4
! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . ! . Kellockbank Junction Old Rayne Colpy © Crown copyright and database right (2020). All rights reserved. OS 100046668. © Scottish Environment Protection Agency and database right (2020). © Crown Copyright and Landmark Information Group Limited (2020). All rights reserved. Reproduced with the permission of the British Geological Survey ©UKRI. All rights Reserved 0 1 2 Kilometres Route Option Pink Adjoining 500m Buffer Area Constraints # * Active Mineral Site (BGS recorded site) Current & Historic OS Map Features ! . Well, Pump or Spring Watercourse Marshland Quarry or Pit BGS - Artificial ground Infilled Ground Made Ground Worked Ground Landmark Information Group - Infilled Ground Potentially infilled land (non-water feature) Potentially infilled land (water feature) Compressible Ground Stability Hazard 1 High Moderate Landslide Ground Stability Hazard 1 Moderate A96PEA Map Number ! ( ! ( ! ( ! ( ! ( ! ( ! ( River Don 1 2 A947 A944 A97 A96 Kemnay Kintore Rhynie Huntly Oldmeldrum Inverurie Insch Project Ref. No. A96PEA Suitability Description Approved for Stage Complete Stage: Stage 2 AMAR EGT SWI MP 000021 CE Location Type Role Number Project Originator Volume Figure 6.13 Geotechnical Constraints Pink Route Option Sheet 1 of 2 A96 Dualling East of Huntly to Aberdeen Project Name Map Title First Issue Revision C01 Created LPAG 16/11/20 Checked ACED 16/11/20 Reviewed ALOW 17/11/20 Approved FMAX 19/11/20 Authorised GMAC 1:25,000 Scale @ A3: - - - - - - | | | | | | | | | Suitability A Revision C01 Note: 1. Due to extensive coverage and overlay of Geotechnical Hazard Layers, only areas of Moderate and High hazard are indicated. Areas of lower hazard are described in Vol 1 Part 1 of the report and included in the GIS database. This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it. 03/12/20

Daviot - transport.gov.scot

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

KellockbankJunction

Old Rayne

Colpy

© Crown copyright and database right (2020). All rights reserved. OS 100046668.© Scottish Environment Protection Agency and database right (2020).© Crown Copyright and Landmark Information Group Limited (2020). All rights reserved.Reproduced with the permission of the British Geological Survey ©UKRI. All rights Reserved

0 1 2Kilometres

Route OptionPinkAdjoining500m Buffer Area

Constraints

#*Active Mineral Site(BGS recorded site)

Current & Historic OS Map Features!. Well, Pump or Spring

WatercourseMarshlandQuarry or Pit

BGS - Artificial groundInfilled GroundMade GroundWorked Ground

Landmark Information Group - Infilled GroundPotentially infilled land (non-water feature)Potentially infilled land (water feature)

Compressible Ground Stability Hazard1

HighModerate

Landslide Ground Stability Hazard1

Moderate

A96PEAMap Number

!(

!(

!(

!(

!(

!(

!(

River Don

1 2

A947

A944

A97 A96

Kemnay

Kintore

Rhynie

Huntly

Oldmeldrum

Inverurie

InschProject Ref. No. A96PEA

Suitability DescriptionApproved for Stage Complete

Stage: Stage 2AMAR EGT

SWI MP 000021CELocation Type Role Number

Project Originator Volume

Figure 6.13Geotechnical ConstraintsPink Route OptionSheet 1 of 2

A96 Dualling East of Huntly to AberdeenProject Name

Map Title

First Issue

Revision

C01

Created

LPAG16/11/20

Checked

ACED16/11/20

Reviewed

ALOW17/11/20

Approved

FMAX19/11/20

Authorised

GMAC

1:25,000Scale @ A3:- - -

- - -| | | |

| | | | |Suitability

ARevision

C01Note:1. Due to extensive coverage and overlay of Geotechnical Hazard Layers, only areas of Moderate and High hazard are indicated.Areas of lower hazard are described in Vol 1 Part 1 of the report and included in the GIS database.This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.

03/12/20

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

Old Rayne

Durno

Whiteford

Daviot

Pitcaple

© Crown copyright and database right (2020). All rights reserved. OS 100046668.© Scottish Environment Protection Agency and database right (2020).© Crown Copyright and Landmark Information Group Limited (2020). All rights reserved.Reproduced with the permission of the British Geological Survey ©UKRI. All rights Reserved

0 1 2Kilometres

Route OptionPinkAdjoining500m Buffer Area

Constraints

#*Active Mineral Site(BGS recorded site)

Current & Historic OS Map Features!. Well, Pump or Spring

WatercourseMarshlandQuarry or Pit

BGS - Artificial groundInfilled GroundMade GroundWorked Ground

Landmark Information Group - Infilled GroundPotentially infilled land (non-water feature)Potentially infilled land (water feature)

Compressible Ground Stability Hazard1

HighModerate

Landslide Ground Stability Hazard1

Moderate

A96PEAMap Number

!(

!(

!(

!(

!(

!(

!(

River Don

1 2

A947

A944

A97 A96

Kemnay

Kintore

Rhynie

Huntly

Oldmeldrum

Inverurie

InschProject Ref. No. A96PEA

Suitability DescriptionApproved for Stage Complete

Stage: Stage 2AMAR EGT

SWI MP 000022CELocation Type Role Number

Project Originator Volume

Figure 6.14Geotechnical ConstraintsPink Route OptionSheet 2 of 2

A96 Dualling East of Huntly to AberdeenProject Name

Map Title

First Issue

Revision

C01

Created

LPAG16/11/20

Checked

ACED16/11/20

Reviewed

ALOW17/11/20

Approved

FMAX19/11/20

Authorised

GMAC

1:25,000Scale @ A3:- - -

- - -| | | |

| | | | |Suitability

ARevision

C01Note:1. Due to extensive coverage and overlay of Geotechnical Hazard Layers, only areas of Moderate and High hazard are indicated.Areas of lower hazard are described in Vol 1 Part 1 of the report and included in the GIS database.This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.

