Data Management Plan GE-Pittsfield/Housatonic River Site - Response Action Oversight

Prepared by: HDR APTIM JV 1 International Blvd, 10th floor Mahwah, NJ 07495

Mahwah, NJ February 26, 2021

Page 2: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Document Revision History

Date Author Version Description 2021 02 26 Christine Weaver 0.0 Initial

Contacts

Name Role/Org Telephone Email [email protected] Dean Tagliaferro EPA Remedial

Project Manager (RPM)

617-918-1282

Bradley Williams, Ph.D.

HDR APTIM JV Program Manager

201-335-9445 [email protected]

Melissa LaMacchia HDR APTIM JV Project/Quality Manager

201-335-9391 [email protected]

Jaak Van den Sype HDR APTIM JV Data Manager

201-335-9437 [email protected]

Tom Czelusniak HDR APTIM JV Field Oversight Lead

413-212-7375 [email protected]

Christine Weaver HDR APTIM JV Data Management

201-335-9468 [email protected]

Frank Brilhante HDR APTIM JV GIS/Mapping

201-335-9339 [email protected]

Lynn Lutz HDR APTIM JV Data Validation

303-754-4200 [email protected]

Hayley Rosado HDR APTIM JV Data QC Reviewer

201-335-9489 [email protected]

i

Page 3: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Contents

1 Project Description .............................................................................................................................. 1 1.1 Site Background ........................................................................................................................ 1 1.2 Field Investigation Description .................................................................................................. 2

2 Purpose ............................................................................................................................................... 2

3 Roles/Responsibilities ......................................................................................................................... 3 3.1 Project Manager ........................................................................................................................ 3 3.2 Data Manager............................................................................................................................ 3 3.3 Data Collection Personnel......................................................................................................... 3 3.4 Database Support Personnel .................................................................................................... 4 3.5 Data Validator............................................................................................................................ 4 3.6 GIS Lead/Support Personnel .................................................................................................... 4 3.7 Data QC Reviewer .................................................................................................................... 4

4 Data Management Sequence.............................................................................................................. 5 4.1 Data Planning............................................................................................................................ 6 4.2 Data Collection .......................................................................................................................... 9 4.3 Data Verification ...................................................................................................................... 11 4.4 Data Validation ........................................................................................................................ 12 4.5 Data Reduction........................................................................................................................ 13

5 Data Management Systems.............................................................................................................. 14 5.1 Analytical Data Management .................................................................................................. 14

5.1.1 EQuIS......................................................................................................................... 14 5.1.2 Access........................................................................................................................ 14

5.2 Spatial Data Management....................................................................................................... 14

6 Data Management Summary ............................................................................................................ 14 6.1 Site Documents ....................................................................................................................... 15 6.2 Site Images ............................................................................................................................. 15 6.3 Geospatial Data....................................................................................................................... 15 6.4 Sampling Data......................................................................................................................... 15 6.5 Analytical Data ........................................................................................................................ 15 6.6 Validated Data......................................................................................................................... 15

7 Data Coordination ............................................................................................................................. 16

8 References ........................................................................................................................................ 16

ii

Page 4: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Tables

Table 1 Data Management Team Table 2 Table 3

Data Planning Tasks Data Collection Tasks

Table 4 Data Verification Tasks Table 5 Data Validation Tasks Table 6 Data Reduction Tasks Table 7 Data Management Summary

iii

Page 5: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

List of Acronyms

ARAR Applicable or Relevant and Appropriate Requirement CD Consent Decree CERCLA Comprehensive Environmental Response, Compensation, and Liability Act CLP Contract Laboratory Program COC Chain of Custody csv Comma-separated values DMP Data Management Plan EDD Electronic Data Deliverable EFM Electronic Folder Management EPA U.S. Environmental Protection Agency ESAT Environmental Services Assistance Team ESRI Environmental Systems Research Institute, Inc. FASTAC Field and Analytical Services Teaming Advisory Committee GE General Electric GIS Geographic Information System GMA Groundwater Management Area GPS Global Positioning System HASP Health and Safety Plan HDR Henningson, Durham and Richardson IAG Inter-Agency Agreement ILG Information Lifecycle Governance jpg Joint Photographic Experts Group OEME Office of Environmental Measurement and Evaluation OPCA On-Plant Consolidation Area MS/MSD Matrix Spike/Matrix Spike Duplicate PCB Polychlorinated Biphenyls PDF Portable Document Format PID photoionization detectors POC Point of Contact PRP Potentially Responsible Party PUF Poly-urethane Foam QA Quality Assurance QAPP Quality Assurance Project Plan QC Quality Control RAA Removal Action Area RAS Routine Analytical Services RCRA Resource Conservation and Recovery Act ROR Rest of River RPM Remedial Project Manager SAP Sampling and Analysis Plan SOP Standard Operating Procedure SPLP Synthetic Precipitation Leaching Procedure. TBC “to be considered” advisory tiff Tagged image File Format TOC Total Organic Carbon UFP-QAPP Uniform Federal policy for Quality Assurance Project Plans URL Uniform Resource Locator USGS United States Geological Survey

iv

Page 6: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

This page is intentionally left blank.

v

Page 7: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

1 Project Description This Data Management Plan (DMP) provides the data management processes and procedures for the performance of work activities associated with data collection for the Response Action Oversight task order for the GE-Pittsfield/Housatonic River Site (“Site”) located in Pittsfield, Berkshire County, Massachusetts.

The Response Action activities at the Site, in accordance with the October 2000 Consent Decree issued by the EPA (EPA, October 2000), are being implemented by the potential responsible party (PRP) and their consultants. HDR APTIM JV will be providing oversight of the PRP’s Response Action activities to ensure the PRP is working in accordance with EPA approved plans and is the focus of this DMP.

1.1 Site Background General Electric (GE), the PRP, used polychlorinated biphenyls (PCBs) at its 254-acre facility in Pittsfield from 1932 to 1977. During this time, the Transformer Division manufactured and repaired transformers containing dielectric fluids, some of which included PCBs. PCBs and other hazardous substances were released to soil, groundwater, Silver Lake, the Housatonic River and were disposed of within and around the facility in landfills, former river oxbows, and other locations. The Consent Decree (CD) for the Site was approved by the federal court in October 2000. The CD, the legal agreement between EPA and GE, segregated the Site into 28 separate cleanups.

The status of the 28 cleanup locations is as follows:

• Twenty Removal Actions Outside the River (also referred to as Removal Action Areas or “RAAs”). Remediation is complete and post-removal site control activities (e.g., inspection and maintenance activities) are ongoing at all RAAs.

o Ten in the GE Plant Area;

o Five in the Former Oxbow Areas;

o Three in the Floodplains;

o Silver Lake Area; and

o Allendale School.

• Five Groundwater Management Areas (GMAs): Long term monitoring is complete at two GMAs (GMA 2 and GMA 5), however GE is required to maintain certain wells and to conduct additional monitoring in these two GMAs at five year intervals Monitoring and response actions are underway at the remaining three (GMA 1, GMA 3, and On-Plant Consolidation Area (OPCA)/GMA 4).

• Three River Reaches:

o Upper ½-Mile Reach: Remediation is complete (Certificate of Completions was issued by EPA on February 4th, 2021) and post-removal site control activities (e.g., inspection and maintenance) are ongoing.

o 1½-Mile Reach: Remediation is complete and post-removal site control activities (e.g., inspection and maintenance) are ongoing.

1

Page 8: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

o Rest of River (ROR): For the ROR, investigations under the CD have been underway since 1998. EPA issued its proposed remedial action in 2016 in the form of a RCRA Permit Modification. The Permit was appealed by five parties. A portion of the Permit was upheld and is in effect and other portions of the Permit are on hold. GE has agreed, pursuant to the 2020 Settlement Agreement to commence and perform investigations and design work as contractual obligations effective February 10, 2020. EPA issued a revised Permit for public comment in July 2020 and a Revised Final Permit in December 2020. The CD requires that after EPA issues its final remedy decision and all appeals have been satisfied, GE will implement the cleanup as a CERCLA remedy.

