trench
2 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading work Sand bagging for preloading work in progress
Surcharge material placement Surcharge material placement in progress
Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished
Concrete Pouring of Base (CH 885-900) Rebar fabrication executed
5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in progress
Shuttering of slab Shuttering of slab in progress
Concrete pouring of Column
7 W asa Relocation Newly installed line is functioning
8 Laboratory / Field Test
9 Interlocking Block ILB production ILB production in progress
10 Dismantling work Mosque dismantling Mosque dismantling work in progress
11 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Open Deep Drain4
Segment 1A1
Electric Sub station6
NCT BACK-UP PROJECT, CHITTAGONG
Work Program,1st Dec, 2011
Segment 13
8/13/2019 Daily Program Dec-2011
2/21
S.l.
No.Description Work Program of 2nd Dec. 2011 Achievement of 1st Dec2011
Drainage pipe installation Drainage pipe installation in progress
Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in
Water Supply pipe Installation work Water Supply pipe Installation work in p
Earth excavation of HT Cable Trench Layout has given
2 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading work Sand bagging for preloading work in pr
Surcharge material placement Surcharge material placement in progre
Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished
CC casting Soling executed
5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in
Shuttering of slab Shuttering of slab in progress
Concrete pouring of Column
Sheet Pile Sheet Pile casting Sheet Pile casting in progress
RCC Drainage Pipe Concrete pouring Concrete Pouring in progress
7 Wasa Relocation Newly installed line is functioning
PDB Relocation Shutdown & new installed 33 KV line connection
8 Laboratory / Field Test
9 Interlocking Block ILB production ILB production in progress
10 Dismantling work Mosque dismantling Mosque dismantling work in progress
11 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Electric Sub station6
NCT BACK-UP PROJECT, CHITTAGONG
Work Program,2nd Dec, 2011
Segment 13
Open Deep Drain4
Segment 1A1
8/13/2019 Daily Program Dec-2011
3/21
S.l.
No.Description Work Program of 3rd Dec.11 Achievement of 2nd Dec.11
Drainage pipe installation Drainage pipe installation in progress
Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in
Water Supply pipe Installation work Water Supply pipe Installation work in p
Earth excavation of HT Cable Trench Layout has given
2 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading work Sand bagging for preloading work in pr
Surcharge material placement Surcharge material placement in progre
Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished
Rebar fabrication of Base CC executed
5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in
Shuttering of slab Shuttering of slab in progress
Concrete pouring of Column Concrete pouring of Column in progres
7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress
8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress
9 Wasa Relocation Newly installed line is functioning
10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.
11 Laboratory / Field Test
12 Interlocking Block ILB production ILB production in progress
13 Dismantling work Mosque dismantling Mosque dismantling work in progress
14 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 3rd Dec,11
Segment 13
Open Deep Drain4
Segment 1A1
Electric Sub station6
8/13/2019 Daily Program Dec-2011
4/21
S.l.
No.Description Work Program of 4th Dec.11 Achievement of 3rd Dec.11
Drainage pipe installation Drainage pipe installation in progress
Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in
Water Supply pipe Installation work Water Supply pipe Installation work in p
Earth excavation of HT Cable Trench Layout has given
2 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading work Sand bagging for preloading work in pr
Surcharge material placement Surcharge material placement in progre
Wall casting/Yard side/1st lift (CH 865-885) Concrete pouring of Base finished
Concrete pouring of Base Rebar fabrication executed
5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in
Shuttering of slab Shuttering of slab in progress
Concrete pouring of Column Concrete pouring of Column in progres
7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress
8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress
9 Wasa Relocation Newly installed line is functioning
10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.
11 Laboratory / Field Test
12 Interlocking Block ILB production ILB production in progress
13 Dismantling work Mosque dismantling Mosque dismantling work in progress
14 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Electric Sub station6
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 4th Dec,11
Segment 13
Open Deep Drain4
Segment 1A1
8/13/2019 Daily Program Dec-2011
5/21
S.l.
No.Description Work Program of 5th Dec.11 Achievement of 4th Dec.11
Drainage pipe installation Drainage pipe installation in progress
Sub-base materials(Shingles) laying Sub-base materials(Shingles) laying in
Water Supply pipe Installation work Water Supply pipe Installation work in p
Earth excavation of HT Cable Trench Layout has given
2 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading work Sand bagging for preloading work in pr
Surcharge material placement Surcharge material placement in progre
Wall casting/Country side/1st lift (CH 865-885) Concrete pouring of Base finished
Concrete pouring of Base Rebar fabrication executed
5 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation (CH 550-620) in
6 Electric Sub station Shuttering of slab Shuttering of slab in progress
7 Sheet Pile Sheet Pile casting Sheet Pile casting in progress
8 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring in progress
9 Wasa Relocation Newly installed line is functioning
10 PDB Relocation Dismantling of 11 KV Line Newly installed 33 KV line is live now.
11 Laboratory / Field Test
12 Interlocking Block ILB production ILB production in progress
13 Dismantling work Mosque dismantling Mosque dismantling work in progress
14 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 5th Dec,11
Segment 13
Open Deep Drain4
Segment 1A1
8/13/2019 Daily Program Dec-2011
6/21
S.l.
No.Description Work Program of 6th Dec.11 Achievement of 5th Dec.11
1 Yard Drainage(Seg-1A) Earth excavation and pipe installat ion
2 Water supply line (Seg-1A) Earth Excavation for Pipe laying 250mm pipe welding (04 Nos)3 RMG Track (Seg-1A) Sub-base materials laying & Bed Rolling Shingles-Sand mixing (500cft)
4 Segment 2A Settlement Record Settlement Record in progress for 45th day
Sand bagging for preloading workSand bagging of preloading work in progress (
Nos)
Surcharge material placement Surcharge material placement (40,000cft)
Wall casting/Country side/2nd lift ,CH 870-
890,(Quantity=6cum)
Wall casting/Country side/1st lift ,CH 910-
930,(Quantity= 6cum)
Earth excavation,soling,CC, CH755-765Wall casting/Yard side/1st lift ,CH 870-
880,(Quantity=4.5 cum)
7 Rail Relocation Sub base preparation (CH 550-620) Sub base preparation in progress(CH 550-62
Sub base watering & Shoulder preparation Sub base watering & Shoulder preparation in
8 Electric Sub station Shuttering and Rebar binding of slab Shuttering and Rebar binding of slab in progr
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (01 Nos)
10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=26 Nos)
12 PDB Relocation Dismantling of 11 KV LineExcavation executed for pole driving (11KV
Line),Quantity=7 Nos
13 Laboratory / Field Test
14 Interlocking Block ILB production ILB production in progress (Quantity=8000 No
15 Released Material removing 2 trip Rail bit deposite to CPA Store no-1
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 6th Dec,11
Segment 15
Open Deep Drain6
8/13/2019 Daily Program Dec-2011
7/21
S.l.
No.Description Work Program of 9th Dec.11 Achievement of 8th Dec.11
1 Yard Drainage(Seg-1A) CC casting 500mm pipe fixing (5 Nos)
2 Water supply line (Seg-1A) Welding & Placing Earth Excavation executed
3 RMG Track (Seg-1A) Earth excavation (remaining 26m) Rolling
4 Segment 2A Settlement Record Settlement Record in progress for 48th
Sand bagging for preloading workSand bagging of preloading work in pro
Nos)
Surcharge material placement Surcharge material placement (42,000c
PVD Driving
Wall casting/Country side/3rd lift ,CH 900-
920,(Quantity=7cum)
Wall casting/Country side/1st lift ,CH 93
950,(Quantity= 6cum)
Bracing fixing
Soling,CC, CH 1000-1020 Earth Excavation
Sub base preparation (CH 550-620) Sub base preparation in progress(CH
Sub base watering & Shoulder preparation Sub base watering & Shoulder prepara
8 Electric Sub station Shuttering and Rebar binding of slab Shuttering and Rebar binding of slab i
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (01 Nos
10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=21 Nos
12 PDB Relocation Pole erection Pole erection (2 Nos)
13 Laboratory / Field Test
14 Interlocking Block ILB production ILB production in progress (Quantity=1
15 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 9th Dec,11
Open Deep Drain6
Rail Relocation7
Segment 15
8/13/2019 Daily Program Dec-2011
8/21
S.l.
No.Description Work Program of 10th Dec.11 Achievement of 9th Dec.11
1 Yard Drainage(Seg-1A) 300 mm pipe fixing CC casting executed
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress
3 RMG Track (Seg-1A) Sub-base material laying Earth excavation executed for
Ballast mixing & laying
4 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading workSand bagging of preloading wo
Nos)
Surcharge material placement Surcharge material placement
PVD Driving PVD Driving in progress
Shuttering/Yard side/3rd lift ,CH 900-920Wall casting/Country side/3rd l
920,(Quantity= 6cum)
Bracing fixing Bracing fixing in progress
Soling,CC, CH 1000-1020
Sub base preparation (CH 550-620) Sub base preparation in progr
Sub base watering & Shoulder preparation Sub base watering & Shoulder
8 Electric Sub station Shuttering and Rebar binding of parapet Shuttering and Rebar binding o
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile
10 RCC Drainage Pipe Concrete pouring(300mm)Concrete Pouring (300mm dia=
nos)
12 PDB Relocation Pole erection Pole erection (3 Nos)
13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in
14 Interlocking Block ILB production ILB production in progress (Qu
15 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 10th Dec,11
Open Deep Drain6
Rail Relocation7
Segment 15
8/13/2019 Daily Program Dec-2011
9/21
S.l.
No.Description Work Program of 11th Dec.11 Achievement of 10th Dec.11
1 Yard Drainage(Seg-1A) Base CC & Side CC Casting CC Casting of 3 Nos Gullyhole
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress
3 RMG Track (Seg-1A) Sub-base material laying Earth excavation executed for r
Ballast mixing & laying Ballast mixing & laying in pro
4 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading workSand bagging of preloading wo
Nos)
Surcharge material placement Surcharge material placement
PVD Driving PVD Driving in progress (3000
Wall casting/Country side/2nd lift ,CH 860-
880,(Quantity= 5cum)
Wall casting/Country side/2nd l
900,(Quantity= 5cum)
Bracing fixing Bracing fixing in progress
CC Casting CH (1020-1040) CC Casting executed (CH 100
Sub base preparation (CH 550-620) Sub base preparation in progr
Sub base watering & Shoulder preparation Sub base watering & Shoulder
8 Electric Sub station Shuttering and Rebar binding of parapet Concrete casting of Parapet (P
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile
10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=
12 PDB Relocation Cable fitting Pole erection (3 Nos)
13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in p
14 Interlocking Block ILB production ILB production in progress (Qu
15 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 11th Dec,11
Open Deep Drain6
Rail Relocation7
Segment 15
8/13/2019 Daily Program Dec-2011
10/21
S.l.
No.Description Work Program of 12th Dec.11 Achievement of 11th Dec.11
1 Yard Drainage(Seg-1A) 500mm pipe fixing Base CC & Side CC Casting ex
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(
3 RMG Track (Seg-1A) Sub-base material laying Sub-base material laying in pro
Ballast mixing & laying Ballast mixing & laying in pro
4 Segment 2A Settlement Record Settlement Record in progress
Sand bagging for preloading workSand bagging of preloading wo
Nos)
Surcharge material placement Surcharge material placement
PVD Driving PVD Driving in progress (3200
Shuttering and Rebar binding ,CH 840-860Wall casting/Country side/2nd l
880,(Quantity= 5cum)
Bracing fixing Bracing fixing in progress
Rebar binding of Base CC Casting executed CH (100
Sub base preparation (CH 550-620) Sub base preparation in progre
Sub base watering & Shoulder preparation Sub base watering & Shoulder
8 Electric Sub station Concrete casting of Parapet Concrete casting of Parapet in
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile
Transverse Sleeper Concrete pouring Concrete pouring in progress(1
10 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=
12 PDB Relocation Cable fitting Pole erection (3 Nos)
13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in p
14 Interlocking Block ILB production ILB production in progress (Qu
15 Released Material removing
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 12th Dec,11
Open Deep Drain6
Rail Relocation7
Segment 15
8/13/2019 Daily Program Dec-2011
11/21
S.l.
No.Description Work Program of 13th Dec.11 Achievement of 12th Dec.11
600 mm dia Pipe fixing 500mm pipe fixing in progress (0
Base casting of Gully hole
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0
Levelling & Rolling Sub-base material(520mm thick
Ballast mixing & laying Ballast mixing & laying in prog
4 Segment 2A Settlement Record Settlement Record in progress fo
Sand bagging for preloading work Sand bagging of preloading wor
Surcharge material placement Surcharge material placement in
Concrete pouring of Base(CH 1000-1020)Wall casting/Country side/2nd lif
880,(Quantity= 5cum)
Bracing fixing Bracing fixing in progress
Rebar binding of Base CC Casting executed CH (1000
Sub base preparation (CH 550-620) Sub base preparation in progres
Sub base watering & Shoulder preparation Sub base watering & Shoulder p
8 Electric Sub station Concrete casting of Parapet Concrete casting of Parapet in p
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile (
10 Transverse Sleeper Concrete pouring Concrete pouring in progress(12
11 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2
12 PDB Relocation Cable fitting Cable fitting in progress
13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr
14 Interlocking Block ILB production ILB production in progress (Qua
15 Dismantling work CC Dismantling CC Dismantling in progress
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
3
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 13th Dec,11
Open Deep Drain6
Rail Relocation7
Segment 15
Yard Drainage(Seg-1A)1
RMG Track (Seg-1A)
8/13/2019 Daily Program Dec-2011
12/21
S.l.
No.Description Work Program of 14th Dec.11 Achievement of 13th Dec.11
300 mm dia Pipe fixing 600 mm dia Pipe fixing in progre
Base casting of Gully hole Base casting of Gully hole in pro
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0
3 RMG (Seg-1A) Ballast mixing & laying Ballast mixing & laying in prog
4 Segment 2A Settlement Record Settlement Record in progress f
Sand bagging for preloading work Sand bagging of preloading wor
Surcharge material placement Surcharge material placement in
Wall casting /1st l ift(CH 1000-1020) Concrete pouring of Base (9 cum
Plastering & Net cement finishin
Ballast mixing & laying Ballast mixing & laying in progre
Concrete casting of Parapet Rebar fabrication & Shuttering e
Shuttering of slab (2nd portion) Shuttering of slab in progress (2
9 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Rebar fabrication & Shuttering e
10 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in progress(10
11 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2
12 PDB Relocation Cable fitting Cable fitting in progress
13 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr
14 Interlocking Block ILB production ILB production in progress (Qua
15 Dismantling work CC Dismantling CC Dismantling in progress
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Rail Relocation7
5
Yard Drainage(Seg-1A)1
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 14th Dec,11
Segment 1
Electric Sub station8
Open Deep Drain6
8/13/2019 Daily Program Dec-2011
13/21
S.l.
No.Description Work Program of 15th Dec.11 Achievement of 14th Dec.11
600 mm dia Pipe fixing & Side CC 300 mm dia Pipe fixing (03 Nos)
Base casting of Gully hole Base casting of Gully hole in pro
2 Water supply line (Seg-1A) Welding & Placing Welding & Placing in progress(0
3 RMG (Seg-1A) Ballast mixing & laying Ballast mixing & laying in prog
4 Segment 2A Settlement Record Settlement Record in progress f
Sand bagging for preloading work Sand bagging of preloading wor
Surcharge material placement Surcharge material placement in
6 Segment-2 Clearing & Grubbing
Wall casting /1st lift/Yard Side(CH 1000-1020) Wall casting /1st lift / Navy Side
Ballast mixing & laying Ballast mixing & laying in progre
Concrete casting of Parapet Concrete casting of Parapet in p
Shuttering of slab (2nd portion) Shuttering of slab in progress (2
10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0
11 Transverse Sleeper Concrete pouring Concrete pouring in progress(10
12 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2
13 PDB Relocation Cable fitting Cable fitting in progress
14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr
15 Interlocking Block ILB production ILB production in progress (Qua
16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progr
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
9
Open Deep Drain7
Rail Relocation8
5
Yard Drainage(Seg-1A)1
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 15th Dec,11
Segment 1
Electric Sub station
8/13/2019 Daily Program Dec-2011
14/21
S.l.
No.Description Work Program of 18th Dec.11 Achievement of 17th Dec.11
Gully hole wall shuttering & Casting (04 Nos) Base CC Casting (15rm),Side C
Manhole CC Casting Manhole Base Casting (01 no)
2 Water supply line (Seg-1A) 100 mm dia MS pipe welding 250 mm dia MS Pipe welding &
3 RMG (Seg-1A) Ballast mixing & layingBallast mixing & laying in prog
layer(1000 cft)
4 Segment 2A Settlement Record Settlement Record in progress fo
Sand bagging for preloading work Sand bagging of preloading wor
Surcharge material placement Surcharge material placement in
6 Segment-2 Clearing & Grubbing Clearing & Grubbing in progress
Wall casting /1st lift/Navy Side(CH 1100-1105) Base Casting,10 cum (CH 1100-
Wall casting /3rd lift/country Side(CH 890-908) Bracing fixing (18 Nos)
Ballast mixing & laying
Concrete casting of Parapet Concrete casting of Parapet in p
Shuttering of slab (2nd portion) Shuttering of slab in progress (2
10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0
11 Transverse Sleeper Concrete pouring Concrete pouring in progress(10
12 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2
13 PDB Relocation Cable fitting Cable fitting in progress
14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pr
15 Interlocking Block ILB production ILB production in progress (Qua
16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progr
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
5
Yard Drainage(Seg-1A)1
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 18th Dec,11
Segment 1
Electric Sub station9
Open Deep Drain7
Rail Relocation8
8/13/2019 Daily Program Dec-2011
15/21
S.l.
