RENCANA PERMINGGU (2)
JADWAL WAKTU PELAKSANAAN REVISI 1PEMBANGUNAN GEDUNG KANTOR BPK
RI143,435.00PERWAKILAN PROVINSI SULAWESI
BARAT102,497.0057,999.000No.Jenis PekerjaanBobot Kontrak
Awal(%)Bobot Kontrak (CCO)(%)MASA PELAKSANAAN : 365 HARI
KALENDERKet.306,000.00DALAM BULAN348,000.00Des. 2010Jan. 2011Feb.
2011Maret 2011April 2011Mei 2011Juni 2011Juli 2011Agust. 2011Sept.
2011Okt. 2011Nov. 20115 Des.
957,931.002341234123412345123412341234123412341234123412341IPRELIMINARIESMASA
PEMELIHARAAN : 180 HARI
KALENDERI.1Preliminaries/Persiapan0.7280.72750.0120.0120.0120.0090.0090.0090.0090.0180.0180.0180.0180.0150.0150.0150.0150.0150.0180.0180.0180.0180.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.01560.72750.00000.7275100%48IISITE
WORKS0.00000.00000II.1Talud Penahan
Tanah3.6275.57420.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2650.2655.57420.00003.6273100%21II.2Cut
&
Fill3.4948.29310.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3460.3468.29310.00003.4940100%24IIIBANGUNAN
GEDUNG0.00000III.1Pekerjaan Struktur0.00000III.1.1Elevasi -2.85 s/d
-0.100.00000.00000III.1.1.1Pekerjaan pondasi
cyclop0.33330.0480.0480.0480.0480.0480.0480.0480.33330.00007III.1.1.2Pondasi
Poer
Plat0.6490.64930.0930.0930.0930.0930.0930.0930.0930.64930.00000.6493100%7III.1.1.3Pondasi
Garis0.5690.55400.0690.0690.0690.0690.0690.0690.0690.0690.55400.00000.5687100%8III.1.1.4Pondasi
Rollag
Bata0.01470.0010.0010.0010.0010.0010.0020.0020.0020.0020.01470.00009III.1.1.5Pedestal
Kolom0.2840.28390.0410.0410.0410.0410.0410.0410.0410.28390.00000.2839100%7III.1.1.6Sloef0.7110.13730.0090.0090.0090.0090.0340.0340.0340.13730.00000.7112100%7III.1.1.7Balok
Lantai Dasar (BaT, BT1 &
BT2)1.45020.0910.0910.0910.0910.3630.3630.3631.45020.00007III.1.1.8Fit
Lift0.1210.12070.0080.0080.0080.0080.0300.0300.0300.12070.00000.1207100%7III.1.2Elevasi
-0.10 s/d 4.000.00000.00000III.1.2.1Kolom0.00000.00000III.1.2.1.1 -
Bekisting0.2630.26320.0880.0880.0880.26320.00000.2632100%3III.1.2.1.2
-
Pembesian0.3190.31860.1060.1060.1060.31860.00000.3186100%3III.1.2.1.3
- Cor
Beton0.1440.14390.0720.0720.14390.00000.1439100%2III.1.2.2Tangga0.3200.31960.0800.0800.0800.0800.31960.00000.3196100%4III.1.2.3Shaft
Lift0.0400.03970.0100.0100.0100.0100.03970.00000.0397100%4III.1.2.4Plat
Lantai Dasar t=12
cm1.58050.2260.2260.2260.2260.2260.2260.2261.58050.00007III.1.3Elevasi
4.00 s/d 8.000.00000.00000III.1.3.1Balok0.00000.00000III.1.3.1.1 -
Bekisting
Balok0.8440.84420.2530.2530.2530.0840.84420.00000.8442100%4III.1.3.1.2
- Pembesian
Balok0.9420.94170.2830.2830.2830.0940.94170.00000.9417100%4III.1.3.1.3
- Cor Beton
Balok0.4120.41160.1230.1230.1230.0410.41160.00000.4116100%4III.1.3.2Plat
Lantai0.00000.00000III.1.3.2.1 - Bekisting Plat
Lantai1.0731.07330.3220.3220.3220.1071.07330.00001.0733100%4III.1.3.2.2
- Pembesian Plat
Lantai0.7810.78150.2340.2340.2340.0780.78150.00000.7815100%4III.1.3.2.3
- Cor Beton Plat
Lantai0.5850.58480.1750.1750.1750.0580.58480.00000.5848100%4III.1.3.3Kolom0.00000.00000III.1.3.3.1
