2
BiotecBiotec InternationalInternational
Biotec International is a Belgian company with more than 25 years experience.Biotec is a world technological leader in biogas generation, capture, handing and usage for tropical agro-industries.
Biotec philosophy“Develop complementary technologies to achieve an Integrated Organic Matter Management for tropical agro-industries”
4
Biotec International Asia Sdn Bhd
• Established in February 2008
• Regional hub for the Southeast Asian Market
• Awarded with the Bionexus status in Malaysia
• Opened its Indonesian office, Medan, in 2010
• Already commissioned:
Ulu Kanchong Biogas Plant located in Negeri Sembilan, Malaysia
Pelakar Biogas Plant located in Sumatra, Indonesia
BIOTEC ASIABIOTEC ASIA
5
Our Technologies
• Anaerobic Biodigesters (covered lagoons, UASB reactors and tanks
biodigester): BIOGAS production
• Ferti-irrigation of treated effluent: ORGANIC FERTILIZER
• Co-composting of sub-products: ORGANIC FERTILIZER
….INTERGRATED MANAGEMENT OF ORGANIC MATTER…
Business ExpertiseBusiness Expertise
6
BIOTEC system for palm oil mills
POME TREATMENT- Biodigesters: Covered lagoons & tanks
BIOGAS PRODUCTION- Electricity generation- Fossil fuel substitution- Biomass replacement
ORGANIC FERTILIZER PRODUCTION- Ferti-irrigation of treated effluent- Co-composting of EFB
Business ExpertiseBusiness Expertise
INTEGRATED MANAGEMENT OF THE ORGANIC MATTER INTEGRATED MANAGEMENT OF THE ORGANIC MATTER IN A PALM OIL MILLIN A PALM OIL MILL
Plantation
Agro-industry
Sub-products:
Solid and liquid organic waste
Main Products: Palm oil
BIOTECTECHNOLOGIES
OrganicFertilizer Biogas
Carbon Credits generation(CER)
Electricity Generation
Electricity sale to the grid
8
BIOTEC covers the whole Project Cycle: ENGINEERING (Feasibility Study, Design, Project management)
CONSTRUCTION (Procurement, Supervision, Commissioning)
OPERATION & MAINTENANCE
Business ExpertiseBusiness Expertise
MILL
OIL
POME
BIOGAS
BIOLOGICAL ANAEROBIC SLUDGE
TREATEDEFLLUENT
FLARE
BIOGAS ENGINE
Existing lagoons
LAND APPLICATIONCOMPOSTING
BIODIGESTOR
Approx. 5 % of biogas production
per year
ELECTRIC GRID
KEY INDICATORS DIAGRAM FOR BIOGAS PLANT IN POMKEY INDICATORS DIAGRAM FOR BIOGAS PLANT IN POM
ORGANIC FERTILIZER APPLIED IN THE PLANTATION
KEY INDICATORS DIAGRAM FOR COMPOSTING PLANTKEY INDICATORS DIAGRAM FOR COMPOSTING PLANTOR FERTIOR FERTI--IRRIGATION SYSTEMIRRIGATION SYSTEM
MILL
TREATEDEFLLUENTBIODIGESTOR
POME
EFB
COMPOSTING PLANT
BIOLOGICAL ANAEROBIC SLUDGE
FERTI-IRRIGATION SYSTEM
11
Honduras2006 – Eecopalsa2008 – Agrotor,2008 – Aguan2009 – Hondupalma2011 – Eecopalsa II
Colombia1988 – Palmar Santa1992 – Palmas Del Lllano1999 – Palmeiras
Peru2007 – El Espino
Argentina2009 – Citrusvil
Indonesia2011 – Pelakar (SinarmasGroup)2011/12 – Benua Puhun(Kalimantan)
Malaysia2010 – Ulu Kanchong
PALMEIRAS , Colombia EECOPALSA , Honduras EL ESPINO, Peru AGROTOR, Honduras ULU KANCHONG, Malaysia PELAKAR (Sinarmas Group),
Indonesia
Ghana2011/12 – GOPDC POM
Gabon2011/12 – MKK POM
Nigeria2011/12 – Presco POM
Dominican Republic2011/12– Induspalma
CITRUSVIL, Argentina
BIOTEC BIOGASBIOTEC BIOGAS--CDM PLANTSCDM PLANTSAROUND THE WORLDAROUND THE WORLD
12
Remarks:PDD : Project Design DocumentPOM : Palm Oil MillCER: Certified Emission Reduction
1st concrete tank
biodigestor in 1988
BIOTEC ACHIEVEMENTS
1st Biogas project – CDM project in POM
in the world
1st Biogas Project issues more CERs
than announced in PDD
1st Biodigestorin POM
industry that has issue
CERs
Total of 12 Biogas
ProjectsAwarded
with BionexusStatus in Malaysia
BIOTEC ACHIEVEMENTSBIOTEC ACHIEVEMENTS
13
Optimization of GAS Extraction from POME supply at a low cost COD removal efficiency of 90%. Biogas composition: 60% methane on average
Return on investment: Revenues streams:
Sale of electricity , replacement of fossil fuel or biomass Carbon Credits generation Sales of Organic Fertilizer
Environmental benefits: Final BOD discharge compliances Clean Boiler emissions
Management of Operation and Maintenance Competent and experimented staff to handle O&M Services
Commercially proven technologies BIOTEC has implemented 12 Biogas Plants in POM around the world
KEY SUCCESS FACTORSKEY SUCCESS FACTORSIN BIOTEC PROJECTS IN BIOTEC PROJECTS
14
Contact us: