Experience of Instrumentation andPerformance of Mtera Dam
THE 22nd AFRICAN HYDRO
SYMPOSIUM
Aballah .O Ikwasa
Welcome to the presentation
15th to 17 th September 2010
ARUSHA, Tanzania
Hydro Power plantCivil Engineer
Mtera Hydro Power
Plant
The 22nd African Hydro
Symposium 15th to 17th Sept.20101
8/7/2019 Dam safety [Compatibility Mode]
2/17
Out line of presentation
Introduction Dam safety
The 22nd African Hydro
Symposium 15th to 17th Sept.20102
Importance of Regular Inspections of Dams Dam Safety Monitoring for Mtera Dam Monitoring Instruments Installed at Mtera
Dam Conlusion and Recommendation
8/7/2019 Dam safety [Compatibility Mode]
3/17
Introduction
Mtera dam was part of theGreat Ruaha Power Project
The 22nd African Hydro
Symposium 15th to 17th Sept.20103
The dam was constructed toserve as a water magazinefor operation of
Mtera(80MW) and Kidatu(200MW)
The dam is the largest one
in the country
8/7/2019 Dam safety [Compatibility Mode]
4/17
Introduction
The dam is located withinRufiji Basin along Great
The 22nd African Hydro
Symposium 15th to 17th Sept.20104
The dam also serves as the
road bridge along Iringa -Dodoma road.
8/7/2019 Dam safety [Compatibility Mode]
5/17
IntroductionMtera Dam Data
Dam Type Concrete buttress dam
Reservoir Volume (million m3) -3200
Dead storage Volume (million m3) -600
Dam height 45m
Crest Length 260m
The 22nd African Hydro
Symposium 15th to 17th Sept.20105
8/7/2019 Dam safety [Compatibility Mode]
6/17
IntroductionMtera Dam Data
Spillway capacity 4000 m3/s
Full supply level 698.50 m.a.s.l.
Minimum Supply level 690.0 m.a.s.l
Reservoir area (km2) at FSL - 660
Reservoir area (km2
) at MSL -200
The 22nd African Hydro
Symposium 15th to 17th Sept.20106
8/7/2019 Dam safety [Compatibility Mode]
7/17
Dam safety
Why do we maintain dams
Recognize problems in their early
The 22nd African Hydro
Symposium 15th to 17th Sept.20107
stages and eliminate them beforethey become complex andexpensive
Minimize risk to others andpotential liability in case of failure
8/7/2019 Dam safety [Compatibility Mode]
8/17
Dam safety
0
50
100East
West
The Events tobe considered
The 22nd African Hydro
Symposium 15th to 17th Sept.20108
s
Qtr
r
Qtr North in dame safetymonitoringincludes:
Natural events
Ancillary Projects
8/7/2019 Dam safety [Compatibility Mode]
9/17
IMPORTANCE OF REGULARINSPECTIONS OF DAMS
Every dam will always deteriorate over
The 22nd African Hydro
Symposium 15th to 17th Sept.20109
time. Dam may either deteriorate slowly or
quickly
Problems that are not recognized andcorrected will always progress
8/7/2019 Dam safety [Compatibility Mode]
10/17
MTERA DAM SAFETY MONITORING
One of the most important activities in a damsafety program is to identify and record any
The 22nd African Hydro
Symposium 15th to 17th Sept.201010
.
8/7/2019 Dam safety [Compatibility Mode]
11/17
MTERA DAM SAFETY MONITORING.
A number of monitoring instruments havebeen installed a Mtera dam to measure:
The 22nd African Hydro
Symposium 15th to 17th Sept.201011
Upstream water levels Leakages
Pore water pressure
Deformations
8/7/2019 Dam safety [Compatibility Mode]
12/17
Table below shows monitoringinstrumentation
S/N Measurement Location Condition
1 Seepage From inspection galleries belowthe ravit dam and
Goodcondition
The 22nd African Hydro
Symposium 15th to 17th Sept.201012
Spillway dam (MW2)
From the down stream part ofthe spillway dam (MW1)
Goodcondition
2 Pore water
Pressure
In the foundation rock below the
dam using stand pipes
stand pipes
are in goodcondition
Below the spillway and gravitydam using manometer
NoManometer
8/7/2019 Dam safety [Compatibility Mode]
13/17
Table below shows monitoringinstrumentation cont..
S/N Measurement Location Condition
3 Up stream Gauge with Automatic Gauge not
The 22nd African Hydro
Symposium 15th to 17th Sept.201013
buttress monolith B6
Water level scales (Gaugeplates) fixed to the frontside of the gravity dam
The scales areworking
Pneumatic water levelinstrument installed at theintake of he power plant
The gauge notworking
8/7/2019 Dam safety [Compatibility Mode]
14/17
8/7/2019 Dam safety [Compatibility Mode]
15/17
CONLUSION AND RECOMMENDATION
Defective daminstrumentation should be
The 22nd African Hydro
Symposium 15th to 17th Sept.201015
Dam designers operatingcriteria is required for
comparison with observedbehavior of the dam
8/7/2019 Dam safety [Compatibility Mode]
16/17
CONLUSION AND RECOMMENDATION...
For hydro power futureprojects, the limiting
The 22nd African Hydro
Symposium 15th to 17th Sept.201016
established and providedto Tanesco beforecommissioning.