Agenda
Radio resources management
Best-effort TBF resources allocation / reallocation
CS pre-emption process
QoS counters and indicators
8/23/2019 Data Resources Management
3/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 3
Agenda
Radio resources management
Best-effort TBF resources allocation / reallocation
CS pre-emption process
QoS counters and indicators
8/23/2019 Data Resources Management
4/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 4
Autonomous Packet Resource Allocation
Contrary to the previous BSS releases and thanks to theAutonomous Packet Resource Allocation feature (alsocalled RAE-4 for Resource Allocation Enhancements n4),
the MFS no longer needs to request additional SPDCHto the BSC, as all the usable PS capable radio timeslotsare explicitly allocated to the MFS through the RRAllocation Indication message
8/23/2019 Data Resources Management
5/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 5
Messages between BSC and MFS (1/3)
As in previous releases a coordination is performedbetween the MFS and the BSC to allocate radio timeslotsfor the PS traffic
The protocol between the MFS and the BSC to handle radioresources uses two BSCGP messages which are new in B9release
they replace the Radio Allocation Request/Confirm and RadioDeallocation Command/Complete used in B8 release by the MFS andthe BSC
moreover the Load Indication message used in B8 release is no moreused in B9 release
8/23/2019 Data Resources Management
6/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 6
Messages between BSC and MFS (2/3)
RR Allocation Indication:
this message is sent from the BSC to the MFS to provide the MFSwith the location of the allocated SPDCH
this message is transmitted periodically every RR_ALLOC_PERIOD *TCH_INFO_PERIOD seconds = 2 * 5 seconds
a bitmap named SPDCHs_Allocation is defined within this messageand indicates whether available timeslots in the cell are allocated ornot to the MFS. The bitmap is present for all the available PS capableTRX of a cell, even if no SPDCH is allocated to the MFS for a given
TRX
8/23/2019 Data Resources Management
7/136All rights reserved 2005, AlcatelData resources management /August 2005
Page 7
Messages between BSC and MFS (3/3)
RR Usage Indication:
this message is sent from the MFS to the BSC periodically (everyTCH_INFO_PERIOD seconds) or in response to a Radio ResourceAllocation Indication message
it provides the BSC with the location of the SPDCH allocated to the MFS (inaccordance with the Radio Resource Allocation Indication messagesreceived from the BSC)
it also provides the BSC with the current usage of the allocated SPDCH, i.e.whether the SPDCH carries PS traffic or not, or whether its basic Abis nibbleis available or not
four bitmaps are defined within the RR Usage Indication message:
SPDCHs_Confirmation bitmap, SPDCHs_Usage bitmap and SPDCHs_RadioUsagebitmap. A fourth bitmap called DTM TCH bitmap indicates the DTM TCH usage of theSPDCH (this last bitmap is defined as a provision for further use, and all its bits arealways set to 0)
these four bitmaps are present for all the available PS capable TRX of a cell, even ifno SPDCH is allocated to the MFS for a given TRX
8/23/2019 Data Resources Management
8/136All rights reserved 2005, AlcatelData resources management /August 2005
Page 8
MFS / BSC synchronisation (1/5)
With the Autonomous Packet Resource Allocation feature,the SPDCH resource management is based on bitmapexchanges between the MFS and the BSC
The BSC informs the MFS about the SPDCH allocations(which ones are allocated to the MFS and which ones areallocated to the BSC)
On receipt of a RR Allocation Indication message, theMFS sends a RR Usage Indication containing aSPDCHs_Confirmation bitmap and a SPDCHs_Usagebitmap
8/23/2019 Data Resources Management
9/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 9
MFS / BSC synchronisation (2/5)
Three SPDCH allocation states are defined in the MFS: not allocated: this state corresponds to a SPDCH that is currently not
allocated to the MFS (i.e. it is allocated to the BSC)
allocated: this state corresponds to a timeslot which is allocated to the
MFS. A timeslot in the allocated state can either be unused or used tosupport some TBF
de-allocating: this state corresponds to a radio timeslot for which theBSC has requested to the MFS a de-allocation (through a RR
Allocation Indication message) but the confirmation of the de-allocation has not yet been done (through a RR Usage Indication
message). That confirmation will be sent after the CS pre-emptionprocess is over (on TCH_INFO_PERIOD timer expiry), i.e. after all theimpacted TBF have been handled (e.g. through T1 reallocations) andafter the SPDCHs basic Abis nibbles have been fetched back
8/23/2019 Data Resources Management
10/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 10
MFS / BSC synchronisation (3/5)
The reception of a RR Allocation Indication message fromthe BSC allows the MFS to update itsSPDCHs_Confirmation bitmap. The role of this bitmap is toindicate the status of each SPDCH from the point of view ofthe MFS and also to acknowledge the allocation of SPDCHnewly granted by the BSC and the deallocation of SPDCHgiven back to the BSC. The value of each bit in theSPDCHs_Confirmation bitmap has the following meaning:
0: this SPDCH is not allocated to the MFS (SPDCH allocation state isnot allocated)
1: this SPDCH is allocated to the MFS (SPDCH allocation state isallocated or de-allocating)
8/23/2019 Data Resources Management
11/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 11
MFS / BSC synchronisation (4/5)
The MFS also takes a picture of the current SPDCH usageand updates the SPDCHs_Usage bitmap accordingly. Thevalue of each bit in the SPDCHs_Usage bitmap has thefollowing s meaning:
0: this SPDCH is either allocated to the MFS and unused (*), or isnot allocated to the MFS
1: this SPDCH is allocated to the MFS and used (*)
(*) a radio timeslot is said to be used if at least one TBF, RT PFC or
one UL block has some radio resources allocated on it, and/or if itsbasic Abis nibble is being used by a GCH channel or is still switchedto an Ater nibble in the BSC. Else the radio timeslot is said to beunused
8/23/2019 Data Resources Management
12/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 12
MFS / BSC synchronisation (5/5)
The MFS also updates the SPDCHs_RadioUsage bitmap.The bit value has the following meaning:
0: this SPDCH is either allocated to the MFS and there is no TBFallocated on it, or is not allocated to the MFS
1: this SPDCH is allocated to the MFS and there is at least one TBFallocated on it
8/23/2019 Data Resources Management
13/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 13
Non preemptable PS zone in a cell (1/2)
Among the radio TS usable for PS traffic (i.e. the radio TS which arecurrently in allocated MFS state), some of them cannot be preemptedby the BSC (due to CS traffic) if they have previously been reported asbeing used for PS traffic (in a RR Usage Indication message sent by
the MFS)
At MFS level, those radio TS are said to belong to the non preemptablePS zone of the cell
The limit of the non preemptable PS zone is given by theNon_Preemptable_PS_Zone_Limit value provided in the RR AllocationIndication message (it corresponds to the limit of theMAX_SPDCH_HIGH_LOAD zone of the BSC)
8/23/2019 Data Resources Management
14/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 14
Non preemptable PS zone in a cell (2/2)
At RR Allocation Indication message reception by theMFS, all the non preemptable radio TS are marked asbelonging to the non preemptable PS zone. This radio TSmarking shall only be reevaluated when receiving anotherRR Allocation Indication message
Remark : the non preemptable PS zone of a cell can bemodified, for example, in case of TRX addition in the cell, in
case of TRE failure in the cell, in case of change of theMAX_PDCH_HIGH_LOAD parameter value by theoperator, or in case of TRX ranking modification
8/23/2019 Data Resources Management
15/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 15
Load evaluation (1/5)
The BSC takes every TCH_INFO_PERIODs a sample of the currentusage on TCH, TCH/SDCCH and TCH/SPDCH TS
At the expiry of the TCH_INFO_PERIOD timer, the timer is re-startedand the following load samples are calculated:
NB_USED_CS_TS(k) NB_USED_PS_TS(k)
NB_USED_TS(k) = NB_USED_CS_TS(k) + NB_USED_PS_TS(k)
NB_UNUSED_TS(k)
TCH_INFO_PERIOD = 5s
NB_USED_CS_TS(k)
NB_USED_PS_TS(k)NB_USED_TS(k)
NB_UNUSED_TS(k)
8/23/2019 Data Resources Management
16/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 16
Load evaluation (2/5)
NB_USED_CS_TS(k): number of available timeslots handled by theBSC and carrying CS traffic in the cell at sampling instant tk
a TS is taken into account in the evaluation of NB_USED_CS_TS(k) if:
SPDCH allocation state = not allocated
Occupancy state = used (i.e. the TS is currently carrying CS traffic or isallocated as SDCCH)
NB_USED_PS_TS(k): number of available timeslots used for PStraffic in the cell at sampling instant tk
a TS is taken into account in the evaluation of NB_USED_PS_TS(k) if: SPDCH allocation state = allocated or de-allocating
Occupancy state = used
8/23/2019 Data Resources Management
17/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 17
Load evaluation (3/5)
NB_UNUSED_TS(k): at the expiry of TCH_INFO_PERIOD timer, theBSC computes the number of unused timeslots at sampling instant tk NB_UNUSED_TS(k) = NB_TS(k) NB_USED_CS_TS(k)
max(MIN_SPDCH(k), NB_USED_PS_TS(k))
