12
INSPECTION OF GONDANG DAM by Puji Pratiknyo Submission date: 07-May-2018 09:43AM (UTC+0700) Submission ID: 959909864 File name: FULL_PAPER_BENDUNG_GONDANG_LAMONGAN_ENGLISH.pdf (844.85K) Word count: 1807 Character count: 8976

DAM INSPECTION OF GONDANGeprints.upnyk.ac.id/15113/1/INSPECTION OF GONDANG DAM.pdf · 2018-05-15 · Geological Engineering Department, UPN "Veteran" Yogyakarta. HP : 0811259588

  • Upload
    halien

  • View
    218

  • Download
    0

Embed Size (px)

Citation preview

INSPECTION OF GONDANGDAM

by Puji Pratiknyo

Submission date: 07-May-2018 09:43AM (UTC+0700)Submission ID: 959909864File name: FULL_PAPER_BENDUNG_GONDANG_LAMONGAN_ENGLISH.pdf (844.85K)Word count: 1807Character count: 8976

5%SIMILARITY INDEX

2%INTERNET SOURCES

3%PUBLICATIONS

0%STUDENT PAPERS

1 2%

2 1%

3 1%

4 1%

5 <1%

INSPECTION OF GONDANG DAMORIGINALITY REPORT

PRIMARY SOURCES

Jan Jelschen, Marion Gottschalk, MircoJosefiok, Cosmin Pitu, Andreas Winter."Towards Applying Reengineering Services toEnergy-Efficient Applications", 2012 16thEuropean Conference on SoftwareMaintenance and Reengineering, 2012Publicat ion

www.dtic.milInternet Source

e-jurnal.ukrimuniversity.ac.idInternet Source

navsource.bizInternet Source

Wen-Wei Lin. "Partial pole assignment for thevibrating system with aerodynamic effect",Numerical Linear Algebra with Applications,02/2004Publicat ion

Exclude quotes Of f

Exclude bibliography Of f

Exclude matches Of f