- Bekisting
Kolom0.2710.27060.2160.0270.0270.27060.00000.2706100%3III.1.3.3.2 -
Pembesian
Kolom0.2950.29450.2360.0290.0290.29450.00000.2945100%3III.1.3.3.3 -
Cor Beton
Kolom0.1470.14710.1180.0150.0150.14710.00000.1471100%3III.1.3.4Tangga0.2380.23830.0790.0790.0790.23830.00000.2383100%3III.1.3.5Shaft
Lift0.0400.03970.0130.0130.0130.03970.00000.0397100%3III.1.4Elevasi
8.00 s/d 12.000.00000.00000III.1.4.1Balok0.00000.00000III.1.4.1.1 -
Bekisting
Balok0.8320.83250.2080.2080.2080.2080.83250.00000.8325100%III.1.4.1.2
- Pembesian
Balok0.9370.93660.2340.2340.2340.2340.93660.00000.9366100%III.1.4.1.3
- Cor Beton
Balok0.4100.40970.1020.1020.1020.1020.40970.00000.4097100%III.1.4.2Plat
Lantai0.00000.0000III.1.4.2.1 - Bekisting Plat
Lantai0.9240.92360.2310.2310.2310.2310.92360.00000.9236100%III.1.4.2.2
- Pembesian Plat
Lantai0.6730.67250.1680.1680.1680.1680.67250.00000.6725100%III.1.4.2.3
- Cor Beton Plat
Lantai0.5030.50320.1260.1260.1260.1260.50320.00000.5032100%III.1.4.3Kolom0.00000.0000III.1.4.3.1
- Bekisting
Kolom0.2730.27260.0140.0140.1230.1230.27260.00000.2726100%III.1.4.3.2
- Pembesian
Kolom0.2560.25630.0130.0130.1150.1150.25630.00000.2563100%III.1.4.3.3
- Cor Beton
Kolom0.1510.15070.0080.0080.0680.0680.15070.00000.1507100%III.1.4.4Shaft
Lift0.0400.03970.0130.0130.0130.03970.00000.0397100%III.1.5Elevasi
12.00 s/d 13.000.00000.0000III.1.5.1Balok0.00000.0000III.1.5.1.1 -
Bekisting
Balok0.7130.71290.1780.1780.1780.1780.71290.00000.7129100%III.1.5.1.2
- Pembesian
Balok0.6450.64520.1610.1610.1610.1610.64520.00000.6452100%III.1.5.1.3
- Cor Beton
Balok0.2790.27880.0700.0700.0700.0700.27880.00000.2788100%III.1.5.2Plat
Lantai0.00000.0000III.1.5.2.1 - Bekisting Plat
Lantai0.2760.27640.0690.0690.0690.0690.27640.00000.2763100%III.1.5.2.2
- Pembesian Plat
Lantai0.2010.20120.0500.0500.0500.0500.20120.00000.2012100%III.1.5.2.3
- Cor Beton Plat
Lantai0.1510.15060.0380.0380.0380.0380.15060.00000.1506100%III.1.5.3Kolom0.00000.0000III.1.5.3.1
- Bekisting
Kolom0.0400.04030.0130.0130.0130.04030.00000.0403100%III.1.5.3.2 -
Pembesian
Kolom0.0330.03340.0110.0110.0110.03340.00000.0334100%III.1.5.3.3 -
Cor Beton
Kolom0.0210.02120.0070.0070.0070.02120.00000.0212100%III.1.5.4Ruang
Lift Mesin0.0710.07070.0350.0350.07070.00000.0707100%III.1.6Elevasi
13.00 s/d Atap0.00000.0000III.1.6.1Balok0.00000.0000III.1.6.1.1 -
Bekisting
Balok0.0990.09850.0490.0490.09850.00000.0985100%III.1.6.1.2 -
Pembesian
Balok0.0860.08640.0430.0430.08640.00000.0864100%III.1.6.1.3 - Cor
Beton
Balok0.0390.03860.0190.0190.03860.00000.0386100%III.1.6.2Rangka
Atap Baja
Ringan2.1012.10070.2100.2100.2100.2100.2100.2100.2100.2100.2100.2102.10070.00002.1007100%III.2Pekerjaan
Arsitektur/Finishing0.00000.0000III.2.1Elevasi -0.10 s/d 4.00 (
Lantai 1)0.00000.0000III.2.1.1Pekerjaan
Lantai1.7281.57170.1960.1960.1960.1960.1960.1960.1960.1961.57170.00001.7276100%III.2.1.2Pekerjaan
Dinding2.6752.36850.2960.2960.2960.2960.2960.2960.2960.2962.36850.00002.6747100%III.2.1.3Pek.
Alumunium Composite Panel0.22690.023
user: user:Pabrikasi0.0230.023
user:
user:Instal0.0230.0230.0230.0230.0230.0230.0230.22690.0000III.2.1.4Pek.
Back
Drope0.07930.0100.0100.0100.0100.0100.0100.0100.0100.07930.0000III.2.1.5Pekerjaan
Plafond1.8891.88860.1720.1720.1720.1720.1720.1720.1720.1720.1720.1720.1721.88860.00001.8886100%III.2.1.6Pekerjaan
Pintu & Jendela
2.4462.44610.3060.3060.3060.3060.3060.3060.3060.3062.44610.00002.4460100%III.2.1.7Railing0.1650.16500.0210.0210.0210.0210.0210.0210.0210.0210.16500.00000.1650100%III.2.1.8Meja
beton0.0270.02680.0130.0130.02680.00000.0268100%III.2.1.9Pengecatan0.3580.35760.0400.0400.0400.0400.0400.0400.0400.0400.0400.35760.00000.3576100%III.2.2Elevasi
+4.00 s/d 8.00 ( Lantai 2)0.00000.0000III.2.2.1Pekerjaan
Lantai1.8051.80460.2260.2260.2260.2260.2260.2260.2260.2261.80460.00001.8046100%III.2.2.2Pekerjaan
Dinding4.2712.45860.3070.3070.3070.3070.3070.3070.3070.3072.45860.00004.2714100%III.2.2.3Pek.
Curtain
Wall0.87570.1250.1250.1250.1250.1250.1250.1250.87570.0000III.2.2.4Pek.
Alumunium Composite
Panel0.82610.1180.1180.1180.1180.1180.1180.1180.82610.0000III.2.2.5Pek.
Back
Drope0.11100.0160.0160.0160.0160.0160.0160.0160.11100.0000III.2.2.6Pekerjaan
Plafond1.0611.06140.1330.1330.1330.1330.1330.1330.1330.1331.06140.00001.0614100%III.2.2.7Pekerjaan
Pintu & Jendela
1.8691.86930.2670.2670.2670.2670.2670.2670.2671.86930.00001.8693100%III.2.2.8Railing0.3080.30780.0440.0440.0440.0440.0440.0440.0440.30780.00000.3078100%III.2.2.9Meja
beton0.0200.01980.0100.0100.01980.00000.0198100%III.2.2.10Water
Proofing0.1400.14030.0350.0350.0350.0350.14030.00000.1403100%III.2.2.11Pengecatan0.4000.40040.0500.0500.0500.0500.0500.0500.0500.0500.40040.00000.4004100%III.2.3Elevasi
+8.00 s/d 12.00 ( Lantai 3)0.00000.0000III.2.3.1Pekerjaan
Lantai1.7491.74920.2500.2500.2500.2500.2500.2500.2501.74920.00001.7492100%(0.00006492)III.2.3.2Pekerjaan
Dinding4.9512.49920.3120.3120.3120.3120.3120.3120.3120.3122.49920.00004.9513100%III.2.3.3Pek.
Curtain
Wall0.87570.1460.1460.1460.1460.1460.1460.87570.0000III.2.3.4Pek.
Alumunium Composite
Panel1.57650.1580.1580.1580.1580.1580.1580.1580.1580.1580.1581.57650.0000III.2.3.5Pekerjaan
Plafond1.3971.39690.1750.1750.1750.1750.1750.1750.1750.1751.39690.00001.3969100%III.2.3.6Pekerjaan
Pintu & Jendela
1.6421.64200.3280.3280.3280.3280.3281.64200.00001.6420100%III.2.3.7Back
Drop0.2380.23800.0480.0480.0480.0480.0480.23800.00000.2380100%III.2.3.8Meja
beton0.0200.01980.0100.0100.01980.00000.0198100%III.2.3.9Water
Proofing0.3230.32290.1080.1080.1080.32290.00000.3229100%III.2.3.10Penutup
Atap2.1962.19600.2740.2740.2740.2740.2740.2740.2740.2742.19600.00002.1960100%III.2.3.11Pengecatan0.2340.23380.0330.0330.0330.0330.0330.0330.0330.23380.00000.2338100%III.2.3.12Stage
Panggung0.4280.42770.1430.1430.1430.42770.00000.4277100%III.2.4Elevasi
+12.00 s/d Atap ( Lantai Top)0.00000.0000III.2.4.1Pekerjaan
Dinding0.3680.08280.0210.0210.0210.0210.08280.00000.3679100%III.2.4.2Pekerjaan
Jendela
0.4440.44350.1480.1480.1480.44350.00000.4435100%III.2.4.3Pek.
Alumunium Composite
Panel0.28520.0950.0950.0950.28520.0000III.2.4.4Water
Proofing0.1840.18350.0610.0610.0610.18350.00000.1835100%III.2.4.5Pengecatan0.0380.03760.0060.0060.0060.0060.0060.0060.03760.00000.0376100%III.3Fixture,
Furnishing and
Equipment0.00000.0000III.3.1Sanitary0.00000.0000III.3.1.1Sanitary
Lantai
10.2410.24070.0600.0600.0600.0600.24070.00000.2407100%III.3.1.2Sanitary
Lantai
20.2620.26230.0660.0660.0660.0660.26230.00000.2623100%III.3.1.3Sanitary
Lantai
30.4160.41590.1040.1040.1040.1040.41590.00000.4159100%III.3.2Signage0.2380.23800.0590.0590.0590.0590.23800.00000.2380100%III.4Mekanikal
dan Elektrikal0.00000.0000III.4.1Sistem Instalasi
Listrik7.0186.04580.2160.2160.2160.2160.2700.2700.2700.2700.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2160.2166.04580.00007.0183100%0.03448275860.7770791358III.4.2Sistim
Instalasi
HVAC6.5296.52920.2330.2330.2330.2330.2910.2910.2910.2910.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2330.2336.52920.00006.5292100%0.839211316III.4.3Sistim
Instalasi
Telepon0.2020.20170.0070.0070.0070.0070.0090.0090.0090.0090.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.0070.20170.00000.2017100%0.025931225III.4.4Sistim
Instalasi Tata
Suara0.6830.68350.0240.0240.0240.0240.0310.0310.0310.0310.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.0240.68350.00000.6835100%0.0878460668III.4.5Instalasi
Fire
Alarm0.4570.45680.0160.0160.0160.0160.0200.0200.0200.0200.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.0160.45680.00000.4568100%0.0587102027III.4.6Sistem
Instalasi
CCTV0.4180.41770.0150.0150.0150.0150.0190.0190.0190.0190.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.41770.00000.4177100%0.0536925418III.4.7Instalasi
Air
Bersih2.4491.22620.0440.0440.0440.0440.0550.0550.0550.0550.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0440.0441.22620.00002.4490100%0.1576050171III.4.8Sistim
Air kotor dan
vent0.2830.28280.0100.0100.0100.0100.0130.0130.0130.0130.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.0100.28280.00000.2828100%0.0363485903III.4.9Sistim
Instalasi Air
hujan0.4220.42230.0150.0150.0150.0150.0190.0190.0190.0190.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.0150.42230.00000.4223100%0.0542734435III.4.10Instalasi
