Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

  • Upload
    hakien

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof
Page 2: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

Page 2 of 6

M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

901 - ADM Construction

001 Project Agreement

100 Contract 901 Award

Open Cut Box

210

220

230

240

250

260 Open Cut Box ABWF / E&M

Cavern

310 Access Shaft ELS & Pump Test

320 Excavate Access Shaft

340 Cavern and SIL Platform

350 P-Way and TRIP

Excavate Open Cut Box & Baseslab

ISL Underpinning

Open Cut Box Construction

Rem. D-wall (affected by ADD) & PumpTest

D-wall (not affected by ADD)

201520142012 20132010 2011ACT

ID

ACTIVITY

DESCRIPTION

SOUTH ISLAND LINE (EAST)

Contract 901 - Admiralty Integrated Station and SCL Enabling Works

Dy

an

mic

Te

st

Te

st

Ru

nn

ing

Tri

al

Ru

nn

ing

RevisionDate Checked Approved

Prog. No. : SCL\O\00\PPD\N30\2261\B

17Feb11 For Reference KL

3 Jun 11 For Reference KL

C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 901 Summary Programme (Block Shifted and ADD omitted).xls 09/06/2011

edanli
Highlight
edanli
Highlight
edanli
Highlight
Page 3: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

Page 3 of 6

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

902 - Nam Fung Tunnel & Vent. Bdgs

100 Project Agreement

110 Contract 902 Award

Telegraph Bay Barging Point

210

220 Ext. DSD Barging Point Modification

230

Hong Kong Park Ventilation Bdg

310 LCSD Reprovision Works at HKB

320

330 HKB Construction

340 D&B Tunnel from HKB to ADM (260m)

Nam Fung Portal Ventilation Bdg

410 NFP Excavation

420 NFP Construction

Nam Fung Tunnel

510 Initial Drive (70m)

520

530

540

550

560

Transition Box

610 Piers A1 to A12 sub-structure

620

630

640

650

660

2011

Piers A1 to A5 super-structure (902 toclose access opening for P-way)

P-way delivery via access opeing intoNam Fung Tunnel

HKB Shaft Excavation

Access to Piers A12 provided toContract 903

Tunnel drive up to Wan Chai Gap(1525m)

Tunnel drive from Wan Chai Gap toMagazine Gap (898m)

Tunnel drive from Magazine Gap to HKB(493m)

P-way & TRIP

201520142012 2013

Tunnel Lining / Invert / Vent Duct /Drainage

Barging Point Site Area Access

P-way (FST) & TRIP

Piers A1 to A12 super-structure (exceptaccess opening for P-way)

Barging Point Operational

ACT

ID

ACTIVITY

DESCRIPTION

SOUTH ISLAND LINE (EAST)

Contract 902 - Nam Fung Tunnel and Ventilation Buildings

RevisionDate Checked Approved

Prog. No. : SCL\O\00\PPD\N30\2262\B

Dyan

mic

Test

Test

Ru

nn

ing

Tri

al R

un

nin

g

17Feb2011 For Reference KL

BS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWFBS / ABWF

P-Way (FST) A5 to A12P-Way (FST) A5 to A12P-Way (FST) A5 to A12P-Way (FST) A5 to A123June2011 For Reference KL

C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 902 Summary Programme (block shifted).xls 07/06/2011

edanli
Highlight
edanli
Highlight
edanli
Highlight
Page 4: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

Page 4 of 6

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

903 - Nam Fung to Ap Lei Chau

100 Project Agreement

110 Contract 903 Award

Viaduct from Transition Box to OCP

210

OCP Station

310

320

Viaduct from OCP to WCH

410

WCH Station

510

520

530

540 All Remaining Works in Nullah Sections

550 Station & Viaduct above Completed Nullah Deck

Viaduct from WCH to Aberdeen Channel

610

Viaduct across Aberdeen Channel

710

ACT

ID

ACTIVITY

DESCRIPTION

Station Super-Structure

Viaduct Sub-Structure and Super-Structure

2011 2012

- New Nullah Wall- Divert Utilities / Prepare for 1st Dry Season

2013 2015

Viaduct Sub-Structure and Super-Structure

Viaduct Sub-Structure and Super-Structure

2014

New Nullah Wall in Existing Traffic DeckLocations

- All Work in Nullah Sections- Prepare for NLSR & PSR Traffic Diversions

Viaduct Sub-Structure and Super-Structure

Station Sub-Structure

2nd

Dry

Season

1st Dry

Season

SOUTH ISLAND LINE (EAST)

