Kitakyushu  Smart  Community  &  technologies  

-­‐Environmental  Future  City-­‐

Feb. 21, 2014 at IEEE_ISGT2014 Yosuke Nakanishi

Fuji Electric Co., Ltd

1  

Page 2: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

2  Contents

Ø  Introduc)on  of  Kitakyushu  ü  Loca7on,    Founda7on  for  industrializa7on  of  Japan  in  1901  ü Overcoming  of  severe  Environmental  Pollu7on  

Ø  Smart  community  pilot  project  ü  Smart  community  pilot  project  by  METI  ü  Kitakyushu  Smart  community  Crea7ve  Project  ü  Local  product  for  local  consumer  

Ø  Overall    structure  of  demonstra)on  system  with  technologies  

ü  Energy  Management  System  for  demand  side  ü  Smart  meter  &  Demand  response  

Ø  Summary  Ø  Reference  

Page 3: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

Kitakyushu Airport   Kitakyushu

1000km Tokyo

Shanghai

Seoul

Dalian

          3

Population: 975 thou.  Area: 485k㎡

Introduction of Kitakyushu

By courtesy of Kitakyushu

Refer to "Showa History of 100 million people Vol.14" published by Mainichi Newspapers Company.

Foundation for industrialization of Japan -Yawata Steel Mill (currently Nippon Steel & Sumitomo metal Corp.) began operation in 1901-

Page 4: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

          4 Overcoming Severe Environmental Pollution In 1960s Present

Worst Air Pollution

“The Dokai Bay” Sea of Death

Blue  Sky  &  Sea  by  environmental  

Restora;on  Ac;vi;es

By courtesy of Kitakyushu

Page 5: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

Smart Community Pilot Projects (FY2010  –  FY2014  [5  years])  in Japan

Reference from a presentation of NEDO (New Energy and Industrial Technology Development Organization )

In Japan, the Ministry of Economy, Trade and Industry is promoting the four verification pilots to study the way of technologies and business in the smart community.

Kitakyushu  Smart  Crea;on  Project  is  selected  as  Pilot  PJ

Smart community pilot project for sustainable development           5

Page 6: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

Summary  of  Kitakyushu  Smart  Community  Crea3on  Project

6  

Main goal is to save energy by 20% and to reduce CO2 emission by 50%.

225 families 50 business institutes

Page 7: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

District  informa3on  for  energy  resource •  10  general  electricity  u;li;es  have  obliga;ons  and  rights  for  the  universal  electricity  

service  in  the  society's  infrastructure  in  Japan.    •  The  experimental  area  in  Kitakyushu  is  a  special  supply  area  where  is  permiTed  to  

supply  the  dedicated  demand  area  instead  of  those  above  elecricity  u;li;es.  •  Therefore  one  of  the  characteris;cs  of  this  region  is  that  it  is  possible  to  change  the  

power  rate  unit  price  by  changing  the  actual  power  contract  in  coopera;on  with  Kitakyushu  Higashida  Maeda  District  Power  Supply  Union    of  the  relevant  region.

7  Local Production for local consumption

Mutual profit between factory area & village area using energy of thermal and electricity

Page 8: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

Higashida-Co gen.

Fuel cell

Overall  structure  of  demonstra;on

G Storage equip.

- +

Smart Meter

System sensor

EV

- + PCS

Hydrogen

Objective Achieve low carbon society ▼ Correspond to large penetration of renewable energy

Challenges Satisfy both system Stabilization & restraining equip. cost

Demonstration ◆Optimal supply &

demand operation ◆Voltage & frequency

maintenance & control

◆Demand responce Optimaland responce

Reverse power flow

CEMS: Community Energy Management

Town Mega Solar

Demand & power generation forecast

PCS

HEMS

CEMS linkageSmart PCS

Factory

FEMS BEMS

SEMS

Heat

Supply & demand planning

Supply & demand control

Energy storage control

Generation control

Demand response

Grid control (voltage control etc)

Distribution line

PV

Shop

Smart Meter Smart

Meter Smart Meter

PV PV

PV

House - + PCS Building

Supply electricity & thermal To Fatcory

Local production for local

consumption

Page 9: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

xEMS:  Energy  Management  System

•  Community  Energy  Management(CEMS)    for  community  demand  •  Home  Energy  Management(HEMS)    for  residen;al  demand  •  Business  Energy  Management(BEMS)    for  business  demand  •  Factory  Energy  Management(FEMS)    for  factory  demand