Fire
Hydrant1.6111.61050.0580.0580.0580.0580.0720.0720.0720.0720.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0580.0581.61050.00001.6105100%0.2070043766III.4.11Sistim
Instalasi
Petir0.1700.16980.0210.0110.0110.0110.0110.0110.0110.0110.0110.0110.0110.0110.0110.0110.0110.16980.00000.1698100%0.0218202768III.4.12Sistem
Transportasi Vertikal ( Lift
)1.9031.90280.2110.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1060.1061.90280.00001.9028100%0.2445737557III.4.13Sistem
Instalasi
LAN0.7540.75390.0540.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.0270.75390.00000.7539100%0.0968986765IVBANGUNAN
LAIN-LAIN0.00000.0000IV.1Pos
Jaga0.4810.48090.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.0400.48090.00000.4809100%IV.2Parkir
Motor0.7900.00000.00000.00000.7901100%IV.3Engineering
Building2.0042.00400.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1250.1252.00400.00002.0040100%VLAND
SCAPE0.00000.0000V.1Pekerjaan Hard
Scape9.5074.44930.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1850.1854.44930.00009.5067100%V.2Pekerjaan
Soft Scape1.3380.00000.00000.00001.3378100%V.3Instalasi Air
Taman0.1200.11980.0150.0150.0150.0150.0150.0150.0150.0150.11980.00000.1198100%VIPEKERJAAN
NON
FISIK1.6870.00000.0000ERROR:#REF!ERROR:#REF!VI.1IMB0.38530.0960.0960.0960.0960.38530.0000VI.2Penyambungan
Listrik1.28441.28441.28440.0000VI.3Penyambungan
Telepon0.01710.01710.01710.00000.00000.0000T O T A
L100.000100.00000.0000
CCORENCANA PRESTASI (%)0.3580.3580.3580.6200.6200.6200.6200.7260.7260.7260.7260.8770.8770.8770.8770.8771.2141.2141.0330.9641.9723.5303.6423.6492.7602.3892.3522.2622.1272.6082.5452.4362.7623.2533.9110.0003.9114.5874.2914.5985.0504.1582.9952.7732.8803.6292.1751.1800.309TOTAL RENCANA PRESTASI (%)0.00000.3580.7151.0731.6932.3132.9333.5534.2795.0045.7306.4557.3338.2109.0879.96410.84112.05513.26914.30215.26517.23720.76724.40928.05730.81833.20735.55937.82139.94842.55645.10247.53850.30053.55357.46457.46461.37665.96270.25374.85079.90084.05887.05389.82692.70696.33598.51199.691100.000KONTRAK AWALTOTAL RENCANA PRESTASI (%)0.00000.1320.2630.3951.0251.6552.2852.9154.0645.2136.3627.5118.87110.23111.59212.95214.31216.83019.34821.86524.38328.56032.73736.91441.09144.75848.42552.09355.76059.27362.78666.29869.81173.04976.28779.52482.76284.59086.41888.24590.07391.88793.70195.51597.32997.86398.39798.93299.466100.000REALISASI PRESTASI (%)0.1440.6541.1430.4180.6380.8390.7340.5500.1800.4802.5681.9591.9531.5801.0950.887TOTAL REALISASI PRESTASI (%)0.00000.1440.7981.9412.3592.9973.8364.5705.1205.3005.7808.34810.30712.26013.84014.93615.823D E V I A S I ( + ) %0.0120.5351.5461.3341.3421.5511.6551.0560.087-0.5820.8371.4362.0292.2491.9841.511
Mamuju, 29 April 2011
PPK PPSPANKonsultan Manajemen KonstruksiKontraktor PelaksanaProyek Pembangunan Gedung Kantor BPK RI PT. Rancang Bangun Utama KonsultanPT. Hutama Karya ( Persero ) Wil. VPerwakilan Sulawesi Barat
( Ir. Martuama Saragi )( Ir. Syarifuddin Beddu )( Ahmad A. Sibali )NIP. 19651016 199903 1001Team LeaderKepala Proyek
1.941.58230.00.3581.6934.2797.33312.05517.23730.81839.94850.30065.9684.0696.34
