    Experience of Instrumentation andPerformance of Mtera Dam

    THE 22nd AFRICAN HYDRO

    SYMPOSIUM

    Aballah .O Ikwasa

    Welcome to the presentation

    15th to 17 th September 2010

    ARUSHA, Tanzania

    Hydro Power plantCivil Engineer

    Mtera Hydro Power

    Plant

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20101

  • 8/7/2019 Dam safety [Compatibility Mode]

    2/17

    Out line of presentation

    Introduction Dam safety

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20102

    Importance of Regular Inspections of Dams Dam Safety Monitoring for Mtera Dam Monitoring Instruments Installed at Mtera

    Dam Conlusion and Recommendation

  • 8/7/2019 Dam safety [Compatibility Mode]

    3/17

    Introduction

    Mtera dam was part of theGreat Ruaha Power Project

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20103

    The dam was constructed toserve as a water magazinefor operation of

    Mtera(80MW) and Kidatu(200MW)

    The dam is the largest one

    in the country

  • 8/7/2019 Dam safety [Compatibility Mode]

    4/17

    Introduction

    The dam is located withinRufiji Basin along Great

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20104

    The dam also serves as the

    road bridge along Iringa -Dodoma road.

  • 8/7/2019 Dam safety [Compatibility Mode]

    5/17

    IntroductionMtera Dam Data

    Dam Type Concrete buttress dam

    Reservoir Volume (million m3) -3200

    Dead storage Volume (million m3) -600

    Dam height 45m

    Crest Length 260m

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20105

  • 8/7/2019 Dam safety [Compatibility Mode]

    6/17

    IntroductionMtera Dam Data

    Spillway capacity 4000 m3/s

    Full supply level 698.50 m.a.s.l.

    Minimum Supply level 690.0 m.a.s.l

    Reservoir area (km2) at FSL - 660

    Reservoir area (km2

    ) at MSL -200

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20106

  • 8/7/2019 Dam safety [Compatibility Mode]

    7/17

    Dam safety

    Why do we maintain dams

    Recognize problems in their early

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20107

    stages and eliminate them beforethey become complex andexpensive

    Minimize risk to others andpotential liability in case of failure

  • 8/7/2019 Dam safety [Compatibility Mode]

    8/17

    Dam safety

    0

    50

    100East

    West

    The Events tobe considered

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20108

    s

    Qtr

    r

    Qtr North in dame safetymonitoringincludes:

    Natural events

    Ancillary Projects

  • 8/7/2019 Dam safety [Compatibility Mode]

    9/17

    IMPORTANCE OF REGULARINSPECTIONS OF DAMS

    Every dam will always deteriorate over

    The 22nd African Hydro

    Symposium 15th to 17th Sept.20109

    time. Dam may either deteriorate slowly or

    quickly

    Problems that are not recognized andcorrected will always progress

  • 8/7/2019 Dam safety [Compatibility Mode]

    10/17

    MTERA DAM SAFETY MONITORING

    One of the most important activities in a damsafety program is to identify and record any

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201010

    .

  • 8/7/2019 Dam safety [Compatibility Mode]

    11/17

    MTERA DAM SAFETY MONITORING.

    A number of monitoring instruments havebeen installed a Mtera dam to measure:

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201011

    Upstream water levels Leakages

    Pore water pressure

    Deformations

  • 8/7/2019 Dam safety [Compatibility Mode]

    12/17

    Table below shows monitoringinstrumentation

    S/N Measurement Location Condition

    1 Seepage From inspection galleries belowthe ravit dam and

    Goodcondition

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201012

    Spillway dam (MW2)

    From the down stream part ofthe spillway dam (MW1)

    Goodcondition

    2 Pore water

    Pressure

    In the foundation rock below the

    dam using stand pipes

    stand pipes

    are in goodcondition

    Below the spillway and gravitydam using manometer

    NoManometer

  • 8/7/2019 Dam safety [Compatibility Mode]

    13/17

    Table below shows monitoringinstrumentation cont..

    S/N Measurement Location Condition

    3 Up stream Gauge with Automatic Gauge not

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201013

    buttress monolith B6

    Water level scales (Gaugeplates) fixed to the frontside of the gravity dam

    The scales areworking

    Pneumatic water levelinstrument installed at theintake of he power plant

    The gauge notworking

  • 8/7/2019 Dam safety [Compatibility Mode]

    14/17

  • 8/7/2019 Dam safety [Compatibility Mode]

    15/17

    CONLUSION AND RECOMMENDATION

    Defective daminstrumentation should be

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201015

    Dam designers operatingcriteria is required for

    comparison with observedbehavior of the dam

  • 8/7/2019 Dam safety [Compatibility Mode]

    16/17

    CONLUSION AND RECOMMENDATION...

    For hydro power futureprojects, the limiting

    The 22nd African Hydro

    Symposium 15th to 17th Sept.201016

    established and providedto Tanesco beforecommissioning.

  • 8/7/2019 Dam safety [Compatibility Mode]

    17/17

    THANK YOU