Dan ChengH. Felice, R. Hafalia
QXF Structures Video MeetingJuly 10, 2014
Coil Handling for Magnet AssemblyStatus Update
Magnet Assembly Coil Handling 2
Outline
7/10/2014
• Assembly requirements & constraints• Status update since the CM
Magnet Assembly Coil Handling 3
Assembly Requirements, Coilpack Handling
7/10/2014
• Impregnated Coil Parameters– OD: 226.7 mm; ID: 149.5 mm– Length:
• SQXF: 1.5 m• LQXF: 4.3 m
– Weight: • SQXF ~130 lbs / 60 kg• LQXF ~375 lbs / 170 kg
• Handling operation requirements– Single coils, bore-side down– Single coils, bore-side up– Coil pairs, bore-side down– Coil pairs, bore-side up– Eliminate manual coil flipping operations– Accommodate and install alignment keys & shims, Ground Plain Insulation (GPI) at
assembly– Accommodate bore-side instrumentation (SGs, etc.) at assembly
Magnet Assembly Coil Handling 4
LARP Magnet Assembly Experience
7/10/2014
• Tooling and processes developed from prior magnets– Based on experience from TQS, HQ, LR, LQ
• Utilizes already-designed tooling– FNAL rollover tooling designs, with some design
modifications– Existing lifting hardware (SQXF, LQ, etc.)
• Differences expected in QXF assemblies:– GPI installation will be incorporated in these coils– SQXF handling tooling should be scalable towards LQXF and
production assemblies
Magnet Assembly Coil Handling 57/10/2014
BNL Lifting Tooling Update
• Fixture has been re-analyzed by BNL• Safety sign-off and proof load test at LBNL is
in process
Magnet Assembly Coil Handling 67/10/2014
FNAL Coil Rollover Tool Modifications
Modify cradle for SQXF diameters
Add cradle cutouts at 45°,2 places
Move support rollers inboard,2 places
Create new coil support mandrels
• Two wheel set pairs required for SQXF coil handling operations (four wheels total)• Six to eight wheels sets may be needed for LQXF
Magnet Assembly Coil Handling 77/10/2014
Rollover Assembly, Modified FNAL
Removable “shelf” support for coil midplanes
Supports can be adjusted to optimize longitudinal position
Pins and/or screws for positively positioning coils
Mandrel and lifting beam to have silicon rubber layers for protecting coil
Magnet Assembly Coil Handling 87/10/2014
Rollover Assembly, Modified FNAL
Magnet Assembly Coil Handling 97/10/2014
GPI Scheme Updated
Magnet Assembly Coil Handling 10
Tooling and Assembly Concept Summary
7/10/2014
• Conceptual SQXF coilpack assembly steps presented at CM is currently unchanged– See additional slides (or CM presentation)– GPI scheme has been simplified since CM
• Status– BNL designed lifting tooling is in process of being
qualified– Rollover tooling is in procurement stages
• 4 sets to be purchased for SQXF• Additional sets can be purchased for LQXF operations
Magnet Assembly Coil Handling 11
Additional Slides
7/10/2014
Magnet Assembly Coil Handling 127/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Clamp rings placed
over coil
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 137/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Wheel assembly
rotated 180°
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 147/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Clamp & mandrel
removed
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 157/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Lifting “spuds” placed
onto coil
Lifting spuds attached in three locations
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 167/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Coil lifting beam
brought to coil
Recycled LQ coil lifting strongback (~3.3 m)
Redesigned coil interfaces, 3 places
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 177/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Beam and “spuds”
engaged via inserted pins
Pin engagement through hole in tooling and spud
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 187/10/2014
Coil Prep, From Shipping to Instrumentation
• Operation:– Coil lifted and
moved to work area
Later steps not shown: Strain gage installation,Wiring & connectorization, QA
• Coil will have:– VT wires attached– No SGs or GPI
Magnet Assembly Coil Handling 19
• Between receiving coils and assembly, a number of steps will have occurred (but not described here)– Coils will be instrumented with SGs– Wiring and connectors will be added– Coil QA will be performed– Coils will go into storage trays, bore-side up
7/10/2014
Intermediate Coil Steps, Before Assembly
Magnet Assembly Coil Handling 207/10/2014
Coil Prep, From Storage to GPI Installation
• Operation:– Coil placed into
rotation wheel
Steps not shown: Coil lifted and moved from storage tray
• Coil will have:– VT wires attached– SG & wires on bore-side– No GPI
Strain gages and wiring will be mounted on bore-side
Magnet Assembly Coil Handling 217/10/2014
Coil Prep, From Storage to GPI Installation
• Operation:– Mandrel & clamps
installed over coil
• Coil will have:– VT wires attached– SG & wires on bore-side– No GPI