1.2 Field Investigation Description Based on current oversight responsibilities as described in the EPA-approved HDR APTIM JV Technical Approach dated November 18, 2020, HDR APTIM JV (HDR APTIM JV, November 2020), will perform oversight of PRP field activities and sample collection for the following:

• Surface water split sampling at the Silver Lake Outfall and the Pomeroy Avenue Bridge for PCB Aroclors and Congeners;

• Air sampling at the On-Plant Consolidation Area (OPCA)/Allendale School for PCB Aroclors;

• Surface water, soil and sediment split sampling associated with PRP ROR activities for PCB Aroclors and Congeners (surface water only)

HDR APTIM JV will oversee PRP response action field activities as determined is necessary by EPA. The primary goal of PRP oversight is to ensure that the data collected by the PRP is sufficient for the response action that will protect public health and the environment. HDR APTIM JV will meet these objectives by observing and documenting that the PRP has complied with all applicable laws, regulations, and requirements, and has met all performance standards specified in the EPA-approved Work Plan. Furthermore, GE’s data will be compared to EPA split sample results to determine if there may be issues with the quality of GE’s data and PCB concentrations in air at the Allendale School playground will be measured and compared to site-specific action levels and national guidance.

2 Purpose This DMP is site-specific and addresses the data management practices for the GE-Pittsfield/Housatonic River Site. Data will be collected by the PRP and HDR APTIM JV. This DMP addresses all aspects of data planning, collection, management, quality control, analysis, and presentation for this Site.

The primary required data types will be analytical results from surface water, soil, and sediment split samples, and air samples collected during the response action activities for the Site. Input on where to collect split samples will be provided by the EPA Remedial Project Managers (RPM). In general, the parent sample will be collected by the PRP and split sample provided to HDR APTIM JV. HDR APTIM JV will also collect air samples to support EPA’s sampling program. The number and location of split samples proposed is documented in the technical approach and is listed on the following page. Split samples will be collected and analyzed for PCB Aroclors and/or Congeners. Duplicate and matrix spike/matrix spike duplicate (MS/MSD) samples will be provided for laboratory quality control of PCBs.

2

Page 9: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

(Note: MS/MSDs are not required for Congeners). In addition, equipment blank samples will be provided for air samples only.

HDR APTIM JV will provide the personnel to collect environmental split samples. HDR APTIM JV will document sampling and observational field data. HDR APTIM JV will collect, handle, and transport samples in accordance with the approved site-specific Uniform Federal Policy for Quality Assurance Project Plans (UFP-QAPP) (HDR APTIM JV, January 2021). HDR APTIM JV will arrange for the shipment and analysis of splits provided by the PRPs EPA-approved field activities as described below:

• Surface water split sampling for PCB Aroclors and Congeners: o Collect quarterly split samples with GE at two locations (11 events January 2021

through September 2023): the Silver Lake outfall and the Pomeroy Avenue Bridge.

o Collect two split samples as part of Rest of River (ROR) activities.

• OPCA/Allendale School Air sampling for PCB Aroclors: o Collect three samples plus one duplicate and one equipment blank sample (for a total

of five Poly-urethane Foam (PUF) samples per round). Sampling rounds will be conducted in July and September each year, starting in July 2021 for a total of six rounds.

• Soil and Sediment Split Samples for PCB Aroclors: o Collect soil/sediment split samples with GE for activities in ROR

• The number and type of samples collected may be modified to meet changing project needs, such as collecting split samples for the ROR Baseline Monitoring Plan or other ROR characterization activities.

3 Roles/Responsibilities The project-specific core data management team consists of the following roles and staff (see Contacts Table at the beginning of the document):

3.1 Project Manager The primary decision maker responsible for determining remedial activities and clarifying information necessary to successfully manage the site.

3.2 Data Manager The person responsible for implementing the data management sequence, in conjunction with the project manager, as detailed in Section 4.

3.3 Data Collection Personnel The team members responsible for collecting field data including sampling, monitoring and field analytical data.

3

Page 10: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

3.4 Database Support Personnel The team responsible for assistance with imports and exports to/from existing databases, database queries and scripts and QA/QC on data manipulations. Database support personnel also produce data summary table. The data summary tables will be submitted to EPA.

3.5 Data Validator The person responsible for performing laboratory analysis data validation in accordance with USEPA or other protocols. Data validator performs data validation activities that include evaluating and qualifying laboratory analytical data against predefined requirements outlined in the UFP-QAPP. It is assumed that the subcontracted laboratory, Eurofins/TestAmerica, will analyze the samples. An in-house data validator within the HDR APTIM JV will perform data validation activities on data received from Eurofins/TestAmerica, except for congener data. EPA, through its ESAT contractor, will perform data validation for congener data.

3.6 GIS Lead/Support Personnel The person responsible for supporting the data manager through geospatial data management and geospatial presentation/visualization.

3.7 Data QC Reviewer A data team member or outside person responsible for performing QC review of all deliverables (EDDs, data summary tables, logs, figures, etc.) produced by others during the data management process.

4

Page 11: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

4

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 1: Data Management Team

Data Role Name Email Office Phone

Cell Phone

Project/Quality Manager

Melissa LaMacchia [email protected] 201-335-

9391 845-548-6960

Data Manager Jaak Van den Sype [email protected] 201-335-

9437 914-433-3931

Data Collection Personnel Lead

Tom Czelusniak [email protected] 413-212-

7375

Data Collection Alternate 1

Scott Campbell [email protected] 413-449-

1065 413-464-1328

Data Collection Alternate 2

Izabela Zapisek [email protected] 413-449-

1075 508-414-1762

Database Support Personnel

Christine Weaver [email protected] 201-335-

9468 845-667-0122

Data Validator Lynn Lutz [email protected] 303-754-4200

720-633-2380

GIS Lead Frank Brilhante [email protected] 201-335-

9339 914-841-7773

GIS Support Personnel

John Cassels [email protected] 610-384-

4678 610-563-0436

Data QC Reviewer

Hayley Rosado [email protected] 201-335-

9489 862-400-0680

Data Management Sequence Throughout the data management planning and implementation, HDR APTIM JV will request and perform analytical services in compliance with EPA requirements as outlined in our approved technical approach. In general, HDR APTIM JV will follow the Field and Analytical Services Teaming and Advisory Committee (FASTAC) tiered hierarchy for obtaining analytical services.

• Tier 1 – Office of Environmental Measurement and Evaluation (OEME) laboratory (includes Environmental Services Assistance Team (ESAT) support)

• Tier 2 – Contract Laboratory Program (CLP) Routine Analytical Services (RAS), CLP Modified Analysis, or National Non-RAS contracts

• Tier 3 – Regional OEME analytical contract mechanisms

• Tier 4 - Regional Field Sampling Contractor subcontracted laboratory services

5

Page 12: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

To maintain continuity with how analytical services have been provided for the project in the past, Tier 4 analytical services will be provided via a subcontract to Eurofins TestAmerica. HDR APTIM JV will submit a Tier 4 request for approval for each sampling event. The request will be submitted to the EPA RPM to coordinate the appropriate approvals.

4.1 Data Planning Participants - Project Manager, Data Manager and Data Validator The data planning phase is the first step in properly collecting, managing, analyzing and presenting data throughout the life of the project. The data planning phase consists of:

• Review the project’s scope of work to determine the data necessary to complete the project.

• Prepare a Quality Assurance/Quality Control Plan describing the practices and procedures necessary to collect, analyze and interpret defensible data meeting the project objectives. A site-specific UFP-QAPP has been prepared and submitted to the USEPA for review and approval.

• Determine the data comparison criteria. PCB results from air samples collected at Allendale School will be compared to the action level of 0.05 ug/m3. Results from soil, surface water and sediment samples will not be compared to criteria; rather they will be used as a qualitative check on GE data.

• Develop a consistent data nomenclature. Sample names will be descriptive, follow a uniform pattern, account for the possibility of additional sample collection at a future time, and consider pre-existing sample nomenclature. See SOP-SM-03 – Sample Naming in the approved site-specific UFP-QAPP for specific guidance on sample nomenclature.

• Determine the required laboratory reporting format. The laboratory reporting format will follow the requirements listed in the approved site-specific UFP-QAPP.

• Determine the required electronic data deliverables format. The EDD format(s) used for the project will be selected based on database compatibility and the reporting laboratory capability.

• Confirm that the reporting detection limit for the chemicals of concern (COC) provided by the laboratory is appropriate for the project. The subcontract laboratory Eurofins/TestAmerica is able to achieve the reporting detection limits as specified in the QAPP.