No.Description Work Program of 21th Dec.11 Achievement of 20th Dec.11
300mm(8 Nos),700mm(6 Nos) dia pipe fixing 700 mm (06 Nos) & 300mm (08 N
15rm Base CC & 45rm side CC casting
2 Water supply line (Seg-1A) 100 mm dia MS pipe welding 250 mm dia MS Pipe welding & la
3 RMG (Seg-1A) Ballast mixing & layingBallast mixing & laying in prog
layer(1200 cft)
Shingles laying (180mm layer)
4 Pre-cast pile driving(Seg-1A) 02 Nos 03 Nos driving finished (Light
5 Segment 2A Settlement Record Settlement Record in progress fo
Sand bagging for preloading work Sand bagging of preloading work
Surcharge material placement Surcharge material placement in
7 Segment-2 Clearing & Grubbing Clearing & Grubbing in progress
Wall casting /2nd lift/Port Side(CH 1100-1125) Rebar fabrication & Shuttering ex
Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in progres
10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in progress (2n
11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Sheet Pile(0
12 Transverse Sleeper Concrete pouring Concrete pouring in progress(10
13 RCC Drainage Pipe Concrete pouring(300mm) Concrete Pouring (300mm dia=2
14 PDB Relocation Cable fitting Cable fitting in progress
15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in pro
16 Interlocking Block ILB production ILB production in progress (Qua
17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progre
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Open Deep Drain8
Yard Drainage(Seg-1A)1
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 21th Dec,11
Segment 1
Rail Relocation9
6
8/13/2019 Daily Program Dec-2011
16/21
S.l.
No.Description Work Program of 22th Dec.11 Achievement of 21th De
15rm Base CC & 45rm side CC casting 300mm(8 Nos),700mm(6
2 nos Gully hole wall cast
Ballast mixing & laying 1st layer
(Area=15mX22m)
Ballast mixing & laying
layer(Area=22mX10m))
Shingles laying (180mm layer)
Earth Excavation for 2nd portion (59 rm)
4 Pre-cast pile driving(Seg-1A) 01 No (Anchor proof) 01 No driving finished (
5 Segment 2A Settlement Record Settlement Record in pro
Sand bagging for preloading work (2500 Nos) Sand bagging of preloadi
Surcharge material placement (50,000 cft) Surcharge material place
Clearing & Grubbing Clearing & Grubbing in pr
150mm local sand laying 150mm local sand laying
Wall casting /2nd lift/Navy Side(CH 1100-1125) Wall casting /2nd lift/Yard
Wall casting /3rd lift/Navy Side(CH 900-915)
Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in
10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in prog
11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of Shee
12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in prog
13 RCC Drainage Pipe Concrete pouring(300mm=22 Nos)) Concrete Pouring (300mm
14 PDB Relocation Cable fitting Cable fitting in progress
15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinde
16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progre
17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) i
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
9
6
Open Deep Drain8
Yard Drainage(Seg-1A)1
RMG (Seg-1A)3
Segment-27
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 22th Dec,11
Segment 1
Rail Relocation
8/13/2019 Daily Program Dec-2011
17/21
S.l.