229,963,795,000.00DESJANFEBMARAPRMEIJUNIJULIAUGUSTSEPTOKTNOVDES0.3581.3352.5863.0544.72216.0029.7649.7179.92617.38614.9759.8650.30967,614,560,000.000.00000.3581.6934.2797.33312.05528.05737.82147.53857.46474.85089.82699.691100.00029.40230.00000.3952.9157.51114.31224.38341.09155.76069.81182.76290.07397.329100100.00091,866,453,328.520.00000.1442.3595.12010.307
0.00000.8664.3699.12312.26516.22917.85420.83223.92126.51630.10032.61835.06837.42839.41941.89144.33146.76749.51852.77156.68256.68260.593842463665.180518502469.471136165974.068636632479.118292193383.27605073686.271129199689.043956440891.924424200495.55365586997.729127386698.90945603931000.00000.3952.9157.51114.31224.38328.56032.73736.91441.09144.75848.42552.09355.76059.27362.78666.29869.81173.04976.28779.52482.76284.59086.41888.24590.07391.88793.70195.51597.32997.99798.66599.332100.000100.0000.00001.9414.5938.36815.867
0.00000.3952.9157.51114.31224.3834.1774.1774.1774.1773.6673.6673.6673.6673.5133.5133.5133.5133.2383.2383.2383.2381.8281.8281.8281.8281.8141.8141.8141.8140.6680.6680.6680.6681000.00000.3952.9157.51114.31224.38341.09155.76069.81182.76290.07397.32910016.70814.66914.05112.9517.3117.2562.671021-May-101-Nov-10165
REALISASIKONTRAKCCO
Sheet1
NoKodeJenis PekerjaanBobot Kontrak Awal(%)Durasi (mg)Pekerjaan YangMendahuluiMengikuti
1IPRELIMINARIES2I.1Preliminaries/Persiapan0.72848-43IISITE WORKS04II.1Talud Penahan Tanah3.62721295II.2Cut & Fill3.49424296IIIBANGUNAN GEDUNG07III.1Pekerjaan Struktur08III.1.1Elevasi -2.85 s/d -0.1009III.1.1.1Pekerjaan pondasi cyclop751010III.1.1.2Pondasi Poer Plat0.649791311III.1.1.3Pondasi Garis0.569851412III.1.1.4Pondasi Rollag Bata951413III.1.1.5Pedestal Kolom0.2847101414III.1.1.6Sloef0.711711,12,131815III.1.1.7Balok Lantai Dasar (BaT, BT1 & BT2)714`1816III.1.1.8Fit Lift0.121792317III.1.2Elevasi -0.10 s/d 4.00018III.1.2.1Kolom019III.1.2.1.1 - Bekisting0.2633202120III.1.2.1.2 - Pembesian0.319314,151921III.1.2.1.3 - Cor Beton0.1442192622III.1.2.2Tangga0.3204303423III.1.2.3Shaft Lift0.0404163924III.1.2.4Plat Lantai Dasar t=12 cm7153625III.1.3Elevasi 4.00 s/d 8.00026III.1.3.1Balok027III.1.3.1.1 - Bekisting Balok0.8444182828III.1.3.1.2 - Pembesian Balok0.9424272929III.1.3.1.3 - Cor Beton Balok0.4124283430III.1.3.2Plat Lantai031III.1.3.2.1 - Bekisting Plat Lantai1.0734183232III.1.3.2.2 - Pembesian Plat Lantai0.7814313333III.1.3.2.3 - Cor Beton Plat Lantai0.5854323434III.1.3.3Kolom035III.1.3.3.1 - Bekisting Kolom0.2713363736III.1.3.3.2 - Pembesian Kolom0.2953303537III.1.3.3.3 - Cor Beton Kolom0.1473354138III.1.3.4Tangga0.2383453939III.1.3.5Shaft Lift0.04033840III.1.4Elevasi 8.00 s/d 12.00041III.1.4.1Balok042III.1.4.1.1 - Bekisting Balok0.83243III.1.4.1.2 - Pembesian Balok0.93744III.1.4.1.3 - Cor Beton Balok0.41045III.1.4.2Plat Lantai46III.1.4.2.1 - Bekisting Plat Lantai0.92447III.1.4.2.2 - Pembesian Plat Lantai0.67348III.1.4.2.3 - Cor Beton Plat Lantai0.50349III.1.4.3Kolom50III.1.4.3.1 - Bekisting Kolom0.27351III.1.4.3.2 - Pembesian Kolom0.25652III.1.4.3.3 - Cor Beton Kolom0.15153III.1.4.4Shaft Lift0.04054III.1.5Elevasi 12.00 s/d 13.0055III.1.5.1Balok56III.1.5.1.1 - Bekisting Balok0.71357III.1.5.1.2 - Pembesian Balok0.64558III.1.5.1.3 - Cor Beton Balok0.27959III.1.5.2Plat Lantai60III.1.5.2.1 - Bekisting Plat Lantai0.27661III.1.5.2.2 - Pembesian Plat Lantai0.20162III.1.5.2.3 - Cor Beton Plat Lantai0.15163III.1.5.3Kolom64III.1.5.3.1 - Bekisting Kolom0.04065III.1.5.3.2 - Pembesian Kolom0.03366III.1.5.3.3 - Cor Beton Kolom0.02167III.1.5.4Ruang Lift Mesin0.07168III.1.6Elevasi 13.00 s/d Atap69III.1.6.1Balok70III.1.6.1.1 - Bekisting Balok0.09971III.1.6.1.2 - Pembesian Balok0.08672III.1.6.1.3 - Cor Beton Balok0.03973III.1.6.2Rangka Atap Baja Ringan2.10174III.2Pekerjaan Arsitektur/Finishing75III.2.1Elevasi -0.10 s/d 4.00 ( Lantai 1)76III.2.1.1Pekerjaan Lantai1.72877III.2.1.2Pekerjaan Dinding2.67578III.2.1.3Pek. Alumunium Composite Panel79III.2.1.4Pek. Back Drope80III.2.1.5Pekerjaan Plafond1.88981III.2.1.6Pekerjaan Pintu & Jendela 2.44682III.2.1.7Railing0.16583III.2.1.8Meja beton0.02784III.2.1.9Pengecatan0.35885III.2.2Elevasi +4.00 s/d 8.00 ( Lantai 2)86III.2.2.1Pekerjaan Lantai1.80587III.2.2.2Pekerjaan Dinding4.27188III.2.2.3Pek. Curtain Wall89III.2.2.4Pek. Alumunium Composite Panel90III.2.2.5Pek. Back Drope91III.2.2.6Pekerjaan Plafond1.06192III.2.2.7Pekerjaan Pintu & Jendela 1.86993III.2.2.8Railing0.30894III.2.2.9Meja beton0.02095III.2.2.10Water Proofing0.14096III.2.2.11Pengecatan0.40097III.2.3Elevasi +8.00 s/d 12.00 ( Lantai 3)98III.2.3.1Pekerjaan Lantai1.749-0.000064918299III.2.3.2Pekerjaan Dinding4.951100III.2.3.3Pek. Curtain Wall101III.2.3.4Pek. Alumunium Composite Panel102III.2.3.5Pekerjaan Plafond1.397103III.2.3.6Pekerjaan Pintu & Jendela 1.642104III.2.3.7Back Drop0.238105III.2.3.8Meja beton0.020106III.2.3.9Water Proofing0.323107III.2.3.10Penutup Atap2.196108III.2.3.11Pengecatan0.234109III.2.3.12Stage Panggung0.428110III.2.4Elevasi +12.00 s/d Atap ( Lantai Top)111III.2.4.1Pekerjaan Dinding0.368112III.2.4.2Pekerjaan Jendela 0.444113III.2.4.3Pek. Alumunium Composite Panel114III.2.4.4Water Proofing0.184115III.2.4.5Pengecatan0.038116III.3Fixture, Furnishing and Equipment117III.3.1Sanitary118III.3.1.1Sanitary Lantai 10.241119III.3.1.2Sanitary Lantai 20.262120III.3.1.3Sanitary Lantai 30.416121III.3.2Signage0.238122III.4Mekanikal dan Elektrikal123III.4.1Sistem Instalasi Listrik7.0180.7770791358124III.4.2Sistim Instalasi HVAC6.5290.839211316125III.4.3Sistim Instalasi Telepon0.2020.025931225126III.4.4Sistim Instalasi Tata Suara0.6830.0878460668127III.4.5Instalasi Fire Alarm0.4570.0587102027128III.4.6Sistem Instalasi CCTV0.4180.0536925418129III.4.7Instalasi Air Bersih2.4490.1576050171130III.4.8Sistim Air kotor dan vent0.2830.0363485903131III.4.9Sistim Instalasi Air hujan0.4220.0542734435132III.4.10Instalasi Fire Hydrant1.6110.2070043766133III.4.11Sistim Instalasi Petir0.1700.0218202768134III.4.12Sistem Transportasi Vertikal ( Lift )1.9030.2445737557135III.4.13Sistem Instalasi LAN0.7540.0968986765136IVBANGUNAN LAIN-LAIN137IV.1Pos Jaga0.481138IV.2Parkir Motor0.790139IV.3Engineering Building2.004140VLAND SCAPE141V.1Pekerjaan Hard Scape9.507142V.2Pekerjaan Soft Scape1.338143V.3Instalasi Air Taman0.120144VIPEKERJAAN NON FISIK1.687145VI.1IMB146VI.2Penyambungan Listrik147VI.3Penyambungan Telepon
0.0