Contract 903 - Ocean Park Station, Wong Chuk Hang Station, Viaducts

and Aberdeen Channel Bridge

Dyan

mic

Test

Test

Ru

nn

ing

Tri

al R

un

nin

g

Dyan

mic

Test

P-W

ay

& T

RIP

P-W

ay &

TR

IPP

-Way &

TR

IP

P-W

ay

& T

RIP

P-W

ay

(T/O

) &

TR

IP

P-W

ay &

TR

IP

RevisionDate Checked Approved

Prog. No. : SCL\O\00\PPD\N30\2263\B

17Feb11 For Reference KL

3 Jun 11 For Reference KL

edanli
Highlight
Page 5: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A O N D

100

110

210

220

230

240

310

320

330

340

410

420

440

410

420

430

440

450

510

520

530

540

550

560

610

S

2015

SOH Station Contruction

Adit Excavatoin

Tunnel Lining / Invert / Vent Duct /

Drainage

P-Way Access

Entrance A & B

P-Way Access

Cavern Excavation

End Plant Building Construction

P-way & TRIP

Site Clerance, Demo. Habor Mission

School & Prepare Access

20132011

904 - Lei Tung Station, South Horizons

Station and Tunnels

C&C Tunnel Construction

Entrance A & B

Station Lining / Structure

ACT

ID

20142012ACTIVITY

DESCRIPTION

South Horizons Station

P-Way Access (Station Track Level

Access before Structure Completes)

Lee Wing Street Vent. Bldg.

Ventilation Building Structure

Design Approval / Portal Formation

From LET towards Ap Lei Chau Drive

From Adit towards SOH

TTM Stages upto Start of Station / End

Plant Building Construction

P-Way & TRIP

Project Agreement

Contract 904 Award

C&C Tunnel (ACB to LET)

Lei Tung Station

HEC Cable Diversion at Ap Lei Chau

Drive

P-Way Access

From Adit towards LET

Excavate Rock Slope for End Plant

Building

D&B Tunnels (LET to SOH)

SOUTH ISLAND LINE (EAST)

Contract 904 - Lei Tung Station, South Horizons Station and Tunnels

Dy

an

mic

Te

st

Te

st

Ru

nn

ing

Tri

al R

un

nin

g

BS / ABWF

BS / ABWF

BS / ABWF

RevisionDate Checked Approved

Prog. No. : SCL\O\00\PPD\N30\2264\B

17 Feb 11 For Refence KL

3 Jun 11 For RefenceKL

C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shif ted)\904 Summary Programme (block shif ted).xls 07/06/2011

edanli
Highlight
edanli
Highlight
Page 6: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

Page 6 of 6

J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D

110 Mobilization

120 Blasting Permit

210 Retaining Structures

220 Excavation

230 Piling

310 Excavation

410 Excavation

420 Piling

510 Retaining Structures

520 Excavation

530 Piling

610 Mobilization

710 Pile Caps & Footings

720 Car Park Levels & Depot Columns

730 Roof

740 Track Area BS & ABWF

810 Pile Caps & Footings

820 Depot Columns

830 Roof

840 Track Area BS & ABWF

910 Pile Caps & Footings

920 Depot Columns

930 Roof

940 Track Area BS & ABWF

1010 Pile Caps & Footings

1020 Depot Columns

1030 Roof

1040 Track Area BS & ABWF

2012 2013 2014 20152011

Fan Area to Grid 20

Activity

Description

Act

ID

Preliminary

Stabling Area

P-Way Infrastructure Area

907 SITE FORMATION

908 DEPOT CONSTRUCTION

Stabling Area

Preliminary

Fan Area to Grid 20

Maintenance Rolling Stock Building

P-Way Infrastructure Area

Maintenance Rolling Stock Building

ApprovedDate Revision Checked

Prog. No. : SIL/O/00/PPD/N30/2265 B

17 Feb 11 For reference KLSOUTH ISLAND LINE (EAST)

Contract 907 - Wong Chuk Hang Depot Site Formation and Piling

Contract 908 - Wong Chuk Hang Depot Superstructure

Test

Ru

nn

ing

Tri

al R

un

nin

g

Dyan

mic

Test

P-Way Access

P-Way Access

P-Way Access

P-Way Access

Access to 908 Available

Contract Award

Contract Award

Access to 908 Available

Access to 908 Available

Access to 908 Available

P-W

ay &

TR

IP

P-W

ay &

TR

IP

03 Jun 11 For reference KL

C:\Documents and Settings\SIL(E) Contracts Summary Programmes 020611\110603 (block shifted)\110603 907 & 908 Summary Prog (block shifted).xls 07/06/2011

edanli
Highlight
edanli
Highlight
edanli
Highlight
Page 7: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof

South Island Line (East)

Environmental Permit No. EP-407/2010 - Submission Schedule

EP Clause Nos. Submissions Submission Dates

1.11 Commencement date of construction no later than 1 month prior to commencement of construction 25 May 2011 (*)

1.14 Commencement date of operation no later than 2 months prior to commencement of operation 4Q 2015

2.1 & 2.2 Employment of IEC & ET no later than 1 month before commencement of construction 06 Apr 2011 (*)

2.3 Employment of Qualified Ecologist no later than 1 month before commencement of construction 06 Apr 2011 (*)

2.4 Employment of Certified Arborist no later than 1 month before commencement of construction 06 Apr 2011 (*)

2.5Management organization of main construction

companiesno later than 2 weeks before commencement of construction 09 Jun 2011 (*)

2.6Construction programme & EP submission

scheduleno later than 2 weeks before commencement of construction 10 Jun 2011 (*)

2.7 Set up of Community Liaison Group no later than 1 month before commencement of construction 20 Apr 2011 (*)

2.8 Updated EM&A Manual no later than 1 month before commencement of construction 16 May 2011 (*)

2.9 Construction noise mitigation measures plan no later than 1 month before commencement of construction

C903: 25 May 2011 (*)

C907: 7 Jun 2011 (*)

C904: Jun 2011

2.11Construction & demolition materials

management plan for barging pointsno later than 2 weeks before commencement of construction 10 Jun 2011 (*)

2.13 (a ) Ecological planting & landscape plan no later than 1 month before commencement of site clearance works 18 Apr 2011 (*)

2.13 (b )As built drawings of ecological planting &

landscape worksno later than 1 month

after completion of planting works (at WCH

nullah)1Q 2014

2.13 (c )Final monitoring report of ecological planting &

landscape worksno later than 1 month

after completion of the 3-year post planting

care and maintenance period1Q 2017

2.14 (a )Detailed transplanting baseline survey report for

plant species of conservation interestno later than 1 month before commencement of site clearance works 06 Apr 2011 (*)

2.14 (b )Transplantation proposal for plant species of

conservation interestno later than 1 month before commencement of transplantation

H. cordata: 9 Jun 2011(*)

A. sinensis: Jun 2011

2.14 (c )As built drawings of transplanting works for

plant species of conservation interestno later than 1 month after completion of transplanting works 3Q 2011

2.15 Tree protection plan no later than 1 month before commencement of site clearance works 06 Apr 2011 (*)

2.16(a ) Silt curtain plan no later than 1 month before commencement of marine-based

construction works30 May 2011 (*)

2.19 Operational groundborne noise review plan no later than 1 month after completion of corresponding parts of

tunnel excavation1Q 2013

2.20Operational groundborne noise mitigation

measures planno later than 1 month prior to installtion of rail tracks 3Q 2013

2.21As built drawings for operational groundborne

noise mitigation measuresno later than 1 month after completion of tracks installation 1Q 2015

2.23As built drawings for operational airborne noise

mitigation measures on viaduct sectionno later than 1 month

after completion of noise mitigation measures

installation on viaduct section4Q 2014

2.24 Noise performance test report no later than 1 month prior to commencement of operation 4Q 2015

2.25 Fixed plant noise audit report no later than 1 month prior to commencement of operation 4Q 2015

2.26 Visual & landscape plan no later than 1 month before commencement of corresponding parts

of landscpae works1Q 2014

3.3 Baseline monitoring report no later than 2 weeks before commencement of construction 10 Jun 2011 (*)

3.4 Monthly EM&A reports within 2 weeks after the end of the reporting month Aug 2011 (first report)

4.2 Internet address of EM&A and project data within 1 month after commencement of construction Jul 2011

Note: Submission to EPD made on date marked with (*). Other dates are tentative only subject to the construction progress.

Timeframe to EPD

Page 8: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof
Page 9: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof
Page 10: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof
Page 11: Date - epd.gov.hk · Contract 904 - Lei Tung Station, South Horizons Station and Tunnels ... 840 Track Area BS & ABWF 910 Pile Caps & Footings 920 Depot Columns 930 Roof