No.Description Work Program of 24th Dec.11 Achievement of 23th De
800mm(6 Nos) & 300mm (8Nos) Installation 300mm(8 Nos), installati
15rm Base CC 15 rm Side CC 15rm Base CC 15 rm Sid
2 RMG (Seg-1A) Shingles laying (180mm layer)Ballast mixing & laying
layer(Area=22mX12m)
3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-01/Anchor proof) 01 No driving f inished
4 Segment 2A Settlement Record Settlement Record in pro
Sand bagging for preloading work (2500 Nos) Sand bagging of preload
Surcharge material placement (50,000 cft) Surcharge material place
Clearing & Grubbing Clearing & Grubbing in p
150mm local sand laying 150mm local sand laying
Wall casting /3rd lift/Navy Side(CH 1100-1125) Wall casting /2nd lift/Nav
Wall casting /3rd lift/Country Side(CH 900-915)
Bal last mixing & laying(Ch 0-200) Bal last mixing & laying in
Sleepers & Rail bit fixing Sleepers & Rail bit fixing
9 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in prog
10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of She
11 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in prog
12 RCC Drainage Pipe Concrete pouring(300mm=22 Nos)) Concrete Pouring (300m
13 PDB Relocation Shut down and Connection with main line Cable fitting completed
14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylind
15 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progre
16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2)
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
Open Deep Drain7
Yard Drainage(Seg-1A)1
Segment-26
Rail Relocation8
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 24th Dec,11
Segment 15
8/13/2019 Daily Program Dec-2011
18/21
S.l.
No.Description Work Program of 25th Dec.11 Achievement of 24th Dec.11
800mm(6 Nos) & 300mm (8Nos) Installation 800mm(6 Nos) & 300mm (8Nos) Ins
30 rm Side CC 15rm Base CC 15 rm Side CC comp
CC Casting of 3 Nos Gully hole.
2 RMG (Seg-1A) Shingles laying (180mm layer) Shingles laying (180mm layer),A
3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-01/Anchor proof) No driving for mechanical fault
4 Segment 2A Settlement Record Settlement Record in progress for 6
Sand bagging for preloading work (2500 Nos) Sand bagging of preloading work in
Surcharge material placement (50,000 cft) Surcharge material placement in pro
Clearing & Grubbing Clearing & Grubbing in progress
150mm local sand laying 150mm local sand laying in progres
Wall casting /3rd lift/Navy Side(CH 1100-1125) Bracing fixing (10 rm)
Wall casting /3rd lift/Country Side(CH 900-915)
Ballast mixing & laying(Ch 0-200) Ballast mixing & laying in progress (
Sleepers & Rail bit fixing Sleepers & Rail bit fixing in progress
9 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab in progress (2nd p
10 Sheet Pile Concrete pouring of Sheet Pile(01 Nos)
11 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in progress(10No
12 RCC Drainage Pipe Concrete pouring(300mm=23 Nos)) Concrete Pouring (300mm dia=22N
13 PDB Relocation Old pole removing connection of 11KV line completed
14 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cylinder) in progr
15 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in progress (Quantit
16 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-2) in progress
Project Manager Sub Assistant Engineer-1 Sub Assistant Engineer-2
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
6
Rail Relocation8
NCT BACK-UP PROJECT, CHITTAGONG
Work Program of 25th Dec,11
Segment 15
Open Deep Drain7
Segment-2
Yard Drainage(Seg-1A)1
8/13/2019 Daily Program Dec-2011
19/21
S.l.
No.Description Work Program of 27th Dec.11 Achievement of 26
Base CC of 15rm (for 300mm) 800mm(1 No) ,700m
Base casting of 4 Nos Gully hole Rebar binding of Ba
2 Water Supply Line Welding of100mm dia pipe Welding of100mm d
3 RMG (Seg-1A) Earth Excavation (Length=59m) Shingles laying (18
4 Pre-cast pile driving(Seg-1A) 01 No (Pile No-02/Anchor proof) 01 No (Pile No-01/A
5 Segment 2A Settlement Record Settlement Record i
Sand bagging for preloading work (2500 Nos) Sand bagging of pre
Surcharge material placement (50,000 cft) Surcharge material
Clearing & Grubbing Clearing & Grubbing
300mm sand blanket laying 150mm local sand la
Navy gate wall casti
Ballast mixing & laying(Ch 0-200) Ballast mixing & layi
Sleepers & Rail bit fixing Sleepers & Rail bit f
10 Electric Sub station
11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of
12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in
13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pouring (5
14 PDB Relocation Old pole removing Old pole removing in
15 Laboratory / Field Test Regular Test (ILB/Cylinder) FDD Test of 150mm
16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in pr
17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg
18
Road maintainance
work(Program of Prime
Minister)
Rolling & water sprayingPipe removing,Road
progress
Project Manager Sub Assistant Engineer-1 Sub Assistant Enginee
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
NCT BACK-UP PROJECT, CHITTAGON
Work Program of 27th Dec,11
Segment 16
Yard Drainage(Seg-1A)1
7
Rail Relocation9
Open Deep Drain8
Segment-2
8/13/2019 Daily Program Dec-2011
20/21
S.l.