NB_TS(k): total number of TCH, TCH/SDCCH or TCH/SPDCH timeslotsavailable in the cell. This parameter is re-computed everyRR_ALLOC_PERIOD * TCH_INFO_PERIOD to take into account possibleTRX failure
MIN_SPDCH(k): minimum number of SPDCHs that are always allocated tothe MFS. This parameter is re-computed every RR_ALLOC_PERIOD *
TCH_INFO_PERIOD to take into account possible TRX failure
8/23/2019 Data Resources Management
18/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 18
Load evaluation (4/5)
Load evaluation: for each cell, every RR_ALLOC_PERIOD * TCH_INFO_PERIOD, the
BSC computes three averaged values through a sliding window ofsize LOAD_EV_PERIOD_GPRS (default value = 3):
AV_USED_CS_TS(k) =
(1/LOAD_EV_PERIOD_GPRS)*i=0 to LOAD_EV_PERIOD_GPRS -1NB_USED_CS_TS(k-i)
AV_USED_PS_TS(k) =
(1/LOAD_EV_PERIOD_GPRS)*i=0 to LOAD_EV_PERIOD_GPRS -1NB_USED_PS_TS(k-i)
AV_UNUSED_TS(k) =
(1/LOAD_EV_PERIOD_GPRS)*i=0 to LOAD_EV_PERIOD_GPRS -1 NB_UNUSED_TS(k-i)
8/23/2019 Data Resources Management
19/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 19
Load evaluation (5/5)
TCH_INFO_PERIOD = 5s
AV_USED_CS_TS(k)
AV_USED_PS_TS(k)
AV_UNUSED_TS(k)
NB_USED_CS_TS(k)
NB_USED_PS_TS(k)
NB_USED_TS(k)
NB_UNUSED_TS(k)
kk-1k-2
LOAD_EV_PERIOD = 3
k+1 k+2
AV_USED_CS_TS(k+2)
AV_USED_PS_TS(k+2)
AV_UNUSED_TS(k+2)
RR_ALLOC_PERIOD * TCH_INFO_PERIOD
8/23/2019 Data Resources Management
20/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 20
MAX_SPDCH_LIMIT calculation (1/7)
MAX_SPDCH_LIMIT calculation:
the BSC periodically (every RR_ALLOC_PERIOD *TCH_INFO_PERIOD) computes the number of Slave PDCHs that itcan provide to the MFS: MAX_SPDCH_LIMIT
MAX_SPDCH_HIGH_LOAD
Computation of CS/PS
Margin
AV_USED_CS_TSAV_USED_PS_TSAV_UNUSED_TS
NB_TS_DEFINEDNB_TS_SPDCH
Computation of
Thresholds
THR_MARGIN_PRIORITY_CSTHR_MARGIN_PRIORITY_PS
NB_TS
MARGIN_PRIORITY_CSMARGIN_PRIORITY_PS
Computation of
MAX_SPDCH_LIMIT
MAX_PDCH_HIGH_LOADMAX_PDCHMIN_PDCH
NB_TS_MPDCH
MAX_SPDCH_LIMIT
MIN_SPDCHMAX_SPDCH
O&M parameters
O&M parameter= 100 HIGH_TRAFFIC_LOAD_GPRS
8/23/2019 Data Resources Management
21/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 21
MAX_SPDCH_LIMIT calculation (2/7)
Calculation of MIN_SPDCH, MAX_SPDCH andMAX_SPDCH_HIGH_LOAD:
re-evaluated every RR_ALLOC_PERIOD * TCH_INFO_PERIOD totake into account TRX failures
introduction of a ratio named AVAILABILITY_TS_RATIO(k), evaluatedperiodically every RR_ALLOC_PERIOD * TCH_INFO_PERIOD atinstant tk:
= NB_TS(k) / NB_TS_DEFINED
NB_TS_DEFINED: total number of TCH, TCH/SDCCH or TCH/SPDCH
timeslots available in the cell if there is no TRX failure. This parameter isretrieved from the O&M configuration of the cell
8/23/2019 Data Resources Management
22/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 22
MAX_SPDCH_LIMIT calculation (3/7)
Calculation of MIN_SPDCH, MAX_SPDCH andMAX_SPDCH_HIGH_LOAD:
MAX_SPDCH(k) = RoundUp[ min(MAX_PDCH NB_TS_MPDCH,NB_TS_SPDCH) *AVAILABILITY_TS_RATIO(k) ]
NB_TS_SPDCH: total number of TCH/SPDCH timeslots available in the cellif there is no TRX failure. This parameter is retrieved from the O&Mconfiguration of the cell
MAX_SPDCH_HIGH_LOAD(k) = RoundUp[ min(MAX_PDCH_HIGH_LOAD NB_TS_MPDCH, NB_TS_SPDCH) *
AVAILABILITY_TS_RATIO(k) ]MIN_SPDCH(k) = RoundUp[ (MIN_PDCH NB_TS_MPDCH) *
AVAILABILITY_TS_RATIO(k) ]
8/23/2019 Data Resources Management
23/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 23
MAX_SPDCH_LIMIT calculation (4/7)
Margins for CS and PS traffics: two new margins, one for CS traffic and one for PS traffic are
introduced to guarantee that a certain number of timeslots are keptavailable for the arrival of new calls between two transmissions of the
RR Allocation Indication message: the first margin, named MARGIN_PRIORITY_CS, is dedicated to CS traffic
the second margin, named MARGIN_PRIORITY_PS, is dedicated to PStraffic
these two margins are re-evaluated every RR_ALLOC_PERIOD *TCH_INFO_PERIOD, before the computation of MAX_SPDCH_LIMIT
MARGIN_PRIORITY_CS(k) = (THR_MARGIN_PRIO_CS *(NB_TS(k) MAX_SPDCH_HIGH_LOAD(k)) / 100
MARGIN_PRIORITY_PS(k) = (THR_MARGIN_PRIO_PS *MAX_SPDCH_HIGH_LOAD(k)) / 100
8/23/2019 Data Resources Management
24/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 24
MAX_SPDCH_LIMIT calculation (5/7)
MAX_SPDCH_LIMIT calculation:
the basic idea to evaluate MAX_SPDCH_LIMIT is to estimate thenumber of unused TS and to share them between CS and PS traffic,taking into account both margins (for CS and PS traffics) defined to
guarantee a certain number of TS available to serve incoming calls
Computation of
MAX_SPDCH_LIMIT_CS
MARGIN_PRIORITY_CS
AV_USED_CS_TS(k)AV_UNUSED_TS(k)
MAX_SPDCH_LIMIT_CS(k)
Computation of
MAX_SPDCH_LIMIT_PSAV_USED_PS_TS(k)
MAX_SPDCH_LIMIT_PS(k)
MIN_SPDCHMARGIN_PRIORITY_PS
Computation of
MAX_SPDCH_LIMIT
MAX_SPDCHMAX_SPDCH_HIGH_LOAD
MAX_SPDCH_LIMIT(k)
8/23/2019 Data Resources Management
25/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 25
MAX_SPDCH_LIMIT calculation (6/7)
MAX_SPDCH_LIMIT calculation:
MAX_SPDCH_LIMIT_CS:
determines the maximum number of SPDCHs that can be allocated to the MFS inorder to ensure that a certain number of timeslots (margin) is kept in the BSC to servepossible incoming CS requests received between two sendings of the RR Allocation
Indication message MAX_SPDCH_LIMIT_CS(k) = RoundDown [ NB_TS(k) AV_USED_CS(k) -
MARGIN_CS(k) ]
MARGIN_CS(k) = max(MARGIN_PRIORITY_CS(k), AV_UNUSED_TS(k) / 2)
MAX_SPDCH_LIMIT_PS:
determines the minimum number of SPDCHs that should be allocated to the MFS inorder to ensure that a certain number of timeslots (margin) is kept in the MFS to
possibly serve incoming PS requests if AV_USED_PS_TS(k) is lower or equal than MIN_SPDCH then
MAX_SPDCH_LIMIT_PS(k) = MIN_SPDCH(k)
else MAX_SPDCH_LIMIT_PS(k) = RoundUp (AV_USED_PS_TS(k) +MARGIN_PRIORITY_PS(k))
8/23/2019 Data Resources Management
26/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 26
MAX_SPDCH_LIMIT calculation (7/7)
MAX_SPDCH_LIMIT calculation:
it can be in the range of [MIN_SPDCH, MAX_SPDCH]
its value can be either MAX_SPDCH_LIMIT_CS or
MAX_SPDCH_LIMIT_PS
Zone whereMAX_SPDCH_LIMIT = MIN( MAX_SPDCH,
MAX_SPDCH_LIMIT_CS)
Zone whereMAX_SPDCH_LIMIT = MIN(MAX_SPDCH_LIMIT_PS,
MAX_SPDCH_HIGH_LOAD)
0
MAX_SPDCH
MAX_SPDCH_HIGH_LOAD
MIN_SPDCH
MIN_SPDCH
MAX_SPDCH_LIMIT_CS
MAX_SPDCH_HIGH_LOAD MAX_SPDCH
MAX_SPDCH_LIMIT_PS
8/23/2019 Data Resources Management
27/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 27
TRX priority
The way to set the priority of the PS capable TRX(TRX_PREF_MARK = 0) is slightly modified in B9 releasewith the introduction of a frequency band criterion:
PS_PREF_BCCH_TRXHW TRE capability (G4 HP -> G4 MP -> G3)
DR TRE capability (FR TRX -> DR TRX)
E-GSM TRX preference (new in B9, E-GSM TRX -> P-GSM/GSM850/DCS TRX)
TRX having the maximum number of consecutive SPDCHsTRX identity (low TRX id -> high TRX id)
8/23/2019 Data Resources Management
28/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 28
MAX_SPDCH_LIMIT TS selection (1/13)
PS TS and TRX ordering:
the first step consists in ordering the PS timeslots and the PS TRX soas to obtain an ordered list of TCH/SPDCH timeslots
the ordering of the timeslots is based on the following criteria: selection of the TRX: the TRX having the lowest rank in the TRX ranking
table (refer to the slide on TRX priority) is selected first
selection of the TS: once the TRX has been selected, the TCH/SPDCHtimeslots having the lowest timeslot index, i.e. located at the most left sideof the TRX, is selected first
8/23/2019 Data Resources Management
29/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 29
MAX_SPDCH_LIMIT TS selection (2/13)
Different PS TS zones:MAX_SPDCH_HIGH_LOAD zone:
this zone corresponds to the MAX_SPDCH_HIGH_LOAD consecutive PScapable TS that are preferred for PS allocation
in this zone, allocated TBFs cannot be pre-emptedNon pre-emptable PS zone:
this zone is always inside the MAX_SPDCH_HIGH_LOAD zone
in this latter zone, we search for the rightest TS allocated to the MFS andused. Then, all the TS located at its left define the non pre-emptable PSzone
inside this zone, a TS: remains allocated to the MFS if already allocated to the MFS
is allocated to the MFS if previously allocated to the BSC and unused
remains allocated to the BSC if already allocated to the BSC and used
8/23/2019 Data Resources Management
30/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 30
MAX_SPDCH_LIMIT TS selection (3/13)
Different PS TS zones:
MAX_SPDCH_LIMIT zone:
this zone corresponds to the MAX_SPDCH_LIMIT consecutive PS capableTS that are preferred for PS allocation
inside this zone, a TS:
remains allocated to the MFS if already allocated to the MFS
is allocated to the MFS if previously allocated to the BSC and unused
remains allocated to the BSC if already allocated to the BSC and used
PS traffic zone:
this zone corresponds to the larger zone between the non pre-emptable PSzone and the MAX_SPDCH_LIMIT zone
8/23/2019 Data Resources Management
31/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 31
MAX_SPDCH_LIMIT TS selection (4/13)
Different PS TS zones:
example: MAX_SPDCH_HIGH_LOAD = 8, MAX_SPDCH_LIMIT = 10
example: MAX_SPDCH_HIGH_LOAD = 8, MAX_SPDCH_LIMIT = 3
TRX2 TRX1
1 3 42 5 6 7 8 9 10 1211 13 14 15 16
MAX_SPDCH_LIMIT zone
PS CSPS CS CSCS CS
MAX_SPDCH_HIGH_LOAD zone
PS PS PS PS
Non pre-emptable PS zone
PS traffic zone
TRX2 TRX1
1 3 42 5 6 7 8 9 10 1211 13 14 15 16
MAX_SPDCH_LIMIT zone
PS CSPS CS CSCS CS
MAX_SPDCH_HIGH_LOAD zone
PS CS CS
Non pre-emptable PS zone
PS traffic zone
CS
8/23/2019 Data Resources Management
32/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 32
MAX_SPDCH_LIMIT TS selection (5/13)
Selection of the TCH/SPDCH TS:
to be selected, the states of a TCH/SPDCH timeslot must have thefollowing values:
SPDCH allocation state = allocated: the timeslot is already allocated to theMFS
SPDCH allocation state = not allocated and occupancy state = unused:the timeslot is allocated to the BSC but there is no CS traffic on it
8/23/2019 Data Resources Management
33/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 33
MAX_SPDCH_LIMIT TS selection (6/13)
Selection of the TCH/SPDCH TS:
the process begins with the non pre-emptable PS zone:
all the TS in this zone that can be or are allocated to the MFS are allocated to theMFS. The verification in terms of number of TS allocated to the MFS is done onlywhen all the TS inside this zone have been handled
if at the end of the non pre-emptable PS zone, the number of selected TS forthe MFS is strictly lower than MAX_SPDCH_LIMIT then the process ofselection continues in the MAX_SPDCH_LIMIT zone
if at the end of the MAX_SPDCH_LIMIT zone, the number of selected TS forthe MFS is still lower than MAX_SPDCH_LIMIT, the process continuesoutside this zone until this number reaches MAX_SPDCH_LIMIT
once MAX_SPDCH_LIMIT TS have been selected, all the remainingTCH/SPDCH TS are now allocated to the BSC, even if they were previouslyallocated to the MFS. This means that a TS with a SPDCH allocation state setto allocated that is no more allocated to the MFS, has its SPDCH allocationstate set to de-allocating
8/23/2019 Data Resources Management
34/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 34
MAX_SPDCH_LIMIT TS selection (7/13)
Pre-reservation mechanism in the PS traffic zone:
in order to increase the PS capacity and limit the occurrence of holesin the SPDCHs_Allocation bitmap, each TCH/SPDCH capable TScarrying CS traffic and located inside the PS traffic zone, has its pre-
reservation state set to pre-reserved for PS. No new incoming CScall can be served on this TS, if it becomes unused once it is pre-reserved for PS. This is valid until the TS becomes not pre-reservedfor PS again and of course still handled by the BSC
the modification of the value of the pre-reservation state can onlyoccur when the SPDCHs_Allocation bitmap is built, everyTCH_INFO_PERIOD * RR_ALLOC_PERIOD seconds
8/23/2019 Data Resources Management
35/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 35
MAX_SPDCH_LIMIT TS selection (8/13)
Pre-reservation mechanism in the PS traffic zone:
the following transition can be foreseen for a timeslot inside the PS trafficzone:
it goes from not pre-reserved for PS to pre-reserved for PS or remains in pre-reserved for PS if it is in one of the two following situations:
SPDCH allocation state = not allocated and occupancy state = used SPDCH allocation state = de-allocating
it goes from pre-reserved for PS to not pre-reserved for PS or remains in not pre-reserved for PS if it is in the following situation:
SPDCH allocation state = allocated
the following transition can be foreseen for a timeslot outside the PS trafficzone:
it goes from pre-reserved for PS to not pre-reserved for PS or remains in not pre-reserved for PS if it is in one of the following situations:
SPDCH allocation state = not allocated
SPDCH allocation state = allocated
SPDCH allocation state = de-allocating
8/23/2019 Data Resources Management
36/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 36
MAX_SPDCH_LIMIT TS selection (9/13)
CS calls in the Non pre-emptable PS zone:
to speed up the release of a TS carrying a CS call inside both the non pre-emptable PS zone and the MAX_SPDCH_LIMIT zone, it is proposed toreallocate the concerned CS call in the CS zone using an intra-cell handover
if EN_RETURN_CS_ZONE_HO = enabled, each time MAX_SPDCH_LIMIT iscalculated, the BSC shall check whether TCHs are allocated in both theMAX_SPDCH_LIMIT zone and the non pre-emptable PS zone. In this case, itshall send a Start HO (cause 30) message to the HO Preparation entity, totrigger an intracell handover, to move these TCHs into the CS zone
if for any reason, the handover fails, the TCH will remain in the PS zone, untilthe next calculation of MAX_SPDCH_LIMIT, where a new HO could betriggered, if still needed
the TS will be considered as unused only once the handover will have beensuccessfully performed. As the pre-reservation state of such a TS is set topre-reserved for PS, no new incoming CS call can be allocated on it
8/23/2019 Data Resources Management
37/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 37
MAX_SPDCH_LIMIT TS selection (10/13)
CS calls in the Non pre-emptable PS zone:
TRX2 TRX1
1 3 42 5 6 7 8 9 10 1211 13 14 15 16
MAX_SPDCH_LIMIT zone
PS CSPS CS CSCS CS
MAX_SPDCH_HIGH_LOAD zone
PS PS PS PS
Non pre-emptable PS zone
PS traffic zone
TRX2 TRX1
1 3 42 5 6 7 8 9 10 1211 13 14 15 16
MAX_SPDCH_LIMIT zone
PS CSPS CS CSCS CS
MAX_SPDCH_HIGH_LOAD zone
PS CS CS
Non pre-emptable PS zone
PS traffic zone
CS
PS CSused by PS used by CS CS used by CS, candidatefor HO cause 30
S C S ( / )
8/23/2019 Data Resources Management
38/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 38
PS PS CS CS CS CS CSCS CSPS PS CS CS CS CS CSCSCSPS PS CS CS CS CS CSCS CS
MAX_SPDCH_LIMIT TS selection (11/13)
Examples of SPDCHs_Allocation_bitmap building:
2 TRXs in the cell
initial situation: TS1 and TS2 on TRX2 allocated to the MFS
the non pre-emptable PS zone is always included in theMAX_SPDCH_LIMIT zone
MAX_SPDCH_LIMIT = 5
TRX 2 TRX 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
MAX_SPDCH_LIMIT_ZONE
PS traffic zone
1 1 0 1 0 0 1 0 1 0 0 0 0 0 0 0
MAX SPDCH LIMIT TS l ti (12/13)
8/23/2019 Data Resources Management
39/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 39
PS PS CS CS CS CS CSCSPS PS CS CS CS CS CSCSPS PS CS CS CS CS CSCS
MAX_SPDCH_LIMIT TS selection (12/13)
Examples of SPDCHs_Allocation_bitmap building:
MAX_SPDCH_LIMIT = 7
TRX 2 TRX 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
MAX_SPDCH_LIMIT_ZONE
PS traffic zone
1 1 1 1 0 0 1 0 1 1 0 0 0 0 0 0
MAX SPDCH LIMIT TS l ti (13/13)
8/23/2019 Data Resources Management
40/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 40
MAX_SPDCH_LIMIT TS selection (13/13)
Examples of SPDCHs_Allocation_bitmap building:
MAX_SPDCH_LIMIT = 4
PS PS CS CS CS CS CSCS
TRX 2 TRX 1
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
MAX_SPDCH_LIMIT_ZONE
PS traffic zone
1 1 1 1 0 0 0 0 0 0 0 0 0 0 0 0
PS PS CS CS CS CS CSCS
P t (1/4)
8/23/2019 Data Resources Management
41/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 41
Parameters (1/4)
RR_ALLOC_PERIOD:
new in B9 release
per BSC, no OMC-R access
range: 1 to 30
default: 2 definition: this parameter allows to tune the time between two sendings of the
BSCGP RR Allocation Indication message
TCH_INFO_PERIOD:
existing in B8 release
per BSS, displayed at the OMC-R
range: 2 to 25,5s
default: 5s
definition: periodicity of TCH usage information update in the BSC
P t (2/4)
8/23/2019 Data Resources Management
42/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 42
Parameters (2/4)
LOAD_EV_PERIOD_GPRS:
existing in B8 release
per cell, changeable at the OMC-R
range: 3 to 30 default: 3
definition: number of load samples (calculated everyTCH_INFO_PERIOD seconds) used to compute the maximumnumber of slave PDCHs that the BSC can allocate to the MFS
P t (3/4)
8/23/2019 Data Resources Management
43/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 43
Parameters (3/4)
THR_MARGIN_PRIO_PS:
new in B9 release
per BSC, no OMC-R access
range: 0 to 100% default: 10%
definition: margin of radio timeslots reserved for PS traffic betweentwo sendings of the BSCGP RR Allocation Indication message. Thethreshold is expressed in percentage of radio timeslots
P t (4/4)
8/23/2019 Data Resources Management
44/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 44
Parameters (4/4)
EN_RETURN_CS_ZONE_HO:
new in B9 release
per cell, changeable at the OMC-R
range: enable / disable default: disable
definition: flag enabling the intracell handovers allowing to move TCHfrom the PS zone to the CS zone of PDCH/TCH allocation
A d
8/23/2019 Data Resources Management
45/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 45
Agenda
Radio resources management
Best-effort TBF resources allocation / reallocation
CS pre-emption process
QoS counters and indicators
PDCH t t (1/3)
8/23/2019 Data Resources Management
46/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 46
PDCH states (1/3)
Following states are defined for a PDCH:
Allocated:
new definition in B9: the PDCH is a SPDCH which has been indicated asusable for PS traffic by the BSC
B8 definition: radio resource allocated to the MFS, but associatedtransmission resources are not allocated
Active:
new definition in B9: an allocated PDCH is active if it supports at least oneradio resource allocated for a TBF or for a RT PFC
the B8 definition was considering the parameter N_TBF_PER_SPDCHwhich is removed in B9 release
PDCH t t (2/3)
8/23/2019 Data Resources Management
47/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 47
PDCH states (2/3)
Following states are defined for a PDCH:
Full:
new definition in B9: an allocated PDCH is full in a given XL (XL = UL or DL)direction if and only if:
for GPRS Best Effort TBF: Nb_RT_PFC_XL + Nb_BE_TBF_XL MAX_XL_TBF_SPDCH
for EGPRS Best Effort TBF: Nb_RT_PFC_XL + Nb_BE_EGPRS_TBF_XL MAX_XL_TBF_SPDCH
for RT resource allocation: Nb_RT_PFC_XL + Nb_BE_TBF_XL MAX_XL_TBF_SPDCH
this is the same definition as in B8 release except that the concepts of RTPFC and best effort TBF are introduced
PDCH states (3/3)
8/23/2019 Data Resources Management
48/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 48
PDCH states (3/3)
