CLUSTER-FLUSHMilking Cluster Disinfection System
SWINGOVER PARLOUR
Installation Manual
Cotswold Dairy Equipment Co LtdAvenue 3 Station Lane Witney
Oxford OX28 4BP UK
Tel +44 (0)1993 774567Fax +44 (0)1993 771776
e-mail sales@cotswold-dairy-equipment.comwww.cotswold-dairy-equipment.com
CEMADE IN ENGLAND
COTSWOLDDairy Equipment Co Ltd
AIR SUPPLY
CHEMICAL ENTRAINMENT(option)
FLEXIBLEPIPERUN
HEADER TANK (Note: Level With Cylinders)
WATER INLET SYSTEM
CONNECTION TO MILK LINE (Y Piece)
PERACETIC ACID CONCENTRATIONSet dosing at 0.5%
Usage @ Twice-A-Day Milking:- 0.7 Litres / 100 Cows / Day
IMPORTANT
BEFORE installation of your new Cotswold Cluster Flush system:
ensure that all EXISTING milk shut-off valves are working
satisfactorily, (sealing fully and without leaks)
COTSWOLD CLUSTER FLUSHMilking Cluster Disinfection System
AIR 2 - 3 bar
HEADER TANK
Pressure Reducing Valve 2 - 3 Bar
Compressor7 - 8 Bar
IMPORTANTSet Cylinder Levels To Header Tank.Level Should Be 50mm Below Top
of Stainless Steel Cylinders
FOR SWING OVER PARLOURS: One controller per 2 milking clusters
24V+ -
ON-OFF
24V+ -
ON-OFF
POWERSUPPLY
To NextMilking Points etc...
MAINS IN230/240v
WATER LEVEL
SCHEMATIC
24v DCWater Supply
1 amp 20mm fuse
Drain Tap(at lowest point)
22mm (flexible)
Rigid
TOCLAW
(clear PVC11mm i/d)
ON - OFF
AIR AIR WATERWATER
TO MILK LINE &CLAW A(clear PVC10mm I/D)
TO MILK LINE &CLAW B(clear PVC10mm I/D)
Clear PVC 13mm I/D
10mm
CONTROL PANEL (one per two
milking points)
24V+ -
Do Not Install Directly
Above Electrical Equipment
A B ESC - + OK
(ALWAYS SWITCH OFF EITHER THE POWER SUPPLYOR THE CONTROLLER(s) WHEN NOT IN USE)
GATE 1VACUUM
GATE 2VACUUM
24v DCFROM PSU
FOR WIRINGSEE
ACCOMPANYINGLARGE SCALE
DRAWING
PERACETIC ACID CONCENTRATIONSet dosing at 0.5%
Usage @ Twice-A-Day Milking:- 0.7 Litres / 100 Cows / Day
INSTALLATION NOTES
ORDER OF INSTALLATION
For ease of installation we recommend the following installation sequence:-
1/ Header Tank(s)2/ Water / Plumbing3/ Set Up Water Cylinders4/ Install Airlines5/ Controllers and Electrical
WATER / CHEMICALSite the Header Tank at the same level as the cylinders. Ensure that the water level in the
(see drawing opposite).
Run 2 inch (50mm) water tube from header tank along the centre of the parlour, connecting using tees, taps and 10x16mm i/d tube. Terminate this tube with a reversed (upside-down) tee/tap so that it can be used as a drain point if required.
cylinders is set 50mm (2 inches) below the top of the stainless tube,
to every cylinder
Chemical DosingWe can supply Dosatron high accuracy dosing units if required. When dealing with chemicals, do take all recommended precautions. Before commissioning the system, ensure all unions are tight and the clusters hang correctly
Schematic Top Viewdisposition of system components for
swing-over parlour
HEADERTANK
PSU
AIR 24v WATER
CONTROLLERS
CONTROLLERS
CONTROLLERS
AIR 2 - 3 bar, (pressure reducer may be required)Use 22mm Flexible Tubing between the compressor (clean air filters should be fitted) and the first 22x22x10mm tee located adjacent to the first controller. Continue to following controllers using rigid tubing. Terminate the air line in a blanking cap.
Anti Syphon Valvesfit one valve either side of the Tee connection of air line, at the mid-point of each half (see schematics)
Pressure ReducerWe can supply a suitable pressure reducing valve if required.
ELECTRICALLocate Power Supply Unit (PSU) in a safe dry location, run 24v supply to first controller, and then daisy-chain the supply from controller to controller.
Each controller controls two milking points simultaneously.
Arrange a convenient switch to turn off the system when not in use.
CONNECTION TO MILK LINECut into the milk line and and fit the “Y” piece moulding using 13mm pvc tubing connecting to upper horizontal outlet of stainless steel cylinder.
Always switch off system when washing the parlour
= Anti Syphon
Valve
AIR
WATER24v
SHUT-OFF VALVE (for CLUSTER FLUSH)
To Claw
Flow
Flow
Unit MUST be installed vertically (as above)
Controls maximum of two (2) cluster points on either side of valve (see schematic on previous page).
ON
- O
FF
CO
NTRO
L P
AN
EL W
IRIN
G
(contr
ols
sid
es
A a
nd B
)
24V
+
-
IB(L
EFT
A)
A
B
ESC
-
+
O
K
24v Input fromPSU or previous controller
I1IB
ID
Fuse
20m
m
1 A
mp
24v
SIG
NA
LS
O
UT
T
O G
AT
ES
24v
GA
TE
SW
ITC
HR
ET
UR
NS
(Optio
n)
TRIG
GER IN
PU
TS
24v D
C
(ALW
AY
S S
WIT
CH
OF
F E
ITH
ER
TH
E P
OW
ER
SU
PP
LY
OR
TH
E C
ON
TR
OL
LE
R(s
) W
HE
N N
OT
IN
US
E)
ID(R
IGH
TB)
GA
TE
or A
CR
V
AC
UU
M
CO
NN
EC
TIO
N
VA
CU
UM
SW
ITC
H
VA
CU
UM
SW
ITC
H
Sw
itch
AIR
AIR
CO
NT
RO
LL
ER
-S
WIN
GO
VE
R A
ND
R
OTA
RY
PA
RL
OU
R
EX
HA
US
T V
EN
TE
XH
AU
ST
VE
NT
CO
TS
WO
LD
DA
IRY
EQ
UIP
ME
NT
XD
10
GA
TE
V
AC
UU
M
CO
NN
EC
TIO
N
MC
L-V
ER
SIO
NR
OTA
RY
(XD
10
in to
p r
igh
tco
rne
r o
f co
ntr
olle
r)
MCL-VERSIONROTARY
(XD10 in top rightcorner of controller)
18
SY
ST
EM
TR
IGG
ER
S V
IAG
AT
E S
WIT
CH
ES
M
AN
UA
L P
US
H B
UT
TO
NS
OR
IDIB
MA
NU
AL
PR
ES
SB
UT
TO
N
GA
TE
SW
ITC
H O
RM
AN
UA
L P
US
H B
UT
TO
N
ACCESSING TIMING PARAMETERSMCL CONTROLLER (XD10)
To open main screen, press the “- ” (minus) button twice.
To access any sub-menuPress OKThen Athen either “+” or “-” to move between sub-menus
2. Sub Menu 1 = Milk Sweep Setup
2a. When finished, press esc
3 Timer Setup - Maintenance(Change Timings)
(a) Initial DelayMilk SweepFlush DelayFirst FlushFill TimeSecond Flush
3. Maintenance HelpShows “A” Solenoid Function
4. Help - Version (call dealer)
5. Software VersionNo. eg: R5-4-M5
CLUSTER FLUSHMAIN MENU
CLUSTER FLUSH MENU(Milk Sweep Setup)Timer SetupPress OK
CLUSTER FLUSH MENU(TIMER SETUP)MaintenancePress OK
CLUSTER FLUSH MENU(MAINTENANCE)HelpPress OK
CLUSTER FLUSH MENU(HELP)VersionPress OK
CLUSTER FLUSH MENU(VERSION)Press OK
Manuals/BackFlush/MASTERFILESControllerSetup-Crouzet-MCL.pdf
IMP
OR
TA
NT
Set C
ylin
der
Leve
ls T
o H
eader
Tank.
Leve
l Should
Be 5
0m
m B
elo
w T
op
of S
tain
less
Ste
el
Cyl
inder
50m
m
(ALW
AY
S
SW
ITC
H O
FF
WH
EN
NO
T I
N U
SE
)
AIR
2 -
3 b
ar
HE
AD
ER
TA
NK
IMP
OR
TA
NT
Set C
ylin
der
Leve
ls T
o H
eader
Tank.
Leve
l Should
Be 5
0m
m B
elo
w T
op
of
Sta
inle
ss S
teel
Cyl
inders
24V
+
-
ON
-OFF
24V
+
-
ON
-OFF
PO
WER
SU
PPLY
WA
TE
R L
EV
EL
SC
HEM
ATIC
Not
To S
cale
Out
24vD
C
1 a
mp 2
0m
m f
use
Dra
in T
ap
(at
low
est
poin
t)
22m
m
(fle
xib
le)
Rig
id
CO
TS
WO
LD
CL
US
TE
R F
LU
SH
Cro
uze
t C
on
tro
ller
Eu
ro/M
CL
SW
ING
OV
ER
& R
OTA
RY
PA
RL
OU
R
TE
E O
FF
AC
R
VA
CU
UM
SU
PP
LY
TE
E O
FF
AC
R
VA
CU
UM
SU
PP
LY
TE
E O
FF
AC
R
VA
CU
UM
SU
PP
LY
CO
TS
WO
LD
DA
IRY
EQ
UIP
ME
NT
CH
EM
ICA
LS
TO
RE
(UP
TO
7 M
ET
RE
S
HO
RIZ
ON
TA
LLY
)
DO
SA
TR
ON
(O
ptio
n)
Ch
em
ica
l In
du
ctio
n U
nit
PO
WE
RS
WIT
CH
ST
OP
VA
LVE P
ress
ure
Reduci
ng
Valv
e 2
- 3
Bar
and food g
rade a
ir filt
ers
PE
RA
CE
TIC
AC
ID C
ON
CE
NT
RA
TIO
NS
et dosi
ng a
t 0.5
%U
sage @
Tw
ice-A
-Day
Milk
ing:-
0.7
Litr
es
/ 100 C
ow
s / D
ay
20
COTSWOLD CLUSTER FLUSH
Crouzet ControllerEuro/MCL
SWINGOVER & ROTARY PARLOUR
Cluster Flush Servicing page 1
Service interval: At 1 year, the following service parts should be fitted
Dosatron Service Kit
Food Grade AIr Filter (Compressor)
1 Year
InlineTap / Lever Valve 152-153
Bracket - Pressure Vessel
CF38A
Bracket - Swingover Control
Box CF100
Dosatron Service Kit DOS/KIT Food Grade Air Filters - Service Kit CF21
Other parts you may find useful to have with you when servicing a cluster Flush system.
10 mm i/d x 16mm o/d hose (30m)………………….. 151-10210mm i/d x 20mm o/d hose (30m) ...........................151-12713mm i/d Hose (30m)………………………………… 151-118Herbi Clips 16mm…………………………………… 154-153BHerbi Clips 20mm ...................................................154-154C10 MM Jubilee clips………………………………… 154-159ABrackets for pressure vessels…………………………CF 38ABrackets for swing over control box…………………...CF 100Taps………………………………………………………152-153
see overleaf for 3 Year Major Service...
Cluster Flush Servicing page 2
Service interval: At 3 years, the following service parts should be fitted (in addition to Annual Servicing)
Service Part: Cylinder Service Kit: Part No CF 99 (See picture below)
CF 99 - Replaces all the internal parts of the pressure vessel.Order one Service Part per Milking Point: example: 10 x 20 order 10, or 20 x 20 order 20
Replacing the complete vessel assembly is:Assured: Complete assembly factory-tested before dispatch.Quick: Internal parts exchanged in-place without moving vessels.Simple: No small parts to take apart. No leaky re-assembly.Warranty: We will give 3 years warranty on serviced assembly.
** See video of service procedure on our Website**
Additional Non-Return Valve:You will also need to replace the external non-return valve, which is included in the service kit.
You may want to change flexible tubes during the service30 Metres 10mm tube - 151-102B30 Metres 13mm tube – 151-11830 metres 20mm tube - 151-127
Thoroughly rinse out header tanks and pipe work with alkaline cleaner.
Check water levels: (See picture)o Water level must be level with or just below top label on the vessels.o Important - water levels above this level risk contamination of milk.
Best way to set water levels: o Set the water in the header tanks level with the overflowo Set the top label of the vessels level with the overflowo This way if the water level rises it only overflows the header tank
Prevent dust and dirt getting into the header tank.
3 Years
Non-Return ValveCF91
NRV Kit comeswith 2 x Tube Clamps
Pressure VesselService Kit
CF99