15
By David Moszkowicz LUMIPLAN

David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

By

David Moszkowicz

LUMIPLAN

Page 2: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

#1 in Southern Europe for PIS and CCTV

80,000 destination displays

3,000 multimedia screens

6,000 PIS at stops / hubs

10,000 bus equipped with CCTV

5,000 bus equipped with PAPIS

40 tramways equipped with rear-view system

and CCTV Onboard and at stop PIS, planning and scheduling software HEURES

Page 3: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Ahmedabad population: 6 to 7 Millions inhabitants

Before 2009: No mass rapid transit system

Solution: Bus Rapid Transit

Design: Gujarat Infrastructure Development Board and CEPT University, from 2005

Launch of BRT: 2009

The first corridor connecting Pirana to RTO Junction was opened to public on 14 October 2009 by then the Chief Minister of Gujarat, Narendra Modi.

Page 4: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:
Page 5: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Operational Route : 97 Kms

Total Fleet: 250 Buses (184 AC & 66 Non AC)

Total No Of Routes: 12 + new airport route

Total Stations: 157

Avg. Ridership/day: 135 000 Passengers

Avg. Income/day: 1 800 000 Rs.

Total Kms/day: 53 000 Kilometers

Business Model: Operations and Maintenance outsourced Gross Cost Model based on 200 Kms/day/bus

Page 6: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Vision: Attract more Passengers with better Services Optimize Operational Costs Using innovative IT Solutions and Data analysis

Innovations: New ITS, integrated with city bus (AMTS) Introducing Planning and Scheduling Big Data Statistical analysis

First Results for 2017 field implementation:

Total Saved Kilometres per Month 1,15,414 KMS

Total Saved Amount per Month

Rs.61,16,953

7.3%

Increase of Ridership (August 2017 vs.

2016) 8.7%

• In all of the above data average cost per kilometre has been taken as Rs.53 • Ridership natural growth average around 3% before implementation

Page 7: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Analysis: GPS logs (Big Data) for speed analysis

Objective: Better service reliability (schedule adherence)

Analysis: Ticketing (Big Data) for ridership analysis

Objective: Services where and when Passenger’s demand Optimize Operational Kilometers

IT Solution: Planning and Scheduling System Producing reliable Passenger’ Services Integrating field constraints and Demand Respecting rules & regulations & O&M contracts Optimizing resources and kilometres Integrating BRT and City bus (AMTS) systems

Page 8: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Travel time analysis

Peak hour speed analysis

Travel time pattern Applied in scheduling

Page 9: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Peak hour boarding analysis

[CELLRANGE

] [CELLRANGE

]

[CELLRANGE

]

[CELLRANGE

]

0

20000

40000

60000

80000

100000

120000

140000

Weekdays Sunday Working

Saturday

(1st, 3rd& 5th

Sat)

Non-Working

Saturday

(2nd & 4th

Sat)

Day type ridership analysis

0

200

400

600

5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

Route 8

BoardPerDay AlightPerDay

Page 10: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Production of regular frequency At each station during the day Where and When Passenger’s Demand Synchronization at Cross Stations Printed and digital export

Printed maps and timetables

Page 11: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Planning and Scheduling: Exact Kilometers as per O&M Contracts

Results: 7.3% savings for AMC

Route No Kilometers Saving/Month Cost Saving/Month

08 25,470 13,49,910

05 13,689 7,25,517

06 17,590 9,32,281

09 270 14,310

101 & 201 29,160 15,45,480

01 9552 5,06,256

03 2448 1,29,744

12 777 41,181

04 9600 5,08,800

07 4800 2,54,400

02 2892 1,53,276

11 2574 1,36,422

TOTAL 26,343 Km Rs. 61,16,953

7.3%

Page 12: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

0:00

0:05

0:10

0:15

0:20

0:25

0:30

0:35

7:40 8:25 9:09 9:54 10:38 11:22

Route 8, Shivaranjani

Actual Frequency (After

Implementation)

Actual Frequency (Before

Implementation)

Scheduled Frequency (For

Implementation)

scheduled frequency (Before

Implementation)

Before Implementation Frequency during peak is distorted with “bunching” and waiting time up to 30 min. Improved schedule adherence Comparatively lesser deviation between scheduled and actual frequencies in “after” implementation

Page 13: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

Route No Route Date of Implementation

08 Naroda Gam to Iskcon Cross Road 27/04/2017

05 Naroda Gam to Vasna 15/05/2017

06 Naroda Gam to Narol 15/05/2017

09 Maninagar to Sola Bhagwat 18/05/2017

101 & 201 RTO Circular & Anti-Circular 24/05/2017

01 Maninagar to Ghuma Gam 02/06/2017

12 RTO to Hatkeshwar 16/06/2017

03 RTO to Maninagar 08/06/2017

04 Zundal to Commerce Six Road 06/07/2017

07 Zundal to Narol 06/07/2017

11 MJ Library to SP Ring Road 06/07/2017

02 Science City Approach to SP Ring Road 24/07/2017

Page 14: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution:

122930

129865

117539 119145

122902

125326

115006 116530

132182

136513

117746

124069

120592

128025

124585

127624

January February March April May June July August

Ridership Comparison (2016 & 2017)

Month wise Ridership-2016 Month wise Ridership-2017

Full Implementation

Exams Holidays & Heavy Monsoon

7.0

4.9

0.2

4.0

-1.9

2.1

7.7 8.7

January February March April May June July August

Monthly % Growth in Ridership (2016 to 2017)

Page 15: David Moszkowicz LUMIPLAN - TRIPPtripp.iitd.ernet.in/assets/newsimage/Ahmedabad... · Ahmedabad population: 6 to 7 Millions inhabitants Before 2009: No mass rapid transit system Solution: