Danish Defence Capability
Acquisition Plans
2019-2023
Danish Defence Annual Conference 2019
February 2019
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization Friday, February 22, 2019 2
Elements of the acquisition plans
Defence
agreement
F-35 Previous
plan
New plan
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Acquisition plan 2019-2023
Listet in 1.000 million DDK. – Price level of 2018
Friday, February 22, 2019 3
Sustainment
Procurement
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Procurement processes
Friday, February 22, 2019 4
Existing and new Frame
Work agreements
More of what we have, e.g.
trucks
Future tenders
Eg. Challenger cockpit update
Sole supplier
e.g. SM-2 missiles
Ongoing deliveries
e.g. Armoured Patrol Vehicles
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Overview before/after the procurement policy
Friday, February 22, 2019 5
Language
E.g. 15 candidates 5 tenderers 1 winner
Suitability/selection based on segmentation of candidates
• Economic and financial standing/solvency ratio new weighting
• List of works without limitation in age
• ‘Samples’ used in the selection of candidates
Evaluation is similar among all tenderers:
• ”Most economically advantageous tender” = weighting between price, quality and security
• ”Lowest price” = the cheapest tender
• ”Prototype”
Process
Pre-qualification Evaluation Award of contract
”Co-financing”Dialogue
Plan
on
Udbud.dk
• Open for business
• DALO Industry Office reinforced
• Visits/exhibitions
• Reinforced collaboration with the industry
• Reinforced briefing regarding the capacity plan and
framework agreements
• Briefing regarding isolated public procurements
• 20 million DKK. Increases
• 50%-50%
Danish English
Lowest price Weighting
Prior market knowledge
/
Preliminary market consultations
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Army related procurement– Medium brigade and light infantry battalion
Friday, February 22, 2019 6
Ongoing and new 15 + 4 Wheeled Howitzer (heavy artillery, CAESAR) Procured 2019/2023Expected delivery late 201915 120mm Armoured Mortars in Piranha 5Procured in 2019
Ongoing
44 Main Battle Tank
(LEOPARD 2)
To be modified 2019-2022Prototype has been delivered
Lastbiler ogpåhængsvogne(1.935 mio.kr. ) Anskaffes 2019-2024
Ongoing and new 900 + 60 Trucks Procured 2019-2024Operational in 2019. For the armoured military trucks the expected delivery is late 2019
New
Anti-Aircraft Missile
System
To be procured 2020-2023
Ongoing and new36 + apx. another 90 Armoured Reconnaissance Vehicles (Eagle 5) To be delivered until 202436 Operational in 2019
Ongoing309 Armoured Personnel Carriers (Piranha 5) To be delivered until 2023First batch in 2019
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Army related procurement– Medium brigade and light infantry battalion
Friday, February 22, 2019 7
Ongoing and new540 + 180 ContainersProcured 2018-20245 out of 13 expected contracts signed. Tenders ongoing
NewAnti-Tank capabilityTo be procured 2021
NewDrones and Surveillance equipmentTo be procured 2019-2023
Ongoing and new Army Tactical Communications NetworkProcured 2013-2023Ongoing integration
NewLaser-Duel SystemTo be procured 2020-2021
NewGeneratorsTo be procured 2021-2027
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Procurements for the Royal Danish Navy
Friday, February 22, 2019 8
NewArea Air Defence SM2 missiles, integration and certification Acquisition 2019-2023Legal document for integration and certification has beenapproved Delivery expected 2023
OngoingMine Counter MeasureMCM (side scan sonar fordetection of mines) Acquisition 2017-2022Legal document expected late2019
NewFrigate Sensor UpdatePreparatory work to study sensor updates in support of Area Air Defence SM6 missiles on the frigates
NewArea Air Defence SM6 missiles Preparatory work with a view to acquire missilesThe study will be initiated as soon as possible
OngoingSAR vessels, phase 12015-2022Legal document expected mid 2019
NewAnti Submarine Warfare ASW Towed sonarAcquisition 2020-2024Legal document expectedmid 2020
NewNaval Response Units,Multi-purpose vessels for e.g. pollution controlAcquisition 2020-2024Legal document expected 2021
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Acquisitions for Royal Danish Air Force
22. februar 2019 9
OngoingAir Warning Radar at Skagen and Bornholm Acquisition 2019-2027
Ongoing and NewFENNEC update and establishment of emergency response EastAcquisition 2016-2020
OngoingChallenger Search Radar and Cockpit Update Acquisition 2017-2023• Cockpit Update• Search Radar.• Mission Equipment.
Ongoing EH101 Simulator Acquisition 2016-2023
Ongoing27 F-35Acquisition 2016-2023Delivery 2021-2026
New acquisitionAnti Submarine Warfare (Sonar and torpedo for MH-60R Seahawk)Acquisition 2019-2023
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Special Operation Force (SOF)
procurement
Friday, February 22, 2019 10
NewDeployable SOF Headquarters (DK/B/NL)NATO SOCC in 2021MoU is signed
OngoingRigid Hull Inflatable Boat (RHIB) Delivery in 2019 and 2020
OngoingISR Multi SensorsFor both SOF and Army. To be procured 2019-2020
NewStrengthen SOF (more personnel and better materiel)Ongoing procurements from 2019-2023
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization Friday, February 22, 2019 11
Increased focus on CYBER• Architecture• Serious gaming and training• Redundancy and passive site• Increased capability detect and defend• New organization
Change the culture of IT/CIS service• Customer centric• Fast• Knowledge driven• Cross functional team based org.
IT/CIS – CHANGING THE OPERATING
MODEL
Cost effective
Optimal cyber security
Max operational outcome
What will we be doing?• Datacenter• C4ISR• Network consolidation• Workstation (FIA)
• Helpdesk (chat bot)• RPA• APP consolidation• IAM
• Life cycle management• Agile development• Business/IT interface• Governance
• DevOps contracts• Digital platform• Cloud• and much more…
Performance
Decision Rights
Financial TalentSourcing & Alliance
Organizational
StructurePlaces Tools
Ways of Working
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Home Guard procurement
Friday, February 22, 2019 12
Initial project for new Vessels2019-2023Expected procurement2024 - 2033
NewLight Tactical VehiclesTo be procured 2021 -2022
Ongoing
Non-Tactical
Vehicles
To be procured 2020
and 2023
Ongoing
Trucks
To be procured 2019 -
2023
OngoingWeapons Locker2019 - 2021
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Home Guard procurement
Friday, February 22, 2019 13
New
Communication
equipment
To be procured 2021 -
2026
Ongoing
Fragmentation/shrapnel
vests
2.500 pcs.
To be procured 2020
New
Combat Helmets To
be procured 2021 -
2024
Ongoing
CBRN-masks
8.000 pcs.
2018 - 2020
New
ISR equipment
To be procured 2022 -
2023
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization
Civil Defence procurement
Friday, February 22, 2019 14
Ongoing
High pressure fire pumps
and containerized fire
pumps
Ongoing
Vehicles
Procured 2018-2020
New
Telescopic front
loader
Delivery 2019-2020
New
CBRN equipment
Delivery 2020-2022
New
Crisis management facilities
Ongoing
Shallow-water vessels for
pollution control.
Delivery 2018-19
Ongoing
Fragmentation/shrapnel vests
and combat helmets
Delivery 2019
© May not be published without permission from the Danish Defence Acquisition and Logistics Organization Friday, February 22, 2019 15
Thank you for your attention