7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 1/6
Revision 0a, 03/20/09
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention Program
Data Form
1
1. Is there a Mechanical Integrity Program Procedure?
Title: Revision & Date:
2. Describe how all equipment, piping and instrumentation has been identified and evaluated to ensure necessary preventive maintenance as defined by vendors, plant experience or good engineering practice is being performed.
7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 2/6
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention ProgramElement Audit Checklist
Revision 0a, 03/20/09
2
3. Types of preventive maintenance identified. Check any that apply.
Type of Preventive Maintenance
C o r r o s i o n / E r o s i o n
M o n i t o r i n g
n o t e 1
O t h e r M o n
i t o r i n g
n o t e 2
C a l i b r a t i o n
F u n c t i o n T
e s t i n g
P a r t R e p l a c e m e n t
o r R e b u i l d
T o t a l R e p l a c e m e n t
O t h e r n o t e 3
Heat Exchangers
Other Types of Pressure Vessels & Storage Tanks
Piping Systems
Manual Valves
Pressure Relief Devices
Pressure Relief Systems (pressure relief discharge headers and flare
systems)
Scrubber Systems
Building Ventilation Systems (if CAPP process inside)
Emergency Shutdown Systems
Instrumentation
Sensors (toxic/combustible gas, flame)
Alarm Systems
Pumps
Compressors
Other Rotating Equipment
Notes:
1. Indicates corrosion or erosion monitoring through non-destructive examination, corrosioncoupons or other methods.
2. Indicates other types of monitoring such as external and internal visual inspection, vibration
monitoring or other types of monitoring.3.
Indicates other types of PM such as heat exchanger cleaning, valve rebuilding
7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 3/6
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention ProgramElement Audit Checklist
Revision 0a, 03/20/09
3
Questions to consider while developing the PM list and schedule (response to these questions on this form is not
required):
a. Is wall thickness monitored for all pressure vessels and storage tanks (operating in excess of 15 psi), and does
the frequency of monitoring consider historical wall loss or the potential for corrosion or erosion in the system?
b. Is wall thickness monitored for all vessels and storage tanks (operating at 15 psi or less), and does the frequency
of monitoring consider historical wall loss or the potential for corrosion or erosion in the system?
c. Is wall thickness monitored for all process piping (where failure could result in the release of toxic gas, or a fire
or explosion) and does the frequency of monitoring consider historical wall loss or the potential for corrosion orerosion in the system?
d. Are all pressure relief devices recertified or changed-out on a periodic basis, which includes verifying the set
pressure, and is the recertification conducted by a nationally recognized code shop when required?
e. Is the recertification of the pressure relief device pursuant to nationally recognized codes & standards, vendor
recommendations, industry recommendations or operating experience?
f. Are flares & igniters maintained in a manner and frequency consistent with vendor recommendations or
industry recommendations or operating experience?
g. Have scrubber components been evaluated for inspection type and frequency, and are the components being
maintained adequately? If the scrubber vendor recommends more stringent maintenance activities or schedule,
is this being maintained?
h. Are emergency shutdown system circuits checked for continuity, and are system components checked foroperability on some frequency? Are system components maintained pursuant to vendor recommendations,
industry recommendations or on a frequency and criteria based upon operating experience?
i. Are critical process instruments, controls and analyzers calibrated and maintained pursuant to vendor
recommendations, industry recommendations or on a frequency and criteria based upon operating experience?
j. Are pumps, compressors, blowers and other rotating equipment maintained pursuant to vendor
recommendations, industry recommendations, or on a frequency and criteria based upon operating experience?
NOTE: If instrumentation, sensors and alarms are used to initiate action under the Emergency Action
Plan / Emergency Response Plan, calibration and testing must be perform at least annually.
7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 4/6
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention ProgramElement Audit Checklist
Revision 0a, 03/20/09
4
4. Source of maintenance requirements and procedures. Check any that apply for each type of equipment or
instrumentation.
Source of Maintenance Procedures V e n d o r O & M
M a n u a l s
C o d e s &
S t a n d a r d s
I n d u s t r y
R e c o m m e n d e d
P r a c t i c e
F a c i l i t y
E x p e r i e n c e
O t h e r ( s p e c i f y )
Heat Exchangers
Other Types of Pressure Vessels & Storage Tanks
Piping Systems
Manual Valves
Pressure Relief Devices
Pressure Relief Systems (pressure relief discharge headers and flare
systems)
Scrubber Systems
Building Ventilation Systems (if CAPP process inside)
Emergency Shutdown Systems
Instrumentation
Sensors (toxic/combustible gas, flame)
Alarm Systems
Pumps
Compressors
Other Rotating Equipment
5. Is a work order system used to schedule and track preventive and corrective maintenance activities?
7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 5/6
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention ProgramElement Audit Checklist
Revision 0a, 03/20/09
5
6. Types of training provided to maintenance personnel. Check any that apply for each position listed below.
Type of Training(Below, list different maintenance positions including
mechanical, instrument & electrical) P r e v e n t i v e
M a i n t e n a n c e
P r o c e d u r e s
C o r r e c t i v e
M a i n t e n a n c e
P r o c e d u r e s
S a f e W o r k
P r a c t i c e s
O v e r v i e w o f
P r o c e s s
M a n a g e m e n t o f
C h a n g e
O t h e r ( s p e c i f y )
7. What system is in place to ensure the compatibility of new components and spare parts with the process?
8. What system is in place to ensure that equipment, instrumentation and electrical components are installed per designspecifications and vendor requirements?
7/23/2019 dataform_06_03-20-09
http://slidepdf.com/reader/full/dataform0603-20-09 6/6
VI. - MECHANICAL INTEGRITY PROGRAM Nevada Division of Environmental Protection
Chemical Accident Prevention ProgramElement Audit Checklist
Revision 0a, 03/20/09
6
9. QA/QC (Quality Assurance / Quality Control)
Quality Assurance is the management oversight function of the portion of the Mechanical Integrity Program procedure
that deals with the proper specification, procurement, receiving, warehousing and installation of process components
Quality Control is the technical function of the Mechanical Integrity Program that insures verification that the process
components were installed according to the Quality Assurance Program.
What system is in place to insure:
a. Proper materials are specified?
b. Specified materials are ordered?
c. Specified materials are received?
d. Specified materials are issued for installation?
e.
Specified materials were correctly installed?