Dale L. MooreNAVAIR AIRSpeed
Deputy Corporate Deployment Champion27 March, 2007
Achieve the Achieve the MissionMission
Decrease Inventory
Decrease Cycle Time
Improve Reliability
Decrease Operating Expenses
Naval Aviation Enterprise AIRSpeed:
Transforming the End-to-End Value Stream
presented to
15th Annual Conference on Quality in Space & Defense
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 2
TQL/TQMISO 9000
1990
1999
2000
2001
2003
2002
2004
ASN RD&A Directs Use of LSS
Cultural Institutionalization
DEPOTS and SHIPYARDS COMMENCE
LEANNAVAL AVIATION
ENTERPRISE
LEAN Events on Three AIRCRAFT CARRIERS
NAVSEA Task Force Lean
Striving for: “LSS - Business as Usual”
NAVAIR HQ AIRSPEED
DoD Senior Leadership Directs Use of LSS
Navy and USMC Industrial Base Shows Output From LSS
2005
Transactional Projects Yield
Output
2006
DoN Lean Six Sigma (LSS) Journey
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 3
FY 07 DoN Budget
RDT&E13%
O&M31%
Procurement26%
M&P30%
DoN Total Obligation Authority (TOA)
$127.3B 65% is people cost
FY06 TOA$125.6B
CVN-21 DDX LCS JSF MMA V-22 ACS LPD-17 EFV LHA(R) HLR
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 4
Continuous Process Improvement Ingrained At The Senior Level of
Navy Leadership
• “…faced with executing two great tasks simultaneously…fighting today’s war and positioning our Force for an uncertain future…
• We face additional fiscal pressures that lead us to better stewardship of taxpayer dollars…where greater efficiency leads to improved effectiveness..
• …I found that both buyers and sellers who employed Lean Six Sigma (LSS) experienced greater efficiencies, increased morale and higher levels of performance…
• LSS is a proven business process…several elements of the Navy/Marine Corps Team have engaged…4:1 return on investment…
• The mission is clear: create more readiness and assets within our budget through LSS…I expect you, my Leadership Team, will personally support this initiative…injecting it into our performance objectives…
• …establish the next steps toward more fully employing LSS in our organization. “
Donald C. Winter
SECNAV Values Leaders Who…•Excel At Business / Process Improvement
•Deliver Solutions At Best Cost
•Are Change Agents
•Lead Based On Insightful Metrics
•Use LSS To Improve
•Cascade / Measure SECNAV Guidance Penetration Throughout Organizations
SECNAV’s Guidance for Senior Executive’s PerformanceAlign Leadership Expectations With Workforce Accountabilities
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 6
5
10
15
20
98 00 02 04 06 08 10 12 14
AV
ER
AG
E A
GE
FISCAL YEAR
The Dilemma
…And We Can’t Afford To Buy The Number Of New Aircraft We
Need
The Problem: We Need To Buy An Average Of 200 New Aircraft Each Year To Maintain
Our Average Aircraft Age.
FY99 FY00 FY01 FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11PB98 71 125 144 150 164
PB99 71 119 143 154 164
PB00 105 140 163 183 187 201
PB01 128 130 173 177 187
PB02 88 92 115 119 143 155
PB03 90 85 105 147 193
PB04 100 100 133 191 254 302
PB05 111 134 183 238 283
PB06 128 170 195 242 248 242
20-year-old Aircraft Are Costly To Maintain… Maintenance Man-hours Per Flight Hour
Increasing…
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 7
Key Organizational Concepts
Three Major Concepts Converging:
• Naval Aviation Enterprise (NAE) Construct
• Competency Aligned/Integrated Product Team Concept of Operations
• NAE AIRSpeed Deployment of Lean Six Sigma and Theory of Constraints Continuous Process Improvement (CPI)
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 8
NAE BOD LOGOS
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 9
Enterprise Principles
• Start With the Outcome (Readiness / Cost), Improve Your Processes (AIRSpeed), Implement Residual Organization
• Utilize A Set Of Consistent, Integrated, And Hierarchical Metrics
• Ensure Full And Consistent Transparency Of Data And Information Throughout
• Establish And Maintain Process Discipline Throughout
• Establish And Maintain Accountability For Actions And Results Throughout
• Apply An Integrated Governance Structure
A Deliberate, Disciplined Process To Achieve Aviation Units Ready For Tasking At Reduced Cost . . . Today And In The Future
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 10
NAE Mission
• “Facilitate business process transformation and foster a culture of productivity and continuous improvement enterprise-wide. Develop and advocate high potential, cross-functional enterprise initiatives and ensure enhanced performance and organizational efficiencies are not lost in the ‘white space’. Ensure savings are harvested and returned to the corporation for reallocation against other corporate Navy priorities.”
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 11
THE NAE ORGANIZATION
PLANNINGCAPT PORTER
PLANNINGCAPT PORTER
TOTAL FORCE READINESS CFT
RDML SHANNON
TOTAL FORCE READINESS CFT
RDML SHANNON
COST MGMT CFTRADM KILCLINE (CFO)
SES NEWTON
COST MGMT CFTRADM KILCLINE (CFO)
SES NEWTON
TOTAL FORCE READINESS STANDARDS & POLICY
RDML SHANNON
TOTAL FORCE READINESS STANDARDS & POLICY
RDML SHANNON
TOTAL FORCE TRAINING DEVELOPMENT &
DISTRIBUTIONRDML QUINN / SES HOLCOMB
TOTAL FORCE TRAINING DEVELOPMENT &
DISTRIBUTIONRDML QUINN / SES HOLCOMB
TOTAL FORCE SHAPINGRDML LEMMONS /
CAPT BARAN
TOTAL FORCE SHAPINGRDML LEMMONS /
CAPT BARAN
NAVRIIP CFTRADM STARLINGNAVRIIP CFTRADM STARLING
METRICSMR. COCHRAN
METRICSMR. COCHRAN
EXECUTIONCAPT MCALOON
EXECUTIONCAPT MCALOON
* NAE CORE LEADERSHIP
NAE BOARD OF DIRECTORS (BOD)
