36
SAFETY SYSTEMS LLC Darb Al Salamah OUR HANDS YOU ARE SAFE IN

Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

  • Upload
    others

  • View
    9

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

OUR HANDSYOU ARE SAFE IN

Page 2: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

2

Page 3: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

3

About Us

Mission

Vision

DARB AL SALAMAH SAFETY SYSTEMS is a Dubai based company established in 2007. Is an innovative and dynamic rapidly growing company specialized in Fire Alarm and Fire Fighting System.

We are an approved company by U.A.E Civil Defense, other Government Departments and leading consultant in United Arab Emirates.

The company’s major strength originate from building positive relations between its customers/suppliers and staff members. The company is operating with credibility, punctuality and professionalism to meet high standards of service and performance on a real win – win basis.

We have a good blend highly skilled and experienced project Managers, Mechanical Engineers, Site Supervisors, Safety Officers and so on. We also have a huge Labour Force of around 60 workers to development deployment to any type of projects We are specialized for any type of Residential or Commercial Units to be handling in Annual Maintenance contract.

Our mission is to promptly attend to the precise needs of our customers in line with the nature of their business using our internationally certified systems and process.

Our vision is to lead as one of the leaders in the UAE Fire Fighting and Fire alarm industry such that others will follow our proven practices and principles.

Page 4: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

4

Engineering Profile

We Would like to introduce our company DARB AL SALAMAH SAFETY SYSTEMS LLC. We Have been since 11 years as for Fire Alarm & Fire Fighting Sector Provider for Design , Supply , Install and Testing & Commissioning.

The Project Progress work will be Fully managed and supervising by a well qualified professional Engineer. Our Project Management Team.

Assuring for all the support and guidance for work requirements and documents control, to arrange work completion on specified times.

Assuring you of our best services always.

Best Regards

DARB AL SALAMAH SAFETY SYSTEMS LLC

Project Manager

Site Manager

Electrical Engineer Mechanical Engineer

Supervisor Supervisor

Fire Alarm Electricians Fire Fighting Technicians

Trained Trained

Helpers Helpers

Page 5: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

5

What We Do

Installation, Testing, Trading, Supply, Commissioning and Preventive break down Maintenance of above equipments and system. Maintenance contracts of all fire fighting systems.

Keep in focus the incoming need in regard with fire fighting equipment we keep equipped with latest and standard fire protection and fire fighting tools and plans matching your requirement and duly approved by United Arab Emirates Civil Defense. On the top we serve you with most competitive price in prevailing market. Variety of fire Alarms, Fire bells, Sounders, Smoke and Heat Detectors.

Addressable Fire Alarm system

Emergency Light Self Contain System

Emergency light Self Contain Monitoring

Emergency Light Central Battery Systems

Voice Evacuation System

Foam System

FM-200 Clean Agent System

Fire Rated Doors

Public Address System

Fire Fighting Pumps (UL Listed)

Wet Chemical System

Fire Extinguishers (CO2 , Dry Powder , Foam , Water , Wet Chemical)

Dry & Wet Standpipe Systems

Fire Hydrant

Sprinkler System

Deluge System

Pre-action System

Page 6: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

6

Fire Alarm System & Voice Evacuation System

We have Designed and Executed various projects Fire Alarm and Voice Evacuation

systems. Most of them own by the government sectors & Clients and Allover U.A.E.

Specialized Experienced Engineers with work team certified by Dubai Civil Defense ready

to execute & serve different projects with wide range of Clients. As per each supplied

systems requirements. Our supervisors mange site installation work and provide Testing

and commissioning.

All Fire Alarm

installation are

submitted to

local Approvals

and Consultants

Requirements. Highly

technical team trained

to give job the quality

standard. Our success

come through using

Advanced Equipments

and cables which able

to give push quick

and prepare details

to testing stages on

turnkey basis.

Page 7: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

7

Expertise in all types for Fire Suppressions Systems. Qualified team of engineers

providing design and equipments specification that can meet all the requirements

besides, our professionals for execution in a wide range with trunkey basis.

Fire Suppression Systems

Wet Chemical System

FM-200 System

Foam System

Pre-Action System

Page 8: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

8

UL Fire Pumps

Horizontal Split Case

Vertical Turbine

End Section Pump

Determine of Pump Motor & Diesel Engine

in various capacity and Alignment in pump

room such unfitted area or Basement located,

DASS professionals Fire Pump installer with

all GI pipes Requirements & Fittings and

Valves till TESTING and COMMISSIONING on

TRUNKEY basis.

Page 9: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

9

Fire Hydrant & HDPE

AS per Dubai Civil Defense Regulations

underground Pipes should be HDPE with high

quality standard & FM Approved providing all

installation work, Pipes, Elbos, Flanches with

testing and commissioning with a third party

certificate.

HDPE available in different size which can

Serve all sites requirements and qualifications.

Specialized team get the plan and processing

installation work as per the sites cases and

infrastructure.

As per approved drawing from Civil Defense,

our project team will arrange the work

schedule with all supports & coordination job

specification, work progress, start by pipes

installation and control valve till Fire Hydrant

unit fixing.

Page 10: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

10

Products

Fire Extinguisher

Service, Supply, Training, Refill, Testing & Parts

Fire Hose Reel

Supply , Installation, Testing & Commissioning,

Parts , Services, Piping work & Fittings

Hydrant Fire Hose Reel Cabinet

Gate Valve 1” & 2” Nozzles

Page 11: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

11

Products

Pump / Sprinkles System / Fire Supervising System

Electric Pump

Deluge Valve

Kitchen Hood System

Racking with Sprinklers

Diesel Pump

Foam System

Sprinkler Unit

Full Pump Set

FM - 200 System

Gate Valves

Design, Supply, Installation, Testing & commissioning, Services, Deluge Valves, Gas Tank, Diesel Tanks,

FM-200 & Kitchen Hood System.

Page 12: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

12

Products

Analog 2 -Wire Bus Addressable Fire Alarm Control System

Addressable Fire Alarm Control System AW-AFP2188

Conventional Smoke and Heat Detector

Conventional MCP

Smoke Detector

Heat Detector

Repeater

MCP

Bell

Entrance LED

Strobe/Horn

Input Module Output Module

Design, Supply , Install, Testing & commissioning, Fire cables,

Faults Rectifications, Emergency Light, Central Battery.

Fire Alarm

Voice Evacuation SystemEmergency Light

Exit Light

Page 13: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

13

Fire Pumps UL & Non UL

Fire Hose Reel System

Landing Valve & Hose

Gate Valves & Control Valves

Sprinkler System

Breech Inlets

Fire Extinguishers Service & Refill all types

Fire Hydrant System

Fire alarm Systems

Voice Evacuation System

Emergency Light System

Replacements Pipes & Risers

To Ensure Clients satisfaction we provide Annual Maintenance Contract, For Fire Alarm

System and Fire Fighting Equipments. Our Company Approved from Dubai Civil Defense,

Expertise qualified Technicians committed to Quarterly report which can show premises

systems condition. Emergency Call service available all over the hour provide the guide.

Preventive Maintenance

All services for all Fire Alarm & Fire Fighting Equipments:

Page 14: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

14

Maintenance Prestige Sites

Government Sector

Page 15: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

15

Maintenance Prestige Sites

Educational Sector

Retail Sector

Industrial Sector

Page 16: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

16

Completed Projects

SiliconB+G+9+Gym+R

WarehousesG+MZ

Al Quoz Plot 3648725

Jadaf2B+G+11+Gym+R

Page 17: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

17

Completed Projects

Al BarshaB+G+7+R

Joseph GroupG+Atic+MZ

Jabel Ali - Factory

Jadaf2B+G+11+Gym+R

Al NahdaG+3p+12+R

Sharjah

Page 18: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

18

Completed Projects

FalconcityFalcon Mosque + Service Block

HyperMarket + Nursery + Medical Center

Labour AccommodationG+4

DIP 5990536

Multi Tyer Racking SystemG+2 above 2000 Sqm @ South FZC

G+2 above 2500 Sqm @ DIP

Page 19: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

19

Completed Projects

Holiday Inn2B+G+3+HC+R

Bur Dubai

Staff & Labour Acco.G+2+2 Service Block

DIP

Al Satwa BuildingG+2

Page 20: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

20

Our Works

Construction SitesBuilding - Warehouse

Preventive Maintenance

Projects Management Design - Supply - Installation - Testing & Comm. - Solutions

Fit Out & Modification

Page 21: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

21

Fit Out Work & Modification

Fire Alarm System:

Isolation fire cable in proposed work area and provide installation for New cable with new system or without and add Additional items to Existing system and to be eligible with system programming for the building.

Emergency & Exit Light System:

Total solution for all site facilities as warehouse or building, using qualified machines for GI pipes trade and grooving machines. Team will provide all advices about fixing work according to the local recommendations & regulations.