No.Description Work Program of 29th Dec.11 Achievement of 28t
300 mm dia (02 Nos) pipe installation 500mm(1 No) , 300m
Base CC (30rm) Side CC (10rm)
Gully hole base casting (01 no),wall casting (2
nos),manhole base casting (1 no)
Base casting of Gull
1 no )
Earth excavation Ballast laying (300m
Rebar fabrication of longitudinal sleepers
3 Pre-cast pile driving(Seg-1A) 01 No (Pile No-22/Anchor proof) 01 No (Pile No-03/A
4 Segment 2A Settlement Record Settlement Record in
Sand bagging for preloading work (2000 Nos) Sand bagging of pre
Surcharge material placement (50,000 cft) Surcharge material p
Clearing & Grubbing Clearing & Grubbing
300mm sand blanket laying 300mm sand blanket
Back filling at Navy gate Navy gate wall castin
Earth excavation (CH 900-920)
Ballast mixing & laying(Ch 0-400) Ballast mixing & layin
Sleepers & Rail bit fixing Sleepers & Rail bit fix
9 Road Type-1 Sub base material placement (2nd layer)
10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of slab (2n
11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pouring of S
12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pouring in p
13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pouring (50
14 PDB Relocation Old pole removing Old pole removing in
15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (ILB/Cy
16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production in pro
17 Dismantling work CC Dismantling (Seg-2) CC Dismantling(Seg-
Project Manager Sub Assistant Engineer-1 Sub Assistant Enginee
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CPA
6
Rail Relocation8
Open Deep Drain7
Segment-2
NCT BACK-UP PROJECT, CHITTAGON
Work Program of 29th Dec,11
Segment 15
Yard Drainage(Seg-1A)1
RMG (Seg-1A)2
8/13/2019 Daily Program Dec-2011
21/21
S.l.
No.Description Work Program of 31th Dec.11 Achievement o
300 mm dia (02 Nos) pipe installation 500mm(1 No) ,
Base CC (30rm) Side CC (10rm)
Gully hole base casting (01 no),wall casting (2
nos),manhole base casting (1 no)
Base casting of
1 no )
Singles Laying 1st layer(520mm thick)Earth excavati
phase)
Rebar fabrication of longitudinal sleepersRebar fabricat
progress
3 Pre-cast pile driving(Seg-1A)All materials of load test reached at site and
preparation in progress01 No (Pile No-
4 Segment 2A Settlement Record Settlement Reco
Sand bagging for preloading work (2000 Nos) Sand bagging of
Surcharge material placement (50,000 cft) Surcharge mate
Clearing & Grubbing Clearing & Grub
300mm sand blanket laying 300mm sand bla
Back filling at Navy gate Back filling at Na
Earth excavation (CH 1000-1040) Earth excavatio
Wall casting at Navy gate (Ch 1100-1125) /3rd lift
/yard sideRebar fabricatio
Ballast mixing & laying(Ch 0-600) Ballast mixing &
Sleepers & Rail bit fixing(Ch 0-600) Sleepers & Rail
9 Road Type-1 Sub base material placement (2nd layer) Sub base mater
10 Electric Sub station Shuttering of slab (2nd portion) Shuttering of sla
11 Sheet Pile Concrete pouring of Sheet Pile(01 Nos) Concrete pourin
12 Transverse Sleeper Concrete pouring (10 Nos) Concrete pourin
13 RCC Drainage Pipe Concrete pouring(500mm=05 Nos)) Concrete Pourin
14 PDB Relocation Old pole removing Old pole removi
15 Laboratory / Field Test Regular Test (ILB/Cylinder) Regular Test (IL
16 Interlocking Block ILB production (Quantity=13000 Nos) ILB production
17 Dismantling work CC Dismantling (Seg-2) CC Dismantling
Project Manager Sub Assistant Engineer-1 Sub Assistant En
NCT Back-up/PBL NCT Back-up/CPA NCT Back-up/CP
NCT BACK-UP PROJECT, CHITTAG
Work Program of 31th Dec,11
Segment 15
Yard Drainage(Seg-1A)1
RMG (Seg-1A)2
6
Rail Relocation8
Segment-2
Open Deep Drain7