READINESS, STANDARDS & POLICY
CAPT PLATAMONE
READINESS, STANDARDS & POLICY
CAPT PLATAMONE
CARRIER READINESS TEAMCAPT DONEGAN
CARRIER READINESS TEAMCAPT DONEGAN
MAINT & SUPPLY CHAIN MGT
RADM ROESNER /RDML WILLIAMS
MAINT & SUPPLY CHAIN MGT
RADM ROESNER /RDML WILLIAMS
ACQUISITION & LIFE CYCLE SUPPORT
RADM VENLET
ACQUISITION & LIFE CYCLE SUPPORT
RADM VENLET
UPDATED: 1MAR06
VADM ZORTMAN, CNAF (CEO) * VADM VENLET, NAVAIR (COO) * LTGEN CASTELLAW, USMC AVN
RADM STARLING, CNAL * RDML SHANNON (TFR) * RADM STONE, NAVSUP
RADM BOZIN, N82 MS. HARRELL, CFFC N4/7 RADM KILCLINE, N88 (CFO) *
RADM MOFFITT, NSAWC MR. BALDERSON, DASNAIR RDML LEMMONS, RES / N43 *
MR. KUNESH, DASNLOG RDML QUINN, CNATRA RDML MCCARTHY, OPTEVFOR
VADM MORAN, NETC VADM HARVEY, NPC VADM SULLIVAN, NAVSEA VADM MCCARTHY, N4
VADM MCARTHUR, NETWARCOM VADM CONWAY, CNI RDML BACHMANN, SPAWAR
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 12
NAVICPNAVAL INVENTORY
CONTROL POINT
COMSPAWAR SPACE & NAVAL WARFARE
SYSTEMS COMMANDCNO
CHIEF OF NAVAL OPERATIONS
PEO (A)AIR ASW, ASSAULT &
SPECIAL MISSIONPROGRAMS
PEO (W)STRIKE WEAPONS &
UNMANNED AVIATION
PEO (JSF)JOINT STRIKE
FIGHTER
PROGRAMEXECUTIVE OFFICES
OPERATINGAGREEMENT
ASN (RD&A)ASSISTANT SECRETARY OF THE NAVY
(RESEARCH, DEVELOPMENT, AND ACQUISITION)
NAVAL RESERVEAIR-09R
DEP ASST CDR / DIRECTOR
NAVAL RESERVEAIR-09R
DEP ASST CDR / DIRECTOR
ORGANIZATIONAL STRUCTURE
COMNAVSUPNAVAL SUPPLY
SYSTEMS COMMAND
ECHELON IVECHELON IV
ECHELON IIIECHELON III
ECHELON IIECHELON II
PEO (T)TACTICAL AIRCRAFT
PROGRAMS
STAFFCOMPTROLLER AIR-10.0
LEGAL AIR-11.0SAFETY DIRECTOR AIR-09F
IG AIR-00GJAG AIR-00J
CMC AIR-00WCIO AIR-7.0
CTO AIR-4.0XSMALL BUSINESS AIR-09D
STAFFCOMPTROLLER AIR-10.0
LEGAL AIR-11.0SAFETY DIRECTOR AIR-09F
IG AIR-00GJAG AIR-00J
CMC AIR-00WCIO AIR-7.0
CTO AIR-4.0XSMALL BUSINESS AIR-09D
AIR-7.0CORPORATEOPERATIONS
ASST. COMMANDER
AIR-7.0CORPORATEOPERATIONS
ASST. COMMANDER
AIR-2.0CONTRACTS
ASST. COMMANDER
AIR-2.0CONTRACTS
ASST. COMMANDER
AIR-1.0PROGRAM
MANAGEMENT
ACQUISITION EXEC
AIR-1.0PROGRAM
MANAGEMENT
ACQUISITION EXEC
ADDU
NAVAL AIR WARFARE CENTERS
NAVAIR HEADQUARTERS
SLIDE PARTIALLY UPDATED 13 JUN 06
NAVAL AIR DEPOTS & LOGISTICS SUPPORT ACTIVITIES
NAVAL AIRDEPOT
(NAVAIRDEPOT)NORTH ISLAND
COMMANDING OFFICER
NAVAL AIRDEPOT
(NAVAIRDEPOT)NORTH ISLAND
COMMANDING OFFICER
NAVAL AIR PACIFICREPAIR ACTIVITY
(NAVAIRPRA)ATSUGI, JAPAN
COMMANDING OFFICER
NAVAL AIR PACIFICREPAIR ACTIVITY
(NAVAIRPRA)ATSUGI, JAPAN
COMMANDING OFFICER
NAVAL AIR MEDITERRANEAN REPAIR ACTIVITY
(NAVAIRMRA)NAPLES, ITALY
COMMANDING OFFICER
NAVAL AIR MEDITERRANEAN REPAIR ACTIVITY
(NAVAIRMRA)NAPLES, ITALY
COMMANDING OFFICER
NAVAL AIRDEPOT
(NAVAIRDEPOT)JACKSONVILLE
COMMANDING OFFICER
NAVAL AIRDEPOT
(NAVAIRDEPOT)JACKSONVILLE
COMMANDING OFFICER
NAVAL AIRDEPOT
(NAVAIRDEPOT)CHERRY POINT
COMMANDING OFFICER
NAVAL AIRDEPOT
(NAVAIRDEPOT)CHERRY POINT
COMMANDING OFFICER
NAVAL AIRTECHNICALDATA & ENG
SERVICE COMMAND(NATEC)
NORTH ISLANDCOMMANDING OFFICER
NAVAL AIRTECHNICALDATA & ENG
SERVICE COMMAND(NATEC)
NORTH ISLANDCOMMANDING OFFICER
NAVAL TEST WINGPACIFIC
PT MUGUCOMMANDER
NAVAL TEST WINGPACIFIC
PT MUGUCOMMANDER
WEAPONSDIVISION
(NAWCWD)
CHINA LAKECOMMANDER
WEAPONSDIVISION
(NAWCWD)
CHINA LAKECOMMANDER
TRAINING SYSTEMS
ORLANDOCOMMANDING OFFICER
TRAINING SYSTEMS
ORLANDOCOMMANDING OFFICER
AIRCRAFTDIVISION
(NAWCAD)
PATUXENT RIVERCOMMANDER
AIRCRAFTDIVISION
(NAWCAD)
PATUXENT RIVERCOMMANDER
NAVAL TEST WINGATLANTIC
PATUXENT RIVERCOMMANDER
NAVAL TEST WINGATLANTIC
PATUXENT RIVERCOMMANDER
AIR-5.0TEST &
EVALUATION
ASST. COMMANDER
AIR-5.0TEST &
EVALUATION
ASST. COMMANDER
AIR-4.0RESEARCH & ENGINEERING
ASST. COMMANDER
AIR-4.0RESEARCH & ENGINEERING
ASST. COMMANDER
AIR-6.0LOGISTICS &INDUSTRIALOPERATIONS
ASST. COMMANDER
AVIATION DEPOT COMMANDER
AIR-6.0LOGISTICS &INDUSTRIALOPERATIONS
ASST. COMMANDER
AVIATION DEPOT COMMANDER
NAVAL AVIATION ENTERPRISE
TOTAL FORCE READINESS
NAVAL AVIATION ENTERPRISE
TOTAL FORCE READINESS
DEPUTY COMMANDERAIR-00A
VICE COMMANDERAIR-09
NAVAL AIR SYSTEMS COMMAND HEADQUARTERSPATUXENT RIVER
COMMANDERAIR-00
** DUAL HATTED
**
** **
**
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 13
INTEGRATED CONCEPT OF OPERATIONSFOR LIFE CYCLE SYSTEMS MANAGEMENT
• COMPETENCIES SPANALL SITES
• LINKED BY COMMONORGANIZATION &PROCESSES
• CAPABILITY / ASSET VISIBILITY
• MULTI-DISCIPLINED• FLEET / PRODUCT
FOCUSED• FULL LIFE CYCLE
SYSTEM SUPPORT
COMPETENCY ALIGNED
ORGANIZATION (FORMAL STRUCTURE)
CHERRY POINT NAVAIRDEPOT
JACKSONVILLE NAVAIRDEPOT
ORLANDO TRAINING
NORTH ISLANDNAVAIRDEPOT, NATEC
CHINA LAKE WEAPONS
PT MUGUWEAPONS
LAKEHURST AIRCRAFT
PATUXENT RIVERNAVAIR HQ, PEOs, AIRCRAFT
NAVAIRPRA - ATSUGI, JAPAN
NAVAIRMRA - NAPLES, ITALY
DEPOTS
FL
EE
T
PEO(T)PEO(A)PEO(W)PEO(JSF)
PROGRAMEXECUTIVEOFFICERS
EXTERNALCUSTOMERS
NAWC• AIRCRAFT DIVISION• WEAPONS DIVISION
PR
OD
UC
TS
& S
ER
VIC
ES
INTEGRATED PROGRAM TEAMS
(TEAM STRUCTURE TO PERFORM WORK)
DEMAND SUPPLY
COMPETENCY ALIGNED WORKFORCE PROGRAM
MGMT
CORP OPS / COMPT / COUNSEL
CONTRACTS LOGISTICS & INDUSTRIAL
ANALYSISRESEARCH &ENGINEERING
ENTERPRISE EFFORTS
INTEGRATED PROGRAM TEAMS
TEST &EVALUATION
CUSTOMER / PRODUCT FOCUSEDDEPLOYMENT
NAVAIRTOTAL WORKFORCE
30 SEP 04
35,437
MIL 2,484CIV 24,178CSS 8,775
TOTAL WITH PEOS
36,839
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 14
SEA BASED AIRCRAFT AND SYSTEMS
MARITIME WEAPONS MARINE EXPEDITIONARY AVIATION SYSTEMS
TEST ANDEVALUATION
REPAIR /MODIFICATION
IN-SERVICE ENGR &LOGISTICS SUPPORT
TECHNOLOGY, R&D,HW / SW PRODUCTS
WE EXECUTE (ON BEHALF OF THE USER)
ACQUISITIONMANAGEMENT
OUR CORE PROCESSES . . .
PERFORM ACQUISITION MANAGEMENT FOR THE DEVELOPMENT, PRODUCTION, AND IN-SERVICE SUPPORT OF AIRCRAFT AND WEAPONS SYSTEMS
TEST AND EVALUATE AIRCRAFT, WEAPONS AND INTEGRATED SYSTEMS, SCIENCE AND TECHNOLOGY FOR TEST AND EVALUATION
PROVIDE FOR THE REPAIR AND / OR MODIFICATION OF AIRCRAFT, ENGINES, SYSTEMS AND COMPONENTS
PROVIDE FOR IN-SERVICE ENGINEERING AND LOGISTICS SUPPORT
CONDUCT EFFORTS FOCUSED ON THE ADVANCEMENT OF SCIENCE, TECHNOLOGY, RESEARCH AND DEVELOPMENT AND DELIVERY OF HARDWARE / SOFTWARE PRODUCTS
DEVELOP / MAINTAIN COMPETENCY POLICIES, PROCEDURES & SUPPORT SERVICES. FACILITATE EFFECTIVE UTILIZATION OF INFRASTRUCTURE, SECURITY, LEGAL, FINANCIAL, HUMAN & INFORMATION RESOURCES
SUPPORTOPERATIONS
AIR ASW / ASUW
AIRCREW / MAINTENANCE TRAINING SYSTEMS
OUR PRODUCTS . . .
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 15
Naval Aviation Enterprise AIRSpeed
Enterprise AIRSpeed(Lean, Six Sigma, TOC)
• Fleet-Wide Repair Sites & Processes
• Led by O-6 ESC
• O-I-D + Supply Chain
• Links to NAVRIIP
• AIR-3.3 Coord Office
Depot AIRSpeed(Lean, Six Sigma, TOC)
• Depot production processes
• Led by COs/AIR-6.0
• Rollout to 3 sites
NAVAIR AIRSpeed(Lean, Six Sigma, TOC)
• Corporate/Competency Processes and Other Productivity Initiatives
• Led by AAG/EDB Guidance
• Enabled by Core Team
• Links with Enterprise & Depot AIRSpeed
• There are FOUR AIRSPEED programs with One Goal and One Metric:
– Depot AIRSPEED which began in 1999
– Enterprise AIRSPEED which began in 2003
– NAVAIR AIRSPEED which began in 2004
– NAVICP AIRSPEED which began in 2005
• All four drive productivity through process improvement using
industry-proven tools, and help establish a self-sustaining culture
of continuous improvement.
NAVICP AIRSpeed(Lean, Six Sigma, TOC)
• Corporate/Competency Processes and Other Productivity Initiatives
• Led by NAVSUP Guidance
• Enabled by Deployment Team
• Links with Enterprise & Depot AIRSpeed
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 16
Corporate Deployment ChampionsRDML Mark Skinner CDC
Stu Young (SES) Executive DirectorCapt. Bob Novak PM/Dale Moore (GS-15) Dep. CDC
Capt. Mike Stabile
Core Team
Phil Zalesak JJ Perryman
Bobby Jenkins Monique Johnson
Allen Heim Susanne Johnson
Project RealizationJJ Perryman
Training Coordination &
SupportAllen Heim
Candidate Selection & Retention
Barb Ward/Allen Heim
Financial ControlTBD
Deployment Champions•AIR 1.0: Ken Mcilhenney•AIR 2.0: Pam Gray•AIR 3.0/6.0: Joe Incorvia
Denise Gontarek•AIR 4.0 Denise Breckon•AIR 5.0 Rick Quade•AIR 7.0/11.0: Chuck Cathcart•AIR 10.0/7.8: Joel Carey/
Chris Cummings•CIO: Carol Ecklund•PEO(A): Glenn Perryman•PEO(T): Randy Allen•PEO(W): Audie Dennis•JSF: TBD
Black Belts & Black Belt Candidates
MBB SupportGeorge Group
Consultants
Project Mgmt and LSS Deployment
TrackingJJ Perryman/Dick
Logue
Communications & Change Mgmt
Phil Zalesak
Deployment Team Activities: Develop recommendations for deployment approach Execute on-going deployment of Lean Six Sigma Develop and manage Lean Six Sigma results objectives, guidelines, and measures Establish and manage Lean Six Sigma management processes Ensure integration between LSS and other NAVAIR productivity efforts Manage internal and external NAVAIR Lean Six Sigma communications
NAVAIR AIRSpeed Deployment Team
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 17
NAVAIR AIRSpeed Roles
(Updated for FY07)
All Employees• Understand vision• Apply concepts to
their job and work area
• Owns vision, direction, integration, business results
• Leads change
• Project owner• Implements solutions• Owns financial results• Part time as part of job• Develops Project
Charter
• Participate on Black Belt teams and/or lead projects
• Part time on projects
• Provide project-specific support
• Can be Yellow or Green Belt and includes Financial Representation
• Part time on projects
• Lead organizational performance improvement
• Prioritize projects• Full time
assignment
DeploymentDeploymentChampionsChampions
ProjectProjectSponsorsSponsors
Project TeamProject TeamMembersMembers
ExecutiveExecutiveLeadershipLeadership
Green BeltsGreen Belts
• Train Black Belts/Green Belts• Coach Black Belts/Green
Belts• Lead Complex/Large projects • Full-time position
MasterMasterBlack BeltsBlack Belts
• Execute AIRSpeed projects • Train and coach Project
Teams• Full-time assignment
Black BeltsBlack Belts
AIRSpeed AIRSpeed Core TeamCore Team
•Enables successful deployment / execution•Develops and reports metrics•Coordinates training •Leads change management and internal / external cross-communication
• Manage Value Stream performance improvement
• Prioritize VS projects• Full time assignment
Value StreamValue StreamManagersManagers
New Role Evolving
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 18
NAVAIR AIRSpeed Implementation Process 2004 2005
YEAR 1 SEP OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG
BENCHMARKING & DEPLOYMENT DESIGN
EXECUTIVE ENGAGEMENT
