DBM MEETING INTERFACES ON DETECTOR ROUTING, DESIGN AND ASSEMBLY SEQUENCES Sébastien MICHAL September 28 st 2011. nSQP OVERVIEW. DBM LOCATION: nSQP C3-4. PP1 END PLATE. BCM. DBM. DBM SERVICES INVENTORY. 1 Cooling loop 1 feeding line 1 exhaust line SIGNAL: (to the IBL optobox) - PowerPoint PPT Presentation
Citation preview
DBM MEETING
INTERFACES ON DETECTOR ROUTING,
DESIGN AND ASSEMBLY SEQUENCES
Sébastien MICHAL
September 28st 2011
Sébastien MICHALSeptember 28st 2011 Slide 2 of 09
nSQP OVERVIEW
• DBM LOCATION: nSQP C3-4
DBM
BCM
PP1 END PLATE
Sébastien MICHALSeptember 28st 2011 Slide 3 of 09
DBM SERVICES INVENTORY
•1 Cooling loop– 1 feeding line– 1 exhaust line
•SIGNAL: (to the IBL optobox)– 16 AWG28 CCA TP (DTO)– 16 AWG36 Copper TP (CLK / CMD)– 2 AWG36 Copper TP (REF)
•POWER: (to the IBL AXON)– 40 AWG22 CCA SINGLE (PWR / SENSE)– 12 AWG36 Copper TP (DCS)
2 bundles
4 bundles
Sébastien MICHALSeptember 28st 2011 Slide 4 of 09
DBM SERVICES
• 2 SIGNALS BUNDLES nSQP C3• 4 POWER BUNDLES nSQP C4
PP1 END PLATE DBM COOLING LOCATION PIPES RUNNING
ALONG THE nSQP BACKBONE
nSQP 34
View from C side
PP1 END PLATE DBM CABLES LOCATION
4 x POWER10 AWG22 S3 AWG36 TPL~ 4 mØ 5 mm
C 4
C 3
2 x SIGNAL8 AWG28 TP9 AWG36 TPL~5.5 mØ 5 mm
Sébastien MICHALSeptember 28st 2011 Slide 5 of 09
DBM COOLING
• FITTINGS LOCATION
PIPES RUNNING ALONG THE nSQP
BACKBONE
COOLING FITTINGS
OUTLET
CAPILLARY
BOILER
Sébastien MICHALSeptember 28st 2011 Slide 6 of 09
• FITTINGS LOCATION
DBM COOLING INTERFACE
From IP
From IPBPSS PLATE
Sébastien MICHALSeptember 28st 2011 Slide 7 of 09
• BPSS INTERFACE
DBM SERVICES
ISP BOTTOM PANEL
4 POWER BUNDLES
2 SIGNALBUNDLES
CABLE BOARD 6/7
SIGNAL BOARD 4/6
BPSS IST
CABLE BOARD 1/8
CABLE BOARD 2/3SIGNAL
BOARD 1/3
Sébastien MICHALSeptember 28st 2011 Slide 8 of 09
DBM SERVICES
•ASSEMBLY PROCEDURE– Fix supports on BPSS– Install DBM– Fix boiling chanel– Install nSQP on BPSS (with DBM bundles routed on PP1 end plate and corrugated panels)
– Install and fix cables boards and signals boards on BPSS
Sébastien MICHALSeptember 28st 2011 Slide 9 of 09
CONCLUSION
• REMAINING ENGINEERING TASKS– Support structures for both cable boards and signal boards (CERN)
– Cable organiser to route the services on the ISP bottom panels and on the BPSS (CERN)
– Thermal coupling between pipe and telescopes (TORONTO)
– Flexes to connect sensors to cable / signal boards ?
– Signal and power bundles design (CERN)