Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations Dipartimento di Ingegneria Andrea D’Ariano, ROMA TRE University, Rome, Italy 1 24/11/2016

D'ARIANO ATRS 2016

Embed Size (px)

Citation preview

Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities,

equity and violations considerations

Dipartimento di Ingegneria

Andrea D’Ariano, ROMA TRE University, Rome, Italy124/11/2016

Junior ConsultingDipartimento di Ingegneria

� Introduction�Modeling a Terminal Control Area

�MILP formulations

Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations

�MILP formulations

�Computational experiments

�Conclusions

This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003

2

Junior ConsultingDipartimento di Ingegneria

Air Traffic Control (ATC)Air Traffic Control (ATC)

An efficient control of air traffic must ensure safe, ordered and rapid transit of aircraft on the ground and in the air resources.

With the increase in air traffic [*], aviation authorities are seeking methods (i) to better use the

[*] Source: IATA 2014

methods (i) to better use the existing airport infrastructure, and (ii) to better manage aircraftmovements in the vicinity of airports during operations.

3

Junior ConsultingDipartimento di Ingegneria

Status Status ofof the the currentcurrent ATC ATC practisepractise• Airports are becoming a major bottleneck in ATC operations. • The optimization of take-off/landing operations is a key factor to improve the performance of the entire ATC system.

• ATC operations are still mainly performed by human controllers whose computer support is most often limited to a graphical representation of the current aircraft position and speed. • Intelligent decision support is under investigation in order to reduce the controller workload (see e.g. recent ATM Seminars).

4

Junior ConsultingDipartimento di Ingegneria

Literature: Aircraft Scheduling Problem (ASP)Literature: Aircraft Scheduling Problem (ASP)Terminal Control Area (TCA) Terminal Control Area (TCA)

Detailed

BasicExisting Approaches Dynamic

Static

5

Junior ConsultingDipartimento di Ingegneria

Literature: Research needsLiterature: Research needs

Aircraft Scheduling Problem in Terminal Control Areas:

Most aircraft scheduling models in literature represent the TCA as a single resource, typically the runway. These models are not realistic since the other TCA resources are ignored.

We present a new approach that includes both accurate modelling of traffic regulations at runways and airways.

6

This approach has already been applied to successully control railway traffic for metro lines and railway networks.

Junior ConsultingDipartimento di Ingegneria

Our approach for TCAsOur approach for TCAs

Implementation and testing of:

• Detailed ASP-TCA models:incorporating safety rules at air segments, runways and holding circlesair segments, runways and holding circles

• Alternative objective functions:maximum versus average delays, delayed aircraft (violations), aircraft equity, throughput (completion time), priority tardiness

• Real-time traffic management instances:Roma Fiumicino (FCO) and Milano Malpensa (MXP) airports

7

Junior ConsultingDipartimento di Ingegneria

� Introduction

�Modeling a Terminal Control Area �MILP formulations

Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations

�MILP formulations

�Computational experiments

�Conclusions

8

This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003

Junior ConsultingDipartimento di Ingegneria

3 HOLDING

CIRCLES

SEVERAL AIR

SEGMENTS

1 COMMON GLIDE

PATH

3 RUNWAYS3 RUNWAYS

Junior ConsultingDipartimento di Ingegneria

ASP ASP ModelModel::AlternativeAlternativeGraphGraph (AG)(AG)

Air Segments

CommonGlide Path

RunwaysHolding Circles

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

A

[Pacciarelli

EJOR 2002]

RWY 25

A1

tA1

10

release date αA

(w0, A1 = αA = expected aircraft entry time)Fixed constraints

tA1 = t0 + w0, A1

A1

0

αA

t0

Junior ConsultingDipartimento di Ingegneria

AG AG ModelModelAir Segments

CommonGlide Path

RunwaysHolding Circles

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

A

A1

RWY 25

tA1

entry due date βA

(wA1,n = βA = - αA )

A1

0 n

αA

βA

11

tn = tA1 + wA1,n

tn

Junior ConsultingDipartimento di Ingegneria

AG AG ModelModelAir Segments

CommonGlide Path

RunwaysHolding Circles

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

A

A1 A4

δ

0

RWY 25

dotted arc (A4, A1)No holding circle

dotted arc (A1, A4)Yes holding circle(δ = holding time)

A1 A4

0 n

αA

βA

0

12

Alternative constraints

Junior ConsultingDipartimento di Ingegneria

AG AG ModelModel

A1 A4 A10min

Air Segments

CommonGlide Path

RunwaysHolding Circles

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

A

RWY 25

A1 A4 A10

0 n

αA

βA

- max

Time window for the travel time in each air segment[min travel time; max travel time]

13

Junior ConsultingDipartimento di Ingegneria

CommonGlide Path

RunwaysHolding Circles Air Segments

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

AAAG AG ModelModel

A1 A4 A15A10 A13 AOUTA16

RWY 25Aircraft routing:A1-A4-A10-A13-A15-A16

A1 A4 A15A10 A13 AOUTA16

0 n

αA

βA

γA

exit due date γA

(γA = - planned landing time)

14

Junior ConsultingDipartimento di Ingegneria

CommonGlide Path

RunwaysHolding Circles Air Segments

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

AA

BB

AG AG ModelModel

A1 A4 A15A10 A13 AOUTA16

Potential conflictbetween A and B on

the common glide path (resource 15) !

