WHAT IS THE POTENTIAL OF AN INVESTMENT IN SMALL HYDRO POWER PLANTS IN REPUBLIC OF MACEDONIA
Sotir PANOVSKI
Gordana JANEVSKA
Faculty of Technical Sciences, Bitola, R. Macedonia
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
1. SHORT OVERVIEW ON HYDROENERGETIC SITUATION AND POSSIBILITIES FOR BUILDING SHPP
2. ACTUAL SITUATION – GIVING CONCESSIONS FOR BUILDING OF SHPP
3. TENDER DOCUMENTATION
4. SOME ADVANTAGES OF AN INVESTMENT IN SHPP
5. EXAMPLE OF AN INVESTMENT
6. CONCLUSION
CONTENTS
Republic of Macedonia, as a mountain country with continental climate, has a beneficial hydro stage
Present situation
8 large HPP - 495 MW
20 SHPP (up to 5MW) - 30 MW
Study about possible small and mini HPP in the Republic of Macedonia, 1982
406 SHPP - 258 MW
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
SHORT OVERVIEW ON HYDROENERGETIC SITUATION
AND POSSIBILITIES FOR BUILDING SHPP
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
ACTUAL SITUATION – GIVING
CONCESSIONS FOR BUILDING SHPP
1. Public tenders
I - February 2007 60 SHPP
II - July 2007 28 SHPP
About 40 firms with more than 160 bids applied on these tenders:
• domestic companies
• foreign companies (Austria, Germany, Slovenia, Luxembourg etc .)
• consortium (domestic and foreign companies )
Till now, Concessions for 41 locations were given
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
ACTUAL SITUATION – GIVING
CONCESSIONS FOR BUILDING SHPP
Some of the tender characteristics
model DBOT (Design, Build,
Operate and Transfer )
Design 1 year
Build 3 years
Operate (Transfer ) 20 years
Deadline for collecting
tender documentation 30 days
Deadline for submission of bids 90 days
Tendering procedure
Financial and economic capabilities of Bidder
Composition of the offer
Needed documents
Freedom of the technical solution
(technical data for the locations were given)
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
TENDER DOCUMENTATION
Needed Guarantees :
Tender Security
Bank Guarantee for the upfront fee
Performance Security
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
TENDER DOCUMENTATION
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
1. Minimal upfront fee MED
(61,3 MKD = 1 EUR)
2. U =? mark-up on the minimum upfront fee as offered by the Bidder (significant factor into the formula: ranking criterion )
Upfront concession fee EN: EN = MED + U
MED [MKD] = 4.500 [MKD/kW] x Pi [kW]
for SHPP with Pi up to 1000 kW
MED [MKD] = 2.700 [MKD/kW] x Pi [kW]
for SHPP with Pi > 1000 kW
Annual concession fee
2% of the annual production
PAYMENT OBLIGATIONS
Pi = 277 kW
MED= 4.500 x Pi = 4.500 x 277=
=1.246.000 MKD = 20.334 EUR
EN = MED + U = 20.334 EUR + U (?)
Present experience U = 500 - 20.000 EUR
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
EXAMPLE
C = 12.500 x Pi + U [MKD]
Pi [kW] - declared, in the Bid, value for the electricity generation capacity at the border of the HPP
U [MKD] - mark-up on the minimum upfront fee
EXAMPLE:
C = 12.500 x Pi + U == 12.500 x 277+ 81.529 = 3.544.029
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
RANKING CRITERION
Feed in tariffs
Market Operator guarantees the purchase of produced electrical energy
Table 1
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
Unit Monthly furnishedelectricity [kWh]
Annual furnishedelectricity [kWh]
Feed in tariffs[€ cents/kWh]
I 1-85000 1-1020000 12,00
II 85001-170000 1-2040000 8,00
III 170001-350000 2040001-4200000 6,00
IV 350001-700000 4200001-8400000 5,00
V above 700001 above 8400001 4,50
PURCHASE OF PRODUCED
ELECTRICAL ENERGY
IVR = 353.163 EUR - Investment value
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
EXAMPLE OF AN INVESTMENT IN SHPP
L k = 1.050 m D k = 800 mmL c = 187 m D c = 560 mm
H n = 45 m Q i = 0,583 m3/sP i = 277 kW E god = 932.963 kWh
Annual gross income (feed in tariffs) 94.605 €
Annual costs 18.921 €
Net income 75.684 €
Unity price 1.275 €/kW
Average price of
generated electricity 0,10 €/kWh
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
EXAMPLE OF AN INVESTMENT IN SHPP
Some advantages of an investment in SHPP in RM : There is guarantee purchase of produced electrical energy (feed in tariffs)
In RM, there are qualify engineers capable for efficient projecting,
supervision and building SHPPs
The civil works can be completely covered by the domestic resources. There is one factory for production of steel pipes and also there are two factories for production of plastic pipes in RM.
The prices of the civil works are relatively low.
What is the Potential of an Investment in Small Hydro Power Plants in Republic of Macedonia
CONCLUSION
In RM the first Concessionaires just have been chosen.According with the Development Programme, it is expected that every 6 months the Government of RM will announce calls for tender applications for 30-40 SHPPs
Our hope is that till next Hidroenergija 2010, i.e. in the next 2 years , the firs concessionaire SHPPs will be build, so then we will be able to present the firs experiences.