• Determine the required data validation level, as applicable. Data Validation activities include evaluating and qualifying laboratory analytical data against predefined requirements outlined in the site specific UFP-QAPP. HDR APTIM JV will perform Tier II data validation of PCB Aroclors in accordance with EPA National and Regional Guidance documents. EPA will perform Tier II data validation of PCB Congeners. Upon completion of the data validation, HDR APTIM JV will upload the data and update the Data Management System

• Identify the data storage location. Data storage will follow HDR APTIM JV’s corporate policy regarding Information Lifecycle Governance. See the Data Management Summary table for storage information on other types of project related data.

• Identify staff who will require access to ProjectWise directories. ProjectWise is project collaboration software from Bentley Systems that allows project teams to manage, share and review project content in a single platform. Following HDR APTIM JV’s corporate policy

6

Page 13: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

regarding Information Lifecycle Governance, the electronic folder management tool provides the capability to apply and manage permissions on project folders. Only users who require access to project directories will be given access.

• Identify the database for storing the analytical data. The EarthSoft EQuIS data management system will be used to manage the analytical data for the site. See section 5 of this DMP for additional information.

• Identify the project deliverables for the analytical data. The data management planning process for the project will include a discussion of what the project deliverables will be and what data is needed to complete the deliverables. Deliverables will include submittals after each sampling event, consisting of full data packages, validation reports, sample summary tables and trip reports (see technical approach for additional details). Also, split sampling data tables will be generated to compare GE results to EPA results to determine if there may be issues with the quality of GE's data. Split Sampling data summary tables will be generated and exchanged with GE for including in GE’s Reports and Documents. Finished products will utilize HDR APTIM JV standard formatting and templates (where applicable). All finished products will undergo QC review and be accompanied by a QC review form.

• Identify the database for storing the geospatial data. All spatial data for the site will be maintained using an ESRI file geodatabase. See section 5 of this DMP for additional information.

• Identify the project deliverables for the spatial data. After receipt of the spatial data from the incumbent contractor, HDR APTIM JV will convert the files to GIS feature classes and format them for compliance with the legacy applications used to present the data cartographically. HDR APTIM JV will use ArcGIS and other graphics support capabilities to generate approximately 50 figures that plot data with GIS information and 25 other figures generated with the ESRI file geodatabase or from commercially available information, such as Google Earth.

7

Page 14: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 2: Data Planning Tasks

Task Link to file/storage location or URL

Name/Date Lab Deliverables – Cat A, B, reduced, full/Validation Level

Example Sample Nomenclature

Scope of Work

Workplan Task Order Proposal – Technical Approach

NA NA

QAPP Prepared

QAPP QAPP/January 2021 NA NA

Laboratory Reporting Format

NA QAPP/January 2021 NA NA

EDD Format As provided by the laboratory

QAPP/January 2021 NA NA

Detection Limit

QAPP QAPP/January 2021 NA NA

Data Validation Level

QAPP QAPP/January 2021 Tier II NA

Soil Boring Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA E2-BH000023-0-0015

Sediment Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA H3-SD040592-0-0000

Surface Water Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA SL-SW000059-0-0A22

Indoor Air Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA AS-AR000056-0-0L15

Performance Evaluation Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA E2-BH000023-6-0015

8

Page 15: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 2: Data Planning Tasks

Task Link to file/storage location or URL

Name/Date Lab Deliverables – Cat A, B, reduced, full/Validation Level

Example Sample Nomenclature

Equipment Blank Sample Nomenclature

QAPP QAPP/January 2021 – Attachment C

NA E2-BH000023-2-0015

4.2 Data Collection Participants – Project Manager, Data Manager, Data Collection Personnel Data generated during the collection phase includes, but is not limited to, visual and olfactory observations and photographs. Procedures for collecting split samples for laboratory analyses and the types of analyses to be conducted during the removal action are provided in the site-specific UFP-QAPP.