Fire Fighting System :

• As per site requirements we provide team

• Work with normal duty time or night time

• To get customer & clients satisfaction and

• Determine quick open for your outlets

Page 22: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

22

Our Major Clients

Page 23: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

23

Commercial Register

Page 24: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

24

Dubai Civil Defense Certificate

Page 25: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

25

ISO Certificate

This Certificate of Registration is granted subject to the Regulations approved by the Board.

PROGRESSIVE INTERNATIONAL CERTIFICATIONS LTD.Office 4, 219, Kensington High Street, Kensington, London, W8 6BD, England.E-mail.: [email protected], Website: www.picluk.comFor current validity of this certificate. Please visit our website

CERTIFICATE OF REGISTRATION

USE OF ACCREDITATION MARK INDICATES ACCREDITATION IN RESPECT OF THE ACTIVITIES COVERED BYACCREDITATION INSTITUTE ASSESMENT BODY (EUROPE) CERTIFICATION NUMBER 004

EVISSERGORP

PROGRESSIVE

Head of Certificate

EVISSERGORP

QMS 004

Registration No.: PICL/QMS/0517/8265

Certificate Issue Date : 10.05.2017

1st Surveillance: 05.2018

2nd Surveillance: 05.2019

Certificate Expire Date: 09.05.2020

WAREHOUSE�NO.�1,�SALAH�AL�DIN�STREET�-AL�KHABAISI,�DUBAI��PO�BOX�39613

Address to which this Certificate refers:

(Here in after called the Registered firm) the right to be listed in the Directory of Registered firm in respect of the services listed below. These services shall be offered by the Registered firm at or from only the address given above in accordance and compliance with

QUALITY MANAGEMENT SYSTEM

ISO 9001:2015

DARB�AL�SALAMAH�SAFETY�SYSTEMS�LLC

The Governing Board ofProgressive International Certifications Limited hereby grant to:

MAINTENANCE & INSTALLATION OF FIRE ALARM SYSTEMS & FIRE FIGHTING SYSTEMS

Approved Scope to which this Certificate refers

Page 26: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

26

Dubai Chambers Membership Certificate

Page 27: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

27

Dubai Branch Office & Store

Page 28: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

28

Project References UAE

Dear Sir/Madam,

It gives us immense pleasure to inform you that our projects have covered most sectors from

Industrial, Logistics, Commercial, Residence & Warehousing etc.....

Sl. No. Client / Owner Name Project Type Consultant Contractor

1. Buthee Ali MohmmedWH, Jabel Ali

Plot No. 5999039A & Z Consultant Al Maher Contracting

2. Thareeque Makhee JafferBuild. G+2 . BurdubaiPiot No. 3160624

Rameesh Consultant Najwani Contracting

3. Mr. Abdulla Ali Saif G+2+R, Deira

4. Humaid Ubaid HumaidWH G+M, AlquezPlot No-3680688

Al Jaferi Consultant Al Maher Contracting

5. Delmo Al SaneeBuild. G Ummu SuquamPlot No.3620938

Al Jaferi Consultant Al Maher Contracting

6. Abdul Noor Asad AliBuild. G+2 +Roof ,Plot No. 127-1416 Hor Al Anz

Sea Shore Construction

7. Emirates Investment Co.Factory Jabel AliPlot No.599 942

Al Jabal ConsultancyEngineers

Alees Star ElectroMechanical

8.Sons Hamad AbdullahHmad

G+M+2, Naif

9.Mohammed Khaleefa Rashid

WH G+M label AliPlot No.5999044

Al Jafree Consultant Al Maher Contracting

10. Sons Hamad Abdullag Hamd G+M+2, Naif

11. Islamic AffairBuild. Muhaisnah -3Plot No. 2240845

Arshoom EngineeringConsultant

Dubai Sky Contracting

12. MARKA VIPG+3, DIPPlot No. 598-1298

CBD

Page 29: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

29

Project References UAE

Sl. No. Client / Owner Name Project Type Consultant Contractor

13.Abdul Rahman MohammedAbdul Raheem

Building, DeiraPlot No. 214-507

Pan Gold Maintenance

14.Ahmed Sohail BatheeMohammed

Villa, Al SafaPlot No. 3570315

Sohail Constructions

15. Holiday Inn Hotel2B+G+6+GYM , Burdubai

16. Mather Saeed SaifWH, Jabel AliPlot No. 5999042

A & Z Consultant Al Maher Contracting

17. Holiday Inn Hotel G+R+R , Burdubai

18. Swedan TradingLabor Camp G+2 SonapurPlot No.264-622

Engineering Consultant

TYA Contracting

19. Abdel Rahim MohammedWH+Camp, SharjahSAJA

20. Apparel FZCO (R&B)6WHS + Racking system, FZCO

21.Ashtar ManufactuaringFurniture

Fact. G+1 , DIPPlot No. 5970257

Al Thafra Constriction

22. Apparel FZCO( DIP)20WHS + Racking system

23. CORODEX industriesLabor Camp+G+2+R, DIPPlot No. 598-970

Al Hatara Consulting BMC Contrcting

24. Al Katbi Building B+G+6+Gym, Warqa

25. Hassan Al Amir 2B+G+12+GYM, Jadaf

26. Sayeed Al Amy & PartnersB+G+9+HC, Sylicon Oasis

Eng. Adnan Safrani

27. Dubai Refreshment Co.Labor Camp G+2 Al quoz

28. Dubai Refreshment Co. Labor Camp Sharjah

In Addition,

Supplies FireAlarm & Fire Fighting System Equipments inline with various business Categories,

which installed by trained man power and professional Tlechnicians, confirming the handover

in specified times .

Page 30: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

30

Sharjah Trade License

Page 31: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

31

Sharjah Chamber Member Registration

Page 32: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

32

This Certificate of Registration is granted subject to the Regulations approved by the Board.

PROGRESSIVE INTERNATIONAL CERTIFICATIONS LTD.Office 4, 219, Kensington High Street, Kensington, London, W8 6BD, England.E-mail.: [email protected], Website: www.picluk.comFor current validity of this certificate. Please visit our website

CERTIFICATE OF REGISTRATION

USE OF ACCREDITATION MARK INDICATES ACCREDITATION IN RESPECT OF THE ACTIVITIES COVERED BYACCREDITATION INSTITUTE ASSESMENT BODY (EUROPE) CERTIFICATION NUMBER 004

EVISSERGORP

PROGRESSIVE

Head of Certificate

Registration No.: PICL/QMS/0818/4346Certificate Issue Date: 26.08.20181st Surveillance: 08.20192nd Surveillance: 08.2020Certificate Expire Date: 25.08.2021

PROVISION�OF�SERVICES�FOR-�INSTALLATION,�MAINTENANCE�AND�TRADE�OF�FIRE�ALARM�SYSTEMS,�FIRE�FIGHTING�SYSTEMS�AND�EMERGENCY�EVACUATION�SYSTEMS

Approved Scope to which this Certificate refers

ISO 9001:2015QUALITY MANAGEMENT SYSTEM

(Here in after called the Registered firm) the right to be listed in the Directory of Registered firm in respect of the services listed below. These services shall be offered by the Registered firm at or from only the address given above in accordance and compliance with

OFFICE�NO.�B�110,�TARYEM�MOHAMMED�BUILDING,�SECOND�INDUSTRIAL�STREET,�INDUSTRIAL�AREA�8,�SHARJAH,�UAE

Address to which this Certificate refers:DARB�ALSALAMAH�SAFETY�SYSTEMS�LLC-�SHJ�BR.

The Governing Board ofProgressive International Certifications Limited hereby grant to:

EVISSERGORP

EMS 004

Darb Alsalamah Safety Systems LLC

Sharjah Branch ISO Certificate

Page 33: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

33

Sharjah Civil Defense Certificate

Page 34: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

34

Location Map

KarachiRestaurant

Al JadeedBakery

SpectroAl MuraqabatPolice Station

Abu Backer Al SiddiqueMetro Station

WarbaCentre

Abu Backer Al SiddiqueMetro Station

Salah Al Din Street

Petrol Station

Darb Al ShamahSafety Systems

Darb Al

TibbaRestaurant Caterpillar

Second Industrial Street

Al K

han

Stre

et

Darb Al ShamahSafety Systems

Office No. 110Tryam Water Building

Dubai Main Office

Sharjah Branch Office

Page 35: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

www.darbalsalamahss.com

Page 36: Darb Al Salamah · 2020-04-30 · Head of Certificate S I V E O G R E S P R QMS 004 Registration No.: PICL/QMS/0517/8265 Certificate Issue Date : 10.05.2017 1st Surveillance: 05.2018

SAFETY SYSTEMS LLCDarb Al Salamah

P.O.Box : 39613, Dubai-UAE.

darbalsalamahss.com+971 50 554 0088 | +971 50 599 4320

[email protected] | [email protected] | [email protected]

Salah Al Din Street, Dubai. | Industrial Area 8, Sharjah +971 4 268 8945