Following states are defined for a PDCH:
EGPRS:
an allocated PDCH is in the EGPRS state if some radio resources areallocated in the DL direction, for an EGPRS TBF or an EGPRS RT PFC.
This state is only used when running the radio resourceallocation/reallocation algorithm in GPRS mode and when considering theUL direction of the candidate TBF allocations
This is nearly the same definition as in B8 release except that the concept ofRT PFC is introduced
Remark:
the busy PDCH state (number of established TBF on the PDCH higherthan N_TBF_PER_SPDCH) is no more used by the allocation algorithm
Introduction (1/6)
8/23/2019 Data Resources Management
49/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 49
Introduction (1/6)
Candidate TS allocation
Best-effort TBF allocation/reallocation request(received from RRM-PCC or dequeued from a Li list)
TRX list
computing (2)
Best candidate allocation computation (4)
No candidate TS allocation
RADIO RESOURCE ALLOCATION/REALLOCATION
ALGORITHM
TBF ESTABLISHMENT PROCESS
(cf. Figure in section 3.2.2) (9)
Cell Transmission Equity (5)
Enough GCHs Not enough GCHs
ALLOC OK case ALLOC FAILED case
Test if enough GCHs (6)
Available_Nb_GCH_With_Equity
TRX list
Transmission Resource
Availability (1)
DSPcongestion state
TRX list sortedby the BSC
Available_Nb_GCH
Transmission resourcereservation (8)
n_MS_requested,n_MS_requested_concurrent
Multislot class,Bias,Traffic type
Numberof radio TSs
determination (3)
Type of the TBF request
PDCH capacity/TFI/TAI/USF
allocation (7)
- rejected request- or L4 queuing- or L5/L6 queuing
- or L7 queuing (10)
- or try to change TBF mode
(EGPRS case) (11)
Introduction (2/6)
8/23/2019 Data Resources Management
50/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 50
Introduction (2/6)
The algorithm presented in the previous slide is used to findthe radio and transmission resources: in the Evolium BTS case
for GPRS and EGPRS best-effort TBF
in case of TBF establishment or TBF resources reallocation
We can distinguish four different goals: find the best candidate timeslot allocation (steps 2, 3 and 4)
verify if there are enough transmission resources (steps 1, 5 and 6) allocate the radio resources (step 7)
reserve the transmission resources (step 8)
Introduction (3/6)
8/23/2019 Data Resources Management
51/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 51
Introduction (3/6)
Transmission resource availability (1): it determines the total number of new GCHs which can be established
in the cell with free Abis and Ater resources (i.e. nibbles notassociated to a GCH) and with inter-cell GCH pre-emptions. Thisnumber is called Available_Nb_GCH
this step is completely new in B9 release
TRX list computing (2): it determines the TRX list on which the TBF candidate allocations will
be searched
Number of RTSs determination (3): it is performed prior to the determination of the best candidate
allocation for the TBF (4) and determines the n_MS_requested andn_MS_requested_concurrent values
Introduction (4/6)
8/23/2019 Data Resources Management
52/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 52
Introduction (4/6)
Best candidate allocation computation (4):
it consists in searching which are the best PDCHs onto which to establish (orreallocate) the TBF, according to various radio related criteria
if no candidate TBF allocation is found in (4), the request has failed (ALLOC
FAILED case due to radio resource reasons). Depending on the type of therequest, the request is rejected or queued into a Li list (10)
Cell transmission equity (5):
if a candidate TBF allocation is found on a TRX, the number of new GCHswhich are possible to be established on that TRX according to intra-cell equityrules is computed. This number is called Available_Nb_GCH_With_Equity
and corresponds to a number of intra-cell GCH pre-emptions that are possibletowards that TRX
this step is completely new in B9 release
Introduction (5/6)
8/23/2019 Data Resources Management
53/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 53
Introduction (5/6)
Test if enough GCHs (6):
the total number of GCHs which are already (or about to be)established on the previously selected TRX (i.e. Current_Nb_GCH)and/or which will be possible to be established on that TRX in the
future (i.e. Available_Nb_GCH + Available_Nb_GCH_With_Equity) istested
if there are not enough GCHs, the request has failed (ALLOCFAILED case due to transmission resource reasons). Depending onthe type of the request, the request is rejected or queued into a Li list(10)
this step is completely new in B9 release
Introduction (6/6)
8/23/2019 Data Resources Management
54/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 54
Introduction (6/6)
PDCH capacity / TFI / TAI / USF allocation (7):
if there are enough GCHs (i.e. it is possible to reachNb_GCH_For_TBF_Estab GCHs in the M-EGCH link of the selected TRX),then the radio resources of the best candidate TBF allocation found in (4) areallocated
the radio resource allocation (7) consists in the allocation of some PDCHcapacity, TFI, TAI and USF resources. The concept of PDCH capacity is newin B9 release
Transmission resource reservation (8):
the necessary transmission resources (which are not yet established) arereserved and the TBF establishment process is undertaken (9)
the main interest of the transmission resources reservation step is toguarantee that the transmission resources will remain available during theGCH establishment process
the priority order to reserve the GCHs is as follows : free Abis and Aterresources then inter-cell GCH pre-emptions and finally intra-cell GCH pre-emptions
Allocation policies (1/4)
8/23/2019 Data Resources Management
55/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 55
Allocation policies (1/4)
The concept of allocation policy is introduced in B9 releaseand is linked to the establishment of the transmissionresources (GCH)
For an Evolium BTS there are two TBF allocation policies(ASAP, Optimal) which are used to serve best effort TBFestablishment / reallocation or One UL block requests
Allocation policies (2/4)
8/23/2019 Data Resources Management
56/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 56
Allocation policies (2/4)
The ASAP policy is used for best effort TBFestablishments, for T1 / T2 / T4 TBF best effort reallocationsand for one UL block allocations. The goal is to serve therequest as soon as possible, even if the TBF allocation or
throughput are not optimal: if it is possible, an ASAP request is served immediately on a TRX
having already Nb_GCH_For_TBF_Estab established GCHs.Otherwise, the establishment of Nb_GCH_For_TBF_Estab GCHs ona TRX of the cell will be necessary to serve the request
in the best candidate TBF allocation computation, the candidate TBFallocations located on the TRXs having alreadyNb_GCH_For_TBF_Estab established GCHs are favored
Allocation policies (3/4)
8/23/2019 Data Resources Management
57/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 57
Allocation policies (3/4)
The Optimal policy is used for T3 best effort TBFreallocations
The idea is to ensure that a significant bandwidth will be
offered to the MS upon T3 reallocation, even if it takessome time to establish all the necessary GCHs:
all the possible GCHs (Target_Nb_GCH) are systematically requestedto be established before serving the request, and an Optimalrequest will only be served if the total number of GCHs successfullyestablished on the TRX is greater than Nb_GCH_For_TBF_Estab
in the best candidate TBF allocation computation, the candidate TBFallocations located on the TRXs having already a high number ofGCHs are not favored
Allocation policies (4/4)
8/23/2019 Data Resources Management
58/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 58
Allocation policies (4/4)
The minimum number of GCHs which are required on the TRX to servethe request (Nb_GCH_For_TBF_Estab) is:
UL TBF establishment without concurrent TBF: 1
UL TBF establishment with concurrent TBF: 1 to 5 depending on the Max
allowed (M)CS of the existing concurrent DL TBF DL TBF establishment without concurrent TBF: 1
DL TBF establishment with concurrent TBF: 1 to 5 depending on the Maxallowed (M)CS of the existing concurrent UL TBF
T1 TBF reallocation: 1
One UL block allocation : 1 T4 TBF reallocation: 1 or 2 depending on the Max allowed CS of the TBF(s)
T3 TBF reallocation : 1 to 5 depending on the Max allowed (M)CS of theTBF(s)
TRX list computing (1/3)
8/23/2019 Data Resources Management
59/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 59
TRX list computing (1/3)
The goal of the TRX list computing step is to determine the TRX list onwhich the TBF or one UL block candidate allocations will be searched
The conditions for a TRX to be inserted into the TRX list are:
the TRX shall be PS capable if the TRX is not already mapped to a DSP, and no DSP can be associated to
the TRX, then the TRX shall not be considered
Difference with B8 release:
there are no longer some restricted EGPRS capable TRX lists (i.e. selectionof the EGPRS TRX of highest class (that is which offer the highestthroughput) as long as the maximum number of EGPRS TBF per PDCH onthese TRX is not higher than a threshold). Indeed, all the EGPRS capableTRXs can offer the same potential throughput: they are all mapped on G4TRE, and the B8 concept of TRX pool type has disappeared
TRX list computing (2/3)
8/23/2019 Data Resources Management
60/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 60
TRX list computing (2/3)
UL or DL TBF establishment without concurrent TBF:
the candidate TRXs list is defined with the following restrictions:
for GPRS MSs, no restriction on TRXs
for EGPRS MSs, only EGPRS capable TRXs are taken into account. If thereis no candidate allocation, then the radio resource allocation algorithm is runagain in GPRS mode on the full TRX list (i.e. on both EGPRS and nonEGPRS capable TRXs)
UL or DL TBF establishment with concurrent TBF:
the candidate TRXs list is defined with the following restrictions:
in case of EGPRS concurrent TBF, the candidate TRXs have to be EGPRScapable
TRX list computing (3/3)
8/23/2019 Data Resources Management
61/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 61
TRX list computing (3/3)
T1 and T3 TBF reallocations:
the candidate TRXs list is defined with the following restrictions:
if the current mode is EGPRS, then the candidate TRXs have to be EGPRScapable
T4 TBF reallocation:
there is no specific restriction to define the candidate TRXs list
Number of RTSs determination (1/7)
8/23/2019 Data Resources Management
62/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 62
Number of RTSs determination (1/7)
The number of radio timeslots to be allocated to a TBF isdetermined according to the:
GPRS or EGPRS MS multislot class
bias traffic type (data / signalling)
Number of RTSs determination (2/7)
8/23/2019 Data Resources Management
63/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 63
Number of RTSs determination (2/7)
The number of radio timeslots has to be determined:
for the direction of the request, = n_MS_requested:
in case of TBF establishment without a concurrent TBF, the direction of therequest is the direction of the TBF to establish
in case of TBF establishment with a concurrent TBF (with T2 reallocationallowed), the direction of the request is the direction of the MS bias
in case of TBF establishment with a concurrent TBF (with T2 reallocationnot allowed), the direction of the request is the direction of the TBF toestablish
in case of DL or UL TBF reallocation (TBF without a concurrent TBF), thedirection of the request is the direction of the TBF to reallocate
in case of DL and UL TBF reallocation (the two TBFs are concurrent), thedirection of the request is the direction of the MS bias
and for the concurrent direction, = n_MS_requested_concurrent
Number of RTSs determination (3/7)
8/23/2019 Data Resources Management
64/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 64
Number of RTSs determination (3/7)
When allocating resources to a mobile, both n_MS_requested andn_MS_requested_concurrent are considered, even when only one TBFis established, to take into account a potential future concurrent TBF.Exception : in case of TBF establishment with a concurrent TBF and T2reallocation not allowed, n_MS_requested_concurrent shall not be used
For a mobile with (MAX (UL TS)+ MAX (DL TS) > MAX (UL TS + DLTS)) then the multislot class does not determine the number of slots ineach direction independently of the opposite direction:
the highest possible number of slots is requested in the directioncorresponding to the bias of the MS, i.e. in the direction on which the highest
volume of data is being transferred exception: in case of TBF establishment with a concurrent TBF and T2
reallocation not allowed, the direction of the bias is ignored to determinen_MS_requested
Number of RTSs determination (4/7)
8/23/2019 Data Resources Management
65/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 65
Number of RTSs determination (4/7)
Differences with B8 release :
the Ater usage (normal / high) is no more taken into account todetermine the number of PDCH to allocate to a TBF (the parameterMAX_PDCH_PER_TBF_High_Ater_Usage is removed in B9 release)
the immediate UL TBF establishment case is no more considered (ULTBF establishment without concurrent DL TBF where onlyn_MS_requested is taken into account to allocate resources to the ULTBF)
Number of RTSs determination (5/7)
8/23/2019 Data Resources Management
66/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 66
Number of RTSs determination (5/7)
UL TBF establishment without concurrent TBF:
Access type Bias Multislot class Traffic type for ULallocation
n_MS_requested andn_MS_requested_concurrent
RACH one phase DL Default Signalling 1
PRACH one phase DL GPRS Data According to GPRS MS multislotclass
EGPRS Packet Channel request one phaseon PRACH
DL EGPRS Data According to EGPRS MSmultislot class
EGPRS Packet Channel request one phaseon RACH
DL EGPRS Signalling 1
PRACH access (short access, page
response, cell update, MM procedure)DL Default Signalling 1
EGPRS Packet Channel request (shortaccess, signalling) DL Default Signalling 1
Packet Resource Request UL GPRS or EGPRS Data According to GPRS or EGPRSMS multislot class
Number of RTSs determination (6/7)
8/23/2019 Data Resources Management
67/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 67
Number of RTSs determination (6/7)
DL TBF establishment without concurrent TBF:
the number of radio timeslots is determined according to the traffic type:
traffic type = signalling: n_MS_requested = n_MS_requested_concurrent = 1
traffic type = data: n_MS_requested and n_MS_requested_concurrent are
determined by the MS multislot class (EGPRS multislot class for an EGPRS capableMS when En_EGPRS = enabled, GPRS multislot class otherwise)
UL or DL TBF establishment with concurrent TBF:
the number of radio timeslots is determined according to the traffic type:
traffic type = signalling: n_MS_requested = n_MS_requested_concurrent = 1
traffic type = data: n_MS_requested and n_MS_requested_concurrent are set
according to the MS multislot class (GPRS MS multislot class if the concurrent TBF isa GPRS TBF, EGPRS MS multislot class if the concurrent TBF is an EGPRS TBF)
Number of RTSs determination (7/7)
8/23/2019 Data Resources Management
68/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 68
Number of RTSs determination (7/7)
T1 TBF reallocation:
the number of radio timeslots is determined according to the traffic type:
traffic type = signalling: n_MS_requested = n_MS_requested_concurrent = 1
traffic type = data: n_MS_requested and n_MS_requested_concurrent are
determined by the MS multislot class (EGPRS multislot class for an EGPRS TBF,GPRS multislot class otherwise)
T3 TBF reallocation:
the traffic type is equal to data in case of T3 TBF reallocation
T4 TBF reallocation:
the number of radio timeslots is determined according to the traffic type: traffic type = signalling: n_MS_requested = n_MS_requested_concurrent = 1
traffic type = data: n_MS_requested and n_MS_requested_concurrent aredetermined by the GPRS MS multislot class
Best candidate allocation computation(1/11)
8/23/2019 Data Resources Management
69/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 69
(1/11)
Once all the usable PDCHs are determined, the differentcandidate timeslot allocations are sorted according totheir respective available throughput, in order tochoose the one offering the highest throughput to serve the
considered request. This is a complete change compared tothe previous BSS releases (B6, B7 and B8)
Best candidate allocation computation(2/11)
8/23/2019 Data Resources Management
70/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 70
(2/11)
Candidate timeslot allocation: a candidate timeslot allocation is a double list of contiguous PDCH in
a TRX (one list for the direction of the request, one list for theopposite direction), which verifies the concurrent constraints asdefined by the MS multislot class
to be included in a candidate timeslot allocation in order to serve abest effort TBF, a PDCH on a given TRX must verify the followingconditions:
the PDCH shall be allocated in the MFS (i.e. the PDCH is in the allocatedstate, but not in the not allocated or de-allocating state). This condition isnew in B9 release and comes from the fact that the MFS does not request
PDCH to the BSC the PDCH shall not be in the Full state in the considered direction
the PDCH shall not be locked due to a CS pre-emption process
Best candidate allocation computation(3/11)
8/23/2019 Data Resources Management
71/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 71
(3/11)
Candidate timeslot allocation:
specific cases:
when reallocating a TBF, whatever the trigger T1, T2, T3 or T4, the existingset of radio resources shall not be taken into account when computing the
best candidate TBF allocation. This rule impacts the PDCH stateevaluation (PDCH Full state), the computing of all the throughput basedcriteria (Nb_BE_TBF_XL, Nb_BE_EGPRS_TBF_XL,THROUGHPUT_RATIO, ) and the PDCH capacity allocation(USED_CAPACITY_BEST_EFFORT_XL)
T3 and T4 TBF reallocation: the PDCHs in the EGPRS state shall beexcluded in case of T3 or T4 reallocation of an UL GPRS TBF. Thisconstraint only applies to the UL direction
Best candidate allocation computation(4/11)
8/23/2019 Data Resources Management
72/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 72
(4/11)
Available throughput of a candidate timeslot allocation:
this is a completely new metric introduced in B9 release. In the pastreleases the idea was already to give the highest possible throughputto a TBF (allocating the highest number of TS, if possible not busy)
but there was no explicit metric evaluating the throughput provided bya candidate TS allocation
the available throughput of a given candidate timeslot allocation(available_throughput_candidate_XL) is the overall throughputprovided by its PDCHs. It depends both on the potential throughput ofits PDCHs (potential_throughput_PDCH) and on the availablecapacity on each of its PDCHs (available_capacity_PDCH_XL)
Best candidate allocation computation(5/11)
8/23/2019 Data Resources Management
73/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 73
(5/11)
Available throughput of a candidate timeslot allocation:
Potential throughput of a given PDCH:
the potential throughput of a PDCH is calculated as follows according toO&M parameters for the Evolium BTS case:
GPRS best effort TBF: R_AVERAGE_GPRS
EGPRS best effort TBF: R_AVERAGE_EGPRS
Best candidate allocation computation(6/11)
8/23/2019 Data Resources Management
74/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 74
(6/11)
Available throughput of a candidate timeslot allocation:
Available capacity on a given PDCH:
The available capacity on a given PDCH (available_capacity_PDCH_XL) is calculatedas follows for a GPRS best effort TBF (XL corresponds to either UL or DL) :
(1 USED_CAPACITY_GBR_XL * (1 + QOS_SAFETY_MARGIN/100)) /
(Nb_BE_TBF_HIGHER_PRIOR_XL*SCHEDULING_PRIORITY_FACTOR +Nb_BE_TBF_SAME_PRIOR_XL + 1)
QOS_SAFETY_MARGIN and SCHEDULING_PRIORITY_FACTOR are O&Mparameters. If the SCHEDULING_PRIORITY_FACTOR parameter value is strictlygreater than 1, this will tend to avoid piling up several TBFs with different priorities onthe same PDCHs, which would degrade the throughput of the low priority TBFs
USED_CAPACITY_GBR_XL is a variable indicating the total PDCH capacity that hasalready been allocated to RT PFCs (both GPRS and EGPRS) on the PDCH in the XLdirection
Nb_BE_TBF_HIGHER_PRIOR_XL (respectively Nb_BE_TBF_SAME_PRIOR_XL)indicates the total number of Best Effort TBFs (GPRS or EGPRS) which have someradio resources allocated on the considered PDCH in the XL direction, and whosepriority (combination of THP (Traffic Handling Priority; QoS parameter used for theinteractive traffic class) and of Precedence) is strictly higher than (respectively equalto) the priority of the TBF to establish / reallocate. In case some TBF reallocations arein progress for some MSs, the old sets of radio resources of the MSs shall not betaken into account when computing Nb_BE_TBF_HIGHER_PRIOR_XL andNb_BE_TBF_SAME_PRIOR_XL
Best candidate allocation computation(7/11)
8/23/2019 Data Resources Management
75/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 75
(7/11)
Available throughput of a candidate timeslot allocation:
Available capacity on a given PDCH:
the available capacity on a given PDCH (available_capacity_PDCH_XL) is calculatedas follows for an EGPRS best effort TBF (XL corresponds to either UL or DL):
(1 USED_CAPACITY_GBR_XL * (1 + QOS_SAFETY_MARGIN/100)) /(Nb_BE_EGPRS_TBF_HIGHER_PRIOR_XL*SCHEDULING_PRIORITY_FACTOR +Nb_BE_EGPRS_ TBF_SAME_PRIOR_XL + 1)
Nb_BE_EGPRS_TBF_HIGHER_PRIOR_XL and Nb_BE_EGPRS_TBF_SAME_PRIOR_XL only take into account EGPRS TBF (the best effort GPRSTBF and the GPRS RT PFC are not taken into account)
the best effort TBFs having a priority strictly lower than the priority of the TBF toestablish / reallocate are not taken into account. Indeed, the T3 TBF reallocation will
enable to demultiplex those low priority TBFs in the future in the above formula the numerator gives the remaining capacity not used by RT
PFCs whereas the denominator counts the number of best effort TBF sharing thisremaining PDCH capacity. Therefore the ratio corresponds to an average availablePDCH capacity per best effort TBF
Best candidate allocation computation(8/11)
8/23/2019 Data Resources Management
76/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 76
(8/11)
Available throughput of a candidate timeslot allocation:
Available capacity of a given candidate timeslot allocation:
for a given candidate timeslot allocation with n PDCHs (n 1), the availablecapacity is computed as follows, for each direction (XL corresponds to either
UL or DL): available_capacity_candidate_XL = i = 1 to n available_capacity_PDCHi_XL
Available throughput of a given candidate timeslot allocation:
finally, the available throughput of a candidate timeslot allocation iscomputed as follows, for each direction (XL corresponds to either UL or DL):
available_throughput_candidate_XL = potential_throughput_PDCH *available_capacity_candidate_XL
Best candidate allocation computation(9/11)
8/23/2019 Data Resources Management
77/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 77
(9/11)
Candidate time slot allocations sorting: the algorithm used in B9 release is completely modified
compared to the one used in B8 release as the key criterion isnow the provided throughput instead of the number of TS
only the candidate timeslot allocations for which some PDCHcapacity, TFI, TAI and USF resources can be allocated in thedirection(s) in which the TBF has to be established, are valid. If suchcandidate timeslot allocation is not found, the best effort TBFallocation / reallocation request has failed and the process is aborted
else, all the valid candidate timeslot allocations are sorted accordingto the following list of ordered criteria (from the highest priority to the
lowest). This list of criteria is valid in all cases: for GPRS or EGPRSservice (contrary to the B8 release case where two lists were used),and in a cell belonging to an Evolium BTS or to a DRFU BTS
Best candidate allocation computation(10/11)
8/23/2019 Data Resources Management
78/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 78
(10/11)
Candidate time slot allocations sorting:
ALPHA: if the policy is ASAP, then the candidate TS allocations which areon some TRXs for which Current_Nb_GCH - Min_Nb_GCH_GBR -Nb_MPDCH Nb_GCH_For_TBF_Estab are preferred
A: the candidate TS allocations which have the lowest number of PDCHs in
the EGPRS state are preferred B: the candidate TS allocations, which have the highest available throughput
in the direction of the bias (available_throughput_candidate_XL) are preferred
C: the candidate TS allocations, which have the highest available throughputin the direction opposite to the bias (available_throughput_candidate_XL) arepreferred
D: the candidate TS allocations, which are on the TRX with the highestpriority, are preferred
E: for EGPRS best effort TBF establishments only: the candidate TSallocations, which have the lowest number of GPRS TBFs in the direction ofthe bias, are preferred
F: combination with the PDCHs that have the lowest index are preferred
Best candidate allocation computation(11/11)
8/23/2019 Data Resources Management
79/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 79
(11/11)
Candidate time slot allocations sorting:
Remarks:
the A criterion is only relevant for an UL GPRS TBF establishment /reallocation (i.e. when considering the UL direction of a candidate TS
allocation in GPRS mode) when evaluating criterion F, the concurrent constraints imposed by the MS
multislot class (if it is known) or by the default multislot class (if the MSmultislot class is not known) shall be taken into account
PDCH capacity / TFI / TAI / USF allocation(1/4)
8/23/2019 Data Resources Management
80/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 80
(1/4)
Once a candidate TS allocation has been found (in thebest candidate allocation computation step), the followingradio resources are allocated to the MS in the directions inwhich a TBF has to be established:
PDCH capacity
TFI
PDTCH / PACCH
TAI
USF (only in the UL direction)
PDCH capacity / TFI / TAI / USF allocation(2/4)
8/23/2019 Data Resources Management
81/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 81
(2/4)
PDCH capacity allocation:
this step is new in B9 release
the PDCH capacity allocation is performed on the best candidate TSallocation so as to guarantee a minimum bandwidth for the
corresponding TBF(s) (data throughput and throughput generated onPACCH channels in DL and in UL)
the PDCH capacity allocation shall only be performed in EvoliumBTSs (no PDCH capacity needs to be allocated in DRFU BTSs)
the PDCH capacity allocation should always succeed, because the
candidate TS allocations for which the PDCH capacity allocationcannot be performed have been excluded during the best candidateallocation computation step
PDCH capacity / TFI / TAI / USF allocation(3/4)
8/23/2019 Data Resources Management
82/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 82
(3/4)
PDCH capacity allocation:
PDCH capacity needed for a best effort TBF:
in a given direction (UL or DL) and on a given PDCH, the minimum capacity (in termsof radio block scheduling in MAC layer) that is required for a best effort TBF is calledneeded_capacity_Best_Effort_XL (XL corresponds to either UL or DL)
this capacity corresponds to a minimum bandwidth that shall be guaranteed for thebest effort TBF
it is computed as follows:
needed_capacity_Best_Effort_XL = 20 / T_MAX_FOR_TBF_SCHEDULING
with T_MAX_FOR_TBF_SCHEDULING an O&M parameter in ms
this calculation of needed_capacity_Best_Effort_XL approximates the maximal load
which can be generated by the data traffic and the signalling traffic of the TBF(signalling traffic on the PACCH in the direction of the TBF). To simplify, it isconsidered that needed_capacity_Best_Effort_DL =needed_capacity_Best_Effort_UL
PDCH capacity / TFI / TAI / USF allocation(4/4)
8/23/2019 Data Resources Management
83/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 83
(4/4)
PDCH capacity allocation:
algorithm to allocate the PDCH capacity needed for a best effort TBF:
in a given direction (XL corresponds to either UL or DL) and on a given PDCH, themaximum PDCH capacity which can be allocated is equal to:
1 - USED_CAPACITY_GBR_XL* (1 + QOS_SAFETY_MARGIN/100) -USED_CAPACITY_BEST_EFFORT_XL
USED_CAPACITY_GBR_XL indicates the total PDCH capacity that has already beenallocated to RT PFCs (both GPRS and EGPRS) on the PDCH in the XL direction
USED_CAPACITY_BEST_EFFORT_XL indicates the total PDCH capacity that hasalready been allocated to best effort TBFs (both GPRS and EGPRS) on the PDCH inthe XL direction in order to ensure a minimum bandwidth for those best effort TBFs
QOS_SAFETY_MARGIN is an O&M parameter
in the direction(s) in which a TBF has to be established, a PDCH capacity equal to
needed_capacity_Best_Effort_XL shall be allocated on each PDCH included in thebest candidate TS allocation
then on each PDCH, the value of USED_CAPACITY_BEST_EFFORT_XL shall beincreased accordingly (incrementation by needed_capacity_Best_Effort_XL)
TBF establishment process (1/6)
8/23/2019 Data Resources Management
84/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 84
( )
The aim of the TBF establishment process is to:
establish the GCHs which were previously reserved
determine the Maximum allowed (M)CS
GCH establishment
the process differs according to the TBF allocation policy: ASAP orOPTIMAL
TBF establishment process (2/6)
8/23/2019 Data Resources Management
85/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 85
Maximum allowed (M)CS calculation:
triggers to assess the maximum allowed (M)CS of a best effort TBF in case ofEvolium BTS:
the nominal trigger to assess the maximum allowed (M)CS of a given best effort TBFis when that TBF is established or reallocated. In case of TBF reallocation, the
maximum allowed (M)CS of the TBF can be increased or decreased the maximum allowed (M)CS of a best effort TBF already established on a given TRX
shall also be reassessed when the Established_Nb_GCH value of the TRX isincreased. In such a case, all the best effort TBFs established on the TRX shallpotentially be warned of their new max allowed (M)CS value
at last, the maximum allowed (M)CS of a best effort TBF already established on aTRX shall be reassessed when a RT PFC is deleted or when an existing RT PFC is
modified (RT PFC modification request with AGBR decrease in a direction) on theTRX. Indeed, when a RT PFC is deleted or its AGBR decreased in a direction, theMin_Nb_GCH_GBR value of the TRX may become lower, which may allow toincrease the maximum allowed (M)CS of the best effort TBFs established on the TRX
TBF establishment process (3/6)
8/23/2019 Data Resources Management
86/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 86
Maximum allowed (M)CS calculation:
triggers to assess the maximum allowed (M)CS of a best effort TBF incase of Evolium BTS:
no maximum allowed (M)CS decrease is managed in case the
Established_Nb_GCH value of a TRX is decreased on the other hand, the Min_Nb_GCH_GBR value of a TRX will never
increase so as to imply a maximum allowed (M)CS decrease for an existingbest effort TBF. So the creation of a RT PFC (or the modification of a RTPFC with AGBR increase in a direction) will have no influence on themaximum allowed (M)CS of the best effort TBFs already established on theTRX
TBF establishment process (4/6)
8/23/2019 Data Resources Management
87/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 87
Maximum allowed (M)CS calculation: calculation of the maximum allowed (M)CS value of a best effort
GPRS (respectively EGPRS) TBF, Evolium BTS case:
the maximum allowed (M)CS is determined according to the number ofestablished GCHs in the M-EGCH link, the Min_Nb_GCH_GBR value of the
TRX, the GPRS (respectively EGPRS) capability of the TRX, the direction ofthe TBF (DL or UL) and the Max_GPRS_CS (respectivelyMax_EGPRS_MCS) parameter value
refer to the below tables for the calculation of Max allowed (M)CS accordingto the number of GCHs in the M-EGCH link
finally:
TBF_Max_allowed_CS = min(Max allowed CS according to the number ofGCHs of the M-EGCH link, GPRS capability of the TRX, Max_GPRS_CS)
TBF_Max_allowed_MCS = min(Max allowed MCS according to the numberof GCHs of the M-EGCH link, EGPRS capability of the TRX,Max_EGPRS_MCS)
TBF establishment process (5/6)
8/23/2019 Data Resources Management
88/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 88
Number of established GCHs in the M-EGCH link
(Established_Nb_GCH - Min_Nb_GCH_GBR
- Nb_GCH_Impacted_By_CS_Preemption)
Max allowed CS of the TBF according to the number of
GCHs of the M-EGCH link
(TBF_Max_allowed_CS)
UL TBF DL TBF
1 CS2 CS1 (*)
2 CS4 CS4
(*) the maximum allowed (M)CS of a (E)GPRS DL TBF established on a TRX having an M-EGCH link containing 1 GCH is set to (M)CS1 (and not
(M)CS2). Indeed, it shall be guaranteed that the MFS-BTS signalling messages will always be possible to be sent in the M-EGCH link in DL. A
possible consequence of this is that the maximum allowed (M)CS of a (E)GPRS DL TBF may be (M)CS1 even if the MAX_(E)GPRS_(M)CS
parameter was set to (M)CS2 (Target_Nb_GCH = 1 if only one PDCH is active on the TRX). Those cases are deemed acceptable (no necessity
to optimise the throughput of the 1 RTS TBFs)
TBF establishment process (6/6)
8/23/2019 Data Resources Management
89/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 89
Number of established GCHs in the M-EGCH link
(Established_Nb_GCH - Min_Nb_GCH_GBR
- Nb_GCH_Impacted_By_CS_Preemption)
Max allowed MCS of the TBF according to the number
of GCHs of the M-EGCH link
(TBF_Max_allowed_MCS)
UL TBF DL TBF
1 MCS2 MCS1 (*)
2 MCS5 MCS5
3 MCS6 MCS6
4 MCS7 MCS7
5 MCS9 MCS9
TBF establishment cases (1/3)
8/23/2019 Data Resources Management
90/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 90
UL TBF establishment without concurrent TBF:
Evolium BTS case:
the UL TBF is immediately established provided that one UL resource isavailable on a TRX already established
on receipt of the MS request, if no TRX is established or if all the PDCHs onthe already established TRXs are full in UL, the radio resources of the ULTBF are allocated on some RTS(s) of a non-established TRX. Thereafter,the corresponding PDCH group waits for Nb_GCH_For_TBF_Estab GCHsto be established in the M-EGCH link of that TRX to complete the TBFestablishment
contrary to the B8 release, there is no PDCH resource anticipation processfor the subsequent DL TBF
TBF establishment cases (2/3)
8/23/2019 Data Resources Management
91/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 91
UL (resp. DL) TBF establishment with concurrent TBF:
case where T2 reallocation is not allowed: the allocated radioresources in UL (resp. DL) shall comply with the constraints imposedby the concurrent DL (resp. UL) TBF and the candidate timeslot
allocations are reduced to the combinations which verify theconcurrent constraints with the already established DL (resp. UL) TBF
case where T2 reallocation is allowed and the existing TBF is notestablished in the direction of the bias: there is no specific condition
TBF establishment cases (3/3)
8/23/2019 Data Resources Management
92/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 92
UL (resp. DL) TBF establishment with concurrent TBF:
case where T2 reallocation is allowed and the existing DL (resp. UL) TBF isestablished in the direction of the bias:
first, the candidate allocations which verify all the following constraints are searched:
T3 TBF reallocation constraints: those constraints are exactly the same as for aclassical T3 TBF reallocation, applied to the existing concurrent TBF. Thoseconstraints guarantee that a T2 TBF reallocation will only be triggered if a significantthroughput gain can be offered to the MS in the direction of the bias
T4 TBF reallocation constraints: in case of GPRS mode, the PDCHs in EGPRSstate in the UL direction shall not be considered. That constraint makes T2 and T4TBF reallocations coherent with each other: following a T2 TBF reallocation, an MSwill not immediately become candidate for T4 reallocation if it is avoidable
the ALPHA criterion shall be mandatorily respected. That constraint makes the globalprocess coherent with the ASAP policy
in case of failure (i.e. no candidate allocation is found), the candidate allocationswhich do not require to reallocate the existing TBF are searched:
the allocated radio resources in UL (resp. DL) shall comply with the constraintsimposed by the concurrent DL (resp. UL) TBF
in case of failure (i.e. no candidate allocation is found in the two previous steps), theremaining candidate allocations are searched without any constraint
TBF reallocation cases (1/10)
8/23/2019 Data Resources Management
93/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 93
T1 TBF reallocation:
best candidate allocation computation:
the candidate timeslot allocations do not require to have the same numberof PDCHs than the current allocation. A candidate timeslot allocation of one
PDCH is sufficient, since the intention of the radio resource reallocation is tosave the TBF(s)
the PDCHs of the TRXs which are highly impacted by the CS pre-emptionhave been previously locked: this prevents to look for candidate TSallocations on those TRXs
the radio resource allocation algorithm is run with the ASAP policy. Thanks
to the allocation criterion ALPHA, the candidate TS allocations located onthe TRXs having already one established GCH are favored (Evolium BTS)
TBF reallocation cases (2/10)
8/23/2019 Data Resources Management
94/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 94
T3 TBF reallocation:
goals of the T3 reallocation (Evolium BTS):
provide a higher throughput, if it is possible, to any TBF in the cell
establish a new M-EGCH link for one of the TRXs of the cell. This is
possible because the T3 TBF reallocation requests are played with theOptimal allocation policy
perform a radio defragmentation process to limit the risk that the TBFs areimpacted by a CS pre-emption. The goal is that the PDCHs supporting theTBFs in the cell are always the first or left-most allocated PDCHs of thecell (when considering the ordered TRXs list provided by the BSC and the
RTSs from RTS 0 to RTS 7 on a given TRX)
TBF reallocation cases (3/10)
8/23/2019 Data Resources Management
95/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 95
T3 TBF reallocation:
conditions for a MS to be candidate for T3 reallocation:
the BSS systematically requests a T3 reallocation for any MS which has anestablished TBF in the direction of the bias verifying the following
conditions: more than N_CANDIDATE_FOR_REALLOC bytes have been sent on the
DL TBF or received on the UL TBF since their establishment
T3192 is not running
TBF reallocation cases (4/10)
8/23/2019 Data Resources Management
96/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 96
T3 TBF reallocation:
THROUGHPUT_RATIO:
for each MS which is candidate for a T3 TBF reallocation, a throughput ratio iscalculated
this throughput ratio is useful to:
validate the candidate TBF allocations when playing the radio resource reallocationalgorithm
sort the T3 TBF reallocation requests within the L5 and L6 lists: low value of thethroughput ratio means high priority of the request
THROUGHPUT_RATIO = ALLOCATED_THROUGHPUT /OPTIMAL_THROUGHPUT
ALLOCATED_THROUGHPUT is the throughput currently allocated to the TBF in thedirection of the bias and is equal to potential_throughput_PDCH *available_capacity_candidate_XL
OPTIMAL_THROUGHPUT is the optimal throughput that could be potentiallyallocated to the TBF in the direction of the bias by considering its multislot class and isequal to potential_throughput_PDCH * n_MS_requested
TBF reallocation cases (5/10)
8/23/2019 Data Resources Management
97/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 97
T3 TBF reallocation:
best candidate allocation computation:
a candidate TBF allocation shall fulfil the following condition:
NEW_THROUGHPUT_RATIO min(1, (1+MIN_THROUGHPUT_GAIN ) *
CURRENT_THROUGHPUT_RATIO) NEW_THROUGHPUT_RATIO is the throughput ratio of the candidate
TBF allocation
CURRENT_THROUGHPUT_RATIO is the throughput ratio of the currentTBF allocation
MIN_THROUGHPUT_GAIN is an O&M parameter
TBF reallocation cases (6/10)
8/23/2019 Data Resources Management
98/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 98
T3 TBF reallocation:
best candidate allocation computation:
the radio resource allocation algorithm is run with the Optimal policy. It isthe best candidate TBF allocation which is targeted, without any distinction
for the GCHs/PDCHs that are currently established. The candidate TBFallocations on already established TRXs (Evolium BTS) / establishedPDCHs (DRFU BTS) are not favored (no ALPHA criterion)
TBF reallocation cases (7/10)
8/23/2019 Data Resources Management
99/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 99
T3 TBF reallocation:
reallocation attempts:
T3 reallocation attempts occur at each expiry of theT_CANDIDATE_TBF_REALLOC timer
up to N_MAX_PERIODIC_REALLOC_T3 T3 reallocation attempts can takeplace at each T_CANDIDATE_TBF_REALLOC timer expiry
in case of successful T3 reallocation attempt, no new attempt takes placeuntil the next T_CANDIDATE_TBF_REALLOC timer expiry even if less thanN_MAX_PERIODIC_REALLOC_T3 attempts have occurred
up to two T3 TBF reallocations can be successfully played at each
T_CANDIDATE_TBF_REALLOC timer expiry (one in L5 list and one in L6list)
TBF reallocation cases (8/10)
8/23/2019 Data Resources Management
100/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 100
T4 TBF reallocation:
goal of the T4 reallocation:
avoid the UL GPRS - DL EGPRS TBF multiplexing situations
indeed, in those multiplexing situations, some dummy DL GPRS TBF(s)
may have to be managed by MAC in order to schedule the USFs of the ULGPRS TBF(s), which can induce a throughput reduction for the DL EGPRSTBFs
triggering conditions:
a GPRS MS becomes candidate for a T4 reallocation as soon as its ULGPRS TBF shares at least one PDCH with a DL EGPRS TBF
the MS remains candidate for a T4 reallocation, after an UL TBF release, ifa DL TBF is still ongoing. This means that a DL TBF can be T4 reallocatedeven if it has currently no UL concurrent TBF
TBF reallocation cases (9/10)
8/23/2019 Data Resources Management
101/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 101
T4 TBF reallocation:
best candidate allocation computation:
the candidate timeslot allocations do not require to have the same numberof PDCHs than the current allocation
in the UL direction, the candidate timeslot allocations cannot contain PDCHsin the EGPRS state. Therefore the criterion A is not relevant
the radio resource allocation algorithm is run with the ASAP policy. Thanksto the allocation criterion ALPHA, the candidate TS allocations located onthe TRXs having already Nb_GCH_For_TBF_Estab established GCHs arefavored
TBF reallocation cases (10/10)
8/23/2019 Data Resources Management
102/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 102
T4 TBF reallocation:
reallocation attempts:
upon T_CANDIDATE_TBF_REALLOC timer expiry it shall be attempted toreallocate a maximum of N_MAX_PERIODIC_REALLOC_T4 candidate
MSs queued within the L7 list if a reallocation succeeds, the next request within the L7 list shall be played
(up to the N_MAX_PERIODIC_REALLOC_T4 limit)
Parameters (1/7)
8/23/2019 Data Resources Management
103/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 103
R_AVERAGE_GPRS
new in B9 release
per cell, OMC-R access: changeable
range: 0 to 20000 bit/s
default: 12000 bit/s definition: average bitrate per PDCH for non-Edge capable terminals in this
cell
R_AVERAGE_EGPRS
new in B9 release
per cell, OMC-R access: changeable
range: 0 to 59200 bit/s default: 30000 bit/s
definition: average bitrate per PDCH for Edge capable terminals in this cell
Parameters (2/7)
8/23/2019 Data Resources Management
104/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 104
QOS_SAFETY_MARGIN
new in B9 release
per cell, OMC-R access: changeable
range: 0 to 100%
default: 20%
definition: additional capacity (in terms of radio bandwidth and interms of transmission resources) which is reserved for a streamingTBF (RT PFC) to correctly fulfill its AGBR contract and to possiblyconvey other multiplexed NRT PFC(s) of the same TBF. The part of
this margin that is not used by the streaming TBF may be used byother TBF(s)
Parameters (3/7)
8/23/2019 Data Resources Management
105/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 105
SCHEDULING_PRIORITY_FACTOR
new in B9 release
per MFS, no OMC-R access
range: 1 to 10
default: 5
definition: when computing the best candidate timeslot allocation for aNRT TBF, this factor enables to give a higher weight (PDCH capacity)to the already established NRT TBFs having a higher schedulingpriority (combination of THP and of Precedence) than the TBF to be
established or reallocated
Parameters (4/7)
8/23/2019 Data Resources Management
106/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 106
T_MAX_FOR_TBF_SCHEDULING
new in B9 release
per MFS, no OMC-R access
range: 0,12 to 0,3s (step size: 20 ms)
default: 0,3s (15 * 20ms)
definition: maximum time between two scheduling of a given NRTTBF (either between two DL block requests for a NRT DL TBF, orbetween two UL blocks received for a given NRT UL TBF)
Parameters (5/7)
8/23/2019 Data Resources Management
107/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 107
MIN_THROUGHPUT_GAIN
new in B9 release
per MFS, no OMC-R access
range: 0,1 to 5
default: 0,4
definition: minimum throughput gain required to be provided to the MSwhen performing a T2 or T3 TBF reallocation
Parameters (6/7)
8/23/2019 Data Resources Management
108/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 108
N_MAX_PERIODIC_REALLOC_T3:
new in B9 release
per MFS, no OMC-R access
range: 0 to 500
default: 20 definition: total number of (unsuccessful) T3 radio resource reallocation
attempts that are allowed to be performed upon expiry of theT_CANDIDATE_TBF_REALLOC timer. As soon as a T3 radio resourcereallocation attempt succeeds, no other attempt is performed (even if lessthan N_MAX_PERIODIC_REALLOC_T3 attempts have been performed so
far). The UL-biased MSs and the DL-biased MSs are considered regardlessof each other. As a result, in a given cell, up to 2 xN_MAX_PERIODIC_REALLOC_T3 T3 radio resource reallocation attemptswill be performed upon expiry of the T_CANDIDATE_TBF_REALLOC timer
Parameters (7/7)
8/23/2019 Data Resources Management
109/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 109
N_MAX_PERIODIC_REALLOC_T4:
new in B9 release
per MFS, no OMC-R access
range: 0 to 500
default: 5
definition: defines the total number of T4 radio resource reallocationattempts (successful or not) that are performed upon expiry of theT_CANDIDATE_TBF_REALLOC timer
Removed parameters
8/23/2019 Data Resources Management
110/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 110
Following B8 parameters are removed in B9 release:
N_TBF_PER_SPDCH
EN_RES_REALLOCATION
MAX_PDCH_PER_TBF_High_Ater_Usage
N_MAX_PERIODIC_REALLOC
Agenda
8/23/2019 Data Resources Management
111/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 111
Radio resources management
Best-effort TBF resources allocation / reallocation
CS pre-emption process
QoS counters and indicators
CS pre-emption (1/10)
8/23/2019 Data Resources Management
112/136
All rights reserved 2005, AlcatelData resources management /August 2005
Page 112
Principles:
the CS pre-emption process is triggered when a radio TS is reportedby the BSC as no longer allocated to the MFS. The PDCH p