SELECTION OF CHAMPIONS, BLACK BELTS AND SPONSORS
PROJECT IDENTIFICATION & SELECTION
MOBILIZATION
BLACK BELT LEAN SIX SIGMA WAVES
BENEFITS
WAVE 1
WAVE 3WAVE 4
WAVE 5
WAVE 6
INIT
IAT
ION
RE
SO
UR
CE
&
PR
OJ
EC
T
SE
LE
CT
ION
IMP
LE
ME
NT
AT
ION
&
EV
OL
UT
ION
• • • •
• • • •
• • • •
• • • •
$ $ $ $ $
• • • •
WAVE 2
ONGOING REVIEWS, INVOLVEMENT AND COMMUNICATION
ONGOING PROJECT PORTFOLIO MANAGEMENT BY CHAMPIONS / MASTER BLACK BELTS
LEADERSHIP REVIEWS OF BLACK BELT PROJECTS AND PROCESSES
PROJECT SPONSORSHIP WORKSHOPS
DEPLOYMENT WORKSHOPS &
LEADERSHIP COORDINATION
EXECUTIVE LAUNCH
REFERENCE: LEAN SIX SIGMA, BY MICHAEL L. GEORGE
PERSONNEL IDENTIFICATION & ROLE-SPECIFIC TRAINING
BB PROJECT ID, PROJECT CHARTERING & SPONSORING
• • • •
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 19
WHAT WE EXPECT
• Eliminate non-value added activities.
• Reduce cycle times.
• Improve quality and productivity.
• Develop a workforce with the right skills, focused on the right workload, at the right time, at the right cost, to deliver the right capability to the Warfighter.
• A fundamental cultural transformation that will help our workforce become more efficient and more productive, while facilitating the cost-wise decisions that will help us deliver Fleet aircraft ready for tasking at reduced cost.
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 20
NAVAIR AIRSpeedService/Transactional
EnvironmentsUnique Attributes/Differences
• Fundamentally Knowledge-based “Creative” Work
• Value-Added Less Tangible/Quantifiable
• More Difficult to “Walk-the-Process” than on the shop floor
• Bounded within: Data, Information, Knowledge Domains
• Highly Complex & Inter-dependent “adhoc” Social Networks
• Strongly IT dependent/facilitated/institutionalized
– Collaboration, databases/repositories, work flow mgmt etc.
• High Variance: Dependent on Knowledge Capital
– Learning, experience, sharing, culture, knowledge mgmt etc.
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 21
VALUE STREAMLIFE CYCLE MANAGEMENT
ACQUISITION MANAGEMENT
S&T, R&D, HARDWARE / SOFTWARE PRODUCTS / DESIGN
TEST AND EVALUATION
IN-SERVICE ENGINEERING & LOGISTICS SUPPORT
REPAIR / MODIFICATIONS
TRANSLATE AND ANALYZE MISSION REQUIREMENTS, DEVELOP ACQUISITION STRATEGY, CONTRACT AWARD / MANAGEMENT, PROGRAM MANAGEMENT OVER LIFE CYCLE
PLAN AND CONDUCT DEVELOPMENTAL TESTS; SUPPORT OPERATIONAL TESTS
PLAN / MANAGE / EXECUTE REPAIRS AND MODIFICATION PROJECTS
PROVIDE NEW WARFIGHTING TECHNOLOGY AND SYSTEMS ANALYZE SYSTEM DATA, DETERMINE / IMPLEMENT CORRECTIVE ACTIONS TO SUSTAIN IN-SERVICE SYSTEMS
AND TO ENSURE SAFETY, AFFORDABILITY, AND AVAILABILITY; PERFORM ENGINEERING INVESTIGATIONS,
ENGINEERING CHANGE PROPOSALS
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT& DEMONSTRATION
CONCEPT REFINEMENT
& TECHNOLOGYDEVELOPMENT
FUTURE READINESS CURRENT READINESS
CORPORATE OPERATIONS
CO
RE
FU
NC
TIO
NS
/P
RO
CE
SS
ES
S&T
RQMTS /RISKSFROMFLEET /OPNAV
HEADQUARTERS / PEOsWARFARE CENTERS / DEPOTS
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 22
Common Process Design Issues
TASK
METRICS
TASK
METRICS
DECISIONPOINTS
REVIEW/APPROVAL
POINTS
Scope is not clearly defined or
bounded
External Dependencies/Undefined Linkages
Inadequate Focus on critical objectives
Emphasis onInspection &
Correction vicePrevention
Poorly Documented/ Defined Procedures
Lack of Performance Measures/Tollgates
Unclear/UndefinedResponsibilities &
“Checklist” ExpectationsUpfront
INPUTS OUTPUTS
DuplicatedActivities
Excess Complexity:Lack of Standardization
& Reuse
Nonvalue Added activities vice
CVA
Poor Understanding of Customer
RQMTS
Feedback Loop
Ref: Enterprise Process Mapping, C. Cobb
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 23
TYPICAL PROCESS IMPROVEMENT
EXPERIENCE W/O LSS1. Problems are not well “defined,” scoped or
bounded; typically a “boil-the-ocean” or “grand slam” approach & challenges are too big and take too long to effectively tackle
2. Data gathering or “measurement” is rarely or poorly conducted around root causes of specific problems
3. Limited “analysis” tools to available
4. Limited “improvement” tools available to develop and implement desired changes
5. Little or no follow-through for institutional lock-in and “control” of required changes
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 24
LSS “DMAIC” METHODOLOGY(the scientific “data driven” method to improve existing
processes)
1. DEFINE: Properly define, decompose and scope the problem to a manageable size for a small team to tackle
2. MEASURE: Gather pertinent, useful, statistically significant data to address the specific problem
3. ANALYZE: Conduct analysis on the data to understand the well-defined problem and gain insights into specific solution recommendations
4. IMPROVE: Design and prototype improvements
5. CONTROL: Lock-in improvements w/metrics, SOPs, Institutionalization and Change Management
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 25
AIRSpeed Project Development Process Success Recipe: Right Project, Right Leader, Right Support and Right
Resources
12/15/2004 10:527.1.1_DBGEDB_BRIEF_TEMPLATE_22DEC03.PPT 15
The Process for Identifying Opportunities and Selecting Lean Six Sigma Projects
Identify value levers in the business
• Strategic
• Financial
• Customer
• Process
Prioritize value levers
Translate Value Levers into Opportunity Areas
Translate Opportunity Areas into Project Ideas
Score each project as High / Med / Low for Benefit and Effort
Fill in Benefit / Effort Matrix
Review plotted results
Select highest priority opportunities for further analysis
Assign opportunities to project sponsors for project definition
Complete Draft Project Charters
Evaluate projects using Evaluation Criteria
Update Benefit / Effort Matrix
Review plotted results
Prioritize projects
Schedule project launches based on resource availability
Identify Value Drivers/ Levers
1Identify Project Opportunities
2Screen Initial List of Opportunities
3Scope and Define Projects
4Prioritize List of Defined Projects
5
BenefitApproach
Calculations
Net Benefit
Assumptions
EffortPeopl e Required
Team Member Role
% of Time
on Project
Proposed
Duration
(in weeks)
Total FTE
Weeks
1 -
2 -
3 -
4 - 5 -
6 -
7 -
8 -
9 -
10 -
-
Project Duration weeks
One Time Costs
Risks
BenefitApproach
Calculations
Net Benefit
Assumptions
EffortPeopl e Required
Team Member Role
% of Time
on Project
Proposed
Duration
(in weeks)
Total FTE
Weeks
1 -
2 -
3 -
4 - 5 -
6 -
7 -
8 -
9 -
10 -
-
Project Duration weeks
One Time Costs
Risks
Simple PDF Templat e Revised 10-24-00
Project Namepage 1 of 2
Problem Statement
- include the 4 basic elements : What , Where, When, Extent
- make quant ifiable whenever possible
Scope StatementScope In
Scope Out
Key MeasuresMeasure Name I/P/O Exists Baseline Notes
1
2
3
4
5
6
7
8
9
10
Simple PDF Templat e Revised 10-24-00
Project Namepage 1 of 2
Problem Statement
- include the 4 basic elements : What , Where, When, Extent
- make quant ifiable whenever possible
Scope StatementScope In
Scope Out
Key MeasuresMeasure Name I/P/O Exists Baseline Notes
1
2
3
4
5
6
7
8
9
10
Project CharterE f f o r t
B e n e f i t
H ig hL o w M e d
Hig
hL
ow
Me
dH
igh
Lo
wM
ed
1 31 3
66
1 51 5
11 88
33
1 21 2
99
44
77
1 71 7
1 41 4221 1
5
1 01 0
1 61 6
AIRSpeed PROJECTINPUTS
ACQ CFT Value Stream
Mapping
Project ID & Selection Workshop
Project Sponsor Training
Grass Roots Ideas/MyIdea Network
5 STEP PROJECT SELECTION PROCESS
BB
MATCHING PROJECTSELECTION
W/BB (or GB) & FORMING TEAM
BLACK BELTDMAIC PROJECT
TRAINING/EXECUTION
TA D/M M/A A I/C V
YB GB
ST YB
PS
TOLLGATES
D M A I C V
1 2 3 4 5
GGCHARTER
APPROVAL
Challenge Areas:•Generating Enough Well-Scoped Projects w/Type I Savings•Following the 5 Step Process to Select Project Portfolios•Engaging Project Sponsors in Charter Devmt, Tollgates & Process Mgmt•Linking Savings to Intelligent Targets/SES Accountabilities•Forming Teams (BB) and Committing Team Members (PS)•BB Project Mgmt: Scheduling Events/Reviews, Team Devmt, Data Mining, Mastering LSS & IT Tools•The “Follow-Through” on Implementation & Control for Type I/II Savings Realization
REALIZATION
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 26
What Is High Impact Core Value Stream Mapping?
• HICVS Analysis Is A Top-Down Approach Tying Specific Activities Occurring Along a Value Stream for a Product or Product Family
• HICVS Mapping And Analysis Provides An End-to-End Value Stream View To Effectively Identify And Address Barriers And Constraints To Program Success
• Value Stream Analysis Provides A Common Framework For Decomposition And “Drill-Down” To Executable Projects
– Addresses Systemic Problems
– Attack Tactical Process Problems
• Results Map Back To Command Objectives
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 27
• SECNAV Directed The PEOs & SYSCOMs To Conduct High Impact Core Value Stream Mapping
• NAVAIR’s HICVS Approach Approved By EDB On 30 October 2006• PEO’s & SYSCOMs Report Monthly Status To SECNAV Via
ASN(RDA) On Progress And Results Of LSS Training, Projects And HICVS Activity
• Ultimate Goal Is To Improve Program Execution
PHASE I YEAR 1CY06
PHASE II YEAR 2CY07
PHASE III YEAR 3CY08
LEADERSHIP
• HIGH IMPACT CORE VALUE STREAMS AND ID’D, MAPPED, AND ALL APPLICABLE PERSONNEL ARE PREPARED TO DMAIC
1) NAVAIR VALUE STREAMS MAPPED / SINGLE PROCESS OWNERS IDENTIFIED; NAE HIGH LEVEL VALUE STREAMS MAPPED BY ACQ / MSCM / SCM / TFR CFTS
2) APPLY AIRSpeed CPI TOOLS TO NAE / NAVAIR HIGH LEVEL VALUE STREAMS TO ADDRESS CURRENT / FUTURE READINESS IMPROVEMENT OPPORTUNITIES
• HIGH IMPACT CORE VALUE STREAMS ARE DMAIC
1) CONTINUE REFINEMENT OF NAVAIR / NAE STRATEGIC “BUSINESS YS” TO FURTHER INTEGRATE CROSS-FUNCTIONAL HORIZONTAL IMPROVEMENT OPPORTUNITIES
• HIGH IMPACT CORE VALUE STREAMS ARE REVISITED
1) EXECUTE CPI TO ADDRESS NAVAIR / NAE STRATEGIC BUSINESS YS
Why Are We Conducting High Impact Core Value Stream
Analysis?
NAVAIR / AVIATION PEO LEAN SIX SIGMA 3-YEAR ACTION PLAN
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 28
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT & DEMONSTRATION
CONCEPT & TECHNOLOGYDEVELOPMENT
Navy and Marine Corps Weapons Systems HICVS
WarfighterRequirements
ResearchDevelopment and
AcquisitionSustainability and
Disposal
NAVAIR / PEO HICVS
Current Readiness CFTFuture Capability CFT
FLEET
JCIDS/JROC
DARPA
ONR
SBIR
OTHERS
N81
N82
N85
N86
N87
N88
AIR
2.0
AIR
4.0
AIR
5.0
AIR
6.0
AIR
7.0
INDUSTRY
AIR
6.0
OPNAV $24 BILLIONFLEET $16
BILLION
CNAF/FRC
FLEET
15,000 ~ 17,000 MIL/GOVT/CSS~165,000 – 167,000
MIL/GOVT/CSS
25 MBBs / 140 BBs 48 MBBs / 363 BBs
Total Force Readiness CFT
NAE CFT / HICVS ALIGNMENT
AIR
1.0
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 29
High Impact Core Value Stream Development Process
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT& DEMONSTRATION
CONCEPT & TECHNOLOGYDEVELOPMENT
Generic High Impact Core Value Stream of Acquisition Process from Concept Decision to IOC
DAU ACQ Map + ALCS CFT Inputs
One Single Integrated “Complexity” HICVS map:•ID Variation
•Apply Available Data• ID Critical Nodes
+ PEO/DC SME Inputs + NAVAIR/GG MBB Skills
04/19/23 13:2200A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 30
High Impact Core Value Stream Development Process
Comments Below
Step Title Ranking ScoreSchedule to IOCDeliver Required CapabilityCost Growth24 Acquisition Plan required to support Contract AM T T3 0.75
31 PPC AM AM4 1
35 Clinger-Cohen Act Documents Prepared (including IT Strategy) AM 1-9 1-9 2 0.5 1-9 1-9
41 Draft Clinger-Cohen Act Compliance (AIR-7.2) IT 1-9 1-9 2 0.5
44 Initial Acquisition Strategy Developed T, W, 1-9 T3, W3, 1-9 2 2 T, W, 1-9 T, W T, W, 1-9
45 PPC AM AM4 1 AM AM
48 Acquisition Program Baseline 1-2, 1-9 1-2 1 0.25 1-2, 1-9 1-2, 1-9 1-2, 1-9
49 C4 Info Support Plan AM, 1-9 AM4, 1-9 2 1.5 AM, 1-9 AM AM, 1-9
50 Program Protection Plan (PPP) AM AM3 0.75 AM AM AM
51 Clinger-Cohen Act 1-9 1-9 2 0.5 1-9 1-9
52 Information Assurance Strategy 1-2, 1-9 1-9 1 0.25 1-2, 1-9 1-9
Pre MS-B SRR T, W T4, W1 0.5
59 Program Protection Plan Update (PPP) AM AM3 0.75 AM AM
62 PPC AM AM4 1
67 Information Assurance Strategy Completed 1-9 1-9 2 0.5 1-9 AS
75 PPC AM AM4 1
Market Research T,W W3 0.75
88 Life Cycle Cost Estimate 1-2 1-2 5 1.25
90 Tech Readiness Assessment 1-2 1-2 4 1 1-2
92 Systems Engineering Plan Update AM, AS AM/AS-2 0.5 AM
93 Systems Engineering Plan Update AM, AS AM/AS2 0.5 AS AM, AS
94 Systems Requirements Review T, W T1, W1 0.5 W W W
99 Critical Design Review (CDR) 4.1 AS, W, 1-2, 1-9 AS5, W4, 1-2 4 3.25 1-2, 1-9 1-2 W
102a SPEC/SOW Updates T T4 1 T T T
107 ALSP Initial Product Support Strategy Developed W W4 1 W
110 Core Logistic Analysis 1-9 1-9 2 0.5 1.8 1.9 1.9
135 Competitive SubProcess AM 1-2 1-2 3 0.75
148 Dev T&E (Tes Report) Operational Assessment T, 1-2 T2, 1-2 5 1.75
149 TEMP Update 1-9 1-9 2 0.5 1-9
157 Initial Capabilities Document (ICD) Developed - N78 1-9 1-9 2 0.5 1-9 1-9 1-9
160 Key Performance Parameters Identified T T4 1
162 Capabilities Development Document (CDD) Initiated AM, W, 1-2, 1-9 AM1, W2, 1-2/1-9 2 1.25 AM, W, 1-2, 1-9 W, 12 AM, W, 1-9
163 Component Cost Assessment Completed (CAIG) AM, AS W AM/AS3, W4 1.5 AM AM, W
170 Non-Advocate Review (NAR) 1-9 1-9 2 0.5 1-9 1-9
171 Capabilities Development Document Approved AM AM1 0.25 AM AM
176 Capability Production Document Initiated AM AM1 0.25
180 Component Cost Assessment Completed (CAIG) AM, AS AM/AS3 1.5
183 Capability Production Document Approved AM AM1 0.25
186 C4ISP NETWARCOM & 7.2 1-9 1-9 2 0.5 1-9 1-9
190 Component Cost Assessment Completed (CAIG) AM,. AS AM/AS3 1.5
193 Independent Initial Operational Test & Evaluation Performed 1-2, 1-9 1-9 2 0.5 1-2, 1-9 1-9 1-2
Sh
ape
ID
ID START & END Point
for Progra
X if NOT
Conducted Critical Node
Significant Impact Only
Prioritized critical node list
Integrated HICVS map, including 224 identified nodes
The 41 prioritized critical nodes were narrowed to 8 focus areas based on PEO prioritization, grouping of related nodes, and degree of commonality between PEOs. PEO staff members then evaluated each for benefit, likelihood of success, interdependencies
During the individual program family HICVS mapping event, the PEO staffs identified & prioritized nodes that impacted their ability to deliver to the KPPs, on-time, and on budget
2/2/2007 11:53 AMnovak Fy07 draft AIRSpeed deployment planning. ppt 17
High Impact Core Value Stream (HICVS) Project Charter(Focus Area – Internal & External Requirements)
Problem: Externally generated additions and changes to
requirements (volatility) impacts programs’ ability to “lock down” internal requirements in a timely manner within acquisition process … resulting in budget and schedule pressures and risk balancing.
High-level requirements volatility results in disconnects within lower level internally “derived”requirements between what Navy wants and what contractors have bid
Problem Statement
Draft POA&M
Business Impact
Team Resources
Existing gaps in requirements definition have significant impacts on system’s final development costs, system’s ability to meet a given IOC date, and its ability to meet its milestone schedule.
Actions/Milestones Proposed date
Detail POA&M complete 26 Jan
Launch decision 12 Feb
Begin measurements baseline effort 19 Feb
N88 alignment complete 1 Mar
Analyze effort complete TBD
Individual Project Launches TBD
• Process Owners: RADM Clingan (N88)
• Project Sponsor (Flag/SES): RDML Skinner
• Team Lead: Glenn Perryman, PEO(A). Lead for Internal scope)Team Lead: Dale Moore, AIRSpeed DC, Lead for External scope
• AIRSpeed Support: Barry Barefoot, Hundley Elliotte (GG), Walt Mores (GG), Rob Sharples (GG), Greg Collins (GG), Bill Kelleher (TG), other NAVAIR BBs/GBs TBD
• Stakeholder SMEs: All PEOs, N88, AIR-1.0, 4.0, 5.0. 7.8, 7.10,
Description: External (N88 & JCIDS) and internal requirements volatility impact execution of programs in terms of schedule, performance, and cost
2/2/2007 11:53 AMnovak Fy07 draft AIRSpeed deployment planning. ppt 18
High Impact Core Value Stream (HICVS) Project Charter(Focus Area – Pre-MS B Acquisition Strategy and Planning)
Problem:The Acquisition Strategy & Planning process is neither
consistently nor effectively executed in a timely manner. Actual documentation tends to be an after the fact formality.
A significant objective of the process is improved understanding of market capability to provide products that meet program requirements. The current process lacks value-add depth and can be treated as a “check-in-the-box”, resulting in programs acquiring deficient capabilities or planning procurement of capabilities that are not available in the marketplace in the required timeframe.