(Alternate clamping mandrel pictured here)
Clearances for SG wiring not shown
Magnet Assembly Coil Handling 227/10/2014
Coil Prep, From Storage to GPI Installation
• Operation:– Rotation wheel
rotated 180°
• Coil will have:– VT wires attached– SG & wires on bore-side– No GPI
Magnet Assembly Coil Handling 237/10/2014
Coil Prep, From Storage to GPI Installation
• Operation:– Clamps removed from
around coil
• Coil will have:– VT wires attached– SG & wires on bore-side– No GPI
Magnet Assembly Coil Handling 247/10/2014
GPI, Alignment Key Installation
• Operation:– GPI and alignment
keys installed
Relief clearances required for GPI installation
For diagram purposes only.GPI & Alignment key (and shims)installation detailed in GPI talk (Jesse) and coil assembly talk (Helene)
Magnet Assembly Coil Handling 257/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Move coil from 2nd
rotation wheel
• Coil will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Second Rotation wheel assembly
Magnet Assembly Coil Handling 267/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Rotate coil by 45°
• Coil will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Note: Coil may have clamps installed, or may be bolted thru during rotation operation
Magnet Assembly Coil Handling 277/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Pick up second coil
with GPI/key
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 287/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Mate second coil to
the first one at 45°
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 297/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Mate second coil to
the first one at 45°
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 307/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Replace clamps and
rotate coils 135°
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 317/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Remove clamps and
mandrel support
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 327/10/2014
Coilpack Assembly, Pairing Bottom Coils
• Operation:– Attach lifting beam to
coil pair
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Clamps may need to be removed during lifting operation, due to presence of alignment keys
Clearances for SG wires may be necessary
Magnet Assembly Coil Handling 337/10/2014
Coilpack Assembly, Pairing Bottom Coils
Clamps may need to either be modified, or removed during lifting operation, due to presence of alignment keys
• Operation:– Lift coil pair; move to
collar stack
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 347/10/2014
Coilpack Assembly, Pairing Bottom Coils (HQ)
First collar stack
• Operation:– Place coil pair onto
collar stack
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
• Collars will have:– Additional Kapton/G11
layers
Magnet Assembly Coil Handling 357/10/2014
Coilpack Assembly, Pairing Upper Coils
• Operation:– Rotate coils by 45°
opposite direction
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 367/10/2014
Coilpack Assembly, Pairing Upper Coils
• Operation:– Align coil pair lifting
strongback
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 377/10/2014
Coilpack Assembly, Pairing Upper Coils
• Operation:– Attach coil pair lifting
strongback
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 387/10/2014
Coilpack Assembly, Pairing Upper Coils
Recycled LQ coil pair lifting strongback (~3.3 m)
Hold down tooling (bolts, pins) may have to be removed before coils can be lifted
• Operation:– Lift coil pair with lifting
strongback
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 397/10/2014
Upper Coils & Collaring Assembly (HQ)
• Operation:– Mate coil pairs
together– Support with angle
irons
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
Magnet Assembly Coil Handling 407/10/2014
Upper Coils & Collaring Assembly (HQ)
• Operation:– Bolt collars (with
shims, GPI, etc.)– Bolt load pads
• Coils will have:– VT wires attached– SG & wires on bore-side– GPI and alignment key
• Collars will have:– Additional Kapton/G11
layers
Magnet Assembly Coil Handling 417/10/2014
Coilpack Assembly, Collar Assembly (HQ)
• Operation:– Coilpack ready
for insertion
Magnet Assembly Coil Handling 42
Tooling and Assembly Concept Summary
7/10/2014
• Conceptual SQXF coilpack assembly steps presented– Key interfaces identified at operation stages
• Reuses exiting tooling designs– LQ lifting hardware (for SQXF), however for LQXF may require new tooling– FNAL rollover tooling will have modifications made to accommodate the
SQXF coils• Scalability
– Both SQXF rollover tables can be reconfigured to accommodate one LQXF coil, and one more set can be purchased for the second rollover assembly needed in LQXF
– LQ lifting hardware can either be extended to accommodate 4.3m long coils, or…
– (Preferable) New, dedicated strongbacks can be designed