•  Shop  Energy  Management(REMS)    for  Retail  (Shop  /Store)  demand

9  

Consumer+ producer = prosumer Demand side includes not only consumer but also producer

Demand side “Energy Management” is Big issue

Demand Side Management controlled or regulated by energy supply side

cooperation or self-regulated by demand side

30 years ago

Page 10: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

CEMS  installed  in  a  regional  power  saving  sta;on            10

[CEMS]  Promotes  op;mal  energy  management  by  connec;ng  with  renewable  energy  in  the  community,  BEMS,  HEMS,  and  community  grid  using  IT  network  with  smart  meter  

Page 11: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

11  Energy management system (

Page 12: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

12  [FEMS]  (FEMS:  Factory  Energy  Management  System)  Coordinates  with  CEMS  and  absorbs  natural  energy  and  energy  fluctua;ons  unique  to  factories  in  order  to  secure  power  stability  

Page 13: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

13

RF mesh network

Concentrator

Ethernet

CEMS

Power Poll

Smart meter

Smart meter and Demand response

Wi-Fi

In-home display

          13

• DR Group (69 households) • No DR Group (69 households)

DR test for households without HEMS

Single family house with HEMS Apartment houses without HEMS

Page 14: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

14

Dec. Jan. Feb.

Level1 18 14 16

DR

Level2 3 4 3

Level3 4 3 4

Level4 3 5 3

Level5 3 5 2

The number of DR days

DR test for households in Winter

•  Electricity price is changed in the morning & evening. •  DR was activated if forecasted “minimum temperature”

for the following day is lower than 5 deg C. •  Total number of DR was 42 days in last winter season .

Electricity price in Winter (from Dec. to March)

Level 1 (\15/kWh)

Level 2 (\50/kWh)

Level 3 (\75/kWh)

Level 4 (\100/kWh)

Level 5 (\150/kWh)

Price without CPP

Condition of DR test for households in winter

Page 15: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

15

Load of “DR” is lower than that one of “No DR” during peak time regulated by electricity prices.

Comparison of “DR” and “No DR” at Level5

DR shifts the load from expensive time to cheap time.

Comparison of averaged road curves between “DR” and “No DR” on January 28th in 2013

No DR

Peak hours Peak hours

Load

kW

Time

DR (Level 5)

Page 16: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

Ø Kitakyushu  city  contributed  to  the  founda;on  for  industrializa;on  of  Japan  in  early  20  century.  

Ø Through  overcoming  of  severe  Environmental  Pollu;on,  Kitakyushu  is  now  on  the  road  of    the  sustainable  development  as  smart  community.  

Ø   Smart  community  pilot  project  is  going  to  be  operated  as  social  pilot  program  from  2010  to  2014.  

Ø This  ac;vity  is  supported  by  several  technologies  such  as    Energy  management  system,  Smart  meter  and  so  on.    

16  Summary

For sustainable community ・・・・・・・・

Page 17: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

17  

Page 18: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

1.  hTp://jscp.nepc.or.jp/en/kitakyushu/index.shtml  2.  hTp://jscp.nepc.or.jp/en/  3.  hTp://www.me;.go.jp/english/policy/energy_environment/

smart_community/index.html#press  4.  hTp://www.ieat.go.th/ieat/upload/HotNews/1.pdf  5.  hTps://www.fujielectric.com/company/tech/pdf/59-­‐01/

FER-­‐59-­‐1-­‐055-­‐2013.pdf  6.  hTp://www.oecd-­‐ilibrary.org/urban-­‐rural-­‐and-­‐regional-­‐

development/green-­‐growth-­‐in-­‐kitakyushu-­‐japan_9789264195134-­‐en  

   

18  Reference

Page 19: Day3 Panel3C YosukeNakanishi - IEEE › isgt2014 › files › 2014 › 03 › Day3... · Level2 3 4 3 Level3 4 3 4 Level4 3 5 3 Level5 3 5 2 The number of DR days DR test for households

19  

Thank you for your attention!