RWY 25

A1 A4 A15A10 A13 AOUTA16

0 n

B3 B8 B15B12 B14 BOUTB17

αA

αB

βA

γA

βBγB

Aircraft ordering problem between A and B for the common glide path (resource 15) : longitudinal and diagonal distances must be respected

15

Junior ConsultingDipartimento di Ingegneria

CommonGlide Path

RunwaysHolding Circles Air Segments

8

16

173

SRN

1

TOR

MBR

2 6

4 10

11

12

15

7

513

14

RWY 16R

RWY 16L

9

AA

BB

CC

AG AG ModelModel

A1 A4 A15A10 A13 AOUTA16α γ

Potential conflict between C and B on a runway (resource 17) !

RWY 25

0 n

B3 B8 B15B12 B14 BOUTB17

αA

αB

βA

γA

βBγB

COUTC17

γC

αC

16

Junior ConsultingDipartimento di Ingegneria

� Introduction

�Modeling a Terminal Control Area

�MILP formulations

Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations

�MILP formulations �Computational experiments

�Conclusions

17

This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003

Junior ConsultingDipartimento di Ingegneria

AG AG viewedviewed asas a MILP (a MILP (MixedMixed--IntegerInteger Linear Linear ProgramProgram))

∈∀−+≥

−−+≥∈∀+≥

AkhjiMxwtt

xMwttFmlwtt

xtf

hkijhkhk

hkijijij

lmlm

),(),,(()1(

),(

),(min

,

,C =

with m ≠ n

18

• Fixed constraintsin F model feasible timing for each aircraft on its specific route, plus α, β, γ constraints on the entrance and exit times.

• Alternative constraintsin A represent the ordering decision between aircraft at air segments and runways, plus holding circle decisions.

=

−+≥

selectediskhif

selectedisjiifx

Mxwtt

hkij

hkijhkhk

),(0

),(1,

,

Junior ConsultingDipartimento di Ingegneria

InvestigatedInvestigated objectiveobjective functionsfunctionsAverage Tardiness

Priority TardinessPriority Equity

Maximum Tardiness

19

Max Completion

Avg Completion

Tardy Jobs P

Junior ConsultingDipartimento di Ingegneria

� Introduction

�Modeling a Terminal Control Area

�MILP formulations

PresentationPresentation outlineoutline

�MILP formulations

�Computational experiments�Conclusions

20

This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003

Junior ConsultingDipartimento di Ingegneria

DescriptionDescription ofof the test the test casescases

21

� Each row presents 20 disturbed scenarios (ASP instances);

� Entrance delays are randomly generated with various distributions;

� Unavoidable delays cannot be recovered by aircraft rescheduling;

� ASP solutions are computed by means of CPLEX MIP solver 12.0.

Junior ConsultingDipartimento di Ingegneria

A A practicalpracticalschedulingscheduling rulerule

Optimizing an objective and Optimizing an objective and looking at the other objectiveslooking at the other objectives

22

Junior ConsultingDipartimento di Ingegneria

Optimizing an objective and Optimizing an objective and looking at the other objectiveslooking at the other objectives

23

Junior ConsultingDipartimento di Ingegneria

A A combinedcombinedapproachapproach

Optimizing an objective and Optimizing an objective and looking at the other objectiveslooking at the other objectives

24

Junior ConsultingDipartimento di Ingegneria

� Introduction

�Modeling a Terminal Control Area

�MILP formulations

Scheduling models for optimal aircraft traffic control at busy airports: tardiness, priorities, equity and violations considerations

�MILP formulations

�Computational experiments

�Conclusions

25

This work has been recently accepted for publication in the journal OMEGA : Reference DOI: 10.1016/j.omega.2016.04.003

Junior ConsultingDipartimento di Ingegneria

AchievementsAchievements• Microscopic ASP-TCA optimization models are proposed.

• Various objective functions and approaches are investigated.

• Computational results for major Italian TCAs demonstrate the existence of relevant gaps between the objective functions.existence of relevant gaps between the objective functions.

• Combining the various objectivesoffers good trade-off solutions.