Problem Statement
Draft POA&M
Business Impact
Team Resources
The strategy for obtaining a capability requirement has significant impacts on the system’s final development costs, the systems ability to meet a given IOC date, and the ability of the system to meet its milestone schedule.
Actions/Milestones Proposed date
Detail POA&M complete 26 Jan
Socialization complete 4 Feb
Launch Decision 12 Feb
Collect and translate VOC
Define key success measures
Characterize current state process
Baseline current performance
Project Sponsor/Process Owner Review
• Process Owner: Dennis Chapman AIR 1.1
• Project Sponsor (Flag/SES): Stephanie Easter
• Team Lead: Ken McIlhenny (AIR-1.0)
• AIRSpeed Support: Mike Meaney, Tim Collins (GG), Rusty Croom(GG), other BBs/GBs: TBD
• Other Stakeholder SMEs: All 3 PEOs, N88, AIR-1.0, 2.0, 4.0, 6.0, 7.8
Description: This area focuses on the process of standing up a sound acquisition program. Prior to MS B, the development of the Acquisition plan & strategy is accomplished over a span of time that eventually leads to a procurement strategy and program structure for acquiring a given set of requirements. The focus area is not about creating a DOD 5000 compliant AP or AS.
2/2/2007 11:53 AMnovak Fy07 draft AIRSpeed deployment planning. ppt 19
High Impact Core Value Stream (HICVS) Project Charter(Focus Area – Accurate Program Budgeting/Costs)
Problem: Early program budgets don't reflect true program costs
and are not fully understood until well after system becomes a program and then has difficulty in getting modified to reflect true program execution costs. Requirements creep causes increased costs not reflected in budget
Early budget estimates may be based on “best case scenarios”, poor requirements baselines or may not have used cost estimating best practices
Actual programs costs exceed programs and independent estimates
Problem Statement
Draft POA&M
Business Impact
Team Resources
Impacts: Existing gaps in requirements definition have significant impacts on system’s final development costs, system’s ability to meet a given IOC date, program’s ability to meet its milestone schedule and control cost growth. The difficulty to control program costs and keep within program cost estimates and budget
Actions/Milestones Proposed date
Detail POA&M complete 26 Jan
Socialization complete 4 Feb
Launch Decision 12 Feb
Begin deep dive analyses
Opportunity ID workshop
Charter projects / schedule PISWs
• Process Owner: Dave Burgess, PEOs
• Project Sponsor (Flag/SES): RDML Eastburg
• Team Lead: Audie Dennis, PEO(W) w/ Denise Breckon (AIR-4.0)
• AIRSpeed Support: Randy Stone, Greg Collins (GG), Mike Higgins (GG), Other NAVAIR BBs/GBs TBD.
• Other Stakeholders SMEs: All 3 PEOs, Chris Cummings (AIR-10.0), AIR-4.2, AIR-3.0, AIR-4.0, AIR-5.0
Description: Process of determining and budgeting to a reasonable cost estimate that is aligned with the budgeting and requirements processes that allows sufficient accuracy to manageable risk throughout the program develop and procurement process.
2/2/2007 11:53 AMnovak Fy07 draft AIRSpeed deployment planning. ppt 20
High Impact Core Value Stream (HICVS) Project Charter(Focus Area – Systems Requirements Review (SRR) & Critical Design Review (CDR) Execution)
Requirements not well understood prior to RFP release
Quality of the reviews
Short cuts made due to optimism
Level of insight at contractor & subcontractor
The depth and standardization of the reviews to cover the required material to the correct depth for program insight and Government oversight.
Reviews may be schedule-driven vs event driven
Problem Statement
Draft POA&M
Business Impact
Team Resources
Systems Engineering Technical Reviews have significant impacts on the system’s final development costs, the systems ability to meet a given IOC date, and the ability of the system to meet its milestone schedule.
Actions/Milestones Proposed date
Detail POA&M complete 26 Jan
Socialization complete 4 Feb
Launch Decision 12 Feb
Collect and translate VOC
Define key success measures
Characterize current state process
Baseline current performance
Project Sponsor/Process Owner Review
• Process Owners: Capt. Carlson, John Fischer, Dave Cohen, Terry Clark 4.1
• Project Sponsor (Flag/SES): Jesse McCurdy, 4.0
• Team Lead: Randy Allen, PEO(T) with Denise Breckon (AIR-4.0)
• AIRSpeed Support: Dave Parker, Greg Collins (GG), Michael Higgins (GG), other NAVAIR BBs/GBs: TBD
• Stakeholder SMEs: AIR-1.0, AIR-2.0, AIR-3.0, AIR-5.0, Contractors, All 3 PEOs
Description: This focus area covers the Systems Engineering Technical Review processes, with particular emphasis on the SRR and the CDR. The DoD 5000 requires all CDRs to be complete prior to the DRR. Both reviews tend to have a significant program management review function as well. Formal descriptions of SETR, SRR & CDR are provided by the Defense Acquisition Deskbook Systems Engineering Guide.
Focus area evaluation
Top four focus areas 4-Quad developed
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 31
The “HICVS” View
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT& DEMONSTRATION
CONCEPT & TECHNOLOGYDEVELOPMENT
Acquisition High Impact Core Value Stream
INPUTS• RQMTS• BUDGET• AP
OUTPUT METRICS:• PRODUCT(s) • COST• CYCLE TIME• QUALITY• SAFETY
Identified Processes to “Improve,” “Replicate” and “Control”
Roadmap Thrust Areas
S&T Innovation
StrategicData AnalysisEVM, HICVS,S&T, SCM, T&E BOD
FC CFT Pilots &StrategicThrusts
EVM
EVM
S&T
S&T
T&E BODHICVS
HICVS
SCM
SCM
EVM
EVMHICVS
S&TPR-09/IWP
PR-09/IWP
ERPABC
ERPABC
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 32
HICVS: “Clipping the Peaks” of EVM Drivers & Productivity Barriers/Degraders
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22……224
Total Cost ($) Impact
Round 1
Round 2
Round 3
ContinuousImprovement
DrivingDown
Total Cost DriversHICVS Processes
HICVS Focus Areas
HICVSVOC/DATA
EVMRed Programs T&E BOD
S&T Innovation Systems Impact
ERP ABCLabor Today
PR09 IWPLabor Budgeted
SCMNAE Costs
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 33
Acquisition Program Cost Growth
“Attacking the Cost Challenges with a Balanced Focus for
Today and Tomorrow”
+$BBow Wave
+ $M/day Cost GrowthAcquisition
Costs(FYDP)
PEO/PMARed Program Prototypes
Operational Focus“Get Well” Plans
HICVSStrategic/Systemic Focus
“Root Cause Plans”
Time
Today
BudgetBaseline
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 34
HICVS Productivity Improvement Process
IntegratedAnalysis
StrategicThrust Area 1
StrategicThrust Area 2
PEO/PMAGet-Well
Pilots
DECOMPOSITION
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
Project
ApprovedExecutionRoadmaps
RESULTS
Codify, Control & Train Process Updates
PrioritizedThrust Areas
Project Portfolios
(BB/GB/Kaizen)
Benefit/Effort
Assessment
B
Project
B
B
E
E
E
HICVS
EVM
T&E BOD
S&T
SCM
Input Data
HICVSConfiguration
Control
Replicate Successes
HICVS/AIRSpeed
ProjectExecution
ERP ABC
PR09IWP
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 35
NAE AIRSpeed – The Power of ReplicationT
ota
l Sav
ing
s $
x
Project #1 Savings X
200X
150X
100X
50X
10XProject 1-5 Savings 5X
Cumulative Project
Execution Costs
AIRSpeed’s return on investmentincreases rapidly as replication
expands
AIRSpeed’s return on investmentincreases rapidly as replication
expandsCumulative
Project SavingsSavings/Project ~ Same
NAVAIRPEO/PMA
Project
ReplicateCost Est
Project AcrossPMA’s
Feedback Loop for continuous improvementincreases savings from
existing projects over time
ReplicateCost Est Projectwith additional
Industry
ReplicateCost Est
Project AcrossPEO’s
ReplicateCost Est Projectwith additional
SYSCOMs
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 36
NAE AIRSpeed INDUSTRY/GOVERNMENT COLLABORATIVE OPPORTUNITIES AT THE SEAMS“ATTACKING THE NON VALUE-ADDED WORK/PROCESSES
BETWEEN THE CUSTOMER & THE SUPPLY CHAIN”
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT& DEMONSTRATION
CONCEPT & TECHNOLOGYDEVELOPMENT
GOVMTINPUTS
• RQMTS• VOC• VOS• VOP• VOB
OPERATIONS &SUPPORT
PRODUCTION &DEPLOYMENT
SYSTEM DEVELOPMENT& DEMONSTRATION
CONCEPT & TECHNOLOGYDEVELOPMENT
INDUSTRYINPUTS
• RQMTS• VOC• VOS• VOP• VOB
ACQUISITION PROGRAM
VALUE STREAM OUTPUTS:
• COST• CYCLE TIME
• QUALITY• SAFETY
ACQUISITION LIFE CYCLE VALUE STREAM PROCESS IMPROVEMENT
“SWEET SPOT” FOR HIGH VALUE-ADD LSS/TOC
UNDERSTANDING & IMPROVING THE AEROSPACE END-TO-END “VALUE CHAIN”: FROM REQUIREMENTS & INNOVATION TO PRODUCT DELIVERY AND SUSTAINMENT
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 37
AIRSpeed Deployment Management System(PowerSteering)
Initial Project List (Future Phase)
Project Charter Problem Statement,
Goal Statement
Project Selected & Team assigned to
project
Project Status, Deliverables &
Dates
Project Documents
Dashboards & Reports
Financial & Non-Financial Metric
Tracking
Idea Tracking
Add Benefits & Effort
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 38
AIRSpeed Systems & Tools Evolution
ADMS
iGrafx
ERP
LSS Curriculum
Crystal Ball
Minitab
DiscreteLSS Systems
ADMS
iGrafx
ERP
LSS Curriculum
Crystal Ball
Minitab
Interfaced LSS Systems
(in work)
ADMS
iGrafx
ERP
LSS Curriculum
Crystal Ball
Minitab
Integrated LSS Systems
(conceptualizing)
Foundation: High Impact Core Value Stream Mgmt & Process Owner Leadership
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 39
Top Deployment Challenges• Cultural Transformation & Change Management
– Significant “Information/Knowledge Diffusion” Challenge: Tools & Methodologies
– Ensuring Alignment/Engagement, Follow-through & Constancy of Purpose
– Driving Standardization & Re-use coupled with Continuous Improvement
– Thinking in terms of Value Streams vice Organizational Stovepipes
• Workforce– “Breaking Lock” on Embedded Behaviors & NVA Activity Awareness
– Work-in-Progress (WIP) mgmt re. “Little’s Law” & Balancing Workload Priorities
– Project Sponsor/ Team Member Availability on Project Teams
• LSS/TOC in the Transactional “Knowledge” Environment vs. Manufacturing– Deployment in the Federal Workplace – Training Alignment & Tailoring
• Inefficient Project Identification– General Lack of Process Related Data: Cost, Cycle Time, Quality
– Business Y/Strategic “North Stars” Difficult to Determine: Step 1 to Step 2 Translation
• Deployment Management System (DMS)– Deploying DMS capabilities across the NAE
• AIRSpeed Infrastructure Institutionalization– Organization Structure/Governance, Financial Strategies, NAE AIRSpeed Activities
• Institutionalized Replication Strategy
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 40
Areas of Emphasis
• Commit to the Change – Make it Last Through Leadership Turnover– Include in Performance Evaluations / FITREPs
– Incentivize Group Performance Goals for Senior Leadership
– Include Productivity Improvement Training in Leadership Development Programs
• Participate in the Effort– Provide Executive Sponsorship for Projects
– Get Trained as a Green Belt
– Demand Data and Metrics …… Stamp Out Obfuscation
• Provide Resources - Vision Without Money Equals Hallucination– Provide Stable Funding To Ensure Success
– Demand Validated Return on Investment
Leadership Commitment And Accountability Make Cultural Change A Reality
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 41
DoN Lean Six Sigma (LSS) Continuous Process Improvement Summary
• DoN is fully committed to deployment of LSS CPI
– Extensive 2 day SECNAV Leadership training (>1300)
– SECNAV Monthly Metrics Reporting
– SECNAV Monthly Strategic Management Reviews
– Tracking Progress to 3 Year LSS CPI POA&M
• LSS CPI contains all the necessary tools
– Lean, Six Sigma, Theory of Constraints
– Leveraging enabling IT
– Baselining DMAICV for existing processes
– Leveraging High Impact Core Value Streams
• Self-Sustainment to drive institutionalization & results
• Continuous Process Improvement for Continuous Process Improvement – Maximize ROIC
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 42
BACKGROUND
The DoN’s LSS CPI consists of methodologies and tools, and associated knowledge, skills and abilities (e.g., Strategic Planning, Communications and Change Management, Knowledge Management, Information Technology Management, Quality Management, and Supply Chain Management etc.).
This procurement will be processed as an unrestricted, competitive, performance-based, Fixed Price Indefinite-Delivery-Indefinite-Quantity (IDIQ) contract with Time-and-Material provisions. This contract is for 60 months during which time orders may be placed.
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 43
BOTTOM LINE
The DoN Wants:
1. “Best-of-the-Best” LSS CPI Knowledge/Capabilities
2. Fully Integrated LSS CPI Organizational System
3. Self-Sustainment & Cultural Transformation
4. Innovation for LSS CPI Transformation Acceleration
5. DoN Enterprise LSS/CPI Commonality
6. Maximized LSS CPI Value Proposition
7. Quality, Speed, Cost & Safety Results
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 44
DoN Lean Six Sigma (LSS) Continuous Process Improvement (CPI)
Go to: a) www.navair.navy.mil
b) DOING BUSINESS WITH US
c) OPEN SOLICITATIONS
d) N00421-07-R-0012DoN LSS CPI
QUESTIONS?
04/19/23 13:2300A1 KC 00A_AIRSPEED_STRUCTURE_4OCT04.PPT 46
Contact Information
Dale L. [email protected]
301-342-8000