03/12/20

!.!.

!.

!.

!.!.

!.

!. !.

!.!.

!.!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.!.!.

!.

!.

!.

KellockbankJunction

CardenJunction

Old Rayne

Colpy

© Crown copyright and database right (2020). All rights reserved. OS 100046668.© Scottish Environment Protection Agency and database right (2020).© Crown Copyright and Landmark Information Group Limited (2020). All rights reserved.Reproduced with the permission of the British Geological Survey ©UKRI. All rights Reserved

0 1 2Kilometres

Route OptionBrownAdjoining500m Buffer Area

Constraints

#*Active Mineral Site(BGS recorded site)

Current & Historic OS Map Features!. Well, Pump or Spring

WatercourseMarshlandQuarry or Pit

BGS - Artificial groundInfilled GroundMade GroundWorked Ground

Landmark Information Group - Infilled GroundPotentially infilled land (non-water feature)Potentially infilled land (water feature)

Compressible Ground Stability Hazard1

HighModerate

Landslide Ground Stability Hazard1

Moderate

A96PEAMap Number

!(

!(

!(

!(

!(

!(

!(

River Don

1 2

A947

A944

A96

A97

Kemnay

Kintore

Rhynie

Huntly

Oldmeldrum

Inverurie

InschProject Ref. No. A96PEA

Suitability DescriptionApproved for Stage Complete

Stage: Stage 2AMAR EGT

SWI MP 000023CELocation Type Role Number

Project Originator Volume

Figure 6.15Geotechnical ConstraintsBrown Route OptionSheet 1 of 2

A96 Dualling East of Huntly to AberdeenProject Name

Map Title

First Issue

Revision

C01

Created

LPAG16/11/20

Checked

ACED16/11/20

Reviewed

ALOW17/11/20

Approved

FMAX19/11/20

Authorised

GMAC

1:25,000Scale @ A3:- - -

- - -| | | |

| | | | |Suitability

ARevision

C01Note:1. Due to extensive coverage and overlay of Geotechnical Hazard Layers, only areas of Moderate and High hazard are indicated.Areas of lower hazard are described in Vol 1 Part 1 of the report and included in the GIS database.This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.

03/12/20

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!.

!. !.

!.

!.

!.

!.

CardenJunction

Old Rayne

Durno

Whiteford

Pitcaple

© Crown copyright and database right (2020). All rights reserved. OS 100046668.© Scottish Environment Protection Agency and database right (2020).© Crown Copyright and Landmark Information Group Limited (2020). All rights reserved.Reproduced with the permission of the British Geological Survey ©UKRI. All rights Reserved

0 1 2Kilometres

Route OptionBrownAdjoining500m Buffer Area

Constraints

#*Active Mineral Site(BGS recorded site)

Current & Historic OS Map Features!. Well, Pump or Spring

WatercourseMarshlandQuarry or Pit

BGS - Artificial groundInfilled GroundMade GroundWorked Ground

Landmark Information Group - Infilled GroundPotentially infilled land (non-water feature)Potentially infilled land (water feature)

Compressible Ground Stability Hazard1

HighModerate

Landslide Ground Stability Hazard1

Moderate

A96PEAMap Number

!(

!(

!(

!(

!(

!(

!(

River Don

1 2

A947

A944

A96

A97

Kemnay

Kintore

Rhynie

Huntly

Oldmeldrum

Inverurie

InschProject Ref. No. A96PEA

Suitability DescriptionApproved for Stage Complete

Stage: Stage 2AMAR EGT

SWI MP 000024CELocation Type Role Number

Project Originator Volume

Figure 6.16Geotechnical ConstraintsBrown Route OptionSheet 2 of 2

A96 Dualling East of Huntly to AberdeenProject Name

Map Title

First Issue

Revision

C01

Created

LPAG16/11/20

Checked

ACED16/11/20

Reviewed

ALOW17/11/20

Approved

FMAX19/11/20

Authorised

GMAC

1:25,000Scale @ A3:- - -

- - -| | | |

| | | | |Suitability

ARevision

C01Note:1. Due to extensive coverage and overlay of Geotechnical Hazard Layers, only areas of Moderate and High hazard are indicated.Areas of lower hazard are described in Vol 1 Part 1 of the report and included in the GIS database.This report was prepared by AmeyArup on behalf of Transport Scotland in connection with the A96 Dualling East of Huntly to Aberdeen Project. It takes into account our client's particular instructions and requirements and addresses their priorities at the time. This report was not intended for, and should not be relied on by, any third party and no responsibility is undertaken to any third party in relation to it.

03/12/20