The data collection phase will consist of the following:

• Search for and obtain existing data from other sources including the following:

o GE Monthly Reports - GE will provide data submissions quarterly basis or following any major sampling event to HDR APTIM JV. These submissions will be posted to SharePoint site set up by EPA and designated specifically for DB exchanges and available for download.

o Weston Access database - The data from the Weston Access database will be migrated into the EQuIS database format (Microsoft SQL Server based) for ease of use and accessibility. Data will be exported from the Weston Access database using queries into a format that matches an EQuIS EDD format. The exported data will be loaded to the EQuIS database. All of the data from the Weston Access database will be available and accessible from the EQuIS database when needed. The original Weston Access database will be archived and stored.

o Weston Geospatial data - The incumbent contractor provided their spatial data and GIS files to HDR APTIM JV. The files will be reviewed and catalogued for their potential use in future deliverables. The spatial data will be converted to GIS feature classes and incorporated into an ESRI file geodatabase where appropriate. The original GIS files and data will be archived and stored

• Obtain new data from the removal action oversight activities including the following:

o Surface water split sampling for PCB Aroclors and Congeners: Collect quarterly split samples with GE at two locations (11 events January

2021 through September 2023): the Silver Lake outfall and the Pomeroy Avenue Bridge.

Collect two split samples as part of Rest of River.

9

Page 16: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

o OPCA/Allendale School Air sampling for PCB Aroclors and Congeners: Collect three samples plus one duplicate and one equipment blank sample (for

a total of five Poly-urethane Foam (PUF) samples per round). Sampling rounds will be conducted in July and September each year, starting in July 2021 for a total of six rounds.

o Soil and Sediment Split Samples for PCB Aroclors and Congeners: Collect soil/sediment split samples with GE for activities in ROR

Samples will be analyzed by the Eurofins/TestAmerica and results will be reported in EDD format which will be loaded to the EQuIS database.

• Document field activities, specifically recording measurements, observations, preparation of chains of custody (COCs) in the field, using either electronic means, or traditional hard copy. A trip report will be completed after each round of sampling. A Field Log will be maintained with detailed observations at the Site, including interactions with all parties, results of field tests, observations about conformance with the task order-specific plans and deviations from the approved plans. Field notebooks/journals and logs may be supplemented by photographs and/or videotaping and will include:

o Time, date, location, and weather conditions

o Visual characterization/description of site conditions

o Listing of all on-site personnel (full name, title, and affiliation)

o Tasks where oversight is being conducted

o A complete description of all activities

o Sample collection procedures and sample description

o Sample IDs, locations, and depths

o Descriptions of any issues or problems, and field deviations from the approved PDI work plan and protocols (including the HASP and QAPP). Any corrective actions/rectification measures that are planned or implemented will also be recorded.

The following documents will be prepared and submitted to the USEPA documenting the field activities:

• After each sampling round, a trip report will be prepared and will consist of a short summary of significant field events during the period, photographs taken during the period, and a copy of all field logs.

• Secure transfer and storage of field documentation. Daily field documentation including a copy of the field logbook and photographs will be promptly saved on a server or device backed-up daily at the direction of the Project Manager. At a minimum, field documentation should be photographed with a cell phone each day and saved under a project directory with a link sent to the project manager as a backup if loss of hard copies/field books occurs.

• Review and correction of COC information after receipt and log-in of samples at the laboratory the following day

10

Page 17: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 3: Data Collection Tasks

Task Link to file/storage location or URL

Name/Source/Date Hard Copy or Electronic/Format

Existing Data GE Monthly Reports

Weston Database

Geospatial Data

GE Monthly Reports

Weston Database

Geospatial Data

Electronic

Recording and Saving Field Data

Environmental Split Sample Collection

NA Electronic

Daily/Field Reports

Field Oversight NA Electronic

COC Data Entry Process

Environmental Split Sample Collection

NA Electronic

COC Review/Tracking Process

Environmental Split Sample Collection

NA Electronic

4.3 Data Verification Participants - Project Manager, Data Manager, Data Collection Personnel, Data Validator, GIS Lead The data verification phase consists of:

• Respond to questions from the laboratory regarding sample issues during laboratory analysis

• Review of preliminary laboratory data for completeness and adherence to scope. Examples include making certain all the requested analyses were performed using the correct laboratory methods, all samples on the COC are accounted for, and the laboratory did not create sample nomenclature errors (i.e., typos)

• Request the laboratory run contingency samples/analyses

• Provide the data validator with the QAPP in advance of validation

• Review the final laboratory report and EDD formats for adherence to scope

• Production of field notes and photographic logs of field documentation shortly after demobilization by Data Collection Personnel. This is particularly important while still fresh in the minds of the field staff.

11

Page 18: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 4: Data Verification Tasks

Task Link to file/storage location or URL

Project Requirement (y/n)

Laboratory Correspondence Documentation

3.2_WIP Y

Field Notes Field Oversight Y

Photographic Logs Field Oversight Y

4.4 Data Validation Participants - Project Manager, Data Manager, Data Validator, Database Support Personnel It is anticipated that split surface water, soil and sediment samples to be collected will be analyzed by the subcontracted Eurofins/TestAmerica laboratory following the FASTAC process. Data validation of PCB Aroclors will be performed by the HDR APTIM JV Chemist; data validation memos will accompany each sampling round/trip report. EPA will perform data validation of PCB Congeners.

Data Validation activities include evaluating and qualifying laboratory analytical data against predefined requirements outlined in the UFP-QAPP. If required, HDR APTIM JV will perform in-house data validation activities on data from the following sources: CLP, regional laboratory contracts, EPA Regional Laboratories, potentially responsible parties (PRPs), EPA field contractors, and other sources. HDR APTIM JV will submit the required data validation report to the EPA according to the UFP-QAPP.

The data validation phase will consist of:

• Receive the preliminary and final laboratory analysis reports and EDDs from the laboratory

• Prepare preliminary data summary tables for the data validator’s use

• Delivery of the EDDs to the validator for qualification

• Communicate with the analytical laboratory to provide any missing information required by the validator

• Prepare the data validation report and qualified EDDs. HDR APTIM JV will complete data validation reports for HDR APTIM JV’s split sample data after each sampling round. EPA’s ESAT contractor will conduct the data validation for congener sampling and will provide a report to HDR.

• The PRPs’ data validation information will not be included in this report.

Table 5: Data Validation Tasks

Task Link to file/storage location or URL Project Requirement (y/n)

Final Lab Reports Analytical Services Support Y

12

Page 19: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 5: Data Validation Tasks

Task Link to file/storage location or URL Project Requirement (y/n)

Supplemental Lab Information

Analytical Services Support Y

EDDs (prelim) Analytical Services Support Y

EDDs (qualified) Data Validation Y

Data Validation Reports Data Validation Y

4.5 Data Reduction Participants - Project Manager, Data Manager, Database Support Personnel, GIS Lead, QC Reviewer The data reduction phase consists of:

• Checking final, qualified EDDs using EQuIS or similar software

• Uploading final EDDs to a database for storage and processing

• Production of data summary tables for review and reporting

• Production of sample summary table for review and reporting

• Production of sample location map

• Production of GIS figures and other visualization of data

• QC review of each deliverable in the bullets above

Table 6: Data Reduction Tasks

Task Link to file/storage location or URL File Checker, Database Types, Coordinate System

EDD Checker 4.2_WIP EDP

Database for Storage – Analytical Data

mahpi-dbsql01\ sqlexpress EQuIS

Database for Storage – Spatial Data

\\nj-mahwah\ActiveProjects\237011\ 20000362\10265786\7.0_GIS_Models

ArcGIS

GIS Horizontal Coordinate System

NA NAD83 MA State Plane, Mainland zone, US-meter

GIS Vertical Datum NA NAVD88, US-feet

13

Page 20: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

5 Data Management Systems 5.1 Analytical Data Management 5.1.1 EQuIS HDR uses the EarthSoft EQuIS environmental data management system to manage and store all of its environmental data. The EQuIS system is comprised of the EQuIS Data Processor and EQuIS Professional. More information can be found at: www.earthsoft.com

5.1.2 Access Microsoft Access may also be used either independently or in conjunction with EQuIS to store environmental data.

5.2 Spatial Data Management HDR APTIM JV uses ESRI’s ArcMap or ArcGIS Pro to spatially display its environmental data. Geospatial data will be saved to a geodatabase. More information can be found at: https://www.esri.com/en-us/home.

6 Data Management Summary The table below summarizes the various types of data defined by the Data Management Plan. Detailed descriptions follow.

Table 7: Data Management Summary Data Input Description Collection

Strategy Deliverable Repository

Site Documents • HASPs • QAPPs • DMP

Documents related to the Site or Site data.

HDR APTIM JV generates Site documents

Microsoft office Formats, PDF Project and/or Data Manager uploads documents and metadata to ProjectWise or other Shared Directory

• Daily Field Reports

• Weekly Oversight Reports

• Monthly Oversight Reports

• Final Field Oversight Summary Report

• Data Validation Reports

• Evaluation Technical Memorandum

Site Images Photos related to the site or site data

Field staff collects site photos.

jpg, tiff - All with associated metadata table which is also uploaded and maintained in ProjectWise

Project and/or Data Manager uploads photos and metadata to ProjectWise or other Shared Directory

14

Page 21: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

Table 7: Data Management Summary Data Input Description Collection

Strategy Deliverable Repository

Analytical Data Results data for samples

Labs generate Electronic Data Deliverable

Lab EDD is validated and imported to EQuIS

Data Manager verifies EDD and imports data into EQuIS

Validation Qualifiers Validation Qualifiers

Data validators generate and report validation qualifiers.

Data manager enters qualifiers into EDD and imports data into EQuIS; data is also uploaded to ProjectWise or other Shared Directory;

6.1 Site Documents Site documents contain planning information pertaining to the activities performed at the Site. This includes documents such as the Health and Safety Plan (HASP), Quality Assurance Project Plan (QAPP) and other site related data management documents. Site documents will be maintained on HDR’s ProjectWise.

6.2 Site Images Site images include maps and photographs related to the site and/or previous sampling events. Site images will be maintained on HDR’s ProjectWise.

6.3 Geospatial Data Geospatial data are native files used in mapping programs, including ArcMap documents and shapefiles, CADD drawings, images and accompanying correspondence. All geospatial data will be maintained on HDR’s ProjectWise. Local copies may be downloaded to a shared directory for loading to ArcGIS geodatabases for use in figure preparation.

6.4 Sampling Data Sampling data are all files and correspondence regarding the field sampling event, including field notes, measurements from field devices, photographs and accompanying correspondence. All sampling data will be maintained on ProjectWise. Local copies may be downloaded to a shared directory for loading to the EQuIS database.

6.5 Analytical Data Analytical data are all files and correspondence regarding laboratory analysis of samples, including laboratory reports, EDDs and accompanying correspondence. All analytical data will be maintained on ProjectWise. Local copies may be downloaded to a shared directory for loading to the EQuIS database.

6.6 Validated Data Validated data are all files and correspondence regarding the validation of analytical data, including original EDDs, validated EDD, validation reports and accompanying correspondence. All validation

15

Page 22: DATA MANAGEMENT PLAN - RESPONSE ACTION OVERSIGHT

HDR APTIM a Joint Ventu-e

7

8

FINAL – GE-Pittsfield/Housatonic River Site/Response Action Oversight February 2021

data and reports will be maintained on ProjectWise. Local copies may be downloaded to a shared directory for loading to the EQuIS database.

Data Coordination An important component of the management of site data will be the coordination of data sharing between agencies. This will be accomplished by identifying a Project Data Point of Contact (POC) for each agency. As agency data POCs are identified, they will be detailed in the table below.

Data POC Agency Email Phone Melissa LaMacchia HDR APTIM JV [email protected] 201-335-

9391 Jaak Van den Sype HDR APTIM JV [email protected] 201-335-

9437

Tom Czelusniak HDR APTIM JV [email protected] 413-212-7375

Izabela Zapisek1 HDR APTIM JV [email protected] 413-449-1075

Scott Campbell1 HDR APTIM JV [email protected] 413-449-1065

Dean Tagliaferro EPA [email protected] 617-918-1282

Jim Madison Eurofins TestAmerica [email protected] 802-923-

1028

John Cassels GEODESY, INC. [email protected] 610-563-0436

1 Team subcontractor to HDR APTIM JV

References HDR APTIM JV. 2021. Uniform Federal Policy for Quality Assurance Project Plan, GE-Pittsfield/Housatonic River Site – Response Action Oversight, January 2021

HDR APTIM JV. 2020. Task Order Proposal for GE-Pittsfield/Housatonic River Site – Response Action Oversight, November 2020

EPA. 2000. State of Connecticut, Commonwealth of Massachusetts v. General Electric